Loading...
HomeMy WebLinkAbout20061103 Ver 1_DWR Closeout Letter_buffer assets_20170427Water Resources ENVIRONMENI AL OUALI7Y April 27, 2017 Division of Mitigation Services Attn: Melonie Allen 1652 Mail Service Center Raleigh, NC 27699-1652 (via electronic mail) Re: Northgate Park (Ellerbe Creek) Stream Restoration Site DMS ID #272 — CLOSEOUT ACCEPTANCE LETTER Dear Ms. Allen, ROY COOPER MICHAEL S. REGAN S. JAY ZIMMERMAN CiirccRn DWR Project # 2006-1103 Durham County On March 22, 2017, the Division of Water Resources (DWR) received a close-out packet from you on behalf of the Division of Mitigation Services (DMS) requesting approval to close-out the subject site from monitoring and maintenance of the riparian areas. The site is located within the Upper Falls Lake Watershed of the Neuse River Basin. On April 26, 2017, Katie Merritt with DWR visited the subject site to assess the vegetation and overall site conditions. An asset map is attached. As a result of Ms. Merritt's review of the close-out request, the following mitigation is approved: River Basin/Service Area Mitigation Mitigation Ratio Mitigation Units Distance from Type stream Neuse (Falls Lake Watershed) Buffer 1:1 145,084.01 ft2 — 0-200' top of 03020201 Restoration Buffer Mitigation bank (grandfathered) Neuse (Falls Lake Watershed) Buffer 3:1 3,333.47 ft2 — 0-200' top of 03020201 Enhancement Buffer Mitigation bank (grandfathered) TOTAL 148,417.48 ft' Please feel free to contact Katie Merritt at (919) 807-6371 if you have any questions regarding this correspondence. KAH/km ATTACHMENTS: Asset Map, Asset Table cc: File Copy - Katie Merritt Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch State of North Carolina I Environmental Quality I Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919 807 6300 Asset Table: Project Assets Northgate Park(Ellerbe Creek Stream Respotration site Restoration Leve] Project Streams Non - riparian Wetland (ac) Credited Buffer (sf) Riverine Non-Riverine Project Segment Exiting Restoration Level Approach As -Built If/s Stationing Mitigation Ratio Mitigation Units SMU/RB Reach 1 1,520 EI Pll 1,247 10+00 - 25+20 1.5:1 831 Reach2 646 R PII 750 25+20-32+70 1:1 750 UT3 104 R PII 117 100+00 - 101+17 1:1 117 TOTAL 2,114 1,698 Project Buffer Buffer R 145,084.01 1:1 145,084.01 Buffer E 10,000.40 3:1 3,333.47 TOTAL 155,084.41 148,417.48 Length and Area Summations by Mitigation Category Northgate Park (Ellerbe Creek) Stream Respotration site Restoration Leve] Stream (If) Riparian Wetland (ac) Non - riparian Wetland (ac) Credited Buffer (sf) Riverine Non-Riverine Restoration 867 145,084.01 Enhancement 10,000.40 Enhancement I 1,247 Enhancement Il Creation Preservation High Quafity Preservation Total 2,114 155,084.41 Owrall Asset Summary Northgate Park (Ellerbe Creek) Stream Respotration site Asset Category Owrall Credits Stream 1,698 Riparian Wetland Non -riparian Wetland Buffer 148,417.48