Loading...
HomeMy WebLinkAbout20170317 Ver 1_More Info Received - Email_20170501275 270 265 260 STORM PROFILE 'P 1 ' HEADWALL, SEE \ INV IN. 264.55 EXISTING GRADE � EXISTING 81DI SAN. SEW* IN M ENCASEMENT F IPE 10+00 PLANS 275 270 265 ' 260 11+00 11+50 270 265 260 STORM PROFILE 'P3' 10+00 GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. HORIZONTAL: 1"=40' VERTICAL: 1"=4' PINA 270 265 260 11+00 11+50 160 16 -SP- 090 HTE #: N/A Approved by the Town of Cary Planner: Date ,,jIIIIIII% S lEA6G - - 23953 = BIC1� (qZ120 O O s FINISH GR DE 88 LF 48-jj�; z BOX CVL VERT HEADWALL, SEE SZRUCTURE LAN —HLA—I)WAII. S ME UCTURE PLANS INV IN. 266.70 LQQINV OUT 264.91 L EXISTING 81DI SAN. SEER IN r ENCASEMENT IPE 10+00 GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. HORIZONTAL: 1"=40' VERTICAL: 1"=4' PINA 270 265 260 11+00 11+50 160 16 -SP- 090 HTE #: N/A Approved by the Town of Cary Planner: Date ,,jIIIIIII% S lEA6G - - 23953 = BIC1� (qZ120 O O s v z U L o � N O a M ROJECT 15-188 ATE APRIL 28, 2017 RAWN KAL STORM SEWER PROFILE 100% BIDDING DOCUMENTS SHEET CO3ol OF FROM WATERSHED EFFECTIVE: 12/10/09 LEVEL SPREADER F� �w A LIP REINFORCED CHANNEL O UNDERDRAIN -SIZED FOR SITE SOIL CONDITIONS- DRAIN INTO BYPASS SWALE APPROPRIATELY SIZED C FOOTER NOTES: 1. LEVEL SPREADER DESIGN WILL BE BASED ON CURRENT DIVISION OF WATER QUALITY DESIGN GUIDELINES. 2. INSPECT AFTER EACH RAINFALL, UNTIL VEGETATION IS WELL ESTABLISHED, AND MAKE ANY NECESSARY REPAIRS, • AFTERWARDS, INSPECT PERIODICALLY AND KEEP VEGETATION HEALTHY AND MAINTAINED. EFFECTIVE: 12/10/09 BERM \ a \ e N .�a 3 INCHES OF SURGE STONE URBAN TRANSITION BUFFER 11 II 11 111 Il II I II II- I - 3 ft. WIDE STRIP OF FILTER FABRIC LEVEL SPREADER CROSS SECTION PIPE FROM DIVERSION INFLUENT STORMWATER 3 ft PLAN VIEW DETAIL No. 04000.22 SHEET 1 OF 2 RECEIVING II STREAM I UNDERDRAIN FOREBA Y SCHEMA TI C STANDARD LEVEL SPREADER TOP ELEV [LS -C] = 267.00' TOP ELEV [LS -D] = 264.00' SAME ELEVATION ACROSS ENTIRE LEVEL SPREADER LEVEL SPREADER �O d a. f #4 REBAR 2500 PSI J 8" 0. C. E. W. CONCRETE SECTION B -B rnMI-M e v DETAIL No. 04000.22 SHEET 2 OF 2 BERM I / \__SPREADER CHANNEL LONGITUDINAL SLOPE (0%) ON FILTER FABRIC SECTION C- C 3'-0"I 12" I 3'-0" I 3' MIN 57. MAX GRASS SLOPE TO I LEVEL SPREADER CLEARING LIMITS \ _ _ 3 3" #57 WASHED STONE ON FILTER FABRIC d 6" 6" I 6" 4„ TOPSOIL SPREADER CHANNEL LONGITUDINAL SLOPE (0%) #4 REBAR� 4" 8" O.C.E.W. 1 4" PERFORATED HDPE SUBDRAIN 2500 PSI CONCRETE #57 WASHED STONE WRAPPED IN FILTER FABRIC SECTION A -A � Q O -� ANCHOR BRIDGEMAT TO A TREE, OR OTHER PERMANENT OBJECT WITH SUFFICIENT STRENGTH, USING STEEL CHAIN OR CABLE. ���P� S ROAD/LOG MAT PER CAROLINA MAT INCORPORATED OR SUBMITTED EQUAL WWW CAROLINAMAT COM TEMP. BRIDGEMAT SHALL BE SIZED, DESIGNED AND MONITORED BY A LICENSED ENGINEER HIRED BY THE CONTRACTOR AS NEEDED TO ACCOMMODATE EQUIPMENT REQUIRED FOR PROJECT. PERSPECTIVE VIEW (252) 793-4045 LOCATED ON BOTH SIDES OF APPROACH AND THROUGH EXTENTS OF WETLAND AREAS. 1/4 SUPPORTED 1/4 SUPPORTED ROAD/LOG MAT LOCATED -.1-1 ROADILOG .1ROAD/LOG MAT LOCATED THROUGH EXTENTS OF WETLAND THROUGH EXTENTS OF WETLAND AREA BRIDGEMAT AREA • e s e • - - `� ORIGINAL STREAMBANK STREAM �E VIEW TEMPORARY STREAM CROSSING N.T.S. HEADWALL, SEE STRUCTURE PLANS BOX CULVERT PLAN VIEW �y Ft L _1 ��J/ F 1 50' JORDA LAKE RIPARIAN Pl6tP9RA1Y 11 STFzEAi' lREAq - `����� TEMP. PUM _-HOSE ��--------- ,�-TRU(J LIMITS (TYP) 1---�'-_`_�_� ZONE hv�i/✓/�� n �-- I I "i� F�IRq fNi Lq� I � IL •- - CULVERT INSTALLATION 1 PLAN VIEW 1 "=40' MORTAR BED CORBEL BRICK 1" PER COURSE FOR SIX COURSES , RCP INFLOW INVERT IN (LS -D].° 264.65 0� INSTALLATION NOTES 1. REFER TO "NORTH CAROLINA DIVISION OF FOREST RESOURCES" LITERATURE, INSTALLATION MAINTENANCE GUIDELINES, & "NORTH CAROLINA FORESTRY BMP MANUAL -2006". 2. USE A BULLDOZER, KNUCKLEBOOM LOADER, OR SKIDDER TO INSTALL & REMOVE DRAGLINE MATS. 3. KEEP HEAVY EQUIPMENT OUT OF STREAM. 4. INSTALL WATER DIVERSION DEVICES (WATER BARS, TURNOUTS, BROAD-BASED DIPS, ETC.) ON BOTH SIDES OF THE MATS. 5. STABILIZE EXPOSED MINERAL SOIL WITH TREE TOPS OR BRUSH DURING MAT INSTALLATION, AND SEEDING/MULCH AFTER MAT REMOVAL. 6. INSTALL MATS TO CREATE A MINIMUM TEN FOOT BRIDGE WIDTH. 7. INSTALL ROAD/LOG MATS THROUGH EXTENTS OF WETLAND AREAS. 8. THERE SHALL BE NO IMPACTS TO THE STREAM. NO PUMP AROUND IS PROPOSED OR REQUIRED. MAINTENANCE NOTES 1. KEEP MATS' SURFACE FREE OF MINERAL SOIL AND DEBRIS THAT COULD ENTER STREAM. 2. PERIODICALLY CHECK MAT HARDWARE; RETIGHTEN NUTS & CABLE CLAMPS AS NECESSARY TO MAINTAIN BRIDGE STRENGTH AND INTEGRITY. 3. IMMEDIATELY REMOVE ANY DEBRIS WHICH ENTERS THE STREAM AT THE CROSSING LOCATION. REMOVAL NOTES 1. CLEAN OFF BRIDGE SURFACE. 2. REMOVE MATS BY USING MAT CABLE LOOP OR SKIDDER GRAPPLE. 3. PERMANENTLY STABILIZE DISTURBED PORTIONS OF STREAM BANK AND APPROACH ROADS WITH PERENNIAL GRASSES/MULCH (OR WETLAND MIX WHEN APPLICABLE). 4. LEAVE APPROPRIATE WATER DIVERSION STRUCTURES IN PLACE ON BOTH SIDES OF STREAM. 3/4" NO LEAD BRASS CAM LOCK TYPE HOSE CONNECTION AS MANDATED BY STATE LAW 3/4" NO LEAD BRASS GATE VALVE NO LEAD BRASS TEE CAUTION RECLAIMED WATER DO NOT DRINK BLOCKING - 18" OF #57 WASHED STONE BASE ELEVATION COVER A 8, 3/4„ 1" NO LEAD BRASS GATE VALVE C� 18" STANDARD 1" PE SERVICE LINE PLUGGED CAUTION REc AIMED warER CONNECTION TO DO NOT DRINK IN -GROUND IRRIGATION opo SKID RESISTANT SURFACE � 8 "o (COLOR PANTONE 522 PURPLE) p� o 3�00�0 lL d �Ik 6" TYPICAL 1� (AROUND PERIMETER) / NOTES: 1. TO ENSURE POSITIVE DRAINAGE, THE VAULT SHALL HAVE AN OPEN BOTTOM TO ALLOW DRAINAGE THROUGH STONE. 2. STANDARD RECLAIMED WATER HOSE BIB AND BOX SHALL BE MAINTAINED ON PRIVATE PROPERTY BY OWNER. 3. PRECAST CONCRETE BOX WITH ALUMINUM ACCESS HATCH WILL BE AN ACCEPTABLE ALTERNATIVE WITH APPROVAL OF THE DIRECTOR OF WATER RESOURCES. 4. THE INTERIOR OF THE BOX SHALL BE STENCILED WITH THE WORDS "CAUTION RECLAIMED WATER DO NOT DRINK". 5. ALL BRASS COMPONENTS SHALL BE 'NO LEAD' BRASS MEETING UNS C89833 AS PER ASTM 3584. fHEADWALL, SEE STRUCTURE PLANS PRIMARY BOX PRIMARY BOX CULVERT BURIED 1' CULVERT BURIED 1' P2 P4 3'Hx6'W J L6'Hx4'W PRE -CAST BOX PRE -CAST BOX 3'Hx6'W CULVERT CULVERT 6'Hx4'W PRE -CAST BOX INVERT IN: 266.70' INVERT IN: 264.55' PRE -CAST BOX CULVERT CULVERT INVERT OUT. 264.91' INVERT OUT 263.20' SECTION A -A SECTION B -B N.T.S. N. T. S. I �I • �'/i �iiii••iiiiiii�iiiii• V I I I I-�•I � I� I i I� � ILI tIl � If,A .� I z �. �i 1 I ■ • a STANDARD TOWN OF CARY STD. 8000.02 YARD INLET I I i SIX COURSES HIGH FLOW BYPASS RCP VARIABLE CULVERT INSTALLATION 2 PLAN VIEW 1 "=40' STREAM CROSSING/CULVERT INSTALLATION INVERT OUT ILS -Cl. 267.94 1 1 1 SPLITTER INVERT OUT [LS -D]: 264.55 1 BARREL INVERT OUT LS -C : 267.07 INVERT OUT LS -D : 264.11 a d * �. OUT TO a. d b <d' 6" MIN. LEVEL SPREADER b CONCRETE 3000 P.S.I. SECTION VIEW FLOW SPLITTER BOX LEVEL SPREADER & SPLITTER BOX DETAIL N.T.S. U C0 m 0 8" BLOCK SPLITTER WALL JUNCTION BOX SUMP MANHOLE C) FLOW SPLITTER BARREL, TO LEVEL SPREADER DIMENSIONS (INCHES) a B A e a. .. a v C. . . a e. ..a d`' a e e d e e . �O d a. f #4 REBAR 2500 PSI J 8" 0. C. E. W. CONCRETE SECTION B -B rnMI-M e v DETAIL No. 04000.22 SHEET 2 OF 2 BERM I / \__SPREADER CHANNEL LONGITUDINAL SLOPE (0%) ON FILTER FABRIC SECTION C- C 3'-0"I 12" I 3'-0" I 3' MIN 57. MAX GRASS SLOPE TO I LEVEL SPREADER CLEARING LIMITS \ _ _ 3 3" #57 WASHED STONE ON FILTER FABRIC d 6" 6" I 6" 4„ TOPSOIL SPREADER CHANNEL LONGITUDINAL SLOPE (0%) #4 REBAR� 4" 8" O.C.E.W. 1 4" PERFORATED HDPE SUBDRAIN 2500 PSI CONCRETE #57 WASHED STONE WRAPPED IN FILTER FABRIC SECTION A -A � Q O -� ANCHOR BRIDGEMAT TO A TREE, OR OTHER PERMANENT OBJECT WITH SUFFICIENT STRENGTH, USING STEEL CHAIN OR CABLE. ���P� S ROAD/LOG MAT PER CAROLINA MAT INCORPORATED OR SUBMITTED EQUAL WWW CAROLINAMAT COM TEMP. BRIDGEMAT SHALL BE SIZED, DESIGNED AND MONITORED BY A LICENSED ENGINEER HIRED BY THE CONTRACTOR AS NEEDED TO ACCOMMODATE EQUIPMENT REQUIRED FOR PROJECT. PERSPECTIVE VIEW (252) 793-4045 LOCATED ON BOTH SIDES OF APPROACH AND THROUGH EXTENTS OF WETLAND AREAS. 1/4 SUPPORTED 1/4 SUPPORTED ROAD/LOG MAT LOCATED -.1-1 ROADILOG .1ROAD/LOG MAT LOCATED THROUGH EXTENTS OF WETLAND THROUGH EXTENTS OF WETLAND AREA BRIDGEMAT AREA • e s e • - - `� ORIGINAL STREAMBANK STREAM �E VIEW TEMPORARY STREAM CROSSING N.T.S. HEADWALL, SEE STRUCTURE PLANS BOX CULVERT PLAN VIEW �y Ft L _1 ��J/ F 1 50' JORDA LAKE RIPARIAN Pl6tP9RA1Y 11 STFzEAi' lREAq - `����� TEMP. PUM _-HOSE ��--------- ,�-TRU(J LIMITS (TYP) 1---�'-_`_�_� ZONE hv�i/✓/�� n �-- I I "i� F�IRq fNi Lq� I � IL •- - CULVERT INSTALLATION 1 PLAN VIEW 1 "=40' MORTAR BED CORBEL BRICK 1" PER COURSE FOR SIX COURSES , RCP INFLOW INVERT IN (LS -D].° 264.65 0� INSTALLATION NOTES 1. REFER TO "NORTH CAROLINA DIVISION OF FOREST RESOURCES" LITERATURE, INSTALLATION MAINTENANCE GUIDELINES, & "NORTH CAROLINA FORESTRY BMP MANUAL -2006". 2. USE A BULLDOZER, KNUCKLEBOOM LOADER, OR SKIDDER TO INSTALL & REMOVE DRAGLINE MATS. 3. KEEP HEAVY EQUIPMENT OUT OF STREAM. 4. INSTALL WATER DIVERSION DEVICES (WATER BARS, TURNOUTS, BROAD-BASED DIPS, ETC.) ON BOTH SIDES OF THE MATS. 5. STABILIZE EXPOSED MINERAL SOIL WITH TREE TOPS OR BRUSH DURING MAT INSTALLATION, AND SEEDING/MULCH AFTER MAT REMOVAL. 6. INSTALL MATS TO CREATE A MINIMUM TEN FOOT BRIDGE WIDTH. 7. INSTALL ROAD/LOG MATS THROUGH EXTENTS OF WETLAND AREAS. 8. THERE SHALL BE NO IMPACTS TO THE STREAM. NO PUMP AROUND IS PROPOSED OR REQUIRED. MAINTENANCE NOTES 1. KEEP MATS' SURFACE FREE OF MINERAL SOIL AND DEBRIS THAT COULD ENTER STREAM. 2. PERIODICALLY CHECK MAT HARDWARE; RETIGHTEN NUTS & CABLE CLAMPS AS NECESSARY TO MAINTAIN BRIDGE STRENGTH AND INTEGRITY. 3. IMMEDIATELY REMOVE ANY DEBRIS WHICH ENTERS THE STREAM AT THE CROSSING LOCATION. REMOVAL NOTES 1. CLEAN OFF BRIDGE SURFACE. 2. REMOVE MATS BY USING MAT CABLE LOOP OR SKIDDER GRAPPLE. 3. PERMANENTLY STABILIZE DISTURBED PORTIONS OF STREAM BANK AND APPROACH ROADS WITH PERENNIAL GRASSES/MULCH (OR WETLAND MIX WHEN APPLICABLE). 4. LEAVE APPROPRIATE WATER DIVERSION STRUCTURES IN PLACE ON BOTH SIDES OF STREAM. 3/4" NO LEAD BRASS CAM LOCK TYPE HOSE CONNECTION AS MANDATED BY STATE LAW 3/4" NO LEAD BRASS GATE VALVE NO LEAD BRASS TEE CAUTION RECLAIMED WATER DO NOT DRINK BLOCKING - 18" OF #57 WASHED STONE BASE ELEVATION COVER A 8, 3/4„ 1" NO LEAD BRASS GATE VALVE C� 18" STANDARD 1" PE SERVICE LINE PLUGGED CAUTION REc AIMED warER CONNECTION TO DO NOT DRINK IN -GROUND IRRIGATION opo SKID RESISTANT SURFACE � 8 "o (COLOR PANTONE 522 PURPLE) p� o 3�00�0 lL d �Ik 6" TYPICAL 1� (AROUND PERIMETER) / NOTES: 1. TO ENSURE POSITIVE DRAINAGE, THE VAULT SHALL HAVE AN OPEN BOTTOM TO ALLOW DRAINAGE THROUGH STONE. 2. STANDARD RECLAIMED WATER HOSE BIB AND BOX SHALL BE MAINTAINED ON PRIVATE PROPERTY BY OWNER. 3. PRECAST CONCRETE BOX WITH ALUMINUM ACCESS HATCH WILL BE AN ACCEPTABLE ALTERNATIVE WITH APPROVAL OF THE DIRECTOR OF WATER RESOURCES. 4. THE INTERIOR OF THE BOX SHALL BE STENCILED WITH THE WORDS "CAUTION RECLAIMED WATER DO NOT DRINK". 5. ALL BRASS COMPONENTS SHALL BE 'NO LEAD' BRASS MEETING UNS C89833 AS PER ASTM 3584. fHEADWALL, SEE STRUCTURE PLANS PRIMARY BOX PRIMARY BOX CULVERT BURIED 1' CULVERT BURIED 1' P2 P4 3'Hx6'W J L6'Hx4'W PRE -CAST BOX PRE -CAST BOX 3'Hx6'W CULVERT CULVERT 6'Hx4'W PRE -CAST BOX INVERT IN: 266.70' INVERT IN: 264.55' PRE -CAST BOX CULVERT CULVERT INVERT OUT. 264.91' INVERT OUT 263.20' SECTION A -A SECTION B -B N.T.S. N. T. S. I �I • �'/i �iiii••iiiiiii�iiiii• V I I I I-�•I � I� I i I� � ILI tIl � If,A .� I z �. �i 1 I ■ • a STANDARD TOWN OF CARY STD. 8000.02 YARD INLET I I i SIX COURSES HIGH FLOW BYPASS RCP VARIABLE CULVERT INSTALLATION 2 PLAN VIEW 1 "=40' STREAM CROSSING/CULVERT INSTALLATION INVERT OUT ILS -Cl. 267.94 1 1 1 SPLITTER INVERT OUT [LS -D]: 264.55 1 BARREL INVERT OUT LS -C : 267.07 INVERT OUT LS -D : 264.11 a d * �. OUT TO a. d b <d' 6" MIN. LEVEL SPREADER b CONCRETE 3000 P.S.I. SECTION VIEW FLOW SPLITTER BOX LEVEL SPREADER & SPLITTER BOX DETAIL N.T.S. U C0 m 0 8" BLOCK SPLITTER WALL JUNCTION BOX SUMP MANHOLE C) FLOW SPLITTER BARREL, TO LEVEL SPREADER DIMENSIONS (INCHES) A B INTERIOR OF THE BOX SHALL BE PAINTED PANTONE 522 PURPLE MOUSE HOLES (2) W 3'x 3" OPENING WITH 3"x 3J 101/4" 15y2„ KNOCKOUT ABOVE OPENING STANDARD RECLAIMED WATER HOSE BIB AND BOX ° LIFTING SLOT AND LOCK MATERIAL SHALL BE LIGHT WEIGHT POLYMER CONCRETE, DYED PANTONE 522 PURPLE. 12A BOX DETAIL No. 06500.04 SHEET 1 OF 1 .3R" TH )NE 264.31' STREAM 4' SECTION C -C N. T. S. �0 1 _=cZZ=C �ooc 2' MIN.�ooc -000SAND BAGS �0000c �0000� TFAIPn12Al2V rnrm2 nAAA STREAM CROSSING CONSTRUCTION SEQUENCE 1. STAKE OUT CLEARING LIMITS AND INSTALL TREE PROTECTION FENCE. 2. INSTALL SILT FENCE ALONG BANKS OF STREAM. 3. INSTALL TEMPORARY STREAM CROSSING. 4. INSTALL TEMPORARY SAND BAG COFFER DAM UPSTREAM OF PROPOSED HEADWALL. 5. INSTALL TEMPORARY PUMP AND BYPASS HOSE PARALLEL WITH EXISTING STREAM BANK TO DISCHARGE BELOW OUTLET OF PROSOSED CULVERTS. CONTRACTOR SHALL SIZE PUMP FOR NORMAL STREAM FLOW AND PROVIDE POWER REQUIRED FOR PUMP OPERATION. 6. EXCAVATE TRENCH FOR THE 2 PROPOSED 5'Hx6'W PRE -CAST BOX CULVERTS. 7 REMOVE STREAM CROSSING >�oa00 um Q N c0 N 01 -OON N 0) O•56A 0(nUNo C Z d1 C7 ��0) 0 co _u U 0),j- N o Co 0) N r �mm�o (l ' x , I I I 0 O N 01c\I 0) W �OZ NN LLQ - a c N _ O O N N z�=T I- UL Q LC T_< E 0 U L L L W N � C 0 0 Z rCO� V co co UJ U O � Q O O (3) C0 0� C\2 �- � O LO � Qrl q) U � J C).1 c ►�`�p xIACARp''�•' -�cr* cce --1953 BICN� �• -7 8. INSTALL PERMANENT CULVERTS AND HEADWALL IN EXCAVATED TRENCH. INSTALL CULVERTS SUCH THAT UPSTREAM AND DOWNSTREAM INVERTS ARE SET AS SPECIFIED IN THE GRADING PLAN. OVER -EXCAVATE UNSUITABLE SOILS AND REPLACE WITH SUITABLE MATERIALS (SEE SPECIFICATIONS). Q 9. BACKFILL CULVERT TRENCH. 10. STABILIZE DISTURBED SLOPES AT INLET AND OUTLET OF PERMANENT CULVERTS WITH PERMANENT SEEDING AND TEMPORARY SLOPE LININGS.Cn 11. REMOVE TEMPORARY SAND BAG COFFER DAM AND PUMP TO ALLOW STREAM FLOW THROUGH PERMANENT CULVERTS. 12. BEGIN PUBLIC ROAD CONSTRUCTION. 13. SEE EROSION CONTROL PLANS FOR ADDITIONAL CONSTRUCTION SEQUENCE INFORMATION. N. T. S. �eZ LS -C: 10' LS -D: 18 ■ ON FILTER FABRIC 3" #57 WASHED STONE p O Eli BERM EXTEND SUB -DRAIN PIPE TO HIGH FLOW PROJECT 15-188 BYPASS CHANNEL DATE APRIL 28, 2017 ----------------------------------------� - - - - - - - - - - - - - - - - - - - - - - - - - DRAWN KMD 4" PERFORATED HDPE SUBDRAIN DETAILS B 100% BIDDING n i B DOCUMENTS FOREBAY SHEET LS -C: 10'LX8'W LS -D: 13'LX17.5'W PLAN VIEW 16 -SP- 090 HTE #: N/A Approved by the Town of Cary Planner: Date II 7L V U Q) 0- 0) O C07.24 OF IMPACT LEGEND TYPE TION ZONE '2' DE LINEA JORDAN BUFFER CH= ZONE '1' WL= (JB Z1) - JORDAN BUFFER 0.13 AC ZONE '2' - (JB Z2) 0.16 AC WETLAND - (WL) 1 0.01 AC STREAM CHANNEL 4 LF (CH) Z1= ZONE '1' Z2= ZONE '2' JB= JORDAN BUFFER CH= STREAM CHANNEL WL= WETLAND IMPACT TABLE STREAM CROSSING CONSTRUCTION SEQUENCE 1. STAKE OUT CLEARING LIMITS AND INSTALL TREE PROTECTION FENCE. 2. INSTALL SILT FENCE ALONG NORTHERN BANK OF STREAM. 3. INSTALL TEMPORARY SAND BAG COFFER DAM UPSTREAM OF PROPOSED HEADWALL. 4. INSTALL TEMPORARY PUMP AND BYPASS HOSE PARALLEL WITH EXISTING STREAM BANK TO DISCHARGE BELOW OUTLET OF PROSOSED CULVERTS. CONTRACTOR SHALL SIZE PUMP FOR NORMAL STREAM FLOW AND PROVIDE POWER REQUIRED FOR PUMP OPERATION. 5. EXCAVATE TRENCH FOR THE PROPOSED 6'Hx4'W AND 3'HX6'W PRE -CAST BOX CULVERTS. 6. INSTALL PERMANENT CULVERTS AND HEADWALL IN EXCAVATED TRENCH. INSTALL CULVERTS SUCH THAT UPSTREAM AND DOWNSTREAM INVERTS ARE SET AS SPECIFIED IN THE GRADING PLAN. OVER -EXCAVATE UNSUITABLE SOILS AND REPLACE WITH SUITABLE MATERIALS (SEE SPECIFICATIONS). 7. BACKFILL CULVERTS AND ROUGH GRADE ROAD CROSSING. 8. STABILIZE DISTURBED SLOPES AT INLET AND OUTLET OF PERMANENT CULVERTS WITH PERMANENT SEEDING AND TEMPORARY SLOPE LININGS. 9. REMOVE TEMPORARY SAND BAG COFFER DAM AND PUMP TO ALLOW STREAM FLOW THROUGH PERMANENT CULVERTS. 10. BEGIN PUBLIC ROAD CONSTRUCTION. ZONE 2 AREA IMPACTED BY ROAD GRADING= Z283 S.F. (0.05 AC) IMPACT LOCATION TYPE SQUARE FT. ACRES LINEAR FT. CH ONLY STREAM IMPACT WIDTH IMPACT AREA #4 JB Z1 9,086 S.F. 0.21 AC - - JB Z2 5,556 S.F. 0.13 AC - - WL 7,009 S.F. 0.16 AC - - CH 585 S.F. 1 0.01 AC 148 LF 4 LF WETLAND POINTS Flag ID Northing Easting WF 70001BEG 766969.9666' 2029174.2888' WF 70002 766986.1087' 2029192.7314' WF 70003 766983.1748' 2029263.7134' WF 70004 766938.0704' 2029262.5486' WF 70005 766922.0030' 2029252.8051' WF 70006 766907.0745' 2029227.4210' WF 70007 766906.5785' 2029204.1468' WF 70008END 766935.5876' 2029189.3495' WF 80001BEG 767016.8654' 2029173.5372' WF 80002 767042.1376' 2029167.2114' WF 80003 767091.9893' 2029168.1013' WF 80004 767116.3579' 2029162.3948' WF 80005 767144.3741' 2029171.7156' WF 80006 767150.6012' 2029197.4575' WF 80007 767190.8863' 2029197.2303' WF 80008 767192.4897' 2029212.5077' WF 80009 767171.7520' 2029213.5946' WF 80010 767132.9226' 2029223.6435' WF 80011 767100.6373' 2029228.2000' WF 80012 767043.8753' 2029250.3990' WF 80013END 767023.7203' 2029245.5453' TOTAL WETLAND IMPACT AREA (WL)= Z309 S.F. (0.05 AC) WETLAND AREA IMPACTED BY ROAD GRADING= 1,252 S.F. (0.03 AC) WF TOTAL ZONE 2 TOTAL ZONE 1 ZONE 1 AREA IMPACT AREA= IMPACT AREA= IMPACTED BY ROAD 2,828 S.F. (0.06AC) 4,369 S.F. (0.10 AC) GRADING= 3,147 S.F. (0.07 AC 80008 mi WF 800071,1, I I 1\ I \ I� 80009 \\ \\ WF 80006 \ \ STREAM 8000 \ � \\ �#2000 \ I \ I I \ I I 100' OF \ WF VOON o I I TRANSI I BUFF WF 80004 N 6 I '�A \ /llI I / ° I �4 /� h Inti A � �i WF 8000, u �LA1VD �e # �,000, i1 A�V�<II�I IIIIJ/ 1I �� I I / \ HEAD 1 WALL WF So 2 �:^.:.:.:...........:::::. -r ss -- j WF 80013EA I-�I WF 70002 I WF 7040 1B .. .........I.*.......�..... ... ... TOTAL WETLAND IMPACT AREA (WL)= 4,700 S.F. (0.11 AC) WETLAND AREA �'T0008 _'WIF" . IMPACTED BY ROADWE f/ ` GRADING= I /#7T TLANLAND I "A 1, 522 S. F. (0.03 AC) / 000 WF 70bg§ / 70007 7e TOTAL STREAM IMPACT AREA = 583 S.F. / (0.01 AC), 147 L. F. / i STREAM AREA IMPACTED BY ROAD GRADING = 402 S.F. (0.01 AC) TOTAL ZONE 1 GRAPHIC SCALE IMPACT AREA= 4,717 S.F. (0.11 AC) 20 40 80 IMPACT MAP #4 ( IN FEET ) 1 inch = 40 ft. M-16 MIDDLE SCHOOL TOWN OF CARY DATE 4/28/17 PROJECT NO: 15.188 C-6 IMPACT MAP #4 ZONE 1 AREA IMPACTED BY ROAD GRADING= 3,175 S.F. (0.07 AC) F I t4'� .1 SAMIN10"l No" 700031 TOTAL ZONE 2 IMPACT AREA= Z728 S.F. (0.06 AC) I I ZONE 2 AREA IMPACTED BY ROAD GRADING= 2,106 S.F. (0.05 AC) CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: 919) 319-6716 Fax: 919) 319-7516 Strickland, Bev From: Elias Ruhl <ERuhl@FandR.com> Sent: Monday, May 01, 2017 3:00 PM To: Norton, April R Cc: Homewood, Sue Subject: RE: Additional Information Request for PCN Application 20170317 Attachments: C-6.pdf, CO3.18.pdf, C07.24.pdf April, Sorry for the delay and thanks for your patience. The two box culverts have been redesigned with one primary 6'Hx4'W culvert for the base flow of the 4' wide stream, and one 4'Hx6'W culvert elevated to bank flow for larger storm events. Cross sections have been included for the box culverts in sheet C07.24, including the amount the primary culvert will be buried, and the length of the culverts. Please see the attached drawings detailing these changes. Additionally, the construction sequence has been added to map C-6. Please let me know if you need any additional information. Thanks! Elias N. Ruhl Environmental Department Manager FROEHLING & ROBERTSON, INC. 310 Hubert Street Raleigh, NC 27603 1 USA T 919.719.1973 1 F 919.828.5751 1 M 919.630.1705 www.FandR.com From: Norton, April R [mailto:april.norton@ncdenr.gov] Sent: Friday, April 28, 2017 2:18 PM To: Elias Ruhl <ERuhl@FandR.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: Additional Information Request for PCN Application 20170317 Hi Eli, If a response is not available by Wednesday of next week, I will have to place the application on hold. Thanks, April From: Elias Ruhl [mailto:ERuhl@FandR.com] Sent: Tuesday, April 18, 2017 5:19 PM To: Norton, April R <april.norton@ncdenr.gov> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: Additional Information Request for PCN Application 20170317 April, Thanks for sending. I am working with the project engineer on a response and will send it to you as soon as I can. 1 Eli Elias N. Ruhl Environmental Services Manager FROEHLING & ROBERTSON, INC. 310 Hubert Street Raleigh, NC 27603 1 USA T 919.719.1973 1 F 919.828.5751 1 M 919.630.1705 www.FandR.com From: Norton, April R[mailto:april.norton@ncdenr.gov] Sent: Tuesday, April 18, 2017 2:55 PM To: Elias Ruhl <ERuhl@FandR.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: Additional Information Request for PCN Application 20170317 Elias, I have reviewed the PCN application for Northwest Cary Middle School. The PCN states that the stream is 4' wide and the two culverts that are used are 5'H x 6'W (sheet C07.24). Could you please provide details on how the physical integrity of the stream will be maintained above and below the culvert? Since two box culverts will be installed, the stream should only flow through one box culvert during normal flow conditions and through the other box culvert above bankfull conditions. The proposed floodplain benches should be installed to restore natural materials for bench stability. A construction sequence and detail should be provided to ensure the contractor is clear on construction of these benches. Thanks, April April R. Norton Environmental Specialist Division of Water Resources North Carolina Department of Environmental Quality 336-776-9692 office 336-354-2284 mobile april.norton(a'�,ncdenr. g ov Winston-Salem Regional Office 450 W. Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 <��Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. The content of this email is the confidential property of Froehling & Robertson, Inc. (F&R) and should not be copied, modified, retransmitted, or used for any purpose except with F&R's written authorization. If you are not the intended recipient, please delete all copies and notify the sender immediately. The content of this email is the confidential property of Froehling & Robertson, Inc. (F&R) and should not be copied, modified, retransmitted, or used for any purpose except with F&R's written authorization. If you are not the intended recipient, please delete all copies and notify the sender immediately.