Loading...
HomeMy WebLinkAbout20170357 Ver 1_Corps of Engineer Correspondence_20170426Burdette, Jennifer a From: Alexander, Tasha L CIV USARMY CESAW (US) <Tasha.L.Alexander@usace.army.mil> Sent: Wednesday, April 26, 2017 4:09 PM To: Burdette, Jennifer a; Smith, Danny Subject: FW: 2017-00643 Myers Point Townes, Morrisville FYI- I'm not sure who is reviewing this project but I'm considering it incomplete. See my email below to Jim Spangler. The site is located off Church Street. Thanks, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://www.saw.usace.army.mil/missions/RegulatoryPermitProgram.aspx to complete the survey online. -----Original Message ----- From: Alexander, Tasha L CIV USARMY CESAW (US) Sent: Wednesday, April 26, 2017 4:08 PM To: Jim Spangler <jspangler@spanglerenvironmental.com> Subject: 2017-00643 Myers Point Townes, Morrisville Jim, On March 27, 2017 we received a PCN on behalf of Wakefield Development Company for Myers Point Townes. After review I have determined the application is incomplete for the following reasons. The project proposes impacts to wetlands and stream however we have not verified a delineation of the waters of the U.S. onsite. The PCN did not include wetland data forms to support the Church Street Delineation map provided. The map does not indicate the amount, linear footage or acreage, of the waters on site. The site contains soils that are frequently flooded, partially hydric, and in the floodplain so I would like to conduct a site visit to review the delineation. Please provide a complete package so we can schedule a site review. The plans provided are not clear. The plans are labeled overall grading plans and impacts maps were not provided. The grading plans do not have impacts clearly highlighted. It appears the fill slopes will encroach into the wetlands however, the PCN does not account for these impacts. The PCN indicates the project will have temporary impacts for utility line. The plans did not include details for the utility line crossing. The plans also note a future 10' wide asphalt greenway trail. Will the greenway have impacts to waters of the U.S.? The PCN does not describe the project in detail. Based on the plans I assume the utility line crossing is for sanitary sewer however the you did not provide enough detail in the overall project description. Will the utility line have a permanently maintained corridor? What is the width of the construction corridor for the utility line installation? Does the line connect to existing infrastructure? Additionally, you did not provide measures taken to avoid or minimized proposed impacts in designing the project. Please provide a detailed description including avoidance and minimization. Please provide additional information within 30 days or I will withdraw the PCN. Thank you, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://www.saw.usace.army.mil/missions/RegulatoryPermitProgram.aspx to complete the survey online.