Loading...
HomeMy WebLinkAbout20040790 Ver 2_401 Application_20170426April 25, 2017 Ms. Karen Higgins NC Division of Water Resources 401 & Buffer Permitting Branch 1617 Mail Service Center Mr. Andrew Williams U.S. Army Corps of Engineers 331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Wynngate Subdivision Phase IV Dear Ms. Higgins and Mr. Williams, On behalf of our client and the applicant, Cimland, LLC, Summit Design and Engineering Services respectfully requests project approval per Section 404 & 401 of the Clean Water Act for impacts associated with Wynngate Subdivision Phase IV. We have attached the following information to assist in your review of the project: • Four copies of the completed Pre -Construction Notification and supporting documentation; • Four copies of the wetland exhibit denoting impacts to jurisdictional resources; • Four copies of email correspondence with Eric Alsmeyer (USACE); • Four copies of the complete construction drawings; • Four copies of the Town of Butner approved stormwater management plan; • Check for minor water quality application ($240). Based on the limited impacts to natural wetlands associated with the construction of this development (3,898 sf / 0.09 Ac.), no wetland mitigation is being offered. Summit Design and Engineering Services will be more than happy to address and provide any clarification needed and looks forward to discussing these matters with you further. Sincerely, SUMMIT DESIGN AND ENGINEERING SERVICES Chris Oliver, E.I. Land Development Dept. C, `Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes NX No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes X❑ No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. N Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes NX No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Wynngate Subdivision 2b. County: Granville 2c. Nearest municipality / town: Butner 2d. Subdivision name: Wynngate Subdivision 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 4GIG, LLC 3b. Deed Book and Page No. 1586/448 3c. Responsible Party (for LLC if applicable): Craig Morrison 3d. Street address: 2330 Operations Drive 3e. City, state, zip: Durham, NC 27705 3f. Telephone no.: 919-880-6297 3g. Fax no.: 3h. Email address: craig.morrison@cimarronhomes.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑X Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Chad Abbott, PE 5b. Business name (if applicable): Summit Design and Engineering Services 5c. Street address: 504 Meadowlands Drive 5d. City, state, zip: Hillsborough, NC 27278 5e. Telephone no.: 919-732-3883 5f. Fax no.: 919-732-6676 5g. Email address: chad.abbott@summitde.net Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 087502884927 1 b. Site coordinates (in decimal degrees): Latitude: 36.111718 Longitude: -78.73358 1 c. Property size: 24.33 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Falls Lake 2b. Water Quality Classification of nearest receiving water: WS -IV -NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing site is nearly 100% wooded. The topography of the site varies with slopes ranging from 5% to 25% and generally slopes from north to south. There are two unnamed tributaries on the southern end of the property that converge and leave the property to the south. 3b. List the total estimated acreage of all existing wetlands on the property: 0.3 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 732 3d. Explain the purpose of the proposed project: To construct a new single family residential subdivision. 3e. Describe the overall project in detail, including the type of equipment to be used: The project includes the development of 43 new lots that are considered Phase IV of the Wynngate Subdivision. The development includes two constructed wetland stormwater BMPs. Standard hauling/grading equipment, such as dump trucks, dozers, excavators, etc. will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases) in the past? ❑X Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ PreliminaryX❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Eric Alsmeyer Agency/Consultant Company: USAGE Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 10/24/2017, Eric Alsmeyer & Tracey Wheeler 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑X Yes ❑ No 6b. If yes, explain. The project was permitted through the Town of Butner as one phase. However, the developer may phase the construction of the subdivision such that Lots 1-5, and 34-42 are constructed first, with the remaining lots to be constructed after the Phase I lots are sold and houses are built. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Headwater Wetland Yes Corps 0.09 W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.09 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - S2 - Choose one - S3 - Choose one - S4 - Choose one - S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed site utilizes the upland areas to the greatest extent possible. The site soils, which are predominately Creedmoor soil series, have a moderate erodibility factor, and design slopes of 3:1 and 4:1 were chosen to reduce the risk of erosion in the the remaining portions of the natural wetland. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Erosion and sediment control measures will be used to prevent impacts to the remaining portions of the wetland. These measures include silt fence, diversion ditches with erosion control matting, and erosion control matting on slopes adjacent to the remaining portions of the natural wetland. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑X- Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Two constructed wetland BMPs provided and designed to remove 40% total nitrogen and phosphorous. Details included in the to the Town Butner. ❑X Yes ❑ No attached stormwater management plan provided of 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 21.05% 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The proposed site contains three storm pipe networks. Two of the pipe networks discharge to a northern constructed wetland. Both of these pipe networks receive flows from drop inlets located in the roadway ditches alongside Sugar Hill Drive. The third pipe network receives flow from drop inlets located at the cul-de-sac. This pipe network discharges to the southern constructed wetland. Both southern and northern constructed wetland will receive overland flow, and will have energy dissipating riprap to reduce erosion. 2e. Who will be responsible for the review of the Stormwater Management Plan? Town of Butner 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Town of Butner ❑ Phase II ❑X NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): 0 Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑X Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑X Other: Not Required 4b. Has the approved Stormwater Management Plan with proof of approval been ❑X Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form - Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposedproject, or available capacity of the subject facility. All subdivision lots will be connected to the sewer system. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑X Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ YesX❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S. Fish & Wildlife Services iPaC tool indicated that the Dwarf Wedgemussel (clam), the Harperella (flowering plant), and the Smooth Coneflower (flowering plant) are endangered species in this area. No critical habitat has been designated for these species. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAH Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation Office GIS Service 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Program Applicant/Agent's Printed Name ❑ Yes ❑X No ApplicanUAgent's Signature is signature is valid only if an authorization letter from the ai -i- licant is provided. Page 10 of 10 4/5/2017 IPaC: Explore Location IPaC U.S. Fish & Wildlife Service IPaC resource list This report is an automatically generated list of species and other resources such as critical habitat (collectively referred to as trust resources) under the U.S. Fish and Wildlife Service's (USFWS) jurisdiction that are known or expected to be on or near the project area referenced below. The list may also include trust resources that occur outside of the project area, but that could potentially be directly or indirectly affected by activities in the project area. However, determining the likelihood and extent of effects a project may have on trust resources typically requires gathering additional site-specific (e.g., vegetation/species surveys) and project -specific (e.g., magnitude and timing of proposed activities) information. Below is a summary of the project information you provided and contact information for the USFWS office(s) with jurisdiction in the defined project area. Please read the introduction to each section that follows (Endangered Species, Migratory Birds, USFWS Facilities, and NWI Wetlands) for additional information applicable to the trust resources addressed in that section. Location Granville County, North Carolina t.aen,P, �ft V40t jov Local office Raleigh Ecological Services Field Office (919) 856-4520 (919) 856-4556 MAILING ADDRESS Post Office Box 33726 Raleigh, NC 27636-3726 PHYSICAL ADDRESS 551 Pylon Drive, Suite F Raleigh, INC 27606-1487 Endangered species CO V%so U\tajt V 01% This resource list is for informational purposes only and does not constitute an analysis of project level impacts. The primary information used to generate this list is the known or expected range of each species. Additional areas of influence (AOI) for species are also considered. An AOI includes areas outside of the species range if the species could be indirectly affected by activities in that area (e.g., placing a dam upstream of a fish population, even if that fish does not occur at the dam site, may indirectly impact the species by reducing or eliminating water flow downstream). Because species can move, and site conditions can change, the species on this list are not guaranteed to be found on or near the project area. To fully determine any potential effects to species, additional site-specific and project - specific information is often required. Section 7 of the Endangered Species Act requires Federal agencies to "request of the Secretary information whether any species which is listed or proposed to be listed may be present in the area of such proposed action" for any project that is conducted, permitted, funded, or licensed by any Federal agency. A letter from the local office and a species list which fulfills this requirement can only be obtained by requesting an official species list from either the Regulatory Review section in IPaC (see directions below) or from the local field office directly. For project evaluations that require USFWS concurrence/review, please return to the IPaC website and request an official species list by doing the following: 1. Draw the project location and click CONTINUE. https:Hecos.fws.gov/ipac/location/NGOZJN4X5JCCJBHOVIB74AYUZA/resources 1/5 4/5/2017 IPaC: Explore Location 2. Click DEFINE PROJECT. 3. Log in (if directed to do so). 4. Provide a name and description for your project. 5. Click REQUEST SPECIES LIST. Listed species! are managed by the Endangered Species Program of the U.S. Fish and Wildlife Service. 1. Species listed under the Endangered Species Act are threatened or endangered; IPaC also shows species that are candidates, or proposed, for listing. See the listing status page for more information. The following species are potentially affected by activities in this location: Clams NAME Dwarf Wedgemussel Alasmidonta heterodon No critical habitat has been designated for this species. https://ecos.fws.gov/ecp/species/784 Flowering Plants NAME Harperella Ptilimnium nodosum No critical habitat has been designated for this species. httl2s://ecos.fws.gov/ecp/soeci es/3739 STATUS Endangered � STATU0 S` t �e is Smooth Coneflower Echinacea laevigata C.0 Endangered ' No critical habitat has been designated fort species. https://ecos.fws.gov/ecp/species/3473 O r Critical hab 0 Potential effects to critical habitat(s) in this location must be analyzed along with the endangered species themselves. THERE ARE NO CRITICAL HABITATS AT THIS LOCATION. Migratory birds Certain birds are protected under the Migratory Bird Treaty Acts and the Bald and Golden Eagle Protection Act2 Any activity that results in the take (to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any ........................................................................................................................................................................................................................................................................................................................................................................................................................ such conduct) of migratory birds or eagles is prohibited unless authorized by the U.S. Fish and Wildlife Service!. There are no provisions for .................................................... allowing the take of migratory birds that are unintentionally killed or injured. Any person or organization who plans or conducts activities that may result in the take of migratory birds is responsible for complying with the appropriate regulations and implementing appropriate conservation measures. 1. The Migratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) Additional information can be found using the following links: • Birds of Conservation Concern http://www.fws.gov/birds/management/managed-species/ birds-of-conservation-concern.phl2 • Conservation measures for birds http://www.fws.gov/birds/management/project-assessment-tools-and-guidance/ conservation-measures.php • Year-round bird occurrence data http://www.birdscanada.org/birdmon/default/datasummaries.sp The migratory birds species listed below are species of particular conservation concern (e.g. Birds of Conservation Concern) that may be potentially affected by activities in this location. It is not a list of every bird species you may find in this location, nor a guarantee that all of the bird species on this list will be found on or near this location. Although it is important to try to avoid and minimize impacts to all birds, special attention should be made to avoid and minimize impacts to birds of priority concern. To view available data on other bird species that may occur in your project area, please visit the AKN Histogram Tools and Other Bird Data Resources. To fully determine any potential effects to species, additional site-specific and project -specific information is often required. NAMF CFAgn N1(r1 https:Hecos.fws.gov/ipac/location/NGOZJN4X5JCCJBHOVIB74AYUZA/resources 2/5 4/5/2017 American Bittern Botaurus lentiginosus https://ecos.fws.gov/ecp/spec i es/6582 Bald Eagle Haliaeetus leucocephalus https://ecos.fws.gov/ecp/species/1626 Brown -headed Nuthatch Sitta pusilla Chuck -will's -widow Caprimulgus carolinensis Fox Sparrow Passerella iliaca Kentucky Warbler Oporornis formosus Least Bittern Ixobrychus exilis https://ecos.fws.gov/ecp/speci es/6175 Loggerhead Shrike Lanius ludovicianus https://ecos.fws.gov/ecp/species/8833 Prairie Warbler Dendroica discolor Prothonotary Warbler Protonotaria citrea Red-headed Woodpecker Melanpes a rc�aIV Rusty Blackbird E u Short -eared Owl Asio flammeus https://ecos.fws.gov/ecp/s pec i es/9295 Wood Thrush Hylocichla mustelina Worm Eating Warbler Helmitheros vermivorum IPaC: Explore Location Wintering Year-round Year-round Breeding Wintering Breeding Breeding � Year -I %0V% %�\�,a Breeding COOBreeding Year-round Wintering Wintering Breeding Breeding What does IPaC use to generate the list of migratory bird species potentially occurring in my specified location? Landbirds: Migratory birds that are displayed on the IPaC species list are based on ranges in the latest edition of the National Geographic Guide, Birds of North America (6th Edition, 2011 by Jon L. Dunn, and Jonathan Alderfer). Although these ranges are coarse in nature, a number of U.S. Fish and Wildlife Service migratory bird biologists agree that these maps are some of the best range maps to date. These ranges were clipped to a specific Bird Conservation Region (BCR) or USFWS Region/Regions, if it was indicated in the 2008 list of Birds of Conservation Concern (BCC) that a species was a BCC species only in a particular Region/Regions. Additional modifications have been made to some ranges based on more local or refined range information and/or information provided by U.S. Fish and Wildlife Service biologists with species expertise. All migratory birds that show in areas on land in IPaC are those that appear in the 2008 Birds of Conservation Concern report. Atlantic Seabirds: Ranges in IPaC for birds off the Atlantic coast are derived from species distribution models developed by the National Oceanic and Atmospheric Association (NOAA) National Centers for Coastal Ocean Science (NCCOS) using the best available seabird survey data for the offshore Atlantic Coastal region to date. NOAANCCOS assisted USFWS in developing seasonal species ranges from their models for specific use in IPaC. Some of these birds are not BCC species but were of interest for inclusion because they may occur in high abundance off the coast at different times throughout the year, which potentially makes them more susceptible to certain types of development and activities taking place in that area. For more refined details about the abundance and richness of bird species within your project area off the Atlantic Coast, see the Northeast Ocean Data Portal. The Portal also offers data and information about other types of taxa that may be helpful in your project review. About the NOAANCCOS models: the models were developed as part of the NOAANCCOS project: Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf. The models resulting from this project are being used in a number of decision- support/mapping products in order to help guide decision-making on activities offthe Atlantic Coast with the goal of reducing impacts to migratory birds. One such product is the Northeast Ocean Data Portalwhich can be used to explore details about the relative occurrence and abundance of bird species in a particular area off the Atlantic Coast. All migratory bird range maps within IPaC are continuously being updated as new and better information becomes available. Can I get additional information about the levels of occurrence in my project area of specific birds or groups of birds listed in IPaC? Landbirds: https:Hecos.fws.gov/ipac/location/NGOZJN4X5JCCJBHOVIB74AYUZA/resources 3/5 4/5/2017 IPaC: Explore Location The Avian Knowledge Network (AKN) provides a tool currently called the "Histogram Tool", which draws from the data within the AKN (latest,survey, point count, citizen science datasets) to create a view of relative abundance of species within a particular location over the course of the year. The results of the tool depict the frequency of detection of a species in survey events, averaged between multiple datasets within AKN in a particular week of the year. You may access the histogram tools through the Migratory Bird Programs AKN Histogram Tools webpage. The tool is currently available for 4 regions (California, Northeast U.S., Southeast U.S. and Midwest), which encompasses the following 32 states: Alabama, Arkansas, California, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kentucky, Louisiana, Maine, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Missouri, New Hampshire, New Jersey, New York, North, Carolina, Ohio, Pennsylvania, Rhode Island, South Carolina, Tennessee, Vermont, Virginia, West Virginia, and Wisconsin. In the near future, there are plans to expand this tool nationwide within the AKN, and allow the graphs produced to appear with the list of trust resources generated by IPaC, providing you with an additional level of detail about the level of occurrence of the species of particular concern potentially occurring in your project area throughout the course of the year. Atlantic Seabirds: For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAANCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. Facilities . Or Wildlife refuges _ �Xta I,% Any activity proposed on National Wildlife Refuge lands must undergo a'r—.Ali ermination' conducted by the Refuge. Please ap contact the individual Refuges to discuss any questions or con�r0 Sur THERE ARE NO REFUGES AT THIS LOCATION. jov Fish hatche O THERE ARE NO FISH HATCHERIES AT THIS LOCATION. Wetlands in the National Wetlands Inventory Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section 404 of the Clean Water Act, or other State/Federal statutes. For more information please contact the Regulatory Program of the local U.S. Army Corps of Engineers District. THERE ARE NO KNOWN WETLANDS AT THIS LOCATION. Data limitations The Service's objective of mapping wetlands and deepwater habitats is to produce reconnaissance level information on the location, type and size of these resources. The maps are prepared from the analysis of high altitude imagery. Wetlands are identified based on vegetation, visible hydrology and geography. A margin of error is inherent in the use of imagery; thus, detailed on -the -ground inspection of any particular site may result in revision of the wetland boundaries or classification established through image analysis. The accuracy of image interpretation depends on the quality of the imagery, the experience of the image analysts, the amount and quality of the collateral data and the amount of ground truth verification work conducted. Metadata should be consulted to determine the date of the source imagery used and any mapping problems. Wetlands or other mapped features may have changed since the date of the imagery or field work. There may be occasional differences in polygon boundaries or classifications between the information depicted on the map and the actual conditions on site. Data exclusions Certain wetland habitats are excluded from the National mapping program because of the limitations of aerial imagery as the primary data source used to detect wetlands. These habitats include seagrasses or submerged aquatic vegetation that are found in the intertidal and subtidal zones of estuaries and nearshore coastal waters. Some deepwater reef communities (coral or tuberficid worm reefs) have also been excluded from the inventory. These habitats, because of their depth, go undetected by aerial imagery. Data precautions https://ecos.fws.gov/ipac/location/NGOZJN4X5JCCJBHOVIB74AYUZA/resources 4/5 Westone Dr Wackttorlc Dr 500 m I ;31 ML Hunter L fi itt", Gteer? JCC!A rl dr,,V House 41 Whitm.011 Dj GV048-B New Hope Methadist Church ki III —re 0 GRANVILLE Sh OVO " 2LY' "n 2070000 FEET 2080000 FEET 860000 FEET 78°45'30"W 78°45'0"W 78°44'30"W 78°44'0"W 860000 FEET :+n `I r '$ SII' Ill Iw 04 r fes:. r S>r. _ _��s{♦'°� � ir� 10 - j'j 'a K 17 � r •r r - .. 1 k t• 7 'i r - - .. t-, t ,'1 ��� •, / 'y, �%` � �` ��* . r 'bf ♦ '}r- �'' ��� 1F�;r, _ �'•tNt .,� riy •1� •1 ;% rJ11{''.. �+,f •drr .. ,. � t / � � _ Rrt ` craf qi� : d•'4/y � �"'�. � � _t q i a ^'-• 'r.�IR' r,�t`,d "!.' • }, yy w. • ' f ij:. �'+)t' ,:r�+`%T1, - ... -_ i.,, r•'r '.i°���q � '. ',+"' * �'l.k..�"r .• _ ♦ ,_ i + :� f '�}+ iZrr �r�..;r. ,� .ijL�yG .� y:a'� • C ,,4�6 �i � -f 4c�,aR�� �, r � ' � �yrr :�r r i�C' S - r � �•�• • r�J sY T1�Rja�- � I I,a� . I t ' �. i rIr• �' /'�� . �-�. Y� �-iaA77")). '_a +f, , .,��.'' ��i. f C+.`� F `4 '^r 4 p s` {iff �R.t' S � w' f' . d +?i�+ �'#• r �+' �!'�� �r it � w ++}- j •� l • a i r +ti UTNE�R �► j /{ , / y3.� " �. `� �.t � ,; r , ..t . i. - '► _ d- . y 1 Alor `/5•. rr°.'R' 1 :r. r� Yr , a S':. if 36°6'30"Nf 4 36°6'30"N J174 _ -T ;-l.s- •i�' .,e- - w+ r�ti'y:3r7,# r•.�-t• .,. r i ro 4 N, t1 yC7 .40 .rhe L,R a ir" ..a; Tributary , Ai r r . ' 4 BU :I�T�ER ETwJ BLTTNER E J x "''-' ' �..�� .A ?81 �- � ` � A Ind ONE AE 8 r f ?,'7 # n V' t { p ►i a yt' 3! '� bio ,r .' �^ r �� 4 - - 36°6'0"N 36°6'0"N 1 �•A,�!� .mar r.j ,f - - `� :a �f r'iy r kt� +w p R V •� •s • ,t� 1 _ ' �3 �y �`� ♦ �':� SNS t• '" sA'r�r . y .tri - A� �� ''.��`'!Y,� , J<'ye� �, �r +�' �` _ • r. . � � � � .. awe•• - :�►' o ' "�# '• —►. AC3 009 _ 3 BU I NER ETTrJ '� y r ,. 37010 660 i }•+'t rt_ , - ;� � ' r.. ` TOO WN • F $9 .� v," ry �� � _ ^,,,� , , • '1R 7RRTIAr' 36°5'30"N36'5'30"N ' ' A�' � � �'��'���' �GRANVIi LE COUNTY '�•' `�1 ..• Cozart +".j� t , t i• ,; Iq y Creek 15 UNIINCOO RPO47TE-0 AREAS •� '' '� � 7` Tributary 1 M ,., FY20Os 5 ` `r•�t �. ZONE AE o � r r dr. ` 4 � �•'� � ����, - �" � opt 261.6 .• `° ;''; ZONE AE E,' "'� � _ •:�,' � C�OZrCLYt r '.' r 1 FY2005 Tributary 3 � t- r _ Cozart r 850000 FEET ;'' a+r '� " 850000 FEET 78°45'30"W 78°45'0"W 78°44'30"W 78°44'0"W 2070000 FEET 2080000 FEET FEMA'3 C-0CPEAATINC� TECH"ICALPAFF14 1 This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach to floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map flood hazard areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT HTTP://FRIS.NC.GOV/FRIS Without Base Flood Elevation (BFE) Zone A,V, A99 With BFE or Depth zone AE, AO, AH, VE, AR SPECIAL FLOOD HAZARD AREAS OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES - - - - - Coastal Transect Baseline Profile Baseline Hydrographic Feature Limit of Study Jurisdiction Boundary For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.c( or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less severe than those in the VE Zone. Limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area \ � \ \ Otherwise Protected Area Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 [I�.Ti�l=i�1I1] 0 75 150 PANEL LOCATOR i i I i 0060 1 0080 0989 03 0948 0968 0946 PERSON COUNTY 0942 0940 11 0960 r 08 I i oa r I DURHAM COUNTY Oa 1,000 Feet Meters 300 q9_1 ' 1928 I 1948 0986 1 1906 1 1926 I 11946 191 1944 I I i 11 1 �1 r 1 1914 1924119341 1 VANCE COUNTY 1 1 1913 1923 1933 1 1942 % 1912 1922 1932 1911 1921 1931 19 ' 41 ; ---- 1910 1920 1930 1940 ----� 1806 1 1826 1804 WAKE COUNTY FRANKLIN COUNTY NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM cc FLOOD INSURANCE RATE MAS`' NORTH CAROLINA VAR 0 PANEL 0875 0 +va s�G�a FE I` 42 cc cc Panel Contains: COMMUNITY CID PANEL SUFFIX r �~ BUTNER, TOWN OF 370660 0875 1 GRANVILLE COUNTY 370325 0875 1 0 0 U. cc a 0 cc Z MAP NUMBER 3720087500J MAP REVISED 04/16/07 Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% Annual Chance Flood with Average Depth Less Than One Foot or With Drainage Areas of Less Than One Square Mile zone x Future Conditions 1% Annual Chance Flood Hazard zone x Area with Reduced Flood Risk due to Levee See Notes zone x Areas Determined to be Outside the 0.2% Annual Chance Floodplain zone x ------------- Channel, Culvert, or Storm Sewer Accredited or Provisionally Accredited Levee, Dike, or Floodwall Non -accredited Levee, Dike, or Floodwall BM5510 X North Carolina Geodetic Survey bench mark BM5510® National Geodetic Survey bench mark BM5510� Contractor Est. NCFMP Survey bench mark Cross Sections with 1% Annual Chance Water Surface Elevation (BFE) s - - - - - - Coastal Transect - - - - - Coastal Transect Baseline Profile Baseline Hydrographic Feature Limit of Study Jurisdiction Boundary For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.c( or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less severe than those in the VE Zone. Limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area \ � \ \ Otherwise Protected Area Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 [I�.Ti�l=i�1I1] 0 75 150 PANEL LOCATOR i i I i 0060 1 0080 0989 03 0948 0968 0946 PERSON COUNTY 0942 0940 11 0960 r 08 I i oa r I DURHAM COUNTY Oa 1,000 Feet Meters 300 q9_1 ' 1928 I 1948 0986 1 1906 1 1926 I 11946 191 1944 I I i 11 1 �1 r 1 1914 1924119341 1 VANCE COUNTY 1 1 1913 1923 1933 1 1942 % 1912 1922 1932 1911 1921 1931 19 ' 41 ; ---- 1910 1920 1930 1940 ----� 1806 1 1826 1804 WAKE COUNTY FRANKLIN COUNTY NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM cc FLOOD INSURANCE RATE MAS`' NORTH CAROLINA VAR 0 PANEL 0875 0 +va s�G�a FE I` 42 cc cc Panel Contains: COMMUNITY CID PANEL SUFFIX r �~ BUTNER, TOWN OF 370660 0875 1 GRANVILLE COUNTY 370325 0875 1 0 0 U. cc a 0 cc Z MAP NUMBER 3720087500J MAP REVISED 04/16/07 2070000 FEET 2080000 FEET 870000 FEET 78°45'30"W 78°45'0"W 78°44'30"W 78°44'0"W 870000 FEET .rs, 6 h A ?rF* r a , ar rw L •, h a i • L r S!M - LI _ •� �•A ' P'[(S1T� �'-." `J Y l.,A" �pi� /� .i_ .i"ir w.�, "'III �, ' I, .r A1C, !`.��, +} �•_ /, yt ? .f �i tp.° �^ S �` /f{.i -fir rya' F s• r r ir F fY'�•IL f t .� 'tn'1, C7•� j/ hd �dJ id J r -�i�J Te com D i . Alk 'Ism F711 � _7k , 1 , f _11A ti c TOO WN -OF °s� ins �j TOWN OI F r ^ w..• .� f „�► BUTNER { �' Sir ♦ $s - r �y - n � � G s _ _ A o�ryr37066'© ? r^ r ^�r 370660 \ �� X05 's •yti� �N i v� ssA e"�jr ,,• 'P�� �� i, 36°8'0"N°:. 36'8'0"N i `' -3 ^ , t s h x '• ''ty Cjt r .0000, .0 ;b e�� ^ •� AM -a Alt - ` 444, - `� BUTNER 370660 , 01 370660 oa0` _ % 36°7'30"N 36°7'30"N o d► ZONE AE •f, � . ' � � . 'r�6 -wY.. ^.,eao,' c �e h Me00''. r rn Q�e cir 7 i 3 Cozart •c4j� f�, 41 Partridge Ctv� iS- o„ .. � Hidden Pond Dr r � I�eY Cir >t `410, _A A, r Gti .� ; SOA \\ d f O r w / Meaa .* r, � k I 1 ;, °.�� �� ,�`� TOO WN OOF •o _ �* "'a Y' 370660. � 370660 " a 36°7'0"N '� ��a �� 36"7'0�"N L a } rt 7�,, ;• • '` Hunter}C 1r f ��►` h : ,,fib ..�* . +. ,.� oa fi �R Summerfield4n W /N Jft omilk''s{'- r� .,� -�., } 54 R��- ff A a� i • m r - .O r Dr ti , 3 , AM 860000 FEET �� _ t s x' 860000 FEET �..t. v 78°45'30"W 78°45'0"W 78°44'30"W 78°44'0"W 2070000 FEET 2080000 FEET FEMA'3 Ci1OPEFIAT1HG TECH"1CALPAg 4U1 This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach to floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map flood hazard areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT HTTP://FRIS.NC.GOV/FRIS Without Base Flood Elevation (BFE) Zone A,V, A99 With BFE or Depth zone AE, AO, AH, VE, AR SPECIAL FLOOD HAZARD AREAS OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES - - - - - Coastal Transect Baseline Profile Baseline Hydrographic Feature Limit of Study Jurisdiction Boundary For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.c( or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less severe than those in the VE Zone. Limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area Otherwise Protected Area Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 [I�.Ti�l=i�1I1] 0 75 150 PANEL LOCATOR i i I i 0060 1 0080 0989 03 0948 0968 0946 PERSON COUNTY 0942 0940 11 0960 � 08 I i ol? I I DURHAM COUNTY Oa 1,000 Feet Meters 300 q9_1 ' 1928 I 1948 0986 1 1906 1 1926 I 11946 191 1944 I I i rl 1 YI Y 1 1914 1924119341 1 VANCE COUNTY 1 1 1913 1923 1933 1942 % 1912 1922 1932 1911 1921 1931 19 ' 41 ; ---- 1910 1920 1930 1940 ----� 1806 1 1826 1804 WAKE COUNTY FRANKLIN COUNTY NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM cc FLOOD INSURANCE RATE MAS`' NORTH CAROLINA e_Rr-�� 0 PANEL 0876 0 +vo s���a FE I` 42 cc Panel Contains: COMMUNITY CID PANEL SUFFIX r f;.f CnBUTNER, TOWN OF 370660 0876 K r , Vn 0 0 U. cc a 0 cc Z MAP NUMBER 3720087600K MAP REVISED 04/16/07 Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% Annual Chance Flood with Average Depth Less Than One Foot or With Drainage Areas of Less Than One Square Mile zone x Future Conditions 1% Annual Chance Flood Hazard zone x Area with Reduced Flood Risk due to Levee See Notes zone x Areas Determined to be Outside the 0.2% Annual Chance Floodplain zone x ------------- Channel, Culvert, or Storm Sewer Accredited or Provisionally Accredited Levee, Dike, or Floodwall I I I Non -accredited Levee, Dike, or Floodwall BM5510 X North Carolina Geodetic Survey bench mark BM5510® National Geodetic Survey bench mark BM5510� Contractor Est. NCFMP Survey bench mark Cross Sections with 1% Annual Chance Water Surface Elevation (BFE) s - - - - - - Coastal Transect - - - - - Coastal Transect Baseline Profile Baseline Hydrographic Feature Limit of Study Jurisdiction Boundary For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1 -877 -FEMA -MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.c( or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina Floodplain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1 -percent -annual -chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5 -foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less severe than those in the VE Zone. Limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1 -800 -344 -WILD. CBRS Area Otherwise Protected Area Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 [I�.Ti�l=i�1I1] 0 75 150 PANEL LOCATOR i i I i 0060 1 0080 0989 03 0948 0968 0946 PERSON COUNTY 0942 0940 11 0960 � 08 I i ol? I I DURHAM COUNTY Oa 1,000 Feet Meters 300 q9_1 ' 1928 I 1948 0986 1 1906 1 1926 I 11946 191 1944 I I i rl 1 YI Y 1 1914 1924119341 1 VANCE COUNTY 1 1 1913 1923 1933 1942 % 1912 1922 1932 1911 1921 1931 19 ' 41 ; ---- 1910 1920 1930 1940 ----� 1806 1 1826 1804 WAKE COUNTY FRANKLIN COUNTY NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM cc FLOOD INSURANCE RATE MAS`' NORTH CAROLINA e_Rr-�� 0 PANEL 0876 0 +vo s���a FE I` 42 cc Panel Contains: COMMUNITY CID PANEL SUFFIX r f;.f CnBUTNER, TOWN OF 370660 0876 K r , Vn 0 0 U. cc a 0 cc Z MAP NUMBER 3720087600K MAP REVISED 04/16/07 Type: CONSOLIDATED REAL PROPERTY Recorded: 3/15/2016 3:01:08 PM Fee Amt: $246.00 Page 1 of 4 Revenue Tax: $220.00 Granville County, NC Kathy M. Taylor Reg of Deeds BK 1586 PG 448 - 451 NORTH CAROLINA SPECIAL WARRANTY DEED Excise Tax: $220.00 Parcel Identification No. 087502884927 Mail after recording to: Sparks Law Group, LLC d/b/a Sparks King & Wafts 3405 Dallas Highway, Bldg 800, Ste 810 Marietta, GA 30064 This Instrument was Jason E. Thurber, Esq. prepared by: 3405 Dallas Highway, Bldg. 800, Suite 810 Marietta, GA 30054 This instrument was prepared by: Jason E. Thurber, a licensed North Carolina attorney. Delinquent taxes, if any, to be paid by the closing attorney to the county tax collector upon disbursement of closing proceeds. This deed made this 3) 7 I ars I la by and between GRANTOR SBC IV REO LLC 1700 Lincoln Street, Suite 2150 Denver, CO 80203 GRANTEE 4G1 G, LLC 2330 Operations Drive Durham, NC 27705 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNFSSFTH_ that the C,rantnr fnr n vniiinhlp mmidpratinn nnirl h%j tha nrnntaa thin rarraint of The property hereinabove described was acquired by Grantor by instrument recorded in Deed Book 1491, Page 376, Granville County Register of Deeds. A map showing the above described property is recorded in Plat Book 37, Page 84. The property does not include the primary residence of a Grantor. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in FEE SIMPLE. And the Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor received, and that Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, except for the exceptions hereinafter stated. Title to the property hereinabove described is hereby conveyed subject to all valid and subsisting restrictions, reservations, covenants, conditions, rights of ways and easements properly of record, if any and current year ad valorem taxes. IN WITNESS WHEREOF, the Grantors have hereunto set their hands and seals, or, if corporate, has caused this Deed to be executed by its duly authorized officers and its seal to be hereunto affixed, the day and year first above written. [Signature Page Follows] 1 liYRnir� ii'iy.haridl'shtl otf�dsi:atart�0 at sral;` iters Vis,,T':HrijF.aG' � - MY oRFt1mwa?o'.*12"' %f � Pr!hfid Notary -N!4"!: .M aF e 8 rrf 48 �, � ;� ",� �,� rA MARISOL SA;10787 Notary Public Statork, � • �., � . N0.41gA62 Qualified in RichmMy Commission Expire I. 0../ itrwtW R4nYa±lY xllf0- - NG1l[O.A{.0 Vr{A" EXHIBIT "A" Being all of that 24.33 acre tract shown on a map entitled "Survey for BDG Wynngate Associates, LLC" recorded in Plat Book 37, Page 84, Granville County Registry. For Reference Only: Said property also known as 1700 E Lyon Station Rd & Gate 2 Rd, Creedmoor, NC 27522 SCALE 1 "=20' FIRST ISSUE DATE 2016-11-09 PROJECT NO. 16-0076 SHEET NO. EX -1 COPYRIGHT © 2016 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. MNNGATE SUBDIVISION EAST LYON STATION ROAD GRANVILLE COUNTY, NC WETLAND EXHIBIT SUMMIT DESIGN AND ENGINEERING SERVICES Creatively Inspired - Technically Executed License #: P-0339 504 Meadowland Drive Hillsborough, NC 27278-8551 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net From: Chad Abbott To: Alsmeyer, Eric C CIV USARMY CESAW (US); Chad Abbott Cc: Thomas Tellup; Randy Hall; Chris Oliver Subject: 16-0076 - RE: [EXTERNAL] RE: Summit 16-0076 Wynngate Sub -Division, Ph 4; AID SAW -2016-02239. Date: Saturday, March 18, 2017 11:03:02 AM Attachments: Memo Stvle.odf SKM C36816111609101.Ddf 16-0076 Allowable Wetland Disturbance.odf Eric, I hope you are doing well, busy I am sure. We had some delays on this project and are now trying to wrap things up. This was the last correspondence I had and wanted to make sure that we settled up with you and closed all loops. Tom Weaver who was working on this with me has left to go back home to Pittsburgh so I don't know if he responded to the items below. In case Tom didn't send, I have attached an email from our client as well as the deed showing that this development was independent of the original development. While they did have it master planned, they were bankrupt and the property had to be rezoned and repermitted through the Town of Butner with the new developer. The believe the only reason that it the name was kept as Wynngate Phase 4 was to avoid the appearance that the developer was trying to isolate this from the rest of the neighborhood and to create a better sense of community amongst the neighbors. I have also attached the wetlands disturbance exhibit for your reference. I just wanted to go ahead and get your thoughts on this as well as confirm our steps moving forward. I assume we would now need to submit to you a PCN with the attached exhibit and our grading plan showing where we have minimized and avoided other sections of stream and wetlands? Please review and let me know your thoughts on this. Thanks again and hope you have a good weekend, Chad E. Abbott, PE Manager, Land Development Dept. Phone: (919) 732-3883 Fax: (919) 732-6676 From: Alsmeyer, Eric C CIV USARMY CESAW (US)[ma iIto: Eric. C.Alsmeyer@usace.army.mi1] Sent: Monday, November 14, 2016 11:02 AM To: Chad Abbott <chad.abbott@summitde.net>; 'Tom Weaver' <thomas.weaver@summitde.net> Cc: thomas.tellup@summitde.net Subject: RE: [EXTERNAL] RE: Summit 16-0076 Wynngate Sub -Division, Ph 4; AID SAW -2016-02239. Chad: Can you e-mail the survey so I can make sure it captured what I flagged, correctly? 1. If you can make the case that this is an independent development from Phases 1-3, the developer can impact up to 0.1 acre of wetlands total for Ph. 4 without a Corps requirement for compensatory mitigation. Condition 23 of the NWPs requires that: (a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site (i.e., on site). (b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating for resource losses) will be required to the extent necessary to ensure that the adverse effects to the aquatic environment are minimal. Therefore, we require you to provide information supporting that minimization has been done to the maximum extent practicable, particularly justification for any wetland impacts for lot fill, that cannot be avoided. 2. The feature between DWR Stream B and Wetland B is also a stormwater conveyance, that is not subject to 404 (my map is incorrect in calling that an Interm. Trib.), and would not require authorization from the Corps for impacts. However, if you would be impacting any area to the west of that conveyance, you would need to determine whether or not there are wetlands in that area. Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Thank you, Eric Eric Alsmeyer Project Manager Raleigh Regulatory Field Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Tel: (919) 554-4884, x23 Fax: (919) 562-0421 Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx u From: Chad Abbott[mailto:chad.abbottPsummitde.net] Sent: Thursday, November 10, 2016 12:57 PM To: Alsmeyer, Eric C CIV USARMY CESAW (US) <Eric.C.AlsmeyerCcDusace.army.miI>; 'Tom Weaver' <thomas.weaver(@summitde.net> Cc: thomas.tellup(@summitde.net Subject: [EXTERNAL] RE: Summit 16-0076 Wynngate Sub -Division, Ph 4; AID SAW -2016-02239. Eric, Good timing. We have surveyed the wetlands and have been looking at the impacts to the lots and are currently in preparation of the impact maps to send to the owner for review. After their input, we will send to you for your determination on the permitting. I actually was anticipating emailing you earlier to check on a couple of things. Please see questions on the attached. I believe you have answered the ones around Wetland 1 and associated S/W Conveys, however I would like a confirmation of the allowable disturbance to each. Furthermore, regarding Wetland 2, the conveyance the comes to that wetland from the 30" culvert was deemed to be a stream up to the flag that you have indicated. However, what is to come of the area from there down to the wetland? Is also a S/W convey and if so, as asked on the other S/W Conveys, can we fill, disturb, pipe, etc over or on this? Please see attached for more details. Thanks again for all of your help on this. Chad E. Abbott, PE Manager, Land Development Dept. Phone: (919) 732-3883 Fax: (919) 732-6676 From: Alsmeyer, Eric C CIV USARMY CESAW (US) [mailto: Eric. C.Alsmeyer(ausace.army. mi1] Sent: Thursday, November 10, 2016 11:22 AM To: Chad Abbott; 'Tom Weaver' Cc: thomas.tellup(absummitde.net Subject: RE: Summit 16-0076 Wynngate Sub -Division, Ph 4; AID SAW -2016-02239. Chad: I was just wondering what's the status of this residential development? Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at Blockedhttp:/://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0. Thank you, Eric Eric Alsmeyer Project Manager Raleigh Regulatory Field Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Tel: (919) 554-4884, x23 Fax: (919) 562-0421 Regulatory Homepage: Blockedhttl2://www.saw.usace.army.miI/Missions/RegulatoryPermitProgram.asl2x LZI From: Alsmeyer, Eric C SAW Sent: Tuesday, October 25, 2016 2:49 PM To: 'Chad Abbott' <chad.abbott(@summitde.net>;'Tom Weaver' <thomas.weaverCcDsum mitde.net> Cc: thomas.tellup(@summitde.net Subject: RE: [EXTERNAL] 16-0076 Wynngate Sub -Division Chad: The S/W Conveys. are unregulated (non -404) stormwater conveyances, so no 404 permit is needed to cross the one below the wetland. Re: Wetland A, the regulations require that your client try to avoid, or at least minimize impacts to the wetland. As I mentioned in my 10/6/16 e-mail to Joel (att.), to figure out permitting and mitigation requirements, we need to determine previous impacts for Wynngate Subdivision (AID's SAW -2004-9985093 and SAW -2004-21243), and whether or not future impacts would be cumulative with those (The 10/22/07 nationwide general permit verification stated 0.08 acre of permanent wetland impact) . We will need information on the connections between the previous phases and this phase to determine the independence of Phase 4 (shared amenities or utilities, etc.). The wetland impacts would possibly fit under nationwide general permit authorization, and not require compensatory mitigation, if the permanent loss of wetlands is less than 0.1 acre, for this phase alone, if we can determine that Phase 4 is independent of the previous phases; or for all phases, if we find that Phase 4 is not independent. Please reply or call me to discuss this further, or if you have any questions, or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0. Eric Eric Alsmeyer Project Manager Raleigh Regulatory Field Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Tel: (919) 554-4884, x23 Fax: (919) 562-0421 Regulatory Homepage: Blockedhttp://www.saw.usace.army.miI/Missions/ReguIatoryPermitProgram.aspx ®, From: Chad Abbott [mailto:chad.abbotticDsummitde.net] Sent: Tuesday, October 25, 2016 1:15 PM To: Alsmeyer, Eric C SAW <Eric.C.Alsmeyer(@usace.army.mil>; 'Tom Weaver' <thomas.weaver(@summitde.net> Cc: thomas.tellup(cDsummitde.net Subject: RE: [EXTERNAL] 16-0076 Wynngate Sub -Division Eric, No worries. I believe our surveyors are familiar enough with the site to make heads or tails of it. With respect to the S/W Convey, and the W/L A, obviously they affect our layout attached and we can't access our site from East Lyon Station so crossing of this would be needed. What would be the allowable disturbance to the S/W Convey and W/LA along with what would be the opportunity to mitigate if we went above those thresholds? Chad E. Abbott, PE Manager, Land Development Dept. Phone: (919) 732-3883 Fax: (919) 732-6676 From: Alsmeyer, Eric C SAW [ma iIto: Eric. C.Alsmeyer(a)usace.army.mi1] Sent: Tuesday, October 25, 2016 9:54 AM To: Chad Abbott; 'Tom Weaver' Cc: thomas.tellup(a)summitde.net Subject: RE: [EXTERNAL] 16-0076 Wynngate Sub -Division Chad and Tom: See att. electronic version of my sketch map. I wasn't able to access my photo of the flag example, but I may be able to get it to you tomorrow. Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at Blocked Blocked httl2://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Eric Eric Alsmeyer Project Manager Raleigh Regulatory Field Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Tel: (919) 554-4884, x23 Fax: (919) 562-0421 Regulatory Homepage: BlockedBlockedhttlf/www.saw.usace.army.miI/Missions/Re ulg atoryPermitProgram.aspx �0 From: Alsmeyer, Eric C SAW Sent: Monday, October 24, 2016 4:23 PM To: 'Chad Abbott' <chad.abbottCo)summitde.net>;'Tom Weaver' <thomas.weaver(@sum mitde.net> Cc: thomas.tellup6Dsummitde.net; Wheeler, Tracey L SAW <Tracey.L.WheelerlcDusace.army.mil> Subject: RE: [EXTERNAL] 16-0076 Wynngate Sub -Division Chad and Tom: As I communicated to Tom on Friday, I went out this afternoon to flag the wetlands that Tracey and I ID'd on Friday AM. There are two wetlands, W/L A (Flags W1— W11) & W/L B (Flags W21— W26), as indicated on the attached sketch map. W/L A, which was not identified before, is relatively small. The top of it is the spring box next to E Lyon Station Road, and flag W11 ties to flag W1. W/L A is connected to other jurisdictional water by discrete surface stormwater conveyances, so it is adjacent, not isolated. W/L B should approximate the previous wetland that was flagged in the mid -2000's JD. Flags W21 and W26 tie to the intermittent stream. W/L B is approx. 105' wide between W21 and W26. I only flagged the north and east sides of W/L B, north of the intermittent tributaries, but the two sides of W/L B keep going beyond the flags, southwest toward Gate 2 Road. I will send you a cleaned up electronic version of this map tomorrow, and I will also attach a photo of my first flag at the spring box, so the surveyors know what they look like (W_, 10/24/16, EA). Once you have these flags surveyed so we have a good location and size for the wetlands, we can talk about permitting. The tributaries that DWR identified should also be included on the map of waters of the US. Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at Blocked Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0. Eric Eric Alsmeyer Project Manager Raleigh Regulatory Field Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Tel: (919) 554-4884, x23 Fax: (919) 562-0421 Regulatory Homepage: BlockedBlockedhttlf/www.saw.usace.army.miI/Missions/Re ulg atoryPermitProgram.aspx 8 From: Chad Abbott[mailto:chad.abbottPsummitde.net] Sent: Monday, October 24, 2016 10:09 AM To: Alsmeyer, Eric C SAW <Eric.C.Alsmeyer(@usace.army.mil>; Wheeler, Tracey L SAW <Tracey.L.Wheeler(@usace.army.mil> Cc: 'Tom Weaver' <thomas.weaver(@summitde.net>; thomas.tellup(@summitde.net Subject: RE: [EXTERNAL] 16-0076 Wynngate Sub -Division Eric/Tracey, I hope you both had a good weekend. I was wondering if you were able to make it out to the site and if so, did you finish your determination such that we could pick up the flags with our surveyors? Also, any indication as to whether or not they did extend up into the site more than we had anticipated or a site markup so that we could give to our surveyors as a go by to make sure they get them all? Thanks to you both again for getting this taken care of so quickly as our client didn't see this coming and we definitely have so regrouping to do to revise our plans accordingly. Chad E. Abbott, PE Manager, Land Development Dept. Phone: (919) 732-3883 Fax: (919) 732-6676 Sum *11T DESIGN AND ENGINEERING SERVICES Creatively Inspired - Technically Executed S TORMWATER & DRAINAGE SUBMITTAL AGATE PHASE IV SUMMIT PROJECT # 16-0076 TOWN OF BUTNER PROJECT # PIN #:087502884927 E. Lyon Station Road, Creedmoor, NC 27522 OWNER/APPLICANT: Cimland, LLC. Attn: Craig Morrison 2330 Operations Drive Durham, NC 27705 Revised 41012017 5LAL a 24 y ENGINEER/CONSULTANT: Chad E. Abbott, PE Summit Design & Engineering Services 504 Meadowland Dr. Hillsborough, NC 27278 P (919)732-3883 / F (919)732-6676 chad.abbott@summitde.net CONTENTS: 1. STORMWATER NARRATIVE & SUMMARY 2. PREPOST DEVELOPMENT ANALYSIS 3. PIPE SIZING CALCULATIONS 4. ANTI -FLOTATION CALCULATIONS 5. DRAINAGE MAPS 6. SOILS MAPS 7. NOAA RAINFALL DATA 8. MISC CALC INFORMATION K:\2016\16-0076\CWIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 2of12 PROJECT NARRATIVE Introduction and Summary: Introduction: The project consists of building a 43 lot residential single family subdivision; the subdivision will be built along two roads, and will have sidewalks for pedestrian access. Two Constructed wetlands will be built to treat stormwater runoff for both quality and quantity. Design Criteria: The site has been designed to control and treat runoff from the first inch of rain, as well as capture, and discharge the 1 year 24 hour storm at a rate less than or equal to the pre - development discharge rate. The Stormwater wetland is designed with sufficient freeboard to capture, the 100 year 24 hour storm. The stormwater wetland will remove at least 85% of average annual Total Suspended Solids. Per Town ordinance 15.6.2(A),(B),(D). Offsite offsets will be used to achieve nitrogen and phosphorus standards , however the site will comply with Town ordinance 15.6.3 (B) (4) which states that both nitrogen and phosphorus loading must be reduced by at least 50% from post - development untreated, to post -development treated. The wetland is designed to NC DENER Stormwater BMP Manual, Minimum Design Criteria. Existing Hydrologic Situation (proposed High School site): The site is currently comprised of Creedmoor coarse sandy loam, which is classified in the "D" Hydrologic Group. The site is bounded by E. Lyon Station road to the west, Gate 2 Road to the South, and Shining Water Ln to the north. The site can be broken into two drainage areas. The majority of the site (+/- 20.27 AC) drains to the unnamed stream which eventually crosses under Gate 2 Road. The other portion of the site (2.09 AC) drains to a roadside ditch that runs west to east alongside Shining Water Ln. The "to the unnamed stream" basin is comprised of (0.17 AC) of impervious surface in the form of a driveway, and rooftops. The majority of the basin is pervious surface. Ground cover is relatively dense wooded area. The time of concentration for this basin is 15.2 minutes. The basin that drains to the roadside ditch along Shining Water Ln is composed of (0.06 AC) of impervious cover in the form of a drive. The rest of the basin (2.03 AC) is pervious surface with wooded ground cover. Time of concentration for this basin is calculated at 10 minutes. The site has 2 natural wetlands that have been delineated by the USACE. We are proposing to disturb +/- 3,898 SF of wetland in the northern natural wetland. The southern natural wetland will not be disturbed. 2 unnamed streams are present on site, no disturbance is proposed in the buffer area of either stream. K:\2016\16-0076\CWIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 3of12 Proposed Hydrologic Situation All existing impervious areas will be demolished. The proposed site will consist of 2 roadways which will add +/- 40,308 SF of impervious surface, sidewalks +/- 10,825 SF of impervious area. In addition, each of the 43 lots has been given an allowance of 2,800 SF of roof area, 800 SF of driveway area, and 400 SF of Sidewalk/Patio area. The site contains three pipe networks. Two of the pipe networks discharge to the northern constructed wetland. Both of these pipe networks receive flows from drop inlets located in the roadway ditches alongside Sugar Hill Drive South. The third pipe network receives flows from drop inlets located at the cul-de-sac. This pipe network discharges to the southern constructed wetland. Both southern and northern constructed wetland will receive overland flow, and will have energy dissipating riprap to reduce erosion. Analysis: The Jordan/Falls Lake Stormwater Nutrient Load Accounting Tool was used to analyze phosphorous and nitrogen loading. Engineering judgment was used when a lot was partially draining to a BMP, and partially draining to a by-pass area. Or a lot was partially draining to both BMPs. The following general principles were applied in the delineation. • Roof drains were assumed to be at the four corners of the building pad graded area. If roof drains were within the constructed wetland delineation boundary it was assumed that the runoff is captured. If the roof drain was on the edge of the delineation boundary, an assessment had to be made if the downspout could be turned in such a manner that the runoff could be captured without directing excess runoff at a neighboring building, or at the home itself. • Driveways were assumed to connect with Sugar Hill Drive, and only extend into the property as far as the building pad grade. • Sidewalks and patios were the most difficult impervious area to assess. Lots were carefully looked at in a case by case basis. In general 50-75 % of the lots sidewalk/patio area was assumed to be in front of the building grade pad. The new pipe networks were analyzed in the Storm Sewer Extension for AutoCad, Calculations are included. Drop inlet grates, and ditches were analyzed in the AutoCad Express Extension (Calculation included). The wetlands were modeled in Hydraflow using the two Pre -development drainage basins described in the existing hydrologic situation section. As the analysis points did not change in the post and pre development drainage areas, post development conditions were analyzed at a point along the unnamed stream, and at the ditch along Shining Water Ln. Please see table below K:\2016\16-0076\CWIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 4of12 Hydrogrqph 131 Discharge at Analysis Pt cfS) Time of Concentration (rounded to nearest Minute Pre -Development to stream 24.94 15 min Pre -Development to road ditch 3.157 10 min Post -Development to North Wetland 6.178 7 min Post -Development to South Wetland 7.335 9 min South Wetland Routed 0.393 N/A North Wetland Routed 0.215 N/A Post-Dev. Bypass to stream 17.00 19 min Post-Dev Bypass to road ditch 4.372 7 min Total Pre Development 28.02 N/A Total Post -Development 20.11 N/A Per the Minimum Design Criteria, the wetland will pond 15 inches above the PPE. As both wetlands discharge to sensitive areas, they were designed to protect the receiving bodies to the maximum extent possible from the 1 year 24 hour storm. Both spillways will "activate" on all storms equal to the 5 year 24 hour storm. Spillways were designed to be somewhat longer than normal in order to keep the depth of flow to a minimum, so that riprap energy dissipaters can be used to maximum effectiveness. Description of Calculations Methods: The SCS method was used to generate all hydrographs for the runoff calculations. The Curve numbers were figured compositely using the Table from Appendix 11C-1 of the VDOT Drainage Manual. Hydraflow Extensions for AutoCAD Civil 3D 2017 programs were used in conjunction w/ AutoCAD Civil 3D to analyze the hydrographs and generate the time of concentrations per the TR -55 method. In instances where the time of concentration was calculated to be less than 5 min., the Time of concentration was switched to "User Defined" and a minimum 5 minutes was used. Area measurements were made using AutoCAD. Ground cover and topographic assessments were based on site visits, existing conditions and field location surveys by others, and aerial photography from GIS,and Google maps. Precipitation frequencies and intensities were based on data provided by NOAA for the project specific location. K:\2016\16-0076\CWIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 5of12 HYDRAFLOW PRE /POST DEVELOPMENT ANALYSIS K:\2016\16-0076\CIVIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 6of12 Watershed Model Schematic 1 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 ,--,1—,Qre-Dev. to Stream re-Dev to Road Ditc�41-ost Dev to North We.H�ost Dev to South Wetland 5 - So+ Wetland Routed Alf 6 - North Routed 9 - Pre-Dev. Combined Legend Hvd. Origin Description 1 SCS Runoff Pre-Dev. to Stream 2 SCS Runoff Pre-Dev to Road Ditch 3 SCS Runoff Post Dev to North Wetland 4 SCS Runoff Post Dev to South Wetland 5 Reservoir South Wetland Routed 6 Reservoir North Routed 7 SCS Runoff Post Dev. Bypass to Stream 8 SCS Runoff Post-Dev. Bypass Road Ditch 9 Combine Pre-Dev. Combined 10 Combine Post Dev. Combined Project: Stormwater design.gpw Dev. Bypass to t"ost-Dev. Bypass Road 10 - Post Dev. Combined Thursday, 03 / 16 / 2017 Hydrograph Return Period Recap Hyd flow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 SCS Runoff ------ 24.94 36.25 ------ 53.75 67.99 87.62 103.60 119.71 Pre-Dev. to Stream 2 SCS Runoff ------ 3.157 4.500 ------- 6.592 8.286 10.61 12.50 14.40 Pre-Dev to Road Ditch 3 SCS Runoff ------ 6.178 9.334 ------- 14.26 18.31 24.11 28.88 33.71 Post Dev to North Wetland 4 SCS Runoff ------ 7.335 10.92 ------- 16.49 21.09 27.60 32.93 38.33 Post Dev to South Wetland 5 Reservoir 4 0.393 1.225 ------- 8.321 16.38 25.49 31.62 37.22 South Wetland Routed 6 Reservoir 3 0.215 0.838 ------- 4.052 12.53 21.97 27.85 32.87 North Routed 7 SCS Runoff ---- 17.00 23.98 ------- 34.52 42.99 54.59 63.95 73.37 Post Dev. Bypass to Stream 8 SCS Runoff ------ 4.372 5.885 ------- 8.112 9.868 12.24 14.14 16.03 Post-Dev. Bypass Road Ditch 9 Combine 1, 2, 28.02 40.75 ------- 60.29 76.17 98.06 115.86 133.82 Pre-Dev. Combined 10 Combine 5, 6, 7, 20.11 28.31 ------- 49.04 78.20 110.50 131.35 151.81 Post Dev. Combined 8, 11 Diversion'! 5 0.000 0.000 ------- 7.005 15.03 24.13 30.25 35.83 South Emergency spillway 12 Diversion2 5 0.393 1.225 ------- 1.316 1.343 1.363 1.378 1.388 South Through the riser 13 Diversion1 6 0.000 0.000 ------- 2.342 10.64 19.94 25.76 30.73 North Emergency spillway 14 Diversion2 6 0.215 0.838 ------- 1.710 1.896 2.025 2.089 2.143 North through riser Proj. file: Stormwater design.gpw Thursday, 03 / 16 / 2017 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 24.94 2 724 72,397 ------ ------ ------ Pre-Dev. to Stream 2 SCS Runoff 3.157 2 722 8,334 ------ ------ ------ Pre-Dev to Road Ditch 3 SCS Runoff 6.178 2 720 14,566 ------ ------ ------ Post Dev to North Wetland 4 SCS Runoff 7.335 2 720 17,158 ------ ------ ------ Post Dev to South Wetland 5 Reservoir 0.393 2 822 17,109 4 308.60 12,527 South Wetland Routed 6 Reservoir 0.215 2 932 14,518 3 330.55 12,388 North Routed 7 SCS Runoff 17.00 2 724 54,319 ------ ------ ------ Post Dev. Bypass to Stream 8 SCS Runoff 4.372 2 718 10,002 ------ ------ ------ Post-Dev. Bypass Road Ditch 9 Combine 28.02 2 722 80,731 1, 2, ------ ------ Pre-Dev. Combined 10 Combine 20.11 2 724 95,948 5, 6, 7, ------ ------ Post Dev. Combined 8, 11 Diversion'! 0.000 2 n/a 0 5 ------ - -- South Emergency spillway 12 Diversion2 0.393 2 822 17,109 5 ------ ------ South Through the riser 13 Diversionl 0.000 2 n/a 0 6 ------ ------ North Emergency spillway 14 Diversion2 0.215 2 932 14,518 6 ------ ------ North through riser Stormwater design.gpw Return Period: 1 Year Thursday, 03 / 16 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 1 Pre-Dev. to Stream Hydrograph type = SCS Runoff Peak discharge = 24.94 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 72,397 cuft Drainage area = 20.270 ac Curve number = 77* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 15.20 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.170 x 98) + (20.100 x 77)] / 20.270 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 Pre-Dev. to Stream Hyd. No. 1 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 1 1 1 1 1 1 i 1 1 1 1 1 1 N 1 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) TR55 Tc Worksheet Hyd. No. 1 Pre-Dev. to Stream Description Sheet Flow Manning's n -value Flow length (ft) Two-year 24 -hr precip. (in) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n -value Velocity (ft/s) 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 I1 = 0.240 = 77.0 = 3.35 = 3.57 = 8.97 = 1092.00 = 5.69 = Unpaved =3.85 = 4.73 = 7.50 = 10.95 = 1.86 = 0.015 =10.51 B 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ({0})920.0 0.0 0.0 Travel Time (min) = 1.46 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. Totals = 8.97 = 4.73 = 1.46 15.20 min Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 2 Pre-Dev to Road Ditch Hydrograph type = SCS Runoff Peak discharge = 3.157 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 8,334 cuft Drainage area = 2.090 ac Curve number = 78* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.060 x 98) + (2.030 x 77)] / 2.090 Q (cfs) 4.00 3.00 2.00 1.00 0.00 ' ' 0 2 4 Hyd No. 2 6 8 Pre-Dev to Road Ditch Hyd. No. 2 -- 1 Year Q (cfs) 4.00 3.00 2.00 1.00 �1 ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) TR55 Tc Worksheet Hyd. No. 2 Pre-Dev to Road Ditch Description Sheet Flow Manning's n -value Flow length (ft) Two-year 24 -hr precip. (in) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n -value Velocity (ft/s) 1 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 I1 = 0.240 = 75.0 = 3.35 = 3.00 = 9.42 = 103.00 = 3.81 = Unpaved =3.15 = 0.55 = 0.00 = 0.00 = 0.00 = 0.015 =0.00 B 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. Totals = 9.42 = 0.55 = 0.00 10.00 min 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 3 Post Dev to North Wetland Hydrograph type = SCS Runoff Peak discharge = 6.178 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 14,566 cuft Drainage area = 5.000 ac Curve number = 73* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.40 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(1.670 x 98) + (3.330 x 61)] / 5.000 Q (cfs) 7.00 .M 5.00 4.00 3.00 2.00 1.00 0.00 ' ' 0 2 4 Hyd No. 3 6 8 Post Dev to North Wetland Hyd. No. 3 -- 1 Year Q (cfs) 7.00 M 5.00 4.00 3.00 2.00 1.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) TR55 Tc Worksheet Hyd. No. 3 Post Dev to North Wetland Description Sheet Flow Manning's n -value Flow length (ft) Two-year 24 -hr precip. (in) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n -value Velocity (ft/s) Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 A = 0.150 = 82.0 = 3.35 = 7.92 = 4.71 = 663.00 = 6.63 = Unpaved =4.15 = 2.66 = 0.00 = 0.00 = 0.00 = 0.015 =0.00 B 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. Totals = 4.71 = 2.66 = 0.00 7.40 m i n Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 4 Post Dev to South Wetland Hydrograph type = SCS Runoff Peak discharge = 7.335 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 17,158 cuft Drainage area = 5.550 ac Curve number = 74* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.20 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(1.990 x 98) + (3.560 x 61)] / 5.550 Q (cfs) 8.00 K 2.00 0.00 ' ' 0 2 4 Hyd No. 4 Post Dev to South Wetland Hyd. No. 4 -- 1 Year 6 8 10 12 14 16 Q (cfs) 8.00 4.00 2.00 ' 0.00 18 20 22 24 26 Time (hrs) TR55 Tc Worksheet Hyd. No. 4 Post Dev to South Wetland Description Sheet Flow Manning's n -value Flow length (ft) Two-year 24 -hr precip. (in) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n -value Velocity (ft/s) 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 A = 0.150 = 75.0 = 3.35 = 5.33 = 5.14 = 964.00 = 5.98 = Unpaved =3.95 = 4.07 = 0.00 = 0.00 = 0.00 = 0.015 =0.00 B 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. Totals = 5.14 = 4.07 = 0.00 9.20 min Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 South Wetland Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 4 - Post Dev to South Wetland Max. Elevation Reservoir name = South Wetland Max. Storage Storage Indication method used. Wet pond routing start elevation = 307.25 ft. Q (cfs) 8.00 . II i KI 2.00 0.00 0 8 Hyd No. 5 South Wetland Routed Hyd. No. 5 -- 1 Year 11 Thursday, 03 / 16 / 2017 = 0.393 cfs = 13.70 hrs = 17,109 cuft = 308.60 ft = 12,527 cuft 16 24 32 40 48 56 64 Hyd No. 4 1111111 Total storage used = 12,527 cuft Q (cfs) 8.00 VIDES 4.00 2.00 1 0.00 72 Time (hrs) Pond Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Pond No. 2 - South Wetland [A] Pond Data [C] [PrfRsr] Rise (in) Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 304.50 ft Stage / Storage Table Span (in) = 6.00 2.00 Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 304.50 185 0 0 1.00 305.50 561 356 356 2.00 306.50 1,435 964 1,320 2.75 307.25 4,766 2,204 3,524 3.50 308.00 6,866 4,338 7,862 4.00 308.50 8,288 3,783 11,644 4.50 309.00 8,923 4,301 15,946 5.50 310.00 9,790 9,352 25,298 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 6.00 2.00 0.00 0.00 Span (in) = 6.00 2.00 0.00 0.00 No. Barrels = 2 1 0 0 Invert EI. (ft) = 307.25 307.25 0.00 0.00 Length (ft) = 307.00 0.00 0.00 0.00 Slope (%) = 0.69 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a No No No Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 1 0.00 9.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 2.50 34.00 0.00 0.00 Crest EI. (ft) = 308.50 309.00 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 310.50 309.50 308.50 307.50 306.50 305.50 ' ' ' ' ' ' 304.50 18.00 27.00 36.00 45.00 54.00 63.00 72.00 81.00 90.00 Discharge (cfs) Storage Indication method used. Wet pond routing start elevation = 329.25 ft. Q (cfs) 7.00 .m 5.00 4.00 3.00 2.00 1.00 North Routed Hyd. No. 6 -- 1 Year Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 0.00 ' r ' 0.00 0 8 16 24 32 40 48 56 64 72 80 Time (hrs) Hyd No. 6 Hyd No. 3 011111 Total storage used = 12,388 cuft 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 6 North Routed Hydrograph type = Reservoir Peak discharge = 0.215 cfs Storm frequency = 1 yrs Time to peak = 15.53 hrs Time interval = 2 min Hyd. volume = 14,518 cuft Inflow hyd. No. = 3 - Post Dev to North Wetland Max. Elevation = 330.55 ft Reservoir name = North Wetland Max. Storage = 12,388 cuft Storage Indication method used. Wet pond routing start elevation = 329.25 ft. Q (cfs) 7.00 .m 5.00 4.00 3.00 2.00 1.00 North Routed Hyd. No. 6 -- 1 Year Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 0.00 ' r ' 0.00 0 8 16 24 32 40 48 56 64 72 80 Time (hrs) Hyd No. 6 Hyd No. 3 011111 Total storage used = 12,388 cuft Pond Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Pond No. 1 - North Wetland Weir Structures Pond Data [A] Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 326.50 ft Stage / Storage Table [A] [B] [C] Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 326.50 100 0 0 1.00 327.50 622 324 324 2.00 328.50 1,679 1,108 1,431 2.75 329.25 4,767 2,319 3,750 3.50 330.00 6,807 4,317 8,067 4.00 330.50 8,656 3,856 11,923 4.50 331.00 9,306 4,489 16,412 5.50 332.00 10,624 9,957 26,369 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 2.00 0.00 0.00 Crest Len (ft) = 2.50 36.50 0.00 0.00 Span (in) = 12.00 2.00 0.00 0.00 Crest EI. (ft) = 330.50 331.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EI. (ft) = 325.00 329.25 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 48.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 2.08 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 1 0.0 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 332.50 331.50 330.50 329.50 328.50 327.50 ' ' ' ' ' ' ' ' ' 326.50 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 Total Q Discharge (cfs) 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 7 Post Dev. Bypass to Stream Hydrograph type = SCS Runoff Peak discharge = 17.00 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 54,319 cuft Drainage area = 12.650 ac Curve number = 80* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.390 x 98) + (12.260 x 79)] / 12.650 Q (cfs) 18.00 15.00 12.00 3.00 0.00 0 2 4 Hyd No. 7 6 8 Post Dev. Bypass to Stream Hyd. No. 7 -- 1 Year Q (cfs) 18.00 15.00 12.00 M 3.00 �. - I I I I I I IN 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) TR55 Tc Worksheet Hyd. No. 7 Post Dev. Bypass to Stream Description Sheet Flow Manning's n -value Flow length (ft) Two-year 24 -hr precip. (in) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n -value Velocity (ft/s) 16 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 A = 0.150 = 81.0 = 3.35 = 3.20 = 6.70 = 2201.00 = 3.44 = Unpaved =2.99 = 12.26 = 0.00 = 0.00 = 0.00 = 0.015 =0.00 B 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. Totals = 6.70 = 12.26 = 0.00 19.00 min 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 8 Post-Dev. Bypass Road Ditch Hydrograph type = SCS Runoff Peak discharge = 4.372 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 10,002 cuft Drainage area = 1.910 ac Curve number = 84* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.80 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.450 x 98) + (1.460 x 80)] / 1.910 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 ' ' 0 2 4 Hyd No. 8 6 8 Post-Dev. Bypass Road Ditch Hyd. No. 8 -- 1 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 .-� ' ' ' ' I m- ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) TR55 Tc Worksheet Hyd. No. 8 Post-Dev. Bypass Road Ditch Description Sheet Flow Manning's n -value Flow length (ft) Two-year 24 -hr precip. (in) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sqft) Wetted perimeter (ft) Channel slope (%) Manning's n -value Velocity (ft/s) 18 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 A = 0.150 = 75.0 = 3.35 = 5.00 = 5.27 = 228.00 = 2.30 = Unpaved =2.45 = 1.55 = 0.00 = 0.00 = 0.00 = 0.015 =0.00 B 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. Totals = 5.27 = 1.55 = 0.00 6.80 min 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 9 Pre-Dev. Combined Hydrograph type = Combine Peak discharge = 28.02 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 80,731 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 22.360 ac Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' 1' 0 2 4 Hyd No. 9 Pre-Dev. Combined Hyd. No. 9 -- 1 Year 6 8 10 Hyd No. 1 12 14 16 Hyd No. 2 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 18 20 22 24 26 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 10 Post Dev. Combined Hydrograph type = Combine Peak discharge = 20.11 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 95,948 cuft Inflow hyds. = 5, 6, 7, 8 Contrib. drain. area = 14.560 ac Post Dev. Combined Q (cfs) Hyd. No. 10 -- 1 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 4 8 12 16 20 24 28 32 Hyd No. 10 Hyd No. 5 Hyd No. 6 Hyd No. 7 Time (hrs) Hyd No. 8 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 36.25 2 722 103,158 ------ ------ ------ Pre-Dev. to Stream 2 SCS Runoff 4.500 2 722 11,775 ------ ------ ------ Pre-Dev to Road Ditch 3 SCS Runoff 9.334 2 720 21,532 ------ ------ ------ Post Dev to North Wetland 4 SCS Runoff 10.92 2 720 25,119 ------ ------ ------ Post Dev to South Wetland 5 Reservoir 1.225 2 750 25,070 4 308.82 14,383 South Wetland Routed 6 Reservoir 0.838 2 760 21,484 3 330.69 13,669 North Routed 7 SCS Runoff 23.98 2 724 75,506 ------ ------ ----- Post Dev. Bypass to Stream 8 SCS Runoff 5.885 2 718 13,486 ------ ------ ------ Post-Dev. Bypass Road Ditch 9 Combine 40.75 2 722 114,932 1, 2, ------ ------ Pre-Dev. Combined 10 Combine 28.31 2 724 135,546 5, 6, 7, ------ ------ Post Dev. Combined 8, Stormwater design.gpw Return Period: 2 Year Thursday, 03 / 16 / 2017 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 53.75 2 722 151,051 ------ ------ ------ Pre-Dev. to Stream 2 SCS Runoff 6.592 2 720 17,102 ------ ------ ------ Pre-Dev to Road Ditch 3 SCS Runoff 14.26 2 720 32,637 ------ ------ ------ Post Dev to North Wetland 4 SCS Runoff 16.49 2 720 37,733 ------ ------ ------ Post Dev to South Wetland 5 Reservoir 8.321 2 726 37,684 4 309.18 17,651 South Wetland Routed 6 Reservoir 4.052 2 728 32,589 3 331.07 17,019 North Routed 7 SCS Runoff 34.52 2 724 107,964 ------ ------ ------ Post Dev. Bypass to Stream 8 SCS Runoff 8.112 2 718 18,719 ------ ------ ------ Post-Dev. Bypass Road Ditch 9 Combine 60.29 2 722 168,153 1, 2, ------ ------ Pre-Dev. Combined 10 Combine 49.04 2 726 196,956 5, 6, 7, ------ ------ Post Dev. Combined 8, Stormwater design.gpw Return Period: 5 Year Thursday, 03 / 16 / 2017 4 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 67.99 2 722 190,578 ------ ------ ------ Pre-Dev. to Stream 2 SCS Runoff 8.286 2 720 21,482 ------ ------ ------ Pre-Dev to Road Ditch 3 SCS Runoff 18.31 2 720 41,960 ------ ------ ------ Post Dev to North Wetland 4 SCS Runoff 21.09 2 718 48,275 ------ ------ ------ Post Dev to South Wetland 5 Reservoir 16.38 2 722 48,226 4 309.32 18,812 South Wetland Routed 6 Reservoir 12.53 2 724 41,912 3 331.20 18,370 North Routed 7 SCS Runoff 42.99 2 724 134,442 ------ ------ ------ Post Dev. Bypass to Stream 8 SCS Runoff 9.868 2 718 22,929 ------ ------ ------ Post-Dev. Bypass Road Ditch 9 Combine 76.17 2 722 212,060 1, 2, ------ ------ Pre-Dev. Combined 10 Combine 78.20 2 724 247,509 5, 6, 7, ------ ------ Post Dev. Combined 8, Stormwater design.gpw Return Period: 10 Year Thursday, 03 / 16 / 2017 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 87.62 2 722 245,836 ------ ------ ------ Pre-Dev. to Stream 2 SCS Runoff 10.61 2 720 27,586 ------ ------ ------ Pre-Dev to Road Ditch 3 SCS Runoff 24.11 2 718 55,156 ------ ------ ------ Post Dev to North Wetland 4 SCS Runoff 27.60 2 718 63,149 ------ ------ ------ Post Dev to South Wetland 5 Reservoir 25.49 2 722 63,100 4 309.43 19,872 South Wetland Routed 6 Reservoir 21.97 2 722 55,108 3 331.31 19,396 North Routed 7 SCS Runoff 54.59 2 724 171,149 ------ ------ ------ Post Dev. Bypass to Stream 8 SCS Runoff 12.24 2 718 28,707 ------ ------ ------ Post-Dev. Bypass Road Ditch 9 Combine 98.06 2 722 273,422 1, 2, ------ ------ Pre-Dev. Combined 10 Combine 110.50 2 722 318,064 5, 6, 7, ------ ------ Post Dev. Combined 8, Stormwater design.gpw Return Period: 25 Year Thursday, 03 / 16 / 2017 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 103.60 2 722 291,375 ------ ------ ------ Pre-Dev. to Stream 2 SCS Runoff 12.50 2 720 32,606 ------ ------ ------ Pre-Dev to Road Ditch 3 SCS Runoff 28.88 2 718 66,136 ------ ------ ------ Post Dev to North Wetland 4 SCS Runoff 32.93 2 718 75,494 ------ ------ ------ Post Dev to South Wetland 5 Reservoir 31.62 2 720 75,445 4 309.49 20,516 South Wetland Routed 6 Reservoir 27.85 2 720 66,087 3 331.36 19,934 North Routed 7 SCS Runoff 63.95 2 724 201,206 ------ ------ ------ Post Dev. Bypass to Stream 8 SCS Runoff 14.14 2 718 33,402 ------ ------ ------ Post-Dev. Bypass Road Ditch 9 Combine 115.86 2 722 323,982 1, 2, ------ ------ Pre-Dev. Combined 10 Combine 131.35 2 722 376,141 5, 6, 7, ------ ------ Post Dev. Combined 8, Stormwater design.gpw Return Period: 50 Year Thursday, 03 / 16 / 2017 25 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 119.71 2 722 337,816 ------ ------ ------ Pre-Dev. to Stream 2 SCS Runoff 14.40 2 720 37,718 ------ ------ ------ Pre-Dev to Road Ditch 3 SCS Runoff 33.71 2 718 77,406 ------ ------ ------ Post Dev to North Wetland 4 SCS Runoff 38.33 2 718 88,144 ------ ------ ------ Post Dev to South Wetland 5 Reservoir 37.22 2 720 88,095 4 309.55 21,057 South Wetland Routed 6 Reservoir 32.87 2 720 77,358 3 331.40 20,393 North Routed 7 SCS Runoff 73.37 2 724 231,724 ------ ------ ------ Post Dev. Bypass to Stream 8 SCS Runoff 16.03 2 718 38,145 ------ ------ ------ Post-Dev. Bypass Road Ditch 9 Combine 133.82 2 722 375,533 1, 2, ------ ------ Pre-Dev. Combined 10 Combine 151.81 2 720 435,322 5, 6, 7, ------ ------ Post Dev. Combined 8, 11 Diversion'! 35.83 2 720 40,794 5 ------ ---- South Emergency spillway 12 Diversion2 1.388 2 720 47,301 5 ------ ------ South Through the riser 13 Diversionl 30.73 2 720 29,963 6 ------ ------ North Emergency spillway 14 Diversion2 2.143 2 720 47,395 6 ------ ------ North through riser Stormwater design.gpw Return Period: 100 Year Thursday, 03 / 16 / 2017 26 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 1 Pre-Dev. to Stream Hydrograph type = SCS Runoff Peak discharge = 119.71 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 337,816 cuft Drainage area = 20.270 ac Curve number = 77* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 15.20 min Total precip. = 7.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.170 x 98) + (20.100 x 77)] / 20.270 Q (cfs) 120.00 100.00 F, 1 11 20.00 0.00 ' ' 0 2 4 Hyd No. 1 6 8 Pre-Dev. to Stream Hyd. No. 1 -- 100 Year Q (cfs) 120.00 100.00 40.00 20.00 -1 ' ' ' ' - ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 2 Pre-Dev to Road Ditch Hydrograph type = SCS Runoff Peak discharge = 14.40 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 37,718 cuft Drainage area = 2.090 ac Curve number = 78* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 7.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.060 x 98) + (2.030 x 77)] / 2.090 Q (cfs) 15.00 12.00 .M 3.00 0.00 ' 0 2 4 Hyd No. 2 6 8 Pre-Dev to Road Ditch Hyd. No. 2 -- 100 Year Q (cfs) 15.00 12.00 M 3.00 -r ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 3 Post Dev to North Wetland Hydrograph type = SCS Runoff Peak discharge = 33.71 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 77,406 cuft Drainage area = 5.000 ac Curve number = 73* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.40 min Total precip. = 7.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(1.670 x 98) + (3.330 x 61)] / 5.000 Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 0.00 ' ' 0 2 4 Hyd No. 3 6 8 Post Dev to North Wetland Hyd. No. 3 -- 100 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 'r ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 4 Post Dev to South Wetland Hydrograph type = SCS Runoff Peak discharge = 38.33 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 88,144 cuft Drainage area = 5.550 ac Curve number = 74* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.20 min Total precip. = 7.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(1.990 x 98) + (3.560 x 61)] / 5.550 Q (cfs) 40.00 30.00 20.00 10.00 0.00 ' ' 0 2 4 Hyd No. 4 Post Dev to South Wetland Hyd. No. 4 -- 100 Year 6 8 10 12 14 16 Q (cfs) 40.00 30.00 20.00 10.00 0.00 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 South Wetland Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 4 - Post Dev to South Wetland Max. Elevation Reservoir name = South Wetland Max. Storage Storage Indication method used. Wet pond routing start elevation = 307.25 ft. Q (cfs) 40.00 30.00 20.00 10.00 0.00 ' ' 0 2 4 Hyd No. 5 South Wetland Routed Hyd. No. 5 -- 100 Year 30 Thursday, 03 / 16 / 2017 = 37.22 cfs = 12.00 hrs = 88,095 cuft = 309.55 ft = 21,057 cuft 6 8 10 12 14 16 18 20 22 24 Hyd No. 4 011111 Total storage used = 21,057 cuft Q (cfs) 40.00 30.00 20.00 10.00 —k-- 0.00 26 Time (hrs) Hydrograph Report 31 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 6 North Routed Hydrograph type = Reservoir Peak discharge = 32.87 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 77,358 cuft Inflow hyd. No. = 3 - Post Dev to North Wetland Max. Elevation = 331.40 ft Reservoir name = North Wetland Max. Storage = 20,393 cuft Storage Indication method used. Wet pond routing start elevation = 329.25 ft Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 0.00 ' ' 0 2 4 Hyd No. 6 North Routed Hyd. No. 6 -- 100 Year 6 8 10 Hyd No. 3 12 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 ' ' 0.00 14 16 18 20 22 24 26 Time (hrs) 011111 Total storage used = 20,393 cuft " Composite (Area/CN) = [(0.390 x 98) + (12.260 x 79)] / 12.650 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Post Dev. Bypass to Stream Hyd. No. 7 -- 100 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' ' ' ' ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 7 Post Dev. Bypass to Stream Hydrograph type = SCS Runoff Peak discharge = 73.37 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 231,724 cuft Drainage area = 12.650 ac Curve number = 80* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.00 min Total precip. = 7.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.390 x 98) + (12.260 x 79)] / 12.650 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Post Dev. Bypass to Stream Hyd. No. 7 -- 100 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' ' ' ' ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Time (hrs) 33 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 8 Post-Dev. Bypass Road Ditch Hydrograph type = SCS Runoff Peak discharge = 16.03 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 38,145 cuft Drainage area = 1.910 ac Curve number = 84* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.80 min Total precip. = 7.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.450 x 98) + (1.460 x 80)] / 1.910 Q (cfs) 18.00 15.00 12.00 3.00 0.00 ' 0 2 4 Hyd No. 8 Post-Dev. Bypass Road Ditch Hyd. No. 8 -- 100 Year 6 8 10 12 14 Q (cfs) 18.00 15.00 12.00 M 3.00 ' 0.00 16 18 20 22 24 Time (hrs) 34 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 9 Pre-Dev. Combined Hydrograph type = Combine Peak discharge = 133.82 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 375,533 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 22.360 ac Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' 0 2 4 Hyd No. 9 Pre-Dev. Combined Hyd. No. 9 -- 100 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 ' ' 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 1 Hyd No. 2 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Post Dev. Combined Hyd. No. 10 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 ' - - ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 10 Hyd No. 5 Hyd No. 6 Hyd No. 7 Time (hrs) Hyd No. 8 35 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 03 / 16 / 2017 Hyd. No. 10 Post Dev. Combined Hydrograph type = Combine Peak discharge = 151.81 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 435,322 cuft Inflow hyds. = 5, 6, 7, 8 Contrib. drain. area = 14.560 ac Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Post Dev. Combined Hyd. No. 10 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 ' - - ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 10 Hyd No. 5 Hyd No. 6 Hyd No. 7 Time (hrs) Hyd No. 8 Watershed Characteristics Ver2.0 l Clear All Values l Return to Instructions l Proceed to BMP Characteristics 1 L Skip to Development Summary Instructions 1. Select your physiographic/geologic region. (see map on 'instructions' page) 2. Enter the area of the entire development in square feet (ft). 3. Select the location that is most representative of the site's precipitation characteristics. (see map on 'instructions' page) 4. For each applicable land use, enter the total area of that land use that lies within the development under pre -development conditions. 5. For each applicable land use, enter the total area of that land use that lies within the development under post -development conditions, before BMP implementation. 6. Ensure that the sum of pre- and post -development areas entered equal the orginal development area. 7. Continue to "BMP Characteristics" tab. Additional Guidelines - For non-residential watersheds, indicate acreages of each land use type in Column 1 for both pre -and post -development conditions. - For residential watersheds, complete the required information in Column 2 for both pre- and post -development conditions. - If a given land use is not present in the given watershed, leave the cell blank or enter a zero. - Ensure that land use areas entered for both pre- and post -development conditions match the total development area entered in cell 021. - Residential areas may be entered by average lot size (column, part A), or may be separated into individual land uses (column 2, part B) -- do NOT list out individual land uses within an area already described by lot size. - Unless runoff flowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. Physiographic/Geologic Region: Piedmont Total Development Area (ft'): 1,060,062 Soil Hydrologic Group D Development Name: Wynngate Subdivision, Ph IV Precipitation location: Butner Model Prepared By: TW COLUMN t -- NON-RESIDENTIAL LAND USES COLUMN 2 -- RESIDENTIAL LAND USES TN EMC (mg/L) TP EMC (mL) Pre- Development I:2) Post - Development Iftz) COMMERCIAL Parking lot 1.44 0.16 Roof 1.08 0.15 Open/Landscaped 2.24 1 0.44 INDUSTRIAL Parking lot 1.44 0.39 Post - Development (ftz) Roof 1.08 0.15 PART A Open/Landscaped 2.24 0.44 TRANSPORTATION High Density (interstate, main) 3.67 0.43 Low Density (secondary, feeder) 1.4 0.52 Rural 1.14 1 0.47 Sidewalk 1.4 1.16 PERVIOUS Managed pervious 3.06 0.59 '/.-ac lots Unmanaged (pasture) 3.61 1.56 - - Forest 1.47 0.25 X -ac lots -- JURISDICTIONAL LANDS* - - Natural wetland - - Riparian buffer -- Open water -- -- LAND TAKEN UP BY BMP, 1.08 0.15 - `Jurisdictional land uses are not included in nutrient/flow calculations. Total Development Area Entered [fit): 1,060,062 Total Pre -Development Calculated Area (ftz): 1,060,062 Total Post -Development Calculated Area (ft): 1,060,062 COLUMN 2 -- RESIDENTIAL LAND USES Custom Lot Size (ac) Age (yrs) TN EMC (mg/L) TP EMC (mg/L) Pre- Development Iftz) Post - Development (ftz) PART A A -ac lots - - - '/.-ac lots - - - X -ac lots -- - - 1 -ac lots -- - -- 2-ac lots - - - Multi -family - - - Townhomes - - - Custom Lot Size - - PART B Roadway - 1.4 0.52 _ 40,308 Driveway 1.0 1.44 0.39 34,400 Parking lot -- 1.44 0.39 0.15 1.16 0.44 0.59 0.25 - - 0.15 _ 31636 120,400 28,025 -T-406,376 909,075 258,968 141,280 154,641 _ 16,944 Roof - 1.08 Sidewalk/Patio - 1.4 Lawn -- 2.24 Managed pervious - 3.06 Forest - 1.47 Natural wetland* - - Riparian buffer* -- -- Open water* -- - LAND TAKEN UP BY BMPs -- 1.08 Total Development Area Entered [fit): 1,060,062 Total Pre -Development Calculated Area (ftz): 1,060,062 Total Post -Development Calculated Area (ft): 1,060,062 BMP Characteristics Ver2.0 rRel. rn to Watershed Proceed to Development Clear All Values Return [o Instructions Characteristics Summary Instructions 1. Select the type of BMP for each catchment. 2. Enter the area of each land use type in the contributing drainage area for each BMP. 3. Continue to "Development Summary" tab. Additional Guidelines This spreadsheet allows the development to be divided into as many as 6 smaller catchments. - BMPs 1, 2, and 3 for a given catchment are assumed to operate in series, with the outflow from 1 serving as the inflow to 2, etc. - If the outflow from an entire catchment (including outflow from selected BMPs) drains to another BMP, indicate this in the drop down menu below the BMP type and leave all cells for individual land uses blank. - Not all BMP or catchments must be utilized. Simply leave fields blank in the columns not needed. - Leave cells blank or insert zeroes if a land use is not present in the area draining to the BMP. - For water harvesting BM Ps, be sure to enter the percent volume reduction that will be achieved by your system. Volume detention (catch -and -release mechanisms) will not be considered - only proven volume reductions are valid inputs. The BMP undersizing option should only be used for existing development or retrofit sites. - Volume reduction efficiencies for undersized BM Ps are calculated based on a 1:1 ratio (a BMP that is 60% smaller than the required design size is assigned a removal efficiency equal to 60% of the standard efficiency value). Effluent concentrations remain the same as full-sized BMPs. - IMPORTANT: for the land area calculation checks to occur, you MUST press enter after entering a value for area to be treated by a BMP (not just click on the next cell). - See User's Manual for instructions on modeling oversized BMPs. Type of BMP: If BMP is undersized, indicate the BMP's size relative to the design size required to capture the designated water quality depth (i.e. 0.75 = BMP is 75% of required design size): *For water harvesting BMP, enter percent volume reduction in decimal form. Catchment 1: Catchment 2: Catchment 3: Catchment 4: Catchment 5: Catchment 6: Drainage Area Land Use COMMERCIAL Parking lot Roof Open/Landscaped INDUSTRIAL Parking lot Roof Open/Landscaped TRANSPORTATION High Density (interstate, main) Low Density (secondary, feeder) Rural Sidewalk MISC. PERVIOUS 2 -ac lots (New) 2 -ac lots (Built after 1995) 2 -ac lots (Built before 1995) 1 -ac lots (New) 1 -ac lots (Built after 1995) 1 -ac lots (Built before 1995) Y -ac lots (New) '/= -ac lots (Built after 1995) %-ac lots (Built before 1995) Y -ac lots (New) Y -ac lots (Built after 1995) Y. -ac lots (Built before 1995) %-ac lots (Built before 1 Townhomes(New) Townhomes (Built after -------------------- CATCHMENT 1 ---------------------- BMP #1 BMP #2 BMP #3 Wetland no no no no no no no no no no no no no Area treated no no Area treated Area Treated by BMP #2 that is by BMP #3 that is by BMP not treated by BMP not treated by BMPs (ft) #1 #1 or#2 no Area treated (ft) (ft) '-------------------- CATCHMENT 2 ---------------------- BMP #1 BMP #2 BMP #3 Wetland ------------------- CATCHMENT 3 ----------------------------- BMP #1 BMP #2 BMP #3 no — no Does BMP no — no accept the outflow from no -- IJ no another Catchment? If so, indicate which no no no no -- -- one(s). (Land use ar no no -- no. no no no no no no no no no no no no I no no Area treated no Area treated no no Area treated Area treated Area Treated by BMP #2 that is by BMP #3 that is Area Treated by BMP #2 that is by BMP #3 that is by BMP not treated by BMP not treated by BMPs by BMP not treated by BMP not treated by BMPs (ft') #1 #1 or#2 (ft) #1 #1 or#2 0.92 (ft) (ft) user defined (ft) I (ft') --------------------------- CATCHMENT4------------------------------------------------------- CATCHMENT5 ----------------------------- BMp #1 BMP#2 BMP#3 BMP#1 BMP#2 BMP#3 eas entered below are in addition to the watershed areas treated by contributing catchment(s).) no no no no no no no no no no no no no no no no IJ no no — — no no no no no no — — no no no no no no Area treated I Area treated Area treated Area treated Area Treated by BMP #2 that is by BMP #3 that is Area Treated by BMP #2 that is by BMP #3 that is by BMP not treated by BMP not treated by BMPs by BMP not treated by BMP not treated by BMPs (ft') #1 #1 or#2 (ft') #1 #1 or#2 (ft) (ft) (ft') (ft) ------------------- CATCHMENT 6 ---------------------. BMP#1 BMP#2 BMP#3 no BMP DETAILS no BMP Volume Reduction (%) TN Effluent Concen. (mg/L) TP Effluent Concen. (mg/L) Bioretention with IWS 50% 0.95 0.12 Bioretention without IWS 35% 1.00 0.12 Dry Detention Pond 0% 1.20 0.20 Grassed Swale 0% 1.21 0.26 Green Roof 50% 1.08 0.15 Level Spreader, Filter Strip 40% 1 1.20 0.15 Permeable Pavement* 0% 1.44 0.39 Sand Filter 5% 0.92 0.14 Water Harvesting user defined 1.08 0.15 Wet Detention Pond 10% 1.01 0.11 Wetland 20% 1.08 0.12 *if treating commercial Parking lot, TP effluent concentration = 0.16 mg/L --------------------------- CATCHMENT4------------------------------------------------------- CATCHMENT5 ----------------------------- BMp #1 BMP#2 BMP#3 BMP#1 BMP#2 BMP#3 eas entered below are in addition to the watershed areas treated by contributing catchment(s).) no no no no no no no no no no no no no no no no IJ no no — — no no no no no no — — no no no no no no Area treated I Area treated Area treated Area treated Area Treated by BMP #2 that is by BMP #3 that is Area Treated by BMP #2 that is by BMP #3 that is by BMP not treated by BMP not treated by BMPs by BMP not treated by BMP not treated by BMPs (ft') #1 #1 or#2 (ft') #1 #1 or#2 (ft) (ft) (ft') (ft) ------------------- CATCHMENT 6 ---------------------. BMP#1 BMP#2 BMP#3 no no no no no no no no no no no no t no no Area treated no Area treated Total Land Use Area Treated by BMP #2 that is by BMP #3 that is Area Treated By by BMP not treated by BMP not treated by BMP, AIIBMPs (ft2) #1 #1 or #2 I (ft)(ft)(ft2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n 0 0 0 0 0 0 0 0 Allowable Total Land Use Area to be Treated Based on Post-Dev. Areas (ft) 0 0 0 0 0 0 II 0 0 0 0 0 0 0 II 0 0 t 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �0 W 0 Custom Lot Size (New) Custom Lot Size (Built after 1995) Custom Lot Size (Built before 1995) Roadway Driveway Parking lot Roof 1,769 12,760 44,800 Sidewalk 8,2355 Lawn 76,222 Managed pervious 65,355 Forest ND TAKEN UP BY BMP 8,656 TOTAL AREA TREATED BY BMP (ftz): 217,800 0 TOTAL AREA TREATED BY SERIES (ft'): „ 217,800 102,491 42,066 2,271 8,288 241,758 0 0 0 0 0 241,758 0 3. Development Summary Prepared By: TW Date: March 16, 2017 WATERSHED SUMMARY Ver2.0 REGION: Piedmont TOTAL DEVELOPMENT AREA (ft-): 1,060,062 22% 22% 0% Annual Runoff Volume (c.f.) 336% 275% Pre -Development Conditions Post -Development Conditions Post -Development w/ BMPs Percent Impervious 0.9% 22.6% 22.6% (%) -27% -54% -37% Total Phosphorus Loading (Ib/ac/yr) Annual Runoff Volume -46% without IWS BMP2 (c.f.) 241,504 1,052,522 905,478 Total Nitrogen EMC 0.20 Grassed Swale 0% (mg/L) 2.61 1.40 1.27 Total Nitrogen Loading 0.15 Level Spdr, Filter - (lb/ac/yr) 1.62 3.77 2.95 1.20 0.15 Permeable Total Phosphorus EMC (mg/L) 0.52 0.38 0.24 1.44 0.39 Sand Filter Total Phosphorus Loading (Ib/ac/yr) 0.32 1.02 0.55 Percent Difference Between: *Negative percent difference values indicate a decrease in runoff volume, pollutant concentration or pollutant loading. Positive values indicate an increase. BMP SUMMARY Ver2.0 Ph IV BMP VOLUME REDUCTIONS/EFFLUENT CONCENTRATIONS Volume Reduction Pre-Dev. & Pre -Development & Post-Dev. without BMPs Post -Development with BMPs Post-Dev without BMPs & Post-Dev with BMPs Percent Impervious (%) 22% 22% 0% Annual Runoff Volume (c.f.) 336% 275% -14% Total Nitrogen EMC (mg/L) -47% -51% -9% Total Nitrogen Loading (Ib/ac/yr) 133% 82% -22% Total Phosphorus EMC (mg/L) -27% -54% -37% Total Phosphorus Loading (Ib/ac/yr) 217% 71% -46% *Negative percent difference values indicate a decrease in runoff volume, pollutant concentration or pollutant loading. Positive values indicate an increase. BMP SUMMARY Ver2.0 Ph IV BMP VOLUME REDUCTIONS/EFFLUENT CONCENTRATIONS Volume Reduction TN Effluent Conten. TP Effluent Concen. (%) (mg/L) (mg/L) Bioretention with 3.82 BMP1 BMP2 BMP3 IWS 50% 0.95 0.12 Bioretention BMP3 BMP1. BMP2 BMP3 35% 1.00 0.12 without IWS BMP2 BMP3 Wetland Dry Detention Pond 0% 1.20 0.20 Grassed Swale 0% 1.21 0.26 Green Roof 50% 1.08 0.15 Level Spdr, Filter - Catchment Outflow 0.539 Wetland -- - Strip 40% 1.20 0.15 Permeable Pavement* 0% 1.44 0.39 Sand Filter 5% 0.92 0.14 Water Harvesting userdefined 1.08 0.15 Wet Detention Pond 10% 1.01 0.11 Wetland I 20% 1.08 0.12 •iftreating commercial parking lot, TP effluent concentration = 0.16 mg/L LReturn to Instructions Return to Watershed Characteristics L Return to BMP Characteristics I Print Summary Catchment Outflow Nitrogen EMC (mg/L) 1.11 CATCHMENT 1 CATCHMENT 2 CATCHMENT 3 CATCHMENT 4 CATCHMENTS CATCHMENT 6 3.82 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 BMP1. BMP2 BMP3 BMP1 BMP2 BMP3 BMPS BMP2 BMP3 Wetland - -- -- -- - -- -- -- -- - -- - -- - Catchment Outflow 0.539 Wetland -- - Total Area Treated - - -- Total Phosphorus (lb/ac/yr) 19% -- - -- -- Percent Reduction in Phosphorus Load (%) 67% 5.00 -- -- 5.55 - - -- -- -- -- - -- - - -- -- Total Inflow Volume 368,684 -- -- 383,106 - - --. - - -- - -- - - - - -- - Percent Volume Reduced 20% -- -- 20% Inflow Nitrogen EMC (mg/L) 1.31 -- -- 1.31 - -- -' - -- -- - -- - Total Inflow Nitrogen (lb/ac/yr) 6.03 -- __ 5.67 - - -- - - -- - -- - - - - - Inflow Phosphorus EMC (mg/L) 0.354 -' '- 0.370 Total Inflow Phosphorus (lb/ac/yr) -- 1.59 -- -- -- BMP Outflow Nitrogen (lbs/ac/yr) 4.07 3.82 - - BMP Outflow Phosphorus (lbs/ac/yr) 0.54 0.51 Catchment Outflow Nitrogen EMC (mg/L) 1.11 1.11. - - - -- Catchment Outflow 4.07 3.82 - - - -- Total Nitrogen (Ib/ac/yr) Percent Reduction in Nitrogen Load (%) 32% 33% - - - -- Catchment Outflow Phosphorus EMC (mg/L) 0.147 0.149 -- - - -- Catchment Outflow 0.539 0.511 -- - - -- Total Phosphorus (lb/ac/yr) 19% -- - -- -- Percent Reduction in Phosphorus Load (%) 67% Design Requirements: NC ADMIN CODE Vegetated Side Slopes 3:1 or less Min. 30' from SW, 50' from Class SA, 1 00'water wells Volume in Excess of design, must Bypass Excess Volume to Outlet Across Filter Strip Seasonal High Water Table Min. 2' Below Bottom Media Permeability of .52"- 6" per hr (1-2 Preferre DWQ POLICY Uphill Slopes not Greater than 1:5 Underdrains provided if in-situ soil drains < 2 in/hr Inflow to be sht flow or Use engy dissipator/sed forebay 12" Max Ponding Depth, (9" preferred) 2' Media for Grass. 3' Media for Trees & Shrubs No Dimension less than 10' drain in 12 hrs, drain 2' below surface in 48 Landscaping Min. 3 Species each of Trees, Shrubs, Herb. GC Tree 19' O.C., Shrubs 12' O.C, Groundcover Thr'out Grass is sodded w/ Hyb. Bermuda or Centipede Min. 400 stems/ acre, Max 1,250 stems/acre 2.5" Caliper trees, 3 -Gal Shrubs, 1 -Quart Plants Triple or Double Shredded Hardwood Mulch not @ inflow locations SUMMIT Southern Wetland WQv Provided: 8,120 Cubic FT. DESIGN AND ENGINEERING SERVICES BIO-RETENTION/STORMWATER WETLAND WATER QUALITY VOLUME Drainage Area (Ac.) 5.550 Impervious Area (Ac.) 1.989 VWQ = 3630 * RD * R v * A y V"" 1.5" Ver, Rough Required SA Calc (SF) 20146.5 Where: RD = Rainfall Depth of Design Storm Water Quality Vol (cf) : 7505.48 11258.21 RD = 1 (Usually 1" or 1.5") Rv = 0.3725449 Rv = Runoff Coefficient (0.05+.9*IA) Approx. Min. Area Required D = 15" Ideal D = 9" Where IA = % Impervious in DA VWQ=1" (sf) 6004.38 10007.30 Required NCEEP payment for nitrogen reduction to 3.6 Ib/ac/vr Nitrogen Received (Ib/yr): Current Rate : per acre Total Nitrogen Removed (Ib/yr): Pro -Rated Period: years Cost $0.00 New Nitroaen Exported (Ib/vr): (Ib/ac/vr) Total Ac. Exportina N : acres 3/16/2017 1:06 PM K:\2016\16-0076\CIVIL\Design\Stormwater\TW Final Design\2016-11-03 wetland WQV.xls Design Requirements: NC ADMIN CODE Vegetated Side Slopes 3:1 or less Min. 30' from SW, 50' from Class SA, 1 00'water wells Volume in Excess of design, must Bypass Excess Volume to Outlet Across Filter Strip Seasonal High Water Table Min. 2' Below Bottom Media Permeability of .52"- 6" per hr (1-2 Preferre DWQ POLICY Uphill Slopes not Greater than 1:5 Underdrains provided if in-situ soil drains < 2 in/hr Inflow to be sht flow or Use engy dissipator/sed forebay 12" Max Ponding Depth, (9" preferred) 2' Media for Grass. 3' Media for Trees & Shrubs No Dimension less than 10' drain in 12 hrs, drain 2' below surface in 48 Min. 3 Species each of Trees, Shrubs, Herb. GC Tree 19' O.C., Shrubs 12' O.C, Groundcover Thr'out Grass is sodded w/ Hyb. Bermuda or Centipede Min. 400 stems/ acre, Max 1,250 stems/acre 2.5" Caliper trees, 3 -Gal Shrubs, 1 -Quart Plants Triple or Double Shredded Hardwood Mulch not @ inflow locations USU111411T Northern Wetland: 8,173 Cubic FT WQv Provided DESIGN AND ENGINEERING SERVICES BIO-RETENTION/STORMWATER WETLAND WATER QUALITY VOLUME Drainage Area (Ac.) 5.00 Impervious Area (Ac.) 1.67 VWQ = 3630 * RD * R v * A 1" V., —1-5—"m. Rough Required SA Calc (SF) 18150 Where: RD = Rainfall Depth of Design Storm Water Quality Vol (cf) : 6349.95 9524.93 RD = 1 (Usually 1" or 1.5") Rv = 0.350 Rv = Runoff Coefficient (0.05+.9*IA) Approx. Min. Area Required D = 15" Ideal D = 9" Where IA = % Impervious in DA VWQ=1" (sf) 5079.96 8466.60 Required NCEEP Payment for nitrogen reduction to 3.6 Ib/ac/vr Nitrogen Received (Ib/yr): Current Rate : per acre Total Nitrogen Removed (Ib/yr): Pro -Rated Period: years Cost $0.00 New Nitroaen Exported (Ib/vr): (Ib/ac/vr) Total Ac. ExDortina N : acres 3/16/2017 1:06 PM K:\2016\16-0076\CIVIL\Design\Stormwater\TW Final Design\2016-11-03 wetland WQV.xls DRAINAGE MAPS K:\2016\16-0076\CIVIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 7of12 Of Of 0f Zw oQ J OOQ J=3: wr <n /-� W OZ �' F W m=mUZ Q W aF0O Z(W/7❑ F❑lLQ Z � rUv7FOz�❑ W U� �¢>�/ o Q�WWZ- z< F.r..� H K❑ LLO !,Z: F J O J J W = W Q J ❑ H w �Fa16>1>z �Q¢ <ww Lj �yw= Q ¢ �wwww¢Z=°��� �-y 0 oz~a�3�0�ao Fri W Q oZ T, UO O ZQ UO 2F0o- < Z o Qa JUw OFcn�Z W oaw�rz=w x U C Z >wzwwwa4�� W Q W U Z jF-- c') Q O p (�Z -U` �U W ~ F 7 Z O W ❑ J Z Q LU � W U z W LU Lu w o o Q U) cn LU w W � (.D Z cn Q cn 0¢ z � z 0 w F - z F- m F- m m N U °° U m z L ¢ � ¢ N M p W � of t of t � U Q d U d U 0 � 6) U m U N N X � W Z fY T W - W m �p Z U I - C9 c co W L m U � U z � a Z -O X co N W V) N W CO 0 N M N M -0 U N M C O z 1\ "O > O mm E k N i0- � m cam- 13 O N U CD Lo 0 VJ 0 �� w � Q QwQ Q O�Ez LU F=1 o � Q F -Z w D CD �Z�� Q �Z0J z �Z Q 0 �a V Lu PROJECT NO. 16-0076 DRAWING NAME: 16-0076G SHEET NO. C-6 U U � � � m \ \ \ W O N � Q O H Z W � a o � z w \ � � N W in � �Z z H O I m O � � z a �` � z z w cn O w w o a z W � � Z (� O O O � � � O w w w J m m m � L, w W m m 0 0 0 � � z z z O O O z � H H H N I� M U-) � M N � Of Of 0f Zw oQ J OOQ J=3: wr <n /-� W OZ �' F W m=mUZ Q W aF0O Z(W/7❑ F❑lLQ Z � rUv7FOz�❑ W U� �¢>�/ o Q�WWZ- z< F.r..� H K❑ LLO !,Z: F J O J J W = W Q J ❑ H w �Fa16>1>z �Q¢ <ww Lj �yw= Q ¢ �wwww¢Z=°��� �-y 0 oz~a�3�0�ao Fri W Q oZ T, UO O ZQ UO 2F0o- < Z o Qa JUw OFcn�Z W oaw�rz=w x U C Z >wzwwwa4�� W Q W U Z jF-- c') Q O p (�Z -U` �U W ~ F 7 Z O W ❑ J Z Q LU � W U z W LU Lu w o o Q U) cn LU w W � (.D Z cn Q cn 0¢ z � z 0 w F - z F- m F- m m N U °° U m z L ¢ � ¢ N M p W � of t of t � U Q d U d U 0 � 6) U m U N N X � W Z fY T W - W m �p Z U I - C9 c co W L m U � U z � a Z -O X co N W V) N W CO 0 N M N M -0 U N M C O z 1\ "O > O mm E k N i0- � m cam- 13 O N U CD Lo 0 VJ 0 �� w � Q QwQ Q O�Ez LU F=1 o � Q F -Z w D CD �Z�� Q �Z0J z �Z Q 0 �a V Lu PROJECT NO. 16-0076 DRAWING NAME: 16-0076G SHEET NO. C-6 U U � � � m \ \ \ W O N � Q O H Z W � a o � z w \ � � N W in � �Z z H O I m O � � z a �` � z z w cn O w w o a z W � � Z (� O O O � � � O w w w J m m m � L, w W m m 0 0 0 � � z z z O O O z � H H H N I� M U-) PIPE SIZING CALCULATIONS K:\2016\16-0076\CIVIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 8of12 Hydraflow Storm Sewers Extension for Autodesk® AutoCAD® Civil 3D® Plan DI -5 8 DI -9 Outfall~ - 9 DI -8 Project File: 2017-03-15 Pipenetwork_CWO REVISED.stm 4 DI -1 3 DI -2 2 DI -3 5 DI -4 1 Outfall 6 M Outfall Number of lines: 9 1 Date: 4/5/2017 Storm Sewers v11.00 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 P-4 14.46 24 Cir 70.320 346.75 347.65 1.280 348.75 349.02 n/a 349.02 j End DropGrate 2 P-2 12.36 24 Cir 158.550 347.75 349.26 0.952 349.02 350.52 n/a 350.52j 1 DropGrate 3 P-1 6.37 18 Cir 45.110 349.45 350.11 1.463 350.52 351.09 n/a 351.09 j 2 DropGrate 4 P -1A 0.84 15 Cir 18.000 353.25 355.50 12.500 353.41 355.86 0.13 355.86 3 None 5 P-3 1.62 18 Cir 24.000 347.75 348.23 2.000 349.02 348.71 n/a 348.71 1 DropGrate 6 P-6 3.14 12 Cir 30.500 326.75 327.30 1.803 327.75 328.06 n/a 328.06 j End Manhole 7 P-5 3.14 12 Cir 135.430 327.40 328.75 0.997 328.09 329.51 0.38 329.51 6 DropGrate 8 P-7 15.76 24 Cir 119.130 307.25 309.43 1.829 309.25 310.86 n/a 310.86 j End DropGrate 9 P-8 7.24 18 Cir 49.030 309.53 311.00 2.998 310.86 312.04 n/a 312.04 j 8 DropGrate File: 2017-03-15 Pipenetwork_CWO REVISED.stm Number of lines: 9 -::1Project Run Date: 4/5/2017 NOTES: Return period = 10 Yrs. ; j - Line contains hyd. jump. Storm Sewers v11.00 Inlet Report Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 DI -4 0.50 1.06 1.48 0.08 DrGrt 0.0 0.00 0.00 3.00 2.00 0,010 2.00 0.330 0.330 0.013 0.19 3.16 0.19 3.16 0.0 Off 2 DI -2 5.99* 0.00 4.93 1.06 DrGrt 0.0 0.00 0.00 3.00 2.00 0,064 2.00 0.330 0.330 0.013 0.24 3.46 0.24 3.46 0.0 1 3 DI -1 5.53* 0.84 6.37 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.330 0.330 0.013 0.36 4.16 0.36 4.16 0.0 Off 4 0.84* 0.00 0.00 0.84 None 0.0 0.00 0.00 0.00 0.00 Sag 2.00 0.050 0.020 0.013 0.00 0.00 0.00 0.00 0.0 5 DI -3 1.62* 0.00 1.62 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.330 0.330 0.013 0.14 2.87 0.14 2.87 0.0 1 6 MH -6 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 7 DI -5 3.14* 0.00 3.14 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.330 0.330 0.013 0.22 3.35 0.22 3.35 0.0 Off 8 DI -9 8.52* 0.00 6.69 1.83 DrGrt 0.0 0.00 0.00 3.00 2.00 0.065 2.00 0.330 0.330 0.013 0.29 3.76 0.29 3.76 0.0 9 DI -8 7.24* 1.83 9.07 0.00 DrGrt 0.0 0.00 6.00 3.00 2.00 Sag 2.00 0.330 0.330 0.013 0.45 4.73 0.45 4.73 0.0 Off Project File: 2017-03-15 Pipenetwork_CWO REVISED.stm Number of lines: 9 7ER7,nDate: 4/5/2017 NOTES: Inlet N -Values = 0.016; Intensity= 71.44 /(Inlet time + 12.30)10.80; Return period= 10 Yrs. ; *Indicates Known Q added. All curb inlets are Horiz throat. Storm Sewers v11.00 ANTI -FLOTATION CALCULATIONS K:\2016\16-0076\CIVIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 9of12 Pond Riser Structure #1 Structure Inside Length Structure Inside Width Structure Wall Thickness Structure Inside Height Depth to Water Table (From Surface) Ballast/Anchor Lip Ballast/Anchor Thickness Unit Weight of Soil Unit Weight of Water Unit Weight of Concrete Factor of Safety (FS) 3 ft ft in ft ft in in pcf pcf pcf 3 6 5.5 0 16 18 110 62.4 150 1.5 Area of Structure Interior 9.00 sf Area of Structure (Concrete) 3.25 sf Area of Ballast/Anchor 44.44 sf Downward (Gravity) Forces Weight of Structure 2681.25 lbs Weight of Ballast/Anchor 10000.00 lbs Weight of Combined Structure 12681.25 lbs Downward (Gravity) Forces (WT) 12681.25 Ibs Is WT greater than Fb? Proposed Ballast/Anchor Dimensions <-- Upward (Bouyancy) Forces Vol. of Structure (Void) 49.50 cf Vol. of Structure (Concrete) 17.88 cf Vol. of Ballast/Anchor 66.67 cf Bouyancy Force 8364.20 lbs Bouyancy Force w/FS (Fb) 12546.3 lbs YES If yes, then ballast/anchor is adequate to prevent structure flotation, if no adjust ballast/anchor dimensions Calculated Factor of Safety 1.52 Pond Riser Structure #2 Structure Inside Length Structure Inside Width Structure Wall Thickness Structure Inside Height Depth to Water Table (From Surface) Ballast/Anchor Lip Ballast/Anchor Thickness Unit Weight of Soil Unit Weight of Water Unit Weight of Concrete Factor of Safety (FS) 3 ft ft in ft ft in in pcf pcf pcf 3 6 1.25 0 3 10 110 62.4 150 1.5 Area of Structure Interior 9.00 sf Area of Structure (Concrete) 3.25 sf Area of Ballast/Anchor 20.25 sf Downward (Gravity) Forces Weight of Structure 609.375 lbs Weight of Ballast/Anchor 2531.25 lbs Weight of Combined Structure 3140.625 lbs Downward (Gravity) Forces (WT) 3140.625 Ibs Is WT greater than Fb? Proposed Ballast/Anchor Dimensions <-- Upward (Bouyancy) Forces Vol. of Structure (Void) 11.25 cf Vol. of Structure (Concrete) 4.06 cf Vol. of Ballast/Anchor 16.88 cf Bouyancy Force 2008.50 lbs Bouyancy Force w/FS (Fb) 3012.75 lbs YES If yes, then ballast/anchor is adequate to prevent structure flotation, if no adjust ballast/anchor dimensions Calculated Factor of Safety 1.56 SOILS MAPS K:\2016\16-0076\CWIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 10 of 12 36° 650" N Custom Soil Resource Report a3 Soil Map P 703730 703810 703890 703970 704050 704130 M V 704210 36° 650" N O M l�L N CO M 36° 6'27'N 703730 703810 703890 703970 704050 3 Map Scale: 1:3,450 if printed on A portrait (8.5" x 11") sheet. Meters N 0 50 100 200 300 Feet 0 150 300 600 900 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 8 704130 O F W M O W M O N W M 36° 6'27'N 704210 3 v MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Soil Map Unit Polygons 0 Soil Map Unit Lines 0 Soil Map Unit Points Special Point Features Uo Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot +� Landfill Lava Flow Water Features Marsh or swamp Mine or Quarry Please rely on the bar scale on each map sheet for map Miscellaneous Water Perennial Water Transportation Rock Outcrop t++ Saline Spot Source of Map: Natural Resources Conservation Service Sandy Spot Interstate Highways Severely Eroded Spot Sinkhole Coordinate System: Web Mercator (EPSG:3857) Slide or Slip 0o Sodic Spot Custom Soil Resource Report MAP INFORMATION This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Granville County, North Carolina Survey Area Data: Version 17, Sep 19, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 14, 2011—Mar 3, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. ( Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause Other misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting +� Special Line Features soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. Transportation t++ Rails Source of Map: Natural Resources Conservation Service r ,.+ Interstate Highways Web Soil Survey URL: http://websoilsurvey.nres.usda.gov Coordinate System: Web Mercator (EPSG:3857) US Routes Major Roads Maps from the Web Soil Survey are based on the Web Mercator Local Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Background Albers equal-area conic projection, should be used if more accurate W Aerial Photography calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Granville County, North Carolina Survey Area Data: Version 17, Sep 19, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 14, 2011—Mar 3, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report Map Unit Legend Granville County, North Carolina (NC077) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI ChA Chewacla and Wehadkee soils, 1.4 6.7% 0 to 2 percent slopes, frequently flooded CrB Creedmoor coarse sandy loam, 11.1 53.9% 2 to 6 percent slopes 7.8 CrC Creedmoor coarse sandy loam, 37.9% 6 to 10 percent slopes PnD Pinkston loamy sand, 10 to 20 0.3 1.5% percent slopes Totals for Area of Interest 20.6 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. 10 Custom Soil Resource Report The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha - Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 11 Custom Soil Resource Report Granville County, North Carolina ChA—Chewacla and Wehadkee soils, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 3sbb Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Map Unit Composition Chewacla and similar soils: 60 percent Wehadkee, undrained, and similar soils: 31 percent Wehadkee, drained, and similar soils: 5 percent Minor components: 4 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Chewacla Setting Landform: Flood plains Down-slope shape: Concave Across -slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile A - 0 to 4 inches: loam Bwl - 4 to 26 inches: silty clay loam Bw2 - 26 to 38 inches: loam Bw3 - 38 to 60 inches: clay loam C - 60 to 80 inches: loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat poorly drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 6 to 24 inches Frequency of flooding: Frequent Frequency of ponding: None Available water storage in profile: High (about 11.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: B/D Hydric soil rating: No 12 Custom Soil Resource Report Description of Wehadkee, Undrained Setting Landform: Depressions on flood plains Down-slope shape: Concave Across -slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile A - 0 to 8 inches: loam Bg - 8 to 43 inches: sandy clay loam Cg - 43 to 80 inches: sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Poorly drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: Frequent Frequency of ponding: None Available water storage in profile: High (about 9.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6w Hydrologic Soil Group: B/D Hydric soil rating: Yes Description of Wehadkee, Drained Setting Landform: Depressions on flood plains Down-slope shape: Concave Across -slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile Ap - 0 to 8 inches: loam Bg - 8 to 43 inches: sandy clay loam Cg - 43 to 80 inches: sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Poorly drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: Frequent Frequency of ponding: None Available water storage in profile: High (about 9.9 inches) 13 Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Hydric soil rating: Yes Minor Components Congaree Percent of map unit: 4 percent Landform: Flood plains Down-slope shape: Linear Across -slope shape: Linear Hydric soil rating: No CrB—Creedmoor coarse sandy loam, 2 to 6 percent slopes Map Unit Setting National map unit symbol: 3sbd Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Creedmoor and similar soils: 80 percent Minor components: 8 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Creedmoor Setting Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Convex Parent material: Residuum weathered from shale and siltstone and/or mudstone and/or sandstone Typical profile Ap - 0 to 7 inches: coarse sandy loam Bt - 7 to 68 inches: clay Cg - 68 to 83 inches: silty clay loam Properties and qualities Slope: 2 to 6 percent 14 Custom Soil Resource Report Depth to restrictive feature: More than 80 inches Natural drainage class: Moderately well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: About 18 to 24 inches Frequency of flooding: None Frequency of ponding: None Sodium adsorption ratio, maximum in profile: 13.0 Available water storage in profile: Moderate (about 8.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C/D Hydric soil rating: No Minor Components Mayodan Percent of map unit: 5 percent Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Convex Hydric soil rating: No White store Percent of map unit: 3 percent Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across -slope shape: Convex Hydric soil rating: No CrC—Creedmoor coarse sandy loam, 6 to 10 percent slopes Map Unit Setting National map unit symbol: 3sbf Elevation: 190 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Creedmoor and similar soils: 80 percent Minor components: 15 percent 15 Custom Soil Resource Report Estimates are based on observations, descriptions, and transects of the mapunit. Description of Creedmoor Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from shale and siltstone and/or mudstone and/or sandstone Typical profile Ap - 0 to 7 inches: coarse sandy loam Bt - 7 to 68 inches: clay Cg - 68 to 83 inches: silty clay loam Properties and qualities Slope: 6 to 10 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Moderately well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: About 18 to 24 inches Frequency of flooding: None Frequency of ponding: None Sodium adsorption ratio, maximum in profile: 13.0 Available water storage in profile: Moderate (about 8.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C/D Hydric soil rating: No Minor Components Mayodan Percent of map unit: 10 percent Landform: Hillslopes on ridges Landform position (two-dimensional): Landform position (three-dimensional). Down-slope shape: Linear Across -slope shape: Convex Hydric soil rating: No White store Percent of map unit: 5 percent Landform: Hillslopes on ridges Landform position (two-dimensional): Landform position (three-dimensional). Down-slope shape: Concave Across -slope shape: Convex Hydric soil rating: No 16 Summit, shoulder Side slope Shoulder, summit Side slope Custom Soil Resource Report PnD—Pinkston loamy sand, 10 to 20 percent slopes Map Unit Setting National map unit symbol: 3sc3 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Pinkston and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Pinkston Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from mudstone and/or shale and siltstone and/or sandstone Typical profile Ap - 0 to 6 inches: loamy sand Bw - 6 to 24 inches: sandy loam C - 24 to 32 inches: sandy loam R - 32 to 80 inches: unweathered bedrock Properties and qualities Slope: 10 to 20 percent Depth to restrictive feature: 20 to 40 inches to lithic bedrock Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 3.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: B Hydric soil rating: No 17 NOAA RAINFALL DATA K:\2016\16-0076\CIVIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 11 of 12 Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 (1) Location name: Creedmoor, North Carolina, US' 1491 ,. Latitude: 36.1102°, Longitude: -78.7333° Elevation: 324 ft' source: Google Maps *� POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration �2 �]� 10 25 50 100 200 500 1000 0.406 1 F 0.475 1 F 0.544 0.607 1 F 0.671 1 F 0.720 1 F 0.764 0.802 1 F 0.844 0.880- 5 -min (0.372-0.444) 1(0.372-0.444)1(0.436-0.519)1(0.498-0.593)1(0.555-0.661 (0.436-0.519) (0.498-0.593) (0.555-0.661 (0.611-0.731) (0.653-0.784) (0.689-0.832) (0.718-0.876) (0.750-0.923) (0.775-0.964) 0.649 0.760 0.871 0.970 1.07 1.15 1.21 1.27 1.34 1.39 10 -min 1(0.595-0.709)1(0.697-0.830)1(0.798-0.949)1(0.887-1.06) (0.974-1.17) 1 (1.04-1.25) (1.09-1.32) (1.14-1.39) 11 (1.19-1.46) (1.22-1.52) 0.811 0.956 1.10 1.23 IF 1.36 1.45 1.53 1.60 1.68 1.74 15 -min 1(0.744-0.886)1(0.876-1.04) 1 (1.01-1.20) 1 (1.12-1.34) 1 (1.24-1.48) 1 (1.32-1.58) 1 (1.38-1.67) 1 (1.44-1.75) 1 (1.49-1.84) 1 (1.53-1.91) 30 -min 1.11 1.32 1.57 1.78 2 -01 -F --2.19 --2.35-F-2.50 2.67 2.82 (1.02-1.22) 1 (1.21-1.44) (1.43-1.71) (1.63-1.94) 1 (1.83-2.19) 1 (1.98-2.38) 1 (2.12-2.56) 1 (2.24-2.73) 1 (2.38-2.92) (2.48-3.09) 60 1-.39--]F--i --66 2.01 2.32 2.67 --2.-96---]F--3.-24---] 3.50 3.84 4.11 -min (1.27-1.52) (1.52-1.81) (1.84-2.19) (2.12-2.52) (2.44-2.91) (2.69-3.23) (2.92-3.53) (3.14-3.82) (3.41-4.20) ( 3.62-4.51) 1.65 1.97 2.41 2.81 3.29 3.70 4.09 4.49 5.01 5.46 2 -hr (1.50-1.81) (1.80-2.16) (2.20-2.64) (2.55-3.07) (2.97-3.59) (3.32-4.03) (3.65-4.46) (3.98-4.89) (4.40-5.46) (4.75-5.97) 3 -hr 1.0593 1.921231 (2.35-2.83) (2.75-3.31) (3.22-3.90) (3.62-4.41) 4.015092 (4.40-5.44) (4.92-6.14) 5.66.79 2.10 2.52 3.09 3.63 4.31 4.91 5.51 6.14 6.99 7.75 6 -hr (1.93-2.31) (2.31-2.77) (2.82-3.39) (3.31-3.98) (3.90-4.71) (4.41-5.36) (4.91-6.01) (5.41-6.68) (6.07-7.61) (6.65-8.47) F-2-.4-8--]F-2-.9-7-]F-3-.6-6-]F--4.3-3-]F-5-.1-9--- -5-.9-5-]F-6-.7-3-]F-7-.5-6-]F-8-.7-1-IF-9-.7-6--I 12 -hr (2.29-2.72) (2.74-3.25) (3.36-4.01) (3.96-4.73) (4.71-5.65) (5.36-6.46) (6.00-7.29) (6.66-8.18) (7.54-9.43) (8.32-10.6) 2.91 3.52 4.38 5.06 5.96 6.67 7.40 8.14 9.15 9.95 24 -hr (2.73-3.12) (3.30-3.77) (4.11-4.69) (4.72-5.41) (5.55-6.38) (6.19-7.15) (6.84-7.95) (7.50-8.76) (8.38-9.87) (9.06-10.7) 3.42 4.11 5.07 5.81 6.79 7.55 8.32 9.10 10.2 11.0 2 -day (3.20-3.66) (3.85-4.40) 4.75-5.43) (5.42-6.22) (6.32-7.28) (7.01-8.10) (7.70-8.95) (8.38-9.81) (9.30-11.0) (10.0-11.9) 3.61 4.33 5.33 6.10 7.13 7.94 8.76 9.59 10.7 11.6 3 -day (3.38-3.86) 1 (4.06-4.64) (4.99-5.70) (5.69-6.53) (6.63-7.64) (7.36-8.52) (8.09-9.41) (8.81-10.3) (9.79-11.6) (10.5-12.6) -3.8-0--]F-4.55 5.59 6.39 7.48 -8.-33--]F-9.19 10.1 11.3 12.2 4 -day (3.56-4.07) (4.26-4.88) (5.23-5.98) (5.96-6.84) (6.95-8.01) (7.71-8.94) (8.48-9.88) (9.25-10.9) ( 10.3-12.2) ( 11.1-13.3) 4.38 5.22 6.33 7.20 8.37 9.30 10.2 11.2 12.5 13.6 7 -day (4.11-4.69) 1 (4.90-5.59) (5.93-6.78) (6.73-7.72) 1 (7.80-8.98) 1 (8.64-10.0) (9.49-11.0) 1 (10.3-12.1) (11.5-13.6) 1 (12.4-14.7) 11 10 -day 4. 89532 5. 596.32 6. 607.58 7.508.57 8. 5-9.91 9.530121.0 10.4112.1 113313.2 125314.7 13.4415.9 6.62 7.81 9.22 10.3 11.9 13.1 14.3 15.6 17.3 18.6 20 -day (6.21-7.07) (7.32-8.34) (8.64-9.84) (9.68-11.1) (11.1-12.7) (12.2-14.0) (13.2-15.4) (14.3-16.8) (15.8-18.7) (16.9-20.2) 30 8'22 9.67 11.2 12.4 14.0 -1-5.-3-]F-1-6-.5-IF-1-7.-7-IF-1-9.-3-]F-2-0.-6-1 -day (7.76-876) (9.10-10.3) (10.6-11.9) (11.7-13.2) (13.1-15.0) (14.2-16.3) (15.3-17.7) (16.4-19.0) (17.9-20.8) (18.9-22.2) 10.4 12.2 14.0 15.4 17.2 18.6 20.0 21.3 23.1 24.5 45 -day (9.90-11.1) (11.6-12.9) (13.2-14.8) (14.5-16.3) (16.2-18.2) (17.5-19.7) (18.7-21.2) (19.9-22.7) (21.5-24.7) (22.7-26.2) 12.6 14.6 16.5 1757-1F- 21.2 22.5 23.8 25.5 26.7 60 -day (11.9-13.2) (13.9-15.4) 1.7-17.4)L1.0-18.9) (18.7-20.8) (20.0-22.3) (21.2-23.8) (22.4-25.2) (23.9-27.0) (24.9-28.4) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1102&lon=-78.7333 &data=... 8/4/2016 Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 (1) Location name: Creedmoor, North Carolina, US' 1491 ,. Latitude: 36.1102°, Longitude: -78.7333° Elevation: 324 ft' source: Google Maps *� POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 4.87 5.70 6.53 7.28 8.05 8.64 9.17 9.62 10.1 10.6 5 -min (4.46-5.33) (5.23-6.23) 1 (5.98-7.12) 1 (6.66-7.93) 1 (7.33-8.77) 1 (7.84-9.41) 1 (8.27-9.98) (8.62-10.5) (9.00-11.1) (9.30-11.6) 3.89 4.56 5.23 5.82 6.42 6.88 7.28 7.63 8.01 8.32 10 -min (3.57-4.25) (4.18-4.98) (4.79-5.69) (5.32-6.35) (5.84-6.99) (6.23-7.49) (6.56-7.94) (6.83-8.33) (7.12-8.76) (7.33-9.11) 3.24 3.82 4.40 4.91 5.42 5.81 6.14 6.42 6.72 6.96 15 -min (2.98-3.54) (3.50-4.18) (4.04-4.80) (4.49-5.35) (4.94-5.90) (5.26-6.32) (5.53-6.69) (5.75-7.00) (5.97-7.35) (6.13-7.62) -2.2-2--]F-2.64 3.13 3.56 4.02 4.37 --4.-70-]F-47­T--5.35 5.64 30 -min (2.04-2.43) 1 (2.42-2.88) 1 (2.87-3.41) (3.25-3.88) 1 (3.66-4.37) (3.96-4.76) 1 (4.24-5.12) 1 (4.47-5.45) 1 (4.75-5.85) (4.96-6.17) -1.-39-]F-1.66 2.01 2.32 2.67 -2.-96--]F-3.24 3.50 3.84 4.11 60 -min (1.27-1.52) (1.52-1.81) (1.84-2.19) (2.12-2.52) (2.44-2.91) (2.69-3.23) (2.92-3.53) (3.14-3.82) (3.41-4.20) ( 3.62-4.51) 0.824 0.986 1.21 1.40 1.64 1.85 2.04 2.24 2.50 2.73 2 -hr 1(0.752-0.903)1(0.901-1.08) 1 (1.10-1.32) 1 (1.28-1.54) 1 (1.48-1.79) 1 (1.66-2.01) 1 (1.82-2.23) (1.99-2.44) (2.20-2.73) (2.38-2.99) 3 -hr 40-0..768 .857 01.10 0533-0641 0.6.584 0.78 -0942 0.914.700 1.07110.30 (1.21-1.47) (1.34-1.64) 1.47616.81 (1.64-2.05) (1.78-2.26) 0.351 0.421 0.516 0.607 0.720 0.820 0.920 1.03 1.17 1.30 6 -hr 1(0.322 -0.386)1(0.385 -0.462)1(0.471 -0.567)1(0.553-0.6651(0.651-0.787)1(0.736-0.895)1(0.819-1.00) (0.903-1.12) ( 1.01-1.27) ( 1.11-1.41) 0.206 0.247 0.304 0.360 0.431 0.494 0.558 0.628 0.723 0.810 12 -hr 1(0.190-0.226)1(0.227-0.270)1(0.279-0.332)1(0.329-0.393 (0.391-0.469) (0.445-0.536) (0.498-0.605) (0.553-0.679) (0.626-0.783) (0.690-0.878) 0.121 0.147 0.183 0.211 0.248 0.278 0.308 0.339 0.381 0.414 24 -hr 1(0.114-0.130)1(0.137-0.157)1(0.171-0.196)1(0.197-0.225 (0.231-0.266) (0.258-0.298) (0.285-0.331) (0.313-0.365) (0.349-0.411) (0.378-0.448) 0.071 0.086 0.106 0.121 0.141 0.157 0.17 3 0.190 0.212 0.229 2 -day 1(0.067-0.076)1(0.080-0.092)1(0.099-0.113)1(0.113-0.130 (0.132-0.152) (0.146-0.169) (0.160-0.186) (0.175-0.204) (0.194-0.229) (0.209-0.248) 0.050 0.060 0.074 0.085 0.099 0.110 0.122 0.133 0.149 0.161 3 -day 1(0.047-0.054)1(0.056-0.064)1(0.069-0.079)1(0.079-0.091 (0.092-0.106) (0.102-0.118) (0.112-0.131) (0.122-0.143) (0.136-0.161) (0.146-0.175) 0.040 0.047 0.058 0.067 0.078 0.087 0.096 0.105 0.117 0.127 4 -day 1(0.037-0.042)1(0.044-0.051)1(0.054-0.062)1(0.062-0.071 (0.072-0.083) (0.080-0.093) (0.088-0.103) (0.096-0.113) (0.107-0.127) (0.115-0.138) 0.026 0.031 0.038 0.043 0.050 0.055 0.061 0.067 0.075 0.081 7 -day (0.024-0.028)1(0.029-0.033)1(0.035-0.040)1(0,040-0.046 ( 0.046-0.053) (0.051-0.059) (0.056-0.066) (0.062-0.072) (0.068-0.081) (0.074-0.088) F1(0-.010-9-0-2011022 10 -day 0.003.0-2050 26 0.008.0-3000 32 0.001.03030 36 0.006.0-3090 41 0.040 0046 0.04 -0 050 0.0470-0 055 0.0520 061 0.056-0 066 0.014 0.016 0.019 0.022 0.025 0.027 0.030 0.032 0.036 0.039 20 -day 1(0.013-0.015)1(0.015-0.017)1(0.018-0.021)1(0.020-0.023 (0.023-0.026) (0.025-0.029) (0.028-0.032) (0.030-0.035) (0.033-0.039) (0.035-0.042) 0.011 0.013 0.016 0.017 0.019 0.021 0.023 0.025 0.027 0.029 30 -day 1(0.011-0.012)1(0.013-0.014)1(0.015-0.017)1(0.016-0.018 (0.018-0.021) (0.020-0.023) (0.021-0.025) (0.023-0.026) (0.025-0.029) (0.026-0.031) 0.010 0.011 0.013 0.014 0.016 0.017 0.018 0.020 0.021 0.023 45 -day 1(0.009-0.010)1(0.011-0.012)1(0.012-0.014)1(0.013-0.015 (0.015-0.017) (0.016-0.018) (0.017-0.020) (0.018-0.021) (0.020-0.023) (0.021-0.024) 0.009 0.010 0.011 0.012 0.014 0.015 0.016 0.017 0.018 0.019 60 -day (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013 (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.016-0.017) (0.017-0.019) (0.017-0.020) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1102&lon=-78.7333 &data=... 8/4/2016 Precipitation Frequency Data Server 25 --- --' ---------------- C _C 20--- -- ..................... m v a 15 ... ... Y �a .0 10 CLv C 5 0 _ - — _ C G c C C t L .�. � ..� ro rtl rp f6 sti rb rt +19 rE E E E Iv A 6 N N N 4+ .-I Nen � to. Duration 30 25 C: L 20 OL v 0 15 .Ci 10 CL 5 a 1 2 5 10 25 50 100 200 500 1000 ack to Tolp Average recurrence interval yearsa rJ��g NOAH Atlas 14, Volume 2. Version 3 MapSc& esf iGhlT): Thu Aug 4 21:27:22 2036 Small scale terrain Page 2 of 4 Average recurrence mleNa l (years) — 1 2 — 5 10 25 50 100 200 500 1000 Duration — 5 -min — 2 -day — 1G -min — 3 -day 15anin — 4 -day — 30 -min — 7 -day — 60 -min — 10 -day 2-1r — 20 -day — 3 -hr — 30 -clay — "r — 45 -day — 12 -hr — 60 -day — 24 -hr Richmond 0 _. Pcla-cke VIRGINIA Petersburg B ack-rbxg Newport News 0 Norfolk 0 aV'irginfa I Winston-Satemo Greensboro o Rurl7afSt• Rocky Mount Nags 4Hea N 0 R T Y I Raleigh Wils©n HFrkay= Greenville C A R O L I N A 0 Charlotte 0 C3 Fayetteville New Bern 0 o5partanburg oRvrk Hill ... Jacksonville Morehead City 0 o bGi o gle 1J km...— Map data ©2010(leoglg Hd601 http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1102&lon=-78.7333 &data=... 8/4/2016 Precipitation Frequency Data Server Page 3 of 4 Large scale terrain Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MID 20910 http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1102&lon=-78.73 3 3 &data=... 8/4/2016 LIL2i Butner Creedunoor 1733 Ln 10, 'kh 1 7=21 ,2o gle 2 km 1$01 Map dRtp*(Nft$Sevgfe Large scale map L lift 1-1-51 Butner Creedmoor 1104 1733 1719 Go a -ale Si gle' 2 k m0. Map dRtpdWQW9;eugte Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MID 20910 http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=36.1102&lon=-78.73 3 3 &data=... 8/4/2016 MISC. CALL INFORMATION K:\2016\16-0076\CIVIL\Design\Stormwater\TW Final Design\2017-03-16 - Stormwater report _CWO REVISED.doc 12 of 12 z C"00 r - E a OM O M O O J N J o �s o M � 0 L; a6pa-� afipa7 ,aD '.O � J300 Q W z CL cc -� W as Nav» OM � - O .t�=a6pa7al��i v N O`aa 0 1`a39WnN 3 VI) W o W [� J O O 300 O O c0a.3Jl�ib3Ssg/ �jg JJJ o� _ \� z C"00 r - E a OM O M O O