Loading...
HomeMy WebLinkAbout20051849 Ver 1_More Info Received_20080702LEVEL SPREADER OPERATION AND MAINTENANCE AGREEMENT The level spreader is defined as an elongated, level threshold, designed to diffuse stormwater runoff. Maintenance activities shall be performed as follows: 1. After construction and until vegetation has been established, level spreader(s) shall be inspected after every rainfall. Thereafter, level spreader(s) shall be inspected at least every month and more frequently during the fall season and after heavy rainfall events: a. Accumulated sediment, leaves, and trash shall be removed, and repairs made if required. b. Inspect level spreader(s) for evidence of scour, undercutting, settlement of the structure, and concentrated flows downhill from the level spreader(s). c. A level elevation shall be maintained across the entire flow-spreading structure at all times. Repair or replace the level spreader if it is damaged. d. Mow vegetative cover to a height of six (6) inches and prune plants if they cover over half of the level spreader surface. e. Repair eroded areas and replace/replant dead or damaged vegetation. 2. The contractor should avoid the placement of any material on and prevent construction traffic across the structure. If the measure is damaged by construction traffic, it shall be repaired immediately. 3. Inspect and repair the collection system (e.g., catch basins, pipes, swales, riprap) four (4) times a year to maintain proper functioning. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, A, b - 15 ra? fiord , a Notary Public for the State of ?) dC A h C-cxrO i 1 no, County of e. , do herrepy certify that C- ?l ar I e s W n e r personally appeared before me this -day of A Lt-!q o S? 200 and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, ?pT?.RY PUBLIC. SEAL My commission expires -To < `1 2 1 2C0 g Page 1 of 1 Title: y lin/? ev ???? e -771