Loading...
HomeMy WebLinkAbout20170341 Ver 1_More Info Received_20170508 (34) Burkhard Environmental 21326 Bethel Church Rd Cornelius, NC 28031 (P) 704.397.6556 (F) 704.892.8525 michaelburkhard@att.net May 5, 2017 Mr. Alan Johnson Sr. Environmental Spec. North Carolina Environmental 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Re: Shoreline Stabilization Beechtree Woodlands and Waterview LLC Beechtree Road Mooresville, NC 28115 Mr. Johnson, I have been commissioned by Woodlands and Waterview LLC (WW LLC) to assist them in obtaining permits and approval for dredging and shoreline stabilization of the above referenced site. I will be overseeing this project to ensure that all permitted work will be in accordance with each permits conditions. It is my understanding that Ms. Ann Duncan has submitted the necessary information and associated fees required to obtain approval from Duke Lake Management for a dredging permit. I believe that Ms. Duncan has submitted to NCDENR the permit application and associated fees to obtain approval for shore line stabilization. Because there are two issues associated with the permitting this project, It’s my intention to hopefully clarify for you how the shoreline stabilization will be accomplished Tree removal for shoreline stabilization:  It is our intent to do this work via water using a barge **  If the lake level should drop, preventing us from completing the shoreline stabilization by water, we will then finish work via land  Our plan is to begin shoreline stabilization at furthest point of the property going out of the cove, this is the area that has the steepest slopes  Material for sediment control will be on site and installed if necessary While lake levels are constantly changing, we want to stress that our intent to accomplish this work via water. **  Should the lake level drop where the barge cannot be used, we will need to finish this work via land. (You will be contacted immediately should the water level drop to the point that the barge cannot be used)  Access points will be located in areas that minimalize tree removal and impacts to the buffer  These access points will be field located and incorporated on our site plan I have attached photographs for your review of the existing vegetative shoreline. Trees located within the Catawba River Buffer identified for removal will be done with minimal impact to the buffer. As stated earlier, I will be onsite overseeing all work including the removal of dredge material from Lake Norman and the removal of all trees. Should you have any questions or would like to meet on site please call me on my mobile phone at 704.397.6556. Thank you Michael W. Burkhard Cc: Woodland and Waterview LLC CBC