Loading...
HomeMy WebLinkAbout20170549 Ver 1_Approval Letter_20170510ROY COOPER Gurernor MICHAEL S. REGAN k•trr-run� Environmentul S. JAY ZIMMERMAN Urrrte�r QUA�f(Y May I 0, 2017 Burke County NCD W R Project No. 20170549 Bridge 160 and 162 on I-40 TIP Project No. B-4447 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Mr. Philip S. Harris III, P.E. NCDOT, Na[ural Environment Section 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: You have our approval, in accordance with the conditions listed below, for the followine impac[s, for the purpose of Bridge Replacemen[ in Burke County: ream Imoacts in the Calawba River Site Permanen[ To[al S[ream Stream Fill in Impac� Impacts Perennial (linear ft) Requiring St rea m M itigat ion (linear ft) pinear ft) 74 I 74 I 74 25 25 25 31 31 TOTAL I I30 I I30 � 99 Total Stream Impact tor Project: 130 linear fee[. The project shall be constructed in accordance with your application dated May I, 2017. After reviewing your application, we have decided thaf these impacts are covered by General Water Quality Certification Number 4093 and 409d. This certitication corresponds to the Nationwide Permit 23 and Nationwide Permit 33 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local pemiits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed reeulations. This approval will expire with [he accompanying 404 permit. This approval is valid solely for [he purpose and design described in your application (unless modified below). Should your projec[ change, you mus[ notify the NCDW R and submi[ a new applica[ion. If the property is sold, the new owner must be �iven a copy of this Certifica[ion and approval letter, and is [hereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the fumre) exceed one acre, or of total impacts to streams (now or in the future) exceed I50 linear feet, compensatory mitigation may be reyuired as described in I SA NCAC 2H .Oi06 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certitication(s) and any additional conditions listed below. State o(Nonh Carolina I Envimnmantal Quality 1617 Mad Service Centzr I Raleigh. North Carolina 27699-1617 Condition(s) of Certification: General Conditions 1. iJnless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a. diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. [15A NCAC 02H.0506(b)(2)] 2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200] 3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 4. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15'A NCAC 02H.0506(b)(2)] 5. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC 02H.0506(b)(2)] 6. The Permittee shall ensure that the fmal design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (�)(2)l 7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual � such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)] 8. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)] 9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAC 02H.0506(b)(3)] 11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) ofthe Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 14. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 15. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 17. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 18. iJpon completion of the project (iricluding any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included 'in the 401 Certification has been completed. [15A NCAC 02H.0502( fl] 19. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [15A NCAC 02B.0231(a)(6)] 20. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)] 21. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices .in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]): a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 22. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certifcation. [15A NCAC 02H.0506(b)(3) and (c)(3)] 23. Compensatory mitigation for 99 linear feet of impact to streams is required. We understand that you have chosen to perform compensatory mitigation for impacts to streams through the North Carolina Division of Mitigation Service (DMS) (formerly NCEEP), and that the DMS has agreed to implement the mitigation for the project. The DMS has indicated in a letter dated Apri126, 2017 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above-referenced project, in accordance with the DMS Mitigation Banking Instrument signed July 28, 2010. [f you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the fa�ced transmission. The mailing address for the Office of Administrative Hearings is: Oftice of Administrative Heazings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Bill Lane, General Counsel Departrnent of Environmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Kevin Barnett at (828) 296-4657 or keviabamett@ncdenr.gov. incerely, �U. S. Jay Zimme , D'uector Division of Water Resources Electronic copy only distribution: Lori Beckwith, US Army Corps of Engineers, Asheville Field Office Roger Bryan, Division 13 Environmental Officer Cazla Dagnino, NC Deparhnent of Transportation Marla Chambers, North Carolina Wildlife Resources Commission File Copy Environmer�tc�l Quality NCDWR Projec[ No.: Applican[: Project Name: Uate of Issuance of 401 Water Quality Certification: County: ROY COOPER rinrcr�urr MICHAEL S. REGAN s���,�r«����� S. JAY ZIMMERMAN r ��, << �,,, Certificate of Completion Upon comple[ion of all work approved wi[hin the 401 Water Quality Certifica[ion or applicable Buffer Rules, and any subsequent modifica[ions, the applican[ is reyuired to re[um [his certifica[e to the 401 Transportation Permitting Unit, North Carolina Division of N�'ater Resources, 1617 Mail Service Center, Ralei�h, NC. 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the prolect engineec It is not necessary to send certificares from all of these. App�icar,r's ce.rijicario„ l, , hereby state that, ro the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed [o be buil[ within substantial compliance and intent of the 40I Water Quality Cenitication and Buffer Rules, the approved plans and specitica[ions, and other supportin� materials. Signamre: Date: Agen7'.s Certifrention I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the constructio� such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifica[ions, and o[her supporting materials. Sfgna[ure: Date: Engineer'.� Cer�ification Partial Final I, , as a duly regis[ered Professional Engineer in [he State of North Carolina, havina been authorized [o observe (periodically, weekly, fiill time) the construc[ion of the project for the Permittee hereby state tha[, to the best of my abili[ies, due care and diligence was used in the observation of [he cons[ruction such [hat the construction was observed [o be built within substantial compliance and in[ent of Ihe 401 Wa[er Quality Certitication and Buffer Rules, the approved plans and specifications, and o[her supportin� materials. Si�na[ure Date Registration No. Sta�z of Nonh Carolina I Environmzmal Qualiry 1617 Maii Service Cznter I Raleigh. Nonh Carolina 27699-1617