Loading...
HomeMy WebLinkAbout20170488 Ver 1_Shoreline Stabilization_20170419Department of Environment and Natural Resources DWR Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 - Water Quality Certification, Shoreline Stabilization FORM: SSCP 10-2013 Shoreline Stabilization Application Ford 0 1 7® 4 8 8 Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 &Buffer Permitting Unit a C�G�MG r 1617 Mail Service Center Raleigh, NC 27699-1617 �N Z017 I. Applicant Information [15A NCAC 02H .0502(a)1 1. Owner Inf rmation Name: Mailing Address ,/ Za L_V �-I- 4M ; 1 -7 f Telephone Number: [__0(TQ b Fax Number: E-mail Address: [or,n -Z ce - us-�- 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.armv.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.odf) must �b�e,attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: lUCm uX�a AIC', -a g-/ -ZJ<�- Telephone Number: '70(/ q19-5 (o Fax Number: E-mail Address: hc,j; r►en+� «rn s r�,c, (< Person to receive the Certification Approval: -Alu, AA em 1,0 II. Project Information [15A NCAC 02H .0502(a) & (b)1 I. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Slt4t') V Nearest Town:wt4 w(� Subdivision name or site address (include phase/lot number): All tin- Aero c Directions to site - please include road names and numbers, landmarks, etc.: Latitude ern deamai ) 3 AP 3+74W8'Longitude fdeamaideVVM 5�` 5 .6292 S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Ate &J Ca�&,dicrrL 6. Property size (acres): 7. Lake/ river/ ocean adjacent to property: 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Aald- ftr-w 1200 s wbPJ' Aw - Ile -W woedew, 9. Will -work be conducted from land? [V From water? 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) be]ow the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all dearin& back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level Normal Water level and 50 feet land -ward in square feet or acres: 6M S �1 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 3/0/ //-7 T Agen s Signa f 15A NCAC OZH .0502(fll Date 'Agent's signature is valid only if an authorization letterfrom the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 FI Norm S Lake (At Full Pond/Normal Water Level) Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 �.J