Loading...
HomeMy WebLinkAbout20170552 Ver 1_SR1324_ChestnutGrove_ECPermitPacket_20170428ROY COOPER GovEariox Apri127, 2017 COUNTY: MEMO TO: FROM: = N�STA�iEo,�O .=`?` �.ra ms 7 a �y�'y�(y' -� 4 � Pp`". r,�� �. �UJ��Y��ZCO�: ��'��C� +�v,.nm i " ���� Ne�.+W'.._ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Watauga County Heath Slaughter Division Environmental Officer Doug Eller [7r✓� / ��'� District Engineer JAMES H. TROGDON, III SECRETARY SUBJECT: Erosion and Sedimentation Control Submittal Packet — Revision 3 SR 1324 (Chestnut Grove Rd.) Township: Meat Camp WBS - 11C.095113 Per your comments on 4/26/17, we have revised the Erosion and Sedimentation Control Submittal Packet as follows: • EC Sheets 4, 5 and 8— Revised Trout Buffer Hatching. • Dissipater Pad added to Wet Pipe at Sta. 16+00. • EC Sheet 7— Removed Trout Buffer. • Remove Trout Buffer Typical Section for Sta. 24+00 Rt. • EC Sheets 5 thru 8— Revised Embankment Notes. If you have any questions or need additional information, please let us know. DWE/bsg/jc Attachments cc: C.C. Reinhardt, PE, Division Maintenance Engineer (Letter Only) K.K. Whittington, County Maintenance Engineer (Letter Only) Mailing Address: NC DEPARTMENT OF TRANSPORTATION BOONE DISTRICT OFFICE P.O. BOX 1460 BOONE, NC 28607 Telephone: (828) 268-6022 Faz: (828) 265-5414 Customer Service: 1-877-368-4968 Website: www.ncdot.�ov Location: 1829 HWY. 194 NORTH BOONE, NC 28607 VICINITY MAP GRAPHIC SCALE �S� PLANS 5� PROFILE (HORIZONTAL) 5� PROFILE (VERTICAL) ROADSIDE ENVIRONMENTAL UNIT DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA � � .� �' 1F, �� �° �, � � °II� :�II ��' .��. l� �41I� I[ � ��l �������� �� ��[������ WA TA UGA CO U1�TY LOCATION: SR 1324 CHESTNUT GROVE RD FROM E11tD OF PAVEME11lT 0.67 MILES TO E111D OF MAl1VT. STA 00 + 00 TO E.O.P. 35 + 41 TYPE OF WORK GRADI11lG, DRAINAGE, BASE AND PAVING — 0.67 MILES BEGAN SURVEY: 09/04/IS END S UR VEY: 0922/15 THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITH THE REGOLATIONS SET FORTH BY THE NCG-0/0000 GENERAL CONSTRUCTION PERMIT EFFECT/VE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY. Prepore0 !n jhe Office of: DIVISI0111 OF HIGHWAYS DIVISION 11, DISTRICT 2 BOONE P.O. BOX 1460, BOONE, N.C. 28607 2012 STANDARD SPECIFICATIONS SI'ATE eTATB PAOI6Cf R6P6R8NC6 N0. SHF.ET SOTnI. NO. HEETS ���a 11C.095113 EC-1 18 STATB P0.01.N0. P.APROI.N0. OBSCRIPTION EROSION AND SEDIMENT CONTROL MEASURES S��A � � i�o.oa °�e��ora�� ��u� �;��� ,� i63o.os °�e�nPa��r, �s�Prsso� _ _ _ -- � -- 1605.01 Tempocer' 3�IE ll�enoe lbob.ol ��e�;au �ea;�e�t cn���m� �en�a _ _ _ . 1624.01 `7C'e��mrncy l�erms ��� �llo�e �9ra��s _ _ �� � l�o.os �,�� ��e�� °���e �--------------- � 1633.O1 �[°emPm�arr IBm�k �il� �he�k �°y�e .� � `�°e�+ra�a=r IBmek Sil� �he�k 7°r�e .� w;ah I�aa��h� a�� iDA➢yaoa�rlamS�le Qf�rAN,Y9. -- --- O t�.os °�e��ora�y �ao�� s�E cbe�u� °�yPe �_ _ _ _ _� W��tle% �osQ Fs6ae W��tle � _ •_ Wad[le. % �mSe F�be� Wad[le � ws�h II�mflya�rylamt�e QII�.�I+�D- - - - - - - - - - - - - 163�.01 Tempo�afy IBmek 5edi�en� V9a� °ICype-.�_ _.. _... 163�.04 °Jf'e��orne� ffbo�lk Se�;me�t D�� Ty�e-B_ _� 1635.01 �8��k II�s�� I�lea �eds���c "IPPaP °�y�e�.�_ _ _ _ _ _ % � 1635.04 d8mr�k V�;�e I�le� 5ed;�ewE "Il'�an °➢°r�e 1�___� �n% 1630.0� �esl➢;�g ]Bas;�------------------------� 1�.� �Peciafl �Ei��ing �aseen_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � �ocdc I��ek �o�iwnemf �Qap: l�ir.�l �SPe � ' "� l�s.�ii �wpe �_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � � l�Z.� �YPe �_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ C � ��cemo-aner �asim � '1['[°;ere� 5kea��er �as;n- - - - - - - - - - - - - � ][n��l�ra��on ffBa��n _ . _ _ . � THIS I'ROJECT CONTAINS EROSION CONTROL PLANS FOR CLE:AIiING AND GRU331NG YHASE ON CONSTRUCTION. Roud�vay StandarJ Drawingx The following roadway english standards as nppear in "Roadway Standurd Drawings"- Roadway Design Unit - V. C. Depurtment of'Pransportation - Raleigh, N. C., dated January 2012 and thc latest revison there�o are applicable [o this projec� and by reference herelry are considered a par� of diese plans. 1604.01 Railroad Fsnsion Control Detail 1632A1 Rouk Inlet Sed'unent 1'ru T e A P 1P 1605AI 'Pemporary Silt Fenee 1632.02 Rock Inlet Sediment Trap Type � 1606.OI Speciel Sediment Coutrol Feuce 1632.03 Rock Inlet Sed'unent Trup Type C 1607AI Gravel C,onstruction N:ntrunce 1633A1 Temporary Rock Silt Check Type .i 1622AI "femporery 3erms and Slope llrains 1633.02 Temporary Rock Silt Check Type � 1630.01 Riser Susin 1634A1 'I'emporary Roek 9ediment Dam "1'ype A 1(30.02 Silt 3aein 7'ype 3 1634.02 "femporary Rock 5ediment Uam "Cype � 1630.03 Temporury Silt Ditch 1635.01 Rock Pipe lutet Sediment Trap Type A 1630.04 Stilling 3asin 163�A2 Rock Pipe Inlet Sediment Trap Type � 1630.05 �I�emporary Diversion 1640A1 Coir Piber iaf0e 1630.06 Speoiel StiOing �asin 1645.01 'Pemporary Stream Croesing ��ai.ui ro�a�r��� i�«�iar�o� EROSION CONTROL & PIPE INSTALLATION SCHEDULE Erosion Control Schedule and Notes 1. Generally, the order of installation of the erosion control measures will be as follows: A. Temporary silt basins shall be installed before clearing and grubbing begins. B. Silt fences and temp orary silt ditches shall be installed after clearing and before grading. C. Temporary stone diich checks with PAM or wattles with PAM shall be installed in all disturbed areas as soon as the disturbance begins. D. Final stone ditch checks or wattles shall be installed as soon as ditch line is established. E. Pipe outlet and inlet protection will be done as soon as the pipe is installed. F. Other permanent erosion control measures are to be implemented as soon as practical. 2. Temporary rock silt checks, type B will be spaced by percent grade as shown in the erosion control plan. 3. No. 5 stone, or equivalent, will be used in conjunction with the tem�orary rock silt checks in locations where water is leaving ihe project or entering a pipe. 4. All devices are to be cleaned out when half full. 5. Establish permanent vegetation per ground stabilization chart. TROUT BUFFER ZONE SEQUENCE GENERAL E&SC NOTES GROUND STABILIZATION CHART Wet Pipe Installation Schedule and Notes 1. Prior to installing any E&SC measures identify permit conditions and impact area limits. 2. Install erosion control devices. 3. Manage the water course. The pipe must be placed in the dry. Install dewatering measures. 4. Remove material and existing pipe while limiting, material and sediment from entenng stream and escaping the project. 5. Excavation of stream channel shall not exceed 10' on either side of new pipe or culvert unless indicated on permit. 6. Per permit conditions for Corps of Engineers and the Wildlife Resources Commission, all pipes in streams 48"or greater must be buried 12" below streambed elevation. Pipes less than 48"must be buried with 20% of the diameter below streambed elevation. 7. Place the new pipe and compact backfill. 8. Instiall slope protection on the outlet and inlet ends of the pipe. Also complete installation of erosion control measures and perform maintenance as needed on existing measures. 9. Establish permanent vegetation per ground stabilization chart. Notes: 10. More information on wet pipe installation can be found For silt basin size see the attached erosion control plans. in the BMP manual section 4.2 "Pipe & Culvert installation" PAM is to be placed on all Type A checks and wattles in the erosion control chain except for the final device in HWQ and Trout projects. GROUND STABILIZATION CHART Site Area Description Perimeter dikes, swales, ditches and slopes High Quality Water Zones Slopes steeper than 3:1 Slopes 3:1 or flatter All other areas flatter than 4:1 Stabilization Time Frame 7 days 7 days 7 days 14 days 14 days Stabilization Time Frame Exceptions None None If slopes are 10 ft. or less in length and are not steeper than 2:1, 14 days are allowed 7 days for slopes greater than 50' in lengh None ' (except for perimeters and HQW zones) General Erosion Control Sequence & Notes for NC DOT Projects in Trout Buffer Zones l. Prior to installing any E&SC measures identify permit conditions and impact area limits. Review trout buffer variance approval conditions for any special provisions. 2. All materials should be on the hand before work is commenced. 3. Install EC devices 4. Work within the buffer zone should be sequenced to minimize the length of time that disturbed areas are exposed. Stream bank stabilization, which includes the area from the edge of water to the top of bank, should be phased so that each day's work is a completed work, including provision of adequate ground cover. 5. Graded slopes and fills within the trout buffer zone will within 7 calendar days of completion of any phase of grading be planted or otherwise �rovided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. 6. Graded slopes and fills within the trout buffer zone (excluding road shoulders) shall be protected with rolled erosion control product, bonded fiber matrix, or flexible growth medium after seeding. Notes: Silt fence backed by woven wire, with a post spacing of 6 feet, shall be used instead of standard silt fence m trout buffer zone. Special sediment control fence shall be used in areas where bedrock is encountered which prohibits the proper anchoring of fabric, and in low points of the silt fence in 3-foot sections to allow for concentrated flows. The disturbed areas within the stream buffer shall be restored to native vegetation characteristic of an undisturbed buffer to the extent practical upon completion of construction. Flyrock �rotection such as blast mats should be provided for blasting in close proximity to streams. PAM is to be placed on all Type A checks and wattles in the erosion control chain except for the final device in HWQ and Trout projects. �IVISI�N �]F ]HIG]HWAYS S�A�C]E �]F N�I��°]H CAI��]LINA SOIL STABILIZA TI01� S UMMAR Y SHEET MATTI11lG FOR EROSI0111 C011lTROL CONST LINE FROM TO SIDE ESTIMATE fSYJ SHEET N0. STATION STATION 5U tOtAl. M I SGEI.I.ANE U5 MAf f I NG 10 6E I N51A I.EO Ay 0 I RE tE0 0Y f NE N(a I NEER tOtAl. 5AY PERMA11lE1�T SOIL REII�FOR CEMEI�T MA T CONST LINE FROM TO SIDE ESTIMATE fSYI SHEET N0. STATION STATION 4 -I.- 0+50 4+81 f�t 315 4 -I,- 4+81 7+50 Rt 200 4 -I,- 6+00 8+ I 7 I.T 160 5 -I,- 7+50 9+35 Rt 135 5 -I.- 9+35 I I+34 Rt I 45 5 -I.- 11+34 16+00 Rt 340 6 -I.- 16+25 20+35 Rt 300 5U tOtAl. I , 595 A00 I t I ONAI. PyRM t0 6E I N51Al.I.E� TOtAI. I , 595 5AY 1,600 �IVISI�N �]F ]HIG]HWAYS S�A�C]E �]F N�I��°]H CAI��]LINA S OIL S TABILIZA T101�1 TIMEFRAMES SlT E DESCRIPT lON ST ABILIZAT lON T lME T IMEFRAME EXCEPT l0/V S PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH CIUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:i 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AN� HQW ZONES. S T A T E 0 F N 0 R T H C A R 0 L IN A PRo��TNo. SHEETNo. DIVISION OF HIGHWAYS 11C .095113 3�E LIST OF PIPES, END WALLS, ETC. (FOR PIPES 48 "& UNDER) NEW P]PES EXbTNG P]PES � � � 0 3II'UM%�IOUaCOA'PliUCS.P]PEI'YPEJ3 � a � a �JNLH�SS NOT'EL� OT}4ERW bE) �; � � O � _ v M � .7 S7ZE � � ]2" l5" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" o� w ro H w o � Q TYPE � w � � � 'y `f'• & y o y o � STATDN w o m q m h REMARKS 3+34 RT 90' ADD q+81 CI 37 23 23 REPIACF 7+50 C1. 46' A�t� g+35 CL 42' ADD 11+39 CL 38' 30' 30' REPIACE 16+00 CL 32' 29' 29' 1 1 REPLACE/,�7EI' 16+OC RT 4 9 9 REPIACE 16+26 RT 30' 97' 97' REPIACL 18+94 R'1' 20' ADD 20+35 CL 52' 36' 36' REPIACE 23+82 CL 46' 34 34' REPLACEXn1liT 24+1i RT 20 10 10 REPIACE 25+72 CL 41' 29' 29' REPIACE 28+27 LT 32' ADD 29+83 CL 37' 25' 25' RliYIACE 32+06 R'1' 34' 25' 25' REPIACE 32+27 RT 25 ADD 34+10 R'T' 32' ADD SHEET TOTALS 0 192 384 46 36 0 0 0 658 0 107 177 34 29 0 0 0 397 1 1 0 > � B.O.P. Sta. 0+00 S� �-���j � � N / / / / 9 x3 x3 2 ft. weir --- ID 4 2 TROUT STREAM PROJECT REFERENCE NO. SHEET NO. EC-4 RNJ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER �Ll BUFFER ZONE STA 6+00-8+00 LT 0 � � o / / �- - � , � --�—.�5�� -�� VIRGINIA CHAPMAN / � �— �,,,, � 7��-�-=� DB 975/PG 270 � F02 ��� � �� � -- / � V � \, � � k � �� z / \ \ �/ �� � k\X k \� VIRGINIA CHAPMAN DB 975/PG 270 / BILLY & REX BYERS DB 548/PG 679 � � � LLLl.1L1�1J TROUT STREAM BUFFER ZONE STA 6+00.8+00 LT 0 W � INSTALL PSRM IN THE PROPOSED DITCH LINE. ��,�1►.rr, i . ��Q;�- II� �a��e� ����.':'-��. -- • : —�� �- _ - �x � � 5✓i� � g W�x \ � L �,� k\ � � VIRGINIA CHAPMAN DB 975/PG 270 N + 9 x 3 x 3 2 ft. weir ID 5.1 • • •� KEITH & TERESA GREEN DB 1561/PG 411 0 O � � 0 + O No Embankment Construction Sta.9+00 to /7+/7 Lt. , 3-���j5��\ _i ° i i � �� i —�� � �%�;--�_.. ���i � p�- INSTALL PSRM IN THE PROPOSED DITCH LINE. X �� � R \\ \ \ I I �C6• � � 27.4 � � �\ / ( iadS --- --- � � X _ — ,,; e � 50 0 O + 0 �1 r N No Embankment Constructlon Sta.9+00 to /7+/7 Lt. PROJECT REFERENCE NO. SHEET NO. EC-5 RNJ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER �S( JS � —� /� /. ---�5� �5 ��JS ... ..� — �—�- _ � � -I- N ^ SR� 46.7 Use 30 Day Option Sta.9+35-11+34 Rt 9 x3 x3 2 ft. weir ID 5.2 INSTALL PSRM IN THE PROPOSED DITCH LINE. BILLY & REX BYERS DB 548/PG 679 1045 Use 30 Day Option Sta.11+34-16+00 Rt 9 x3 x3 2 ft. weir ID 5.3 INSTALL PSRM IN THE PROPOSED DITCH LINE. � 00 X � ~ KEITH & TERESA GREEN DB 1561/PG 411 BILLY & REX BYERS DB 548/PG 679 / SEE DETAIL "A" HOWARD JONES LIFE ESTATE GARY & RITA JONES DB 931/PG 162 \+ \+ \+ �+ 1 O O � �� � GARY & RITA JONES � � DB 931/PG 162 � ` � � � � � � � � `��'�. PROJECT REFERENCE NO. SHEET NO. EC-b RNJ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER z 0 � > � � � � � y y N C 9 Q 0 3 C 0 0 W N O C 00 k o� O — + rn No Embankment Const�uction Sta.19f00 to 28+00 Lt. O � N GARY & RITA JONES DB 931/PG 162 O � N No Embankment Constructlon Sta.l9t00 to 28+00 Lt. O � N O � � PROJECT REFERENCE NO. SHEET NO. EC-7 RNJ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER O � � N No Embankment Construction Sta.19+00 to 28t00 Lt. GARY & RITA JONES DB 931/PG 162 BILLY & REX BYERS DB 548/PG 679 Z 0 � W � O � � � � � y y N C 9 Q 0 3 C 0 0 W N O C N Cn + w � GARY & RITA JONES DB 931/PG 162 GARY JONES � p O DB 023/PG 376 � N �1 '_ / " S� , � �x _� )S i No Embankment Construction �� S� � � / i Sta.19+00 to 28+00 Lt. �S _ _ . �S � , � • S^/_�--- , � � , , �-sr �—/ �s—����s�_�—� �— � ,' , �' , , 31 + 75 , , , . , , . . , . , , , . , � E ' , JESco pR!`�. . � P __ - ' / M 'Use 30 Day Option _ -' � Sta. 28+35-29+89 Lt ��25 \ 9 x3 x3 2p.8 ,� 2 ft. weir INSTALL RIPRAP IN THE ID 8.2 PROPOSED DITCH LINE. � C/4A N 38.6 � Use 30 Day Option STA.29+89-32+75 LT PROJECT REFERENCE NO. SHEET NO. EC-8 RNJ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 0 W � O k 34+00 F10.1 25.0 352 —_— / / GWO � / /5.0% \ S SB W � / /i �O• � .� �R�J E �� �G C7.8 �' ' 25.9 � 0.5:/ p ' \ `o:�:� � -- x`99 � 12 x4 x3 3 ft. weir ID 9.2 INSTALL RIPRAP IN THE PROPOSED DITCH LINE. F C�/C — _1 I � 34 + 00 � � 40A � PASTURE � ZZ X��X3 4 ft. weir 33.4 ID 9.1 )/.8 � � -�-'Z., :1—. Mi 34 + 30 40.0 +3� � o � "�.0 _ ANK � i WELL � +53 P�� 'SF� �� ,' 19.8 � i C7B � � C4J 27.9 C//.6 � � 24.0 05:1 25.8 C5.0 � ��� 0.5:1 0.5:1 24. �� � /� o.�:� x � � , � � � � � , i `\ � '1 ^� \ � , / V \ � � 35+41 25.0 � X- BILLY & REX BYERS DB 548/PG 679 WOODS E.O.P. Sto. 35 +4/ NCDOT SIGN EOM , � � �- \� � - � �'R/VA7- � _ R/W W � �RA= ORWY C8.6 35 + 41 2/3 25.0 0.5:/ \ \� \ O / . , ,� INSTALL SOD—FACED MSE WALL �. � � STA 32 + 50 — 35 + 00 RT � v . BILLY & REX BYERS DB 548/PG 679 \ PROJECT REFERENCE NO. SHEET NO. EC-9 RNJ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER KIMBERLY CARTER DB 1765/PG 101