HomeMy WebLinkAboutNorth Shore Road (17)Lake Fontana
Subject: Lake Fontana
From: "David S Chang, PE" <dchang @ dot state nc us>
Date: Fri, 19 Aug 2005 11 22 46 -0400
To: Brian Wrenn <bnan wrenn@ncmail net>
Brian- After reviewing DOT projects that were recently completed
in or near the Lake Fontana area, I suggest that we can assume 4
water quality BMP structures (hazardous spill basins) are needed
per mile Each structure costs about $40,000 including all
(survey, design, construction & materials, etc ) but maintenance
Two mayor (approximately 35 miles in length, total) roadway
improvement projects might be affected by the proposed ORW
ruling. If you need more information, please advise.
David
1 of 1 9/15/2005 11 42 AM