Loading...
HomeMy WebLinkAbout20120041 Ver 2_Riparian Buffer Authorization_20170421G. NCDOT PROGRAMMATIC CATEGORICAL EXCLUSION (PCE) ACTION CLASSIFICATION FORM PCE Approval TIP Project No. WBS Element Federal -Aid Project No, C-5572 46401.3.F1 CMS -0505(70) Project Description: (Repeat all information from Page 1) The West Ellerbe Creek Greenway Project is a 10 -feet wide multi-purpose path along West Ellerbe Creek in Durham County, North Carolina (Figure 1). The greenway will be designed as a multi -use bicycling and pedestrian trail. This type of trail is typically constructed as a 10 -foot wide asphalt path, with an aggregate base, and two -foot wide shoulders on either side. Land disturbance for the construction of these trails is generally 15 to 30 feet wide. The proposed corridor extends Northeast from the existing park west of Guess Road (Westover Park) to the Stadium Drive Trail. The total length of the project corridor is approximately 1.0 miles. There will be two signalized crossings associated with this project. A pedestrian hybrid beacon for the Guess Road crossing, and a full traffic signal with pedestrian accommodations at the North Pointe Road crossing. Categorical Exclusion Action Classification: (Check one) TYPE I (A) NO BOXES Checked x TYPE I (B) ANY BOX Checked refer to Section E TYPE II(A) NO BOXES Checked TYPE II(B) ANY BOX is Checked � q Prepared By: 9! 11/17/15 Michael Taylor, PE, Senior Roadway Engineer SEAL Date Name, Title - 36598 - Stewart, Inc. Company/Agency, Telephone # E Prepared For: City of Durham Local GoyernmSnt Agency Reviewe Date/- Project Dev. Unit Head / Division Representative NCDOT - PDEA / NCDOT Division NOTE: NCDOT Review may occur at either PDEA or the Division Office. Mark through non -applicable position. Approved: For Type I(B) or II(B) Fro' cts only: Date Division Administrator 0W Federal Highway Administration PCE -100L 11 June 2013