Loading...
HomeMy WebLinkAbout20060963 Ver 3_More Info Received_20080908 WITHERS September 5, 2008 DWQ 401 Unit 2321 Crabtree Blvd. Suite 250 Raleigh, NC 27604 Attn: Annette Lucas RAVEN EL ENGINEERS I PLANNERS D6 W? Vs Re: Renaissance Park Commercial W&R Project No. 02050170.10 Dear Ms. Lucas: I SURVEYORS q??D' 1, Lq S.;P ZOOg ? WE- JaANDc" A^?CrS,w-!4Tti'rskrxb This letter follows our meeting on September 4, 2008 at your offices. The purpose of this letter is to summarize the discussion that took lace regarding buffer and stormwater permitting for the above referenced project. The Renaissance Park Development includes 8 stormwater BMPs which have been permitted and constructed. A ninth BMP was planned as part of the commercial portion of the development, generally located at the intersection of Tryon Road and Ileagnes Road in Raleigh, NC. The original plan included one stormwater BMP located on the north side of Tryon Road. The outfall from the BMP would utilize an existing cross pipe under Tryon Road, which discharges into a buffered feature south of Tryon Road. Stormwater runoff from the new site, as well as runoff from portions of an existing site was to be directed into the stormwater BMP, which would be sized for the entire watershed. The purpose of the meeting was to identify potential implications of a revised stormwater management plan. In short, the revised plan handled stormwater by directing only the flow from the existing impervious areas to the existing cross pipe. The proposed stormwater BMP will be moved to an undeveloped parcel south of Tryon Road, and stormwater from new impervious surfaces will be directed to the BMP via a new cross pipe. A new outfall is to be created from the BMP into the buffered feature. ill MacKenan Drive i Cary, NC 27511 1 tel: 919.469.3340 1 fax: 919.467.6008 i www.withersravenel.com 7040 Wrightsville Avenue i Suite 101 i Wilmington, NC 28403 1 tel: 910.256.9277 1 fax: 910.256.2584 Brunswick Surveying 1 1027 Sabbath Home Rd, SW i Supply, NC 28462 1 tel: 910.842.9392 1 fax: 910.842.8019 Ms. Lucas 9/5/2008 Page 2 of 2 It is anticipated that the new BMP will be a constructed wetland, sized for the contributing drainage area. Per current stormwater and buffer regulations, the outfall from the constructed may result in additional buffer impacts, which would require written approval from the Division of Water Quality. Similar impacts have been permitted in the past provided that the stormwater management structures are designed in accordance with the latest guidance. At this time, the Division of Water Quality expressed no immediate concerns over the revisions to the previously approved plan. Full construction drawings and stormwater management plans will need to be reviewed and approved by the City of Raleigh stormwater staff prior to approval of any additional buffer disturbances. Upon approval from the City, the applicant will forward a courtesy set of plan to the Division for their files. Assuming that no runoff from new impervious surfaces is directed to the existing stormwater outfall, that outfall may be extended as required for the associated roadway widening project on Tryon Road. No permit would be required for this activity. The meeting was requested primarily for discussion of the Renaissance Park Commercial site. The majority of watershed area which can be directed to the new stormwater BMP location is within the project limits of the previously approved site. At this time, we do not anticipate and additional wetland or surface water impacts due to the proposed revision. There may be additional development which can be supported by this stormwater feature, and any such development would require additional approvals from the City of Raleigh prior to construction. If you have any questions or comments regarding the contents of this letter, please do not hesitate to contact me at the number below. Sincerely, WITHERS -RAV NEL, INC. Hunter C. Freeman, P.E. 06-0963v2 Rnaissance Park Commercial Subject: 06-0963v2 Rnaissance Park Commercial From: Annette Lucas <Annette.Lucas@NCMail.net> Date: Wed, 10 Sep 2008 11:24:32 -0400 To: Hunter Freeman <HFreeman@withersravenel.com> CC: Annette Lucas <Annette.Lucas@NCMail.net> Dear Hunter: I have received your letter dated September 5, 2008 about the stormwater management plan for this project. I concur that it is acceptable to locate the remaining BMP needed for this site on an undeveloped parcel south of Tryon Road as long as it is properly sized for the entire drainage area and designed in accordance with the most recent version of the BMP Manual. I also concur that it is acceptable to bypass stormwater from the adjacent development site directly to the receiving stream. Sincerely, Annette Lucas 1 of 1 9/10/2008 11:24 AM