HomeMy WebLinkAbout20170552 Ver 1_SR 1324, Chestnut Grove Application_20170428STATE OF NORTH CAR(7LINA DEPART�,'NI' OF TRANSPfJRTAT`ION ROY COOPBR Gov��a� Apri� 28, 2017 Mr. Monte Matthe�s U. S. Aimy Corps of Engineers Raleigh Regulatory Field OfF�ce 3331 Heritage Trade Drive, �uite 105 Wake Forest, NC 27587 Subject: Nationwide Permit #14 SR 1324 (Chestnut Grove Road) Wata.uga County, North Carolina PrQject Nn�ber: 1l C,0951.13 {DWR Per�uit Fee: $240) Dear Mr. Matthews: JAMES H. TROGDON, III SECRETARY The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1324, Claest�ut Grave Road in Watauga County. Tatal project length is 0.67 miles. Lmpervious surface axea �vill uncrease by abaut 0.25 acres. T'bis praject vvill require the replacennez�t of twa wet pipes as shown helovv: S#ream Im acts: Station Exis#ing Pi N��pnber Siz�. 16+001� 2 30"x 29' 23+821 24"x 34' Permanent FilURiuran � Prapos�d 3(}"x 32' 24"x 46' r- �`' Dewatering : as:�ts I O' 20' 1 a? 40� = 34' � Tatal Proiect Total Impael 37' (See be �z� = 99' 1 If buried, these pipe slopes wauid exceed 6°fo grade. As a result, we are not proposing to bury these pipes since any fish passage wouid be very unlikely and head cuts would be prohable. A riprap pad will be placed in the streambed at the �outlet of the pipe at station 16+0� to reduce scour. This pipe wi111ikely remain perched. 2 There is an existing privafie wet pipe discharging into our ditch Iine at this lacation. We intend ta cut a few feet off of that gipe, install a box and replace our pipe with a slightly longer pipe. The net new permanent fill will be 2' for the box, 5' of additional pipe on the outlet end to address the failed shoulder and 1Q' for the dissipater pad f+or a total of 17' at this station. Dewatering adds another 20' af �emporary impact. MailingAddress: Telephone: (336} 667-91 i 1 Locaieon: NC DEPARTMEN'T OF TIiATiSPOIiTATIOT�T F"az: (336) 667�544 ADDRBSS 2 DNISIdN 11 CustomerServece: T-877-368-496$ CTT'Y, NC ZIi' 801 STATESVILLE ROAD NORTH WILKESBORO, NC 28b59 WeBsite: www.ncdatgov Mr. Moate Matthews SR 1324, Chestnut Grove Road Apri12$, 2417 The replacement of the above noted wet pipes wilt requ�re temporary dewatering. An impervious sandbag dike will be constructed upstream of the existing pipes to create a small pool. Clean water will temporarily be pumped around the consfruction areas and will be discharged downstream. Any dirty water located inside of the construction areas wili he pumped into a silt bag if necessaty. Once the new pipes are in p�aee, the impervious dikes wiil be removed and precanstruction st�reambed elevations will be restored. The pipes at stations 16+00 and 23+$2 carry different UTs to Cobb Creek (class: C; Trout, +} in the 7'Jew River Basin. This praject was reviewed far the presence of threatened and endangered species in the iield and I have also included a query of the NCNHP database. Based on the project area mapped with my request, the database search indicates that there are no records for rare species, unportant natural communities, natural areas, or conservation/rnanaged areas within the pz-oposed project boundary, or within a ane-mile radius of the project bauz�dary. There will be approximately 1.9 acres of tree cutting at the project location due to cut and fill vvork. The NLEB is listed as a protected sp�cies in this county but the project does not fall within 0.25 miles of any red HUC identified in the SLOPES spelled out in the Nationwide Permit Regional Conditions. We do not anticipate any irnpact to any other federally listed species. Cultural resource compliance work has been completed. No archaealogical resources or historic properties will be affec#ed by this project {see attachad}. The project impacts are not significant in nature and should not remove or degade existing water yuality uses. Stormwa#er wili be routed through grass or rock lined ditches, depending on the ditch line slope. Dissipater pads wil] be installed out pipe outlets as appropriate. Pipe si�es used will be the minimum necessary to create a safe roadr�vay. By utilizing the erosion control measures outlined in the attachments to this application, dawnstream water quality sta�tzdards will be protecied. �verall water quality in the area will be im�roved by paving the ABC travei lanes. All appropriate BMFs will be used during construction. Attached is a Preconstruction Notificatian Form, plan sheets with proposed erosion control measures5 a marked county map and a marked topagraphy map. By copy of this etectronic letter, it is requested that Mrs. Marta Chambers with the North Carolina Wildlife Resources Commission comment directly to ydu concerning the 404 Nationwide Permit application with a copy sent to me. Please note that a trout buffer variance will be requested for land disturbance frvm stations 6+40 — 8+0� (lt.), 17+39 — 18-�47 (lt_) and 28+60 — 29-�22 {lt.). By copy of this electronic Ietter, it is requesied that the Division of Water Resources, 401/Wetlands Unit, issue the appropriate petmit for constructifln of �ais p:roject. It is requested that any comrnents related to the 401 certification be electronically forwarded directly to me with a copy sent to the US Army Corps ofEngir�eers_ We would like to begin construction as soon as possible. If further information is reyuired, please let me know. Your early review and consideration will be appreciated. Mr. Mante Matthevvs SR 1324, Chestnut Grove Raad April 28, 2417 Sincerely, /���� /.� 9 �� Heath Slaughter Division Environrnental Officer Encios�res cc: Marla Chambers, NCWRC Amy Chapman, Divisicrn of Water Resources Dave �rVanucha, Division of Water Resources Matt Ga,ntt, PE, Division of Land Resources Mike Pettyjohn, FE, Division Engineer Doug Eller, Ilistrict Engineer Kevin Whittington, County Main►tenance Engineer Zack Souther, Roadside Environtne:ntal Field 4perations Technician .;:s ; Office Use Only: Corps action ID r�o. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification C Farm A. A licant Informafion 1. Processing 1 a. Type{s) of appro�al sought from the Corps: � Section 4Q4 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number_ 14 or General Permit (GP) number: 9 c. Has the NWP or GP number been �erified by the Corps? ❑ Yes � No 1 d. Type(s) of appro�al sought fram the DWQ {checic all that apply}: � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certiflcation — Express ❑ Riparian Buffer Authorization 1 e. Is ihis notification solely fpr the recorcf For the record only for DWQ 401 For the record only for Corps Permit: because written appro�al is noi required? Certificafion: ❑ Yes � Mo ❑ Yes � No 1f. Is payment into a mitigation bank or in-iieu fee pragram proposed for mifigation � Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. fs the project located in any nf NC's iwenty coas#al caunties. If yes, answer '! h ❑ Yes � No below. 1 h. !s the project located within a NC �CM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project lnformation 2a. Name of project: SR 132A�, Chestnut Grove Road 2b. County: UVatauga 2c. Nearest municipality 1#own: Boane Zd. Subdi�ision name: 2e. NCDOT on1y, i.I.P. or state � 1 C.095113 project no: 3. Owner Infarmation 3a. Name(s) on Recorded Deed: NCDOT 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicabie): 3d. Street address: 801 Statesrrilie Road 3e. City, state, zip: North Wilkesboro, NC 28659 3f. Telephone no.: 336-903-9202 3g. Fax no.: 336-667-4549 3h. Emaif address: hslaughter@ncdat.go►r Page 1 af 1 Q PGN Form — Version 1.3 December 10, 2008 Version 4. Appficant Information (if different frnm owner) 4a. App[icant is: ❑ Agent ❑ OkF�er, specify: 4b. Name: 4c. Business name (if applicable}: 4d. Sfireet address: � 4e. City, state, zip: 4f. Telephone na.: 4g. Fax no.: 4h. EmaiE address: 5. AgentlCansultant Infarmatian {if applicable} 5a. Name: 5b. Business name (if applicable): 5c. Stree# address: 5d. City, state, zip: 5e_ Telephone no.: 5f. Fa�c no.: 5g. Email address: Page 2 af 1 p PCN Form — Version 1.3 (]ecember 10, 20Q8 Versic�n B. Praject Infarmation and Prior PrQject His#ory 1. Property Identification 1a. Properiy identification na. (tax PIM or parcel �D): 1 b. Site coordinates (in decimal degrees): Latikude: 3627370 Longitude: - 81.686$4 (Dd.DDDDDp} (-DD.DaQDDQ} 1 c. Property size_ 4 acres 2. Surtace Waters 2a. Name af nearest body of water (stream, ri�er, ete.) to �-�� �o Cobb Creek proposed project: 2b. Water Quali#y Classification of nearest receivir�g water: C; Trout + 2c. Rir�er basin: N�W 3. Project Description 3a. Describe the existing conditions an th� site and the general land use in the vicinity of the prflject at the time of this application: UnpaVed secondary road in a rural area.. 3b. List the total estimated acreage of all existing wetlands on the properky: 0 acres 3c. List the total estimated linear feet of all exis#ing streams (intermittenk and perertniai) on the property: 100 linear feet 3d. Explain the purpose of the proposed project: Secondary Road Impro�ement 3e. Describe the averall project in detail, including the type of equipmen# to be used: See attached co�er letter. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or s�-eam determinations by the Corps or State been requested or obtained for this property 1 project (induding all prior phases} in the past? ❑ Yes � No ❑ Unknown Comments: 4b. If the Carps made the jurisdictional determination, wha# type of determination was made? ❑ Preliminary ❑ Final �4c_ If yes, who delineated the jurisdictiona! areas? Agency/Cvnsultant Company: fUame (if knawn): Other 4d. If yes, list the dates of the Corps jurisdictianal determinaiions or State determinations and a#tach documentaiion. 5. Project History 5a. Ha�e permits or certifieations been requested or obtaineci for � y�s � Na ❑ Unknawn this project (including all prior phases) in #he past? 5b. If yes, explain in detaiE according to "help file" ir�structions. 6. Futare Prbject Plans 6a. !s this a phased praject? ❑ Yes � No 6b. It' yes, explain. Page 3 af 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your praject (check all that appfy}: ❑ Wetlands � Streams - tribUtaries ❑ Buffers ❑ Open Waters ❑ Rond Construction 2. Wetland Impacts If there are wet(and impacts proposed on the site, then eampfete this quesiion for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f, Wetland impact Type o# jurisdiction number — 7ype of impact 7ype of wetland Forested {Carps - 404, 10 Area of impact Permanent (P} or {if known) DWQ — non-404, other) (acres} Tem ara T W1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P[] T ❑ Yes ❑ Gorps ❑ No ❑ DWQ W3 ❑ P � T ❑ �'�S ❑ Corps ❑ No ❑ DWQ W4 ❑ P 0 T ❑ Yes ❑ Corps ❑ No [j DWQ W5 ❑ P[] T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 0 P❑ i ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Camments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temparary impacts) proposed on the site, then cvmplete this question far all stream sites i�pacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type af impact Stream name Perennia( Type of jurisdiction A�erage Impact number - {PER) or (Corps - 404, 10 stream fength Permanent (P) or intermittent DWQ — non�4{]4, width (linear Tempora►'Y (i (���? other) (feet) feet) S1 � P� T Piping, Riprap and UT #1 to Cobb � PER � Corps 1 37 dewatering Creek ❑ !NT � DWQ S2 � P� T Piping, Riprap and UT #2 to Cobb � PER � Corps � �Z dewatering Creei� ❑ INT � DWQ S3 ❑ P 0 T ❑ PER ❑ Corps ❑ {NT ❑ DWQ S4 ❑ P � T ❑ PER ❑ Corps ❑ lNT ❑ DWQ S5 ❑ P � T ❑ PER ❑ Corps ❑ lNT ❑ DWQ S6 ❑ P[] T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Tatal stream and Eributary impacts 99 3i. Cornments: 19' piping, 20' riprap, 60 temporary dewatering Page A� of 9 D PCN Form — Version 1.3 December '10, 2008 Version 4. Open Water Impacts If there are proposed impacEs to lakes, ponds, est�anes, tr�butaries, sounds, #he Atlantic Ocean, or any ather o�en water of the U.S_ then indi�idualiy list ali open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable} Type of impact Waterbady type Area af impact (acres) Permanent (P) or Tem ora T 01 ❑P[]T �2 ❑P�T 03 ❑POT 04 ❑P�T 4f. 'I"otal open water impacts 4g. Comm�ents: 5. Pond or Lake Canstruction If ond or lake construc#ion ro osed, then com lete the chart belaw. 5a. 5b. 5c. �d. 5e. Wet(and Impacts {acres) Stream Impac#s (feet) Upland Pond ID Proposed use or purpose {acres) number of pond Flaaded �illed Excavated Flooded Filled Excavated Flooded P1 P2 Sf. Tatal 5g. Comments: NlA 5h. fs a dam high hazard permit required? ❑ Yes � Ida If yes, permit ID na: 5i. Expected pond surface area {acres): 5j. Size af pond watershed {acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If praject will impact a protecked riparian buffer, then complete the chart below_ If yes, then indi�idually list all buffer impacis below. If any im acts require mitigation, then ou MUS7 fill aut Section D o# this form. 6a. ❑ fVeuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reasan Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigatian (square feet) {square feet} Tem ora im act re uired? B9 ❑POT ❑Ye5 ❑ No 62 ❑P0T ❑Yes ❑ No B3 ❑P❑T ❑Yes ❑ No bh. Total buffer impacts 6i. Gomments: Page 5 of 1 � PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justifrcatian and Mitigation 1. A�oidance and Minimlzation 1 a. Specifically describe measures taken ta avoid ar minimize the proposed impacts in designing project. Proposed pipe lengths are the shortest needed ta adequately construet the roadway. 1 b. 5pec�ficalfy describe measures taken to avoid or minimize the proposed impacts through construction techniques. Afi apprapriate BMPs wii! be usecE durinq construction 2. Campensatory Mitigation for Impacts to Waters of the U.S. or Waters nf the State 2a. Does the project require Compensatory Mitigation far impacts to Wafiers of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): 2c. !f yes, which mitigation option wEil bE used for this project? 3. Cnmpiete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letterj 3e. Commen#s: 4. Complete if Making a Payment to In-fieu Fee Pragram � Yes ❑ No ❑ DWQ � Corps � Mitigation bank ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigatfon Type � Quantity 4a. Appro�al letter from in-lieu fee program is attached. � Yes 4b. Stream rxEitiga#ian requested: 29 linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool 4d. Buffer mitigation requested (DWQ only): 4e. Riparian wetland mitigation requested: 4f. Non-riparian wetland mitigation requested: 4g. Coastal {tidal) wetland mitigation requested: 4h. Comments: 5. Complete i# Using a Permittee Responsible Mitigatio� Plan square feet acres acres acres l:1 . . Sa. If using a permittee responsibie miiigatian plan, provide a description of the proposed mitigatian pian. P�ge 6 vf 10 PCN Forrt� — Version 1_3 Qecember 10, 2pa8 Version fi. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requir�s ❑ Yes � No buffer mitigation? 6b. If yes, ther� identify the square feet of impact to each zone af the riparian buffer tha# requires mitigation. Calculat� the amount of mitigafion required. 6c. 8d. 6e, Zone ��ason for impact Total ii'npact Multiplier Required mitigation (square #eet} (sq�are feet) Zone 1 3(2 for Catawbaj Zone 2 � _� 6f. Total Fiuffer mitigatian required: 6g. If buffer mitigation is required, discuss what type af r►�itiga#ian is proppsed (e.g., payment ta private mitigation bank, permittee responsi�le riparian bufFer reskoration, payment into an appra�ed in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form — Versian 1.3 December 10, 2Q08 Version E. Stormwaier Management and Diffuse Flow Plan (required by DWQ} 1. DifFuse Flow Plan 1a. Does the project include or is it adjacent to pratected nparian buffers identified � Yes � No within one af the NC Riparian Buffer Protection Rules? i b. If yes, then is a diff�se flow plan inciuded? If no, explain why. Comments: ❑ Yes ❑ No 2. S#orntwater Mana emer�t Plan 2a. What is the overall percent imperviousness of this praject? % 2b_ Daes #his project require a Stormwater Managerr�ent Pfan? � Yes ❑ No 2c. If this project DOES NOT require a 5tvrmwater Management Plan, expiain why_ 2d. If this project DOES require a Stormwater Management Plan, then p�ovide a brief, naerative descrip#ian of the plan: See cover letter. ❑ Certi�ed Lacal Go�ernment 2e. Wha will be responsible for the review of the Stormwater Manage�ent Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governmenYs jurisdiction is this projact? ❑ Phase II 3b. Which of the fallowing locally-implemented s#ormwater management programs � N$W apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Dt�er: 3c. Has the approved S#ormwater Management Pfan with proof af approvai been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pra ram Review ❑ Coastal counties ❑ HQW 4a. Which of the follawing state-implemented stormwater management pragrams app(y � �RW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has #he approved Starmuvafer Management Plan with praof of approrral been attachetf? ❑ Yes ❑ �io 5. DWQ 4A1 Unit Stormwater Review 5a. Iloes #he Stormwater Management Plar� meet Ehe appropriate requirements? � y,�s ❑ No 5b. Have all of the 401 LJnit submitta! requirements been met? ❑ Yes ❑ No Page$of1� PCN Form — Version '1.3 December 10, 2d08 Version F. Supplementary Informatic�n 1. Environmental Documentation {DWQ Requirement) ia. �o�s the projeet inval�e an expenditure of public (fed�ral/state/local) funds or the � Yes ❑ No use of public (federallstate) land? 1 b. lf you answered "yes" to the aba�e, does the project require preparatian of an environman#al document pursuant to the requirements of the National ar State ❑ Yes � No {North Carolina) Environmen#al Policy Ack (N�PA/SEPA}? 1 c. If you answ�red "yes" to the abave, has the dacument review E�een finalized by the State Cl�aring House? (!f so, at�ac#� a copy of the NEPA or SEPA final approual letter.) ❑ Yes ❑ Na Camments: 2. Violations {DWQ Requirement) 2a. Is the site in �iolation of DWQ Wetland Reales (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .130Q), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .�200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" ta one ar bath of the abo�e questians, pro�ide an explanat[on of the �iolation(s)_ 3. Cumulative Impac� (pWQ Requirement) 3a_ Will this projeci (based on past and reasonabfy anticipated future impacts) resu[t in � yes � No additionai development, which could impact nearby downstream water quaEity? 3b. If you answeeed "yes" #o the above, submit a qualitati�re or quantitative cumulative impact analysis i� accordance with the most recent DWQ policy_ If you answered "no," provide a short �arrative descnption. 4. Sewage Disposal (DWQ Requirement) 4a. Clear�y de#ail the ultimate treatrraent methods and disposition {non-disci�arge or discharge) of was#ewa#er generated from khe proposed project, ar availabfe capacity of the subject facility. NIA Page 9 af 10 PCN Farm — Versian 1.3 December 10, 20Q8 Uersion 5. Endanger�d Species and Designated Critical Habitat (Corps Rec�uirement� 5a. Wil! this project occur in or near an area with federally protected species ar � Yes � Na habitat? 5b. Flave you checked with �he USFWS concerning �ndangered Species Act � Yes � No impacts? ❑ Raleigh 5c. If yes, indicate the U5FV1lS Field Office yau have contacted. ❑ Ashevil(e 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Halaitat? NHt�, GIS and �isual observation. 6. Essentiaf Fish Habitat (Carps Requirement) 6a. Will this project occur in ar near an area designa#ed as essential fish habitat? ❑ Yes � No 6b. What data sources did you use #o determine whether your site would impact Essential Fish Habitat? NOAA T. Historic or Prehistoric Cul#ural Resources {Corps Requirement) 7a. Will this project occur in or near an area that the state, #ederal or tribal governments have designated as ha�ing historic or cultural preserva#ion � Y�s � No status (e.g., National Histvric Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine +whether your site wau(d impact his#oric or archealogical resaurces? Project was reuiewed by the IUCDOT FiEU. No surveys were required. 8. Flood Zone �esignaiivn (Carps Requirement) Sa. Will this praject occur in a FEMA-designated 100-year flaodplain? ❑ Yes � No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodpfain deterrnina#ion? nefloodmaps � A 9 ^ � � � '� �'/� J. Heath Slaugliter 4128��7 ApplicantlAgent's Printed Name ApplicantfAgent's Si ture Date (AgenPs signature is valid only if an authori on letter from the applicant is pravided_} Page 10 of 'i0 PCN Form — Version 1.3 December 10, 2008 Version