HomeMy WebLinkAbout20170494 Ver 1_230198_Hyd_prm_wet_ANSI B_11X17_170427_20170427+
L
�Q�
0
NM�
� ec
�o�.
�N/
M C'.� f.:..
�
�
•�
�
V
�
�
O
V
See Shee'1� 1A For Index of Shee'ls
See Sheet 9B For C'onventlonol Symbols
See Sheet 1C For Survey Control Sheet
����� �ll ����� ��������
�������� �� ��������
COLUMBUS COUI�TY
LOCATI0111: BRIDGE N0.230198 OVER WESTERIV PR01VG CREEK 0111
SR I546 (BILL HOOKS RD.)
TYPE OF WORK GRADI11tG, DRAIIVAGE, PAVING F� STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
sTwre sTwre nno�ecr neaenxnce no.
���� 17BP.6.R.70
176P.6oRn70 I P A f�1�A o
sxea.r mrn�
. . SHF.P.TS
�
PE
WW /UTIL.
BRIDGE #230198
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
GRAPHIC SCALES DESIGN DATA
30 15 0 30 60 ADT 2016 = 270
T = 6 % *
PLANS V = 55 MPH
30 15 0 30 60 *�ST = 3% DUAL =
PROFILE (HORIZONTAL) FUNC. CLASS = MINOR
COLLECTOR, RUF
6 3 0 6 72 (SUBREGIONAL)
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT 176P.6.RJ0 = 0.060 MILES
LENGTH STRUCTURE PROJECT 17BP.6.R.70 = 0.017 MILES
TOTAL LENGTH TIP PROJECT 17BP.b.R.70 = 0.077 MILES
ETHERI�� DIVISION OF HIGHWAYS
ENGINEERING DIVISION 6
1223 Jones Franklin Rd. Raleigh, N.C. 27606 558 G�Respie S:+eee
License No. F-0377 Fayerreville Nq 28307
Bus: 919.851.8077 Fax: 919.851.8107
2072 STANDARD SPECIFICA770NS
RIGHT OF WAY DATE: EDWARD G. WETHERILL,. PE
PAOJECT ENGINEER
LETTING DATE:
NCDOT CONTACT:
GREG S. PURVIS, PE
PROjECT DESIGN ENGINEEft
BRICE BELL, PE
DIV7570N 6 BRlDGE AROGRAM MANAGER
HYDRAULICS ENGINEER
ROADWAY DESIGIY
ENGINEER
P.E.
P.F,.
Hqa ��;���
8��q
?p��
PERMIT DRAWING
SHEET 1 OF 6
DOCUMENT NOT LONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETEO
iiiiiiiiiiiiiiiiiiii
iiiiiiiiiiiiiiiiiiii
iiiiiiiiniiiiiiiiii�
��������i �� ����������
��������i ��� y��:r.i n�i:�m�
��������I IY iYilli/i�WY�
��������I 1� ��1:71 � �����
��������I lii ij:�ll io���
J�I�l9
��������I1� ��������^�
��������I I\ ��������r�
��������I1� ����������
��������I1� ����������
��������11� ����������
X-1
X-2
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L- 18+45 to 22+20 1@25', 1@30', 1@35' 18" C.S. 0.03 0.06 0.07 < 0.01 < 0.01 44 4
TOTALS*: 0.03 0.06 0.07 < 0.01 < 0.01 44 4 0
*Rounded totals are sum of actual impacts
NOTES:
44 Ft. of permanent existing channel impacts is for Bank Stabilization
Mechanized Clearing+Fill in wetlands=0.097Ac
Temporary SW Impacts: 312 Sq. Ft.
Permanent SW Impacts: 149 Sq. Ft.
2013 10 24