Loading...
HomeMy WebLinkAbout20071556 Ver 2_Certification of Completion_20170509AI- , NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor DWR Project No.. a 7-15*rC Applicant. Project Name: --X Date of Issuance of John E. Skvarla, III Secretary County: —17�_ Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification s I, _ /! oSt~l ill , hereby state that, to the best of my abilities, due care and diligence was used in the obsArvation of the construction such that the construction was observed to be built within substantial compliance and intent of t.,e 401 We uality Ce 'cation and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: _ _ _ _ _ Date: Agent's Certification ,hereby state that, to the best of my abilities, due care and diligence was used in the observation o' he construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date:� If this project was designe y a Certfiied Professional I, �ll /•+ , as a duly registered Professional A°� (i.e., Engineer, Landscape Architect, Surveyor, a .) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the constmction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. 0.3a'.07 Date T 1 *Roseanne Giordani is the Manager of The Office, LLC, and The Office, LLC is the manager of Applicant. 401 u;.