RE: NWP 18 Application; Beamon's II Retail Shopping Center
Brunswick County, NC
Dear Kim:
0 8- 1 380
traa,
?,rl rir?
Enclosed is a NWP 18 application for your review. This application is submitted on behalf of
Dr. Christopher Moshoures for the construction of the Beamon's II Retail Shopping Center located in
Shallotte, NC. The applicant is proposing to construct an 8,000-square foot retail shopping center
with associated parking. Because of the location of wetlands within the site, some wetland impact is
needed in order to gain access to the property. The total impact area is .032 acre of 404 wetlands.
The applicant plans to preserve remaining wetlands within the site in order to mitigate for the
proposed impact.
The Pre-Construction Notification form, maps, site plan, and other associated materials are
enclosed for your review. Please contact me if you have any questions. Thank you for your assistance
with this project.
Sincerely,
Kim Williams
Environmental Scientist
Encl.
C: Dr. Christopher Moshoures
Mr. Michael Norton; Compass Pointe Engineering
Mr. Chad Coburn; DWQ
Mr. Ian McMillan; DWQ
www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060
3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402
0C-1380
Office Use Only: Form Version March 05
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 18
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ?
If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here:
II. Applicant Information
1. Owner/Applicant Information
Name: Dr. Christopher J. Moshoures
Mailing Address: P.O. Box 867
Shallotte. NC 28459
Telephone Number: (910) 754-2020 Fax Number:
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Kim Williams
Company Affiliation: Land Management Group, Inc.
Mailing Address: PO Box 2522
Wilmington NC 28402
Telephone Number: (910) 452-0001 , Fax Number: (910) 452-0060
E-mail Address: kwilliams Ini noup.net
Updated 11/1/2005
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Beamon's II
2. T.I.P. Project Number or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN): 197-000-5524
4. Location
County: Brunswick Nearest Town: Shallotte
Subdivision name (include phase/lot number): Not Applicable
Directions to site (include road numbers/names, landmarks, etc.): From Wilmington, take
US 17 South into Brunswick County. Follow 17 South to Shallotte. Turn left onto
17Bus/Main Street. Property will be on the left just past Whiteville Road. It is bordered by
Main Street and Village Road.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 33.9667 ON 78.3918 °W
6. Property size (acres): 2.85
7. Name of nearest receiving body of water: Shallotte River
8. River Basin: Lumber 03040207
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: The property is currently undeveloped. Adjacent land use is
commercial or undeveloped.
Updated 11/1/2005
Page 6of12
10. Describe the overall project in detail, including the type of equipment to be used: The
project consists of the development of an 8,000 sf building that will be divided into six retail
units. Associated parking will also be provided. A retaining wall will be constructed adjacent
to the wetlands in areas were buildings are in close proximity. The development will tie in to
the Town of Shallotte's sewer svstem.
11. Explain the purpose of the proposed work: To provide access to the proposed development.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. Staff of LMG delineated the wetlands in March of 2008. Ms. Kim
Garvey with the Corps verbally approved the line on 5/15/08. Copies of the wetland survey
been submitted to Ms. Garvev.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permit requests are anticipated.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: One road crossing will impact 0.032
acre of 404 wetlands.
Updated 11/1/2005
Page 7of12
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
se>7arately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
'100-year
Floodplain
(yes/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
1 Fill/Road Crossing Forested Yes 150 0.032
Total Wetland Impact (acres) 0.032
3. List the total acreage (estimated) of all existing wetlands on the property: 1.3
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acrea,2e, multiply len,2th X width, then divide by 43,560.
Stream Impact
Number
(indicate on map)
Stream Name
Type of Impact
Perennial or Intermittent? Average
Stream Width
Before Impact Impact
Length
(linear feet) Area of
Impact
(acres)
N/A
Total Stream Impact (by length and acreage)
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill. excavation. dredaini2. flooding. drainage. bulkheads. etc.
Open Water Impact
Site Number
(indicate on map) Name Waterbody
(if applicable) e)
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres)
N/A
Total Open Water Impact (acres)
Updated 11/1/2005
Page 8 of 12
6. List the cumulative impact to all Waters of the U.S. resulting from the project:
Stream Impact (acres): N/A
Wetland Impact (acres): 0.032
Open Water Impact (acres): N/A
Total Impact to Waters of the U.S. (acres) 0.032
Total Stream Impact (linear feet): N/A
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ® uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): Excavation
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): Stormwater
Current land use in the vicinity of the pond: N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. Permanent impacts are limited
to one road crossing that will impact 0.032 acre of wetlands. Wetlands exist at both access
points to this property and some impact could not be avoided. The site designers chose to utilize
the access point that would minimize impacts the most. In addition the driveway was positioned
at the narrowest point of the wetland finger. Please note that the original site plan showed
wetland impacts from both the driveway and from buildings. However, the project engineer
reduced parking and utilized retaining walls to redesign _the plan to reduce wetland impacts
substantially.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
Updated 11/1/2005
Page 9of12
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
To mitigate for impacts to 0.032 acre of wetlands, remaining wetlands (1.25 acres) on site
will be preserved. This is a 39:1 preservation ratio.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.ne.us/wlT/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
Updated 11/1/2005
Page 10 of 12
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ? No
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No ?
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ? No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Impact Required
Zone* r- Multiplier
1 3 (2 for Catawba)
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260. N/A
Updated 11/1/2005
Page 11 of 12
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. There is currently no existing impervious cover
on this site. The proposed project would have 0.79 acre of impervious surface, or 27.7% of the
total site. A Stormwater Management Plan is being developed for the site.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
The applicant proposes to tie into the Town of Shallotte's sewer system.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: Project
will not provide connections or utilities to surrounding tracts. In addition, remaining wetlands
will be preserved.
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
N/A
I{
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Updated 11/1 /2005
Page 12 of 12
` 08 02:30p Carolina Bluewater Constr 19105751214 p.2
Sep 04 08 08:57a Carolina Bluewater Constr 19105751214 p,2
AGENT AUTHORIZATION FORM
TO WHOM IT MAY CONCERN:
Uwe, the undersigned, hereby authorize Land Management Group, Dw. to act as out agent in the
preparation and representation of information related to the permit application for the
eamn's 11 site. All questions -in regards to this project should be ditccted to Land
Management Group, Inc.
Sincerely,
(C) D
Owner/App icant
Dr. C rDngVher? Mosh29res
Print Name
Se tember 4 2009
Bate
. C.
.
, 1Z
M Boys ?
s ?
WHITEWLE N / i t _ f f
1t - 4b/
Y .. • Red [Oug
SITE
130
Landinn i? It ?
Stri Qp gP A hahotte
17
3€ L
Fulfowd
i QO Co
I/
?11Jt7'E RO Nry '•?_ O? ?S q3.,?
17"
5 it tte 3
179
Pb F ? r -
o
t
'a'te, ? • - - ??% 7D
qp 5`N ? AO
?h
$W
1
\!4 3
o?
o SIR t,AN??? ,
i?
MMrK?grain S h
D ?
t1 '\
tr S?It," ? "?lT
Q ?\ 7
re
lk '
Ott '
SE'
lv?ttNGrQ pp?Nt -?r
Boundaries are approximate arils are
flea meant to he absolutesYT
SCALE 1" = 1 Mile
Map Source: North Carolina Atlas & Gazetteer. Pg .2003
Beamon's II
Dr. Christopher Moshoures LMG Figure 1
Shallottee NC EnviLANDronmmeennttal s! M ConsEhTulttaanntts s
G Vicinity Map
40-08-043 September 2008
'Boundaries are approximate and are
not meant to be absolute SCALE 1" - 400'
Map Source: Shallotte Quadrangle 7.5 minute (topographic) 1990.
Beamon's II
Dr. Christopher Moshoures LMG Figure 2
Shallotte NC LAND MANAGEMENTGROUP-USGS Topgraphic Map
s EnVlron+nental Consultants
40-08-043 September 2008
Toundaries are approximate and are
not meant to be absolute
Map Source: NRCS Soil Survey.
SCALE 1" = 200'
Beamon's II
Dr. Christopher Moshoures LMG Figure 3
Shallotte, NC LAND MANAGEMENT GROUPiwc Soils Map
Environmental Consultants
40-08-043 September 2008
BDC - Baymeade and Marvyn soils
Mk - Muckalee loam
On - Onslow fine sandy loam
Toundaries are approximate are 1 are
not meant to be absolute
Map Source: 2004 aerial photography
SCALE 1" = 200'
Beamon's II
Dr. Christopher Moshoures ?q?LMG Figure 4
Shallotte, NC LAND MANAGEMENT GROUP INc. Aerial Photograph
Environmental Consultants
40-08-043 September 2008
mi ICI,
? I p l
? ? ? ' 4 III
r;
a
o a N °d?z 3? ?°Z aZ mm 23, mzm z wt°°O rwN V
u U0 € p m o 2 jcA X32 j? on ? > _ PaVid a
3 o5o-gw 058 ?°?? §o00 ? o U` F??
gzz p f d ° °8 a z?? a?0 Go° < r'0
z? < j m zFZ z
op° ?d? - w
2,220 z m °ot -Q.0 z? ?? o =? wJF??ww IOw o v
F N U m° O ?Z C9 zN2 Uwm=m w OHO O ?d? n z 0 Q) N=N w E
Z° Jzd0 NF??a?a wWO ?k ?d Z. ?pmq? 1O-
Q Q? ° L S wm m 2 u?. ) Kµ°+ Z? W} Q o ? N W= O^~?~ W ° N m F°
° o >?iqpO 9 Nt 's?!M gam °zm °z? ? uwa? O ?w?c=5? ?yyaz a
a4pz?°?? mm ;? z m?° N
?o N U oo o? o °z m$og?G° aw? _ ?
w s `2 U w°o?z °o ?o ?zzW SS boo °° uoN?d
m €9dr'€zo N? ?Sz=p on uZd on ? U) 80 ?? oo^w >>W>>w000 0 a?
U a zzz° oww pp 5a= 99 > >(t?1 = p.
V' NN rt1 Q O 8 Ply u1? lUm uZI?? 1? Q m O? m U3t mN2N? ~ 2
eL95-9L5 (016) 6909E eull-'e0 44'°N Veag aisi uLa; O n
VNilt7 ab P I ! ' ' O7lbl7N Mr, •up peag 9 olmr,, V£69 ? W.._
1 t
1 - _ E"'Puel peO1.1 ule•}unOA 6df'LL046L£O££d..I,q 1
y? `Duiba-z);qu9Dug ojuioj GGeCIL.IoD
NVIJ ---JAG
oC ° N w
n C;
2o?p z
p z _ ?z O a? t
u °?p?q?~F ?m ?E3 w z Q?Q °o=a u?p
o ?u N w N N N € l9 m U Q¢ w N w N O
tF a_zz0 Z Oo?m wu?a K K u'F =Inm_ r?°
?° Apo 2 =o° 50?
o?< b?
Eo °? °o g FFNZ a?w? k?} EF?? FF?°° °z? I? ?
Uwl 3 Q S N 3 j 5 S m O?N_ ,I -
d K= > p m Z ¢ o? zg t9 p m O > > p N V U W O i
p d 2 a Q a w a p N m F Z N Z w w L
T Q _
° N
°?EO Vim' OZ 5° k G
MO f
n_
v}
? 3 tC1
r
,. :l C7
ti d
0
?S-2
O
?G
W
U
O
O
M
0
y`
? '.
? j
_ ? I
O N '!
N
II '
o'.
W
U
sar,9aaoz?oE?do i
a-
? N M
O?
w o O
r ? z
O
00
00
°m
II?? g
IIII ??
IIII w
Z
IIII Z
IIII
ED
°
N
W
J
Q
W
0
Z
O
U
W
n
n
I?-
Z
? I
III
I II
`II
II II-
II _
II
????? ? II-li
=IIII=
1111111 l
,??Il ll?,u_II I??ru
=
? ,
II
,. I 1i
II
III
II
C
Z
d'r
..J
Q'.
Z'.
1-'
C?
(a31dI(l0W N333 30NIS S`dH NV-ld)
S10ddWl oNV-11?]M-I`dN01114a`d HilM NV-ld ElIS ?VNIJIUO
17 2_95 Ss V016) 65192 r 1.. yl,m,,, 'y ,vag'I,I uea,p -
VIIIIOvo 111Y011 JU011-9
?i6 '0 'I'T=99 "'S 1L69 \ _
II S
NOMI]g
,
`
6uuoow6ug o}uioc ssedwo3
H? U
Wd 3115
-------------------
0
0