HomeMy WebLinkAbout20061103 Ver 1_DWR Closeout Letter_buffer assets_20170427Water Resources
ENVIRONMENI AL OUALI7Y
April 27, 2017
Division of Mitigation Services
Attn: Melonie Allen
1652 Mail Service Center
Raleigh, NC 27699-1652
(via electronic mail)
Re: Northgate Park (Ellerbe Creek) Stream Restoration Site
DMS ID #272 — CLOSEOUT ACCEPTANCE LETTER
Dear Ms. Allen,
ROY COOPER
MICHAEL S. REGAN
S. JAY ZIMMERMAN
CiirccRn
DWR Project # 2006-1103
Durham County
On March 22, 2017, the Division of Water Resources (DWR) received a close-out packet from you on
behalf of the Division of Mitigation Services (DMS) requesting approval to close-out the subject site from
monitoring and maintenance of the riparian areas. The site is located within the Upper Falls Lake
Watershed of the Neuse River Basin. On April 26, 2017, Katie Merritt with DWR visited the subject site
to assess the vegetation and overall site conditions. An asset map is attached.
As a result of Ms. Merritt's review of the close-out request, the following mitigation is approved:
River Basin/Service Area
Mitigation
Mitigation Ratio
Mitigation Units
Distance from
Type
stream
Neuse (Falls Lake Watershed)
Buffer
1:1
145,084.01 ft2 —
0-200' top of
03020201
Restoration
Buffer Mitigation
bank
(grandfathered)
Neuse (Falls Lake Watershed)
Buffer
3:1
3,333.47 ft2 —
0-200' top of
03020201
Enhancement
Buffer Mitigation
bank
(grandfathered)
TOTAL
148,417.48 ft'
Please feel free to contact Katie Merritt at (919) 807-6371 if you have any questions regarding this
correspondence.
KAH/km
ATTACHMENTS: Asset Map, Asset Table
cc: File Copy - Katie Merritt
Sincerely,
Karen Higgins, Supervisor
401 & Buffer Permitting Branch
State of North Carolina I Environmental Quality I Water Resources
1617 Mail Service Center I Raleigh, North Carolina 27699-1617
919 807 6300
Asset Table:
Project Assets
Northgate Park(Ellerbe
Creek Stream Respotration site
Restoration Leve]
Project Streams
Non -
riparian
Wetland
(ac)
Credited
Buffer (sf)
Riverine Non-Riverine
Project
Segment
Exiting
Restoration
Level
Approach
As -Built
If/s
Stationing
Mitigation
Ratio
Mitigation
Units
SMU/RB
Reach 1
1,520
EI
Pll
1,247
10+00 - 25+20
1.5:1
831
Reach2
646
R
PII
750
25+20-32+70
1:1
750
UT3
104
R
PII
117
100+00 - 101+17
1:1
117
TOTAL
2,114
1,698
Project Buffer
Buffer
R
145,084.01
1:1
145,084.01
Buffer
E
10,000.40
3:1
3,333.47
TOTAL
155,084.41
148,417.48
Length and Area Summations by Mitigation Category
Northgate Park (Ellerbe Creek) Stream Respotration site
Restoration Leve]
Stream
(If) Riparian Wetland (ac)
Non -
riparian
Wetland
(ac)
Credited
Buffer (sf)
Riverine Non-Riverine
Restoration
867
145,084.01
Enhancement
10,000.40
Enhancement I
1,247
Enhancement Il
Creation
Preservation
High Quafity Preservation
Total
2,114
155,084.41
Owrall Asset Summary
Northgate Park (Ellerbe Creek) Stream Respotration site
Asset Category Owrall Credits
Stream 1,698
Riparian Wetland
Non -riparian Wetland
Buffer 148,417.48