Loading...
HomeMy WebLinkAbout20150610 Ver 3_IP Application_20170428U.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB APPROVAL 003 EXPIRES: 28 FEBRUARY20 20133 33 CFR 325. The proponent agency is CECW-CO-R. Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Steve Middle - Last - Cahoon First - Richard Middle - Last - Harmon Company - Duke Energy Company - Amec Foster Wheeler Environment & Infrastructure, Inc. E-mail Address-steve.cahoon@duke-energy.com E-mail Address-richard.harmon@amecfw.com 6. APPLICANT'S ADDRESS: 9. AGENT'S ADDRESS: Address- 411 Fayetteville Street - Mail Code: NC14 Address- 4021 Stirrup Creek Drive, Suite 100 City - Raleigh State - NC Zip -27601 Country -USA City - Durham State - NC Zip - 27703 Country -USA 7. APPLICANT'S PHONE NOs. w/AREA CODE 10. AGENTS PHONE NOs. WAREA CODE a. Residence b. Business c. Fax a. Residence b. Business c. Fax N/A 919-546-7457 919-546-4409 919-801-8990 919-381-1366 919-381-9901 STATEMENT OF AUTHORIZATION 11. 1 hereby authorize, Amec Foster Wheeler E & I to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) Dan River Steam Station Stormwater Diversion Project and Associated Projects 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRESS (if applicable) Unnamed tributaries to the Dan River Address 524 South Edgewood Road 15. LOCATION OF PROJECT Latitude: -N 36.491523 Longitude: -W -79.719668 City - Eden State- NC Zip- 27288 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID 798908886870 Municipality Rockingham County Section - Township - Range - ENG FORM 4345, OCT 2012 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3 17. DIRECTIONS TO THE SITE From Raleigh: Take I-40 West to Rock Creek Dairy Rd in Rock Creek, take exit 135. Get on US -29 North in Madison from US -70 West. Follow US -29N to NC -14 North / US -158 West in Reidsville. Take exit 153 from US -29N. Continue on NC -14N to South Edgewood Road in Leaksville. Take a right on S. Edgewood Rd and follow to the Dan River Steam Station on the right. 18. Nature of Activity (Description of project, include all features) The Dan River Steam Station (the Station) is a 620MW combined cycle power generating facility located near the southeastern side of the City of Eden in northern Rockingham County. NC S729 requires Duke Energy to phase out wet ash handling; all coal ash will be covered by state solid waste laws. Duke Energy has initiated the process at the Station to transport some of the coal ash to an existing lined landfill in Jetersville, VA. The excavation and disposal of coal combustion residual (CCR) materials from areas of ash fill will entail the diversion of stormwater to facilitate these actions. The implementation of stormwater diversion will require removal of ash from an existing dredge basin, construction of a soil divider berm, construction of five pipelines, streambank stabilization and culvert extension. The proposed method for implementing stormwater diversion will incorporate a pump -around operation. The proposed action would require impacts to waters of the US. Additional information and details are included in the attached Wetland Master Plan (WMP) with Plan View and Cross- section drawings included in Appendix E. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) The purpose of the stormwater diversion project is to divert stormwater to facilitate the excavation and disposal of CCR materials from areas of ash fill within the Station. This purpose is based on the following needs: address NC regulatory requirements related to diverting stormwater away from the Primary Ash Basin and Secondary Ash Basin and disposal of CCR materials; provide separation between water that has contacted CCR material (contact water) and water that has not contacted CCR material (non -contact water); increase safety by improving site access. The purpose of the DR 134 project is to stabilize a portion of the western streambank of Stream 3 with rip -rap to prevent further erosion and increase stability of the streambank. The purpose of the DR 131 project is to extend the culvert pipe downstream at the southern road crossing of Stream 3 in order to raise the elevation of the crossing crest for possible future scarp repairs along the Dan River. Additional information and details regarding purpose and need are included in the attached WMP. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge Based on the proposed action to divert stormwater to facilitate the excavation/disposal of CCR materials from ash fill areas within the Station, the proposed impacts to jurisdictional waters, including wetlands, a perennial stream, and a jurisdictional dredge basin, are necessary to provide separation between contact water and non -contact water, and to increase safety by improving site access. The DR 134 project will entail streambank stabilization due to erosion with some undercutting along the toe of bank. The DR 131 project will entail the extension of the culvert pipe downstream to raise the elevation of the crest of the southern road crossing and provide more permanent stable approach. Access to the northern shoreline is necessary for scarp repair during closure of the ash basins and coal ash transport. Impacts to Wetlands A, D, and F, and previously permitted H, and Stream 1 will be due to overflooding. Construction of WSA-I will require removal of vegetation, CCR removal, and regrading to promote drainage within the existing dredge basin area. Impacts are shown on the Plan View drawing in the attached WMP. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards 6,800 CCR material 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres 2.29 (overflooding - includes dredge basin) or Linear Feet 624 (overflooding) 23. Description of Avoidance, Minimization, and Compensation (see instructions) No contact water will be discharged into jurisdictional wetlands and streams; therefore, the water quality of downstream receiving waters, specifically the Dan River, will not be impaired. Separation will be provided between water that has contacted CCR material and water that has not contacted CCR material. The overflooding impacts to wetlands and a perennial stream are to be classified as permanent; however, once the stormwater diversion operations have concluded, the flooding of these jurisdictional waters will cease. Mitigation will be provided via the purchase of credits from the NCDMS In -Lieu Fee program. For additional details, see Section 7.0 in the WMP. ENG FORM 4345, OCT 2012 Page 2 of 3 24. Is Any Portion of the Work Already Complete? Yes [—]No IF YES, DESCRIBE THE COMPLETED WORK 1) Installation of culverts at road crossings of Railroad Branch Creek along the eastern boundary of the Station in March 2016 (see the Dan River 134 and 131 Projects in attached WMP). 2) 36-Inch Pipe Closure Project located in the eastern central region of the Station just north of the Primary Ash Basin (PAB), west of the Secondary Ash Basin and east of Ash Fill 2: project activities entailed closing (grouting) a 36- inch corrugated metal pipe that transported flow under the PAB. 3) 48-Inch Pipe Closure Project located in the central region of the Station just east of the plant and west of the PAB: project activities entailed the clean-up of ash and the impoundment of stormwater at the grouted 48-inch reinforced concrete pipe; pumped flows are discharged to the Service Water Settling Pond by way of existing piping to a new storm water outfall. For additional information and locations of each project, see the attached WMP and Figure 2. 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- *See attached labels and list in MS-Word file on the enclosed CD City - State - Zip - b. Address- City - State - Zip - c. Address- City - State - Zip - d. Address- City - State - Zip - e. Address- City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL* IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER USACE NWP 13 SAW-2016-00331 2016-02-18 USACE NWP 18 SAW-2014-01477 2014-09-29 USACE NWP 18 SAW-2015-01670 2015-07-31 * Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. SIGNATURE OF APPLICANT DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, OCT 2012 Page 3 of 3