Loading...
HomeMy WebLinkAboutNorth Shore Road (17)Lake Fontana Subject: Lake Fontana From: "David S Chang, PE" <dchang @ dot state nc us> Date: Fri, 19 Aug 2005 11 22 46 -0400 To: Brian Wrenn <bnan wrenn@ncmail net> Brian- After reviewing DOT projects that were recently completed in or near the Lake Fontana area, I suggest that we can assume 4 water quality BMP structures (hazardous spill basins) are needed per mile Each structure costs about $40,000 including all (survey, design, construction & materials, etc ) but maintenance Two mayor (approximately 35 miles in length, total) roadway improvement projects might be affected by the proposed ORW ruling. If you need more information, please advise. David 1 of 1 9/15/2005 11 42 AM