Loading...
HomeMy WebLinkAbout20061804 Ver 16_Stormwater Approval_20170425ROY COOPER Governor MICHAEL S. REGAN Secrelmy S. JAY ZIMMERMAN Direclor Water Resources Environnioual Quality April 25, 2017 DWR # 06-1804 v16 Johnston County Mr. Bret Mangum Dan Ryan Builders NC, LLC 3131 RDU Center Dr, Suite 120 Morrisville NC 27560 Subject: APPROVAL OF STORMWATER MANAGEMENT PLAN Pad NE -2 and NE -5 at Flowers Plantation Dear Mr. Mangum: The Division of Water Resources (Division) recently reviewed the proposed stormwater management plan (SMP) for the subject project as required by Individual 401 Water Quality Certification #3766 issued by the Division on March 15, 2010. Submittal of the SMP satisfies Condition No. 9 of the 401 Certification for this Phase of the project and is subject to the requirements below. 1. The Division approves the SMP consisting of one (1) wet detention basin (wet pond) and all associated stormwater conveyances, inlet and outlet structures, and grading and drainage patterns depicted on plan sheets dated February 1, 2017 and updated plan sheets submitted on April 4, 2017, which are incorporated by reference and are enforceable by the Division. The following conditions also apply [15A NCAC 02H .0506(b)(5)]: a. The maximum allowable drainage area for the approved Pond shall be 1,166,675 square feet and the maximum allowable built -upon area within that drainage area shall be 465,296 square feet. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the Division. [15A NCAC 02H .0506(b)(5)] b. The footprint of all stormwater management devices as well as an additional 10 -foot wide area on all sides of the devices shall be located in either: public rights-of-way; dedicated common areas; or recorded easement areas. The final plats for the project showing all such rights-of-way, common areas and easement areas shall be in accordance with the approved plans. [15A NCAC 02H .0506(b)(5)] c. The approved SMP shall be constructed and operational before any permanent building or other structure is occupied at the site. [15A NCAC 02H .0506(b)(5)j State of North Carolina I Environmental Quality 450 W. Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone: 336-776-98001 FAX: 336-776-9797 DWR # 06-1804 v16 SMP Approval Page 2 of 2 d. The SMP may not be modified without prior written authorization from the Division. [15A NCAC 02H .0506(b)(5)] e. Maintenance activities for the wet detention basin shall be performed in accordance with the notarized O&M agreement signed by Mr. Bret Mangum on February 27, 2017. The 0&M agreement shall transfer with the sale of the land or transfer of ownership/responsibility for the BMP facility. The Division shall be notified promptly of every transfer. [15A NCAC 02H .0506(b)(5)] f. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at https:Hedocs.deq.nc.gov/Forms/Certificate-of-Completion). [15A NCAC 02H .0506(b)(5)] g. In accordance with Session Law 2011-256, the Homeowner's or Property Owner's Association shall be eligible to assume the responsibility of the stormwater approval conditions from the permittee at any point in time after at least 50% of the lots or units have been sold to an individual owner other than the Declarant. The Permittee shall ensure that the HOA/POA is given a copy of this approval and they are responsible for complying with all conditions. Please contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: Ms. Rebecca Flowers, River Dell Company Inc, 4880 NC 42 East, Clayton NC 27527 DWR 401 & Buffer Permitting Branch File Kevin Varnell, Stocks Engineering (via email) DWR RRO