Loading...
HomeMy WebLinkAbout20170491 Ver 1_CAMA Application_20170421Coastal Management ENVIRONMENTAL QUALITY April 13, 2017 TO: X017®491 Karen Higgins 401 & Buffer Permitting Unit DWR/Water Quality Permitting ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director RScefv e'D APR 21 2017 1640�AQ - - 1�y FROM: Heather Coats, Assistant Major Permits Coordinator Wl`Tfva NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(aD-ncdenr.cLov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Brunswick Regional Water & Sewer H2GO Project Location: along Gregory Rd., adjacent to the Brunswick River, in Belville, BR Co. Proposed Project: construction of an effluent discharge pipeline and diffuser, and new water treatment plant Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by May 6, 2017. If you have any questions regarding the proposed project, contact Brooks Surgan at (910) 796-7270 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 MOGENSEN MITIGATION, INC. I ENVIRONMENTAL CONSULTING MMI-RJGA RALEIGH (Robert J. Goldstein & Associates) 104 East Chestnut Avenue, Wake Forest, NC 27587 Tel: (919) 556-8845 GPottern@RJGAcarolina.com 06 March 2017 Ms. Heather Coats NC Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405-3845 PAK MOGENSEN MITIGATION. INC MMI MAIN OFFICE -- CHARLOTTE P.O. Box 690429, Charlotte, NC 28227 Tel: (704) 576-1111 Rich@MogMit.com RE: CAMA Major Permit Application for Brunswick H2GO WTP Effluent Discharge at Belville, NC. Dear Ms. Coats, Attached is a CAMA Major Permit application and supporting documents for a proposed effluent discharge pipeline extending from the proposed Brunswick Regional Water and Sewer H2GO water treatment plant (WTP) on Gregory Rd in Belville to the proposed effluent diffuser in the Brunswick River, adjacent to Brunswick H2GO's existing wastewater effluent discharge. The project components addressed in this CAMA Major Permit application include: 1) approximately 17,450 feet of buried effluent discharge line from the proposed WTP eastward to the diffuser in the Brunswick River; 2) The total length includes 400 ft of buried effluent discharge line from the river bank eastward to the diffuser structure; 3) a 35 -ft long diffuser pipe on the river bed with four discharge ports extending one foot above the river bottom; and 4) a row of pilings to mark the diffuser location and to support a debris deflector. We have completed the relevant portions of CAMA forms MP -1, MP -3, and MP -4, as instructed by you and Debra Wilson, along with supporting text, plans, and maps. A CAMA Major Permit application fee of $400 payable to NC Department of Environmental Quality is also included. The proposed WTP will produce potable water for the H2GO service area (Leland, Belville, Navassa, and adjacent areas) from brackish groundwater aquifers that are not currently tapped for any other uses. H2GO will no longer routinely use Brunswick County for water supply; this will free up approximately 2 MGD (current daily demand) of Brunswick County water for other customers. At full design capacity of 4.0 million gallon per day (MGD), the WTP will require about 5.0 MGD of raw groundwater and will discharge about 1.0 MGD of reverse osmosis (RO concentrate effluent with a salinity and major ion composition similar to seawater., hTC, four-nnrt diffuser to he installed annroximately 360 feet offshore from the west baF1 0 9rl:'Is I �, 9 I I t 2 L' NEPA & SEPA Environmental Impact Reports ■ Jurisdictional Wetland & Stream Buffer Delineations ■ Section 404-401 Permitting ■ Endangered & Threatened Species Surveys ■ Federal & State Environmental Agency Consultation ■ Stream & Wetland Restoration & Mitigation Planning ■ Mitigation Banking & Monitoring ■ GPS & GIS Mapping ■ Water Quality & Stream Flow Studies ■ Phase 1 Risk Assessments ■ Lake & Watershed Management ■ Conservation Planning ■ Parks & Greenways ■ Water Supply, Wastewater & Stormwater Utilities ■ Electric & Gas Transmission Lines ■ Ponds, Lakes & Dams ■ Residential & Commercial Site Development MOGENSEN MITIGATION, INC. (MMI-RJGA) I Illy River will ensure rapid mixing of the effluent, more than 40x dilution within 10 meters from the diffuser ports. The eastern half of the WTP effluent line will share the existing right-of- way/easement to the riverbank with H2GO's Belville wastewater treatment plant (WWTP) effluent discharge line, but the two effluents cannot be combined prior to discharge due to differences in NPDES compliance monitoring. The remainder of the overall Brunswick H2GO water supply project will be permitted under a separate CAMA General Permit and Section 404-401 Nationwide Permit. These remaining project components include: 1) five well sites, each with two wells and ancillary structures, spaced about one mile apart; 2) a 4.0 MGD Reverse Osmosis WTP and ancillary structures at the Gregory Rd site aquired last year for this purpose; 3) raw water lines connecting the well sites to the WTP; and 4) a potable water line from the WTP to the existing H2GO water distribution system. These components are located from Gregory Rd westward, far inland from tidal influence. The only CAMA-jurisdictional Public Trust Water affected by these components is Jackeys Creek at US -17 (Ocean Hwy), which may be navigable by kayak. The proposed raw water lines will cross several other very small non -tidal freshwater streams (Morgan Br, Sturgeon Cr, unnamed tributaries and ditches) and non -tidal wetlands subject to Section 404-401 regulation but not subject to CAMA regulation. Notification letters are being mailed by Certified Mail to the property owners adjacent to the Brunswick River near the discharge site, along with copies of this permit application. These parcel owners include NC State Ports Authority, which owns the riverfront land; D.R. Horton, Inc., current developer of residential lots along the north edge of the easement; and an older single-family house on a wooded lot immediately south of the easement. Cape Fear River Watch serves as the steward for a conservation easement on the NC State Ports parcel. A copy of the notification letter sent to the three adjacent property owners (plus Cape Fear River Watch) is included with this permit application. Sincerely, Gerald Pottern Mogensen Mitigation Inc - RALEIGH office MMI-RJGA Environmental Consultants 104 East Chestnut Avenue Wake Forest, NC 27587 Office: 919-556-8845 Mobile: 919-649-6506 GPoftern@RJGAcarolina.com CC: Carl Scharfe, The Wooten Company Bob Walker, Brunswick H2GO ' 2E 17 Page 2 i ._u DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Brunswick Regional Water & Sewer H2GO c/o Gerald Pottern 2. LOCATION OF PROJECT SITE: The project is located between 600 River Rd. and Hawkswater At The River Subdivision, adjacent to the Brunswick River, in the City of Belville, Brunswick County. Photo Index - 2006: M-6586: K -O, 22 Latitude: 34°13.30"N Longitude: 77°58'46.24"W 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 02/20/2017 Was Applicant Present — Yes 5. PROCESSING PROCEDURE: Application Received — 03/07/2017 (Incomplete), 04/06/2017 (Complete) Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — City of Belville/Brunswick County Land Classification From LUP — Conservation/Developed (B) AEC(s) Involved: EW, PTA Water Dependent: Yes (D) Intended Use: Commercial/Industrial (E) Wastewater Treatment: Existing: Municipal Planned: None (F) Type of Structures: Existing — 8" force main discharge pipe from the Town of Belville WWTP. Planned — Installation of a 16" PVC concentrate line, 20" diffuser pipe, river debris deflector, diffuser trench excavation and fill. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] nRF7X'Pn FILLFT) OTHFR (A) Vegetated Wetlands N/A (B) Non -Vegetated Wetlands (Open water) 4,960 sq. ft. 4,960 sq. ft. (C) Other — Highground (Outside AEC) 326,700 sq. ft. (D) Total Area Disturbed: 336,620 sq. ft. (7.7 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The applicant is proposing to install a 16" PVC concentration line via direction bore from the upland are to the 10' depth contour in the Brunswick River. A 20" diffuser pipe will be installed at the terminal end of the line and buried in an excavated trench with riprap. A river debris deflector will be installed upstream of the diffuser, and a submerged hazard warning piling will be installed downstream of the diffuser. Brunswick Regional Water & Sewer H2GO c/o Gerald Pottern Page Two 9. PROJECT DESCRIPTION The project site is located between 600 River Road and Hawkswater At The River Subdivision, adjacent to the Brunswick River, in the City of Belville, Brunswick County. To locate the property from the Wilmington DCM Office, travel north on Cardinal Dr. Ext. and turn left on to Market St. Drive 0.4 miles and turn right on to Martin Luther King Jr. Parkway (US -74W). Travel 5.25 miles and merge right on to Isabel Holmes Bridge. Go over the bridge and take a left onto US-17S/74W/421 S towards Leland. Continue 0.96 miles and keep right on US-17S/74W/76W (Ocean Hwy). Travel 2.0 miles and stay right, taking the Southport/Oak Island US -133S exit, then stay in the left lane and take the left exit toward Belville US -133S. Continue on US -133S (River Road) for 1.3 miles and the property will be on the left side. The project is located on the west bank of the Brunswick River, just south of the Ocean Highway Bridge and is approximately 0.53 acres. The approximate elevation is 25' above Normal High Water (NHW) in the upland project area. The site is currently utilized as a river discharge easement and has been maintained via mowing and clipping of upland vegetation. Existing structures include a wastewater pump adjacent to NC -133, with a buried 8" Force Main Discharge outfall pipe from the upland area, under the wetlands, and extending approximately 350' in to the Brunswick River. The application states the Force Main line corridor from the WTP site to NC -133 is mostly alongside public roads (10,600 ft.), except for an off-road easement through residential neighborhoods between Chappel Loop Rd. and NC -133 (5,900 ft.). The proposed line will be installed alongside the existing Force Main line in the existing easement. CAMA General Permit #68043D was issued on March 6, 2017 authorizing the installation of one (1) raw water main, one (1) finished watermain, and one (1) force main, via horizontal directional bore, under Jackey's Creek. The project site was historically a storage area for retired military ships known as the "Mothball Fleet" in the 1940's to 1970. The Brunswick River had been widened and deepened by the Army Corps to create a turning and storage basin for these vessels. The existing effluent discharge line was approved via State Permit #32-90 on March 7, 1990 to the Town of Belville. The authorization was a part of the applicant's proposal to create a sewer district for the Town of Belville and the surrounding areas. The service area for the proposal included 1,600 single family homes and approximately 400 light industrial and commercial operations. The Town of Belville Wastewater Treatment Plant and service lines are now owned and operated by H2GO. The easement has been maintained and cleared of upland vegetation. NC State Ports Authority (NC SPA) was the original owner of the property through which the existing easement runs. The existing easement was granted to the Town of Belville by the NCSPA on December 1, 1989, for the installation of the existing effluent discharge line. In 2001, H2GO purchased the Town of Belville WWTP and all associated properties and easements (see Assignment and Bill of Sale), including the easement from US -133 to the Brunswick River. The underlying property of the existing easement is now owned by D.R. Horton. Upland vegetation within the easement consists of wild grasses, shrubs, and hardwood species located on the western portion of the site. The northern adjacent property has been completely cleared for future development of a residential home. The adjacent property south of the easement contains dense upland shrubs, vines, and hardwood species. The coastal wetlands on the site includes a border of Smooth Cordgrass (Spartina alterniflora), Phragmites, Spike Grass (Distichlis spicata), Saltmeadow Cordgrass (Spartina patens), and Groundsel Tree (Baccharis halimifolia) that is approximately 50 ft. in width and 40 ft. in length. The waters of the Brunswick River (in the vicinity of the project) are classified SC, by the N.C. Division of Water Resources. The area is designated as a Primary Nursery Area (PNA), by the N.C. Division of Marine Fisheries and these waters are CLOSED to the harvesting of shellfish. The Brunswick County Land Use Plan classifies the area as Conservation. Brunsw1k Regional Water & Sewer H2GO c/o Gerald Pottern Page Three PROPOSED PROJECT The applicant is proposing to construct a Reverse Osmosis Water Treatment Plant (WTP) to connect to an existing water distribution system serving Leland, Belville, Navassa, and adjacent areas. The purpose of this project is to increase Brunswick County's water capacity to serve more customers. The Water Treatment Plant will be located 2.88 miles west of the Brunswick River at the end of Gregory Road in Belville, and will transmit water through 17,150 linear feet of finished water main to the Brunswick River. The mains will be installed within road right-of-ways and private utility easements by open cut trenching and will avoid and minimize impacts to waters and wetlands by horizontal direction drilling and bore and jack. The applicant anticipates approximately 12 acres of total disturbed area. Four (5) well sites are proposed to retrieve water from existing subterranean aquifers. The applicant states that the proposed Brunswick River discharge site is along the eastern edge of the H2GO service area, a tidal semi -tidal river with bi-directional flow and salinities varying from nearly fresh water to at least 24 g/L in the proposed discharge area, depending on tidal stage and fresh water inflow. The Brunswick River is 1500ft wide, and 1Oft- 14ft deep (depending on tide stage) in the discharge area, 3 60f out from the river bank. The new 16" PVC concentrate line will be installed 275' east of US -133 via horizontal direction bore and will follow the existing effluent discharge easement toward the Brunswick River. The diffuser line will be within the 75' Estuarine Shoreline Area of Environmental Concern as it reaches the shoreline and will continue under the Brunswick River until it reaches the 10ft depth contour at approximately 360ft from shore. When the bore hole is complete out in the water, the concentrate line will be floated out by barge and fed through the bore hole back towards shore. The line will then be connected to the main line in the upland area on shore. As stated by the applicant, a proposed diffuser pipe will be located at the end of the 16" PVC concentrate line at a 45 - degree angle to release RO wastewater in to the Brunswick River. The proposed diffuser is a 35ft long pipe with four (4) discharge port pipes protruding one foot above the riverbed and angled downstream at 45 degrees. Rubber "duckbill" valves will be fixed to each discharge port to help keep out sediment. The diffuser pipe will be lowered in to the river by barge and placed at the bottom of an excavated trench and covered with riprap. A turbidity curtain will be installed several days prior to the start of the excavation process to limit suspended sediments to the project area. The bottom curtain will be approximately lft off the river bottom and will be anchored by bottom anchors or six (6) temporary wood pilings. The turbidity curtain will be marked by flashing lights from floating buoys and temporary pilings to aid in safe navigation around the project site. Excavation equipment will reach over the turbidity curtain during operation and installation. The turbidity curtain will be removed seven (7) days after the diffuser has been completely installed and secured in the trench. The applicant proposes to excavate a 5.5ft deep, l Oft wide, and 84ft long bottom trench for the placement of the new diffuser assembly. The trench sides will be graded so that the top of the trench (at existing grade) is 40ft in width and 124ft in length. The excavation of the trench will be accomplished using the bucket to barge method. When the diffuser is in place, the trench will be backfilled with clean #67 stone fill to a height of approximately 36" from the trench bottom to cover the diffuser. Approximately 24" of clean NCDOT Class 1 riprap will be placed on top of that to the existing grade (- l Oft) to secure the diffuser assembly at the bottom of the Brunswick River. Clean NCDOT Class A riprap will be hand placed around each "duckbill" diffuser head to complete installation. Approximately 470 cu. yds. of excavated river bottom material, will be deposited on to a floating barge (with a skirt) and transported to an offload area where it will be transferred to trucks on shore. A contractor will then transport the dredge material from shore to a l 00ft by 200ft disposal site owned by H2GO. Backfill material will be loaded on to the barge from land and transported to the trench to be deposited. Brunswick Regional Water & Sewer H2GO c/o Gerald Pottern Page Four The proposed diffuser will be protected by a debris deflector located 4ft-20ft upstream of the diffuser. The deflector will be installed after the removal of the turbidity curtain and will comprise of a row of four (4) permanent pilings spaced 11 ft apart. The pilings will be "wet jetted" to a depth of 20ft below the river bottom, with the top of the pilings at 2ft above Mean High Water (MHW). The floating cross beams, measuring approximately 35ft in width, will be attached just below the MHW line. The debris deflector will be positioned at an angle toward the channel, with the landward end piling 20ft from the connection point of the diffuser, and the waterward end piling 4ft from the terminal end of the diffuser. One additional permanent piling will be installed approximately 4ft from the concentrate line/diffuser connection point, using the same method as the deflector pilings. The permanent pilings will all have solar powered warning lights and signs marking their locations. 10. ANTICIPATED IMPACTS The technique of horizontal directional drilling will result in no direct excavation or fill impacts to wetlands or waters. Clearing and trench excavation is expected to cause 7.5 acres of disturbance in upland areas where horizontal directional drilling is not possible or not applicable. H2GO's discharge easement from US -133 to the river is not open to public use. Excavation of the diffuser trench by bucket to barge method is expected to cause temporary turbidity and siltation, however, the impacts will be limited to the project area by the. installation of turbidity curtains. Placement of stone riprap within the trench is anticipated to have a low impact on benthic invertebrate and vertebrate species. Natural sediment in this area contains sands and silts that is not high quality habitat for benthic fauna or aquatic vegetation. Five benthic samples taken in November 2013 in the proposed diffuser area revealed very low abundance and diversity of benthic macroinvertebrates. Two samples contained no macro invertebrates, and three samples yielded two Polychaete worms, one marsh clam, and one Amphipod. Introduction of riprap may provide habitat for estuarine mollusks, crustaceans, bottom -dwelling fishes, and other aquatic life. The site has had a prior history of being disturbed by dredge activities for the "Mothball Fleet" and the existing effluent discharge line. A SEPA Environmental Assessment was circulated in 2015 by the applicant among National Marine Fisheries, US Fish & Wildlife, NC Heritage Program, NC Wildlife Resources Commission, DENR Wilmington Regional Office, NC Division of Coastal Management, and NC Division of Marine Fisheries. The applicant states that comments from the agencies concluded low impact to fisheries, shellfishes, wildlife, endangered species, or water quality. Due to changes in SEPA law in 2015, SEPA review was discontinued before the Environmental Assessment was finalized. The installation of an RO discharge pipe to the Brunswick River without proper plant operations could create potential water quality degradation with a resulting impact on animal resources, including the Short -nosed Sturgeon. Submitted by: Brooks R. Surgan Date: 04/12/2017 Office: Wilmington DIM MP -1 APPLICATION for Midor Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Brunswick Regional Water & Sewer H2GO Brunswick 1-12GO Reverse Osmosis WTP Effluent Outfall Applicant 1: First Name MI Last Name Bob Agent/ Contractor 1: First Name Walker Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 516 Village Rd NE 2230 Leland NC ZIP Country Phone No. FAX No. 28451 910-371 -9949 ext. 106 - Street Address (if different from above) City State ZIP (same) 27587 919 - 556 - 8845 Email bwalker@h2goonline.com 2. Agent/Contractor Information Business Name Mogensen Mitigation Inc (Mmi-Rjga) Agent/ Contractor 1: First Name MI Last Name Gerald Pottern Agent/ Contractor 2: First Name MI Last Name Richard Mogensen Mailing Address PO Box City State 104 East Chestnut Ave Wake Forest NC ZIP Phone No. 1 Phone No. 2 27587 919 - 556 - 8845 ext. (Gerald) 704 - 576 -1111 ext. (Rich) FAX No. Contractor # Street Address (if different from above) City State ZIP same Email gpottern@RJGAcarolina.com <Form continues on back> 252-808-2808 .. 1-888-4110©AST ., www.nccoastaimanagemeit.net Form DCM MP -1 (Page 2 of 5) APPLICATION for Major Development Permit r 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick 600 River Rd SE NC -133 Subdivision Name City State Zip c. Belville NC 28451 - Phone No. Lot No. (s) (if many, attach additional page with list) - - ext. 048CA02003, 048CF008 , 048CB001, 048CB00101, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Cape Fear Brunswick River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Brunswick River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Discharge site: Existing wastewater pump station adjacent to NC -133, with buried wastewater effuent outfall extending into Belville 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) Easement width at Brunswick River = 35 feet Discharge line easement from NC -133 to river bank = 0.53 acre c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 0 to 25 ft ❑NHW or ®NWL e. Vegetation on tract River discharge site: Mowed utility easement, except for marsh/scrub vegetation (fresh to low -salinity brackish) at river bank (Morella, Ligustrum, Phragmites, Panicum, Gelsemium). Also additional roadside and off-road utility corridors along US -17, Ploof Rd, Chappell Loop Rd, Two Pines Rd, Morecamble Blvd, and River Rd. Mostly mowed scrub and lawn. f. Man-made features and uses now on tract Discharge site: Existing wastewater pump station adjacent to NC -133, with buried wastewater effuent outfall extending into river. The effluent line corridor from the WTP site to NC -133 is mostly alongside public roads (10,600 ft), except for an off- road easement through residential neighborhoods between Chappel Loop Rd and NC -133 (5,900 ft). The proposed line will be installed alongside the existing WWTP discharge line in the existing easement. g. Identify and describe the existing land uses adjacent to the proposed project site. Roadside corridors, WTP to Chappel Loop Rd: Mixed industrial, commercial, residential, and vacant land. Off-road corridor (Chappel Loop Rd east to NC -133): Residential development and forested wetlands. River discharge easement (NC -133 to river): New residential development to the north (under construction 2016-2017) and mixed hardwood/pine forest and marsh to the south. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R10 Residential (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No [INA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808.2808 :. 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP -1 (Page 3 of 5) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes [:]No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes [:]No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. The existing H2GO municipal wastewater treatment plant (formerly Belville WWTP) is a conventional tertiary treatment plant located on Chappel Loop Rd, with a discharge line into the Brunswick River. The proposed effluent discharge line for the reverse osmosis (RO) water treatment plant will be intalled in the existing easement alongside the WWTP discharge line. The two effluents cannot be combined prior to discharge due to differences in NPDES compliance monitoring. o. Describe existing drinking water supply source. H2GO currently purchases treated water from Brunswick County's Northwest Water Treatment Plant on the Cape Fear River. p. Describe existing storm water management or treatment systems. The proposed discharge alignment follows mostly along roadsides adjacent to developed land with stormwater ditches draining into into Jackeys Creek and unnamed tributaries of Brunswick River. Some newer development has stormwater ponds and other BMPs, but these are not within the proposed construction corridor and will not be affected. There is no existing stormwater management structure in the project vicinity at the riverbank. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed WTP will produce potable water for the H2GO service area (Leland, Belville, Navassa, and adjacent areas) from brackish groundwater aquifers that are not currently tapped for any other uses. H2GO will no longer routinely use Brunswick County for water supply; this will free up approximately 2 MGD (current daily demand) of Brunswick County water for other customers. At the design capacity of 4.0 MGD, the WTP will require about 5.0 MGD of raw groundwater and will discharge about 1.0 MGD of RO wastewater with a salinity and major ion composition similar to seawater. The diffuser to be installed 360 ft offshore from the west bank of Brunswick River will employ four ports with rubber "duckbill" valves to ensure rapid mixing of the effluent, more than 40x dilution within 10 meters from the diffuser. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. **" See attached supporting text: d. List all development activities you propose. The project components addressed in this CAMA Major Permit application include: 1) approximately 17,150 feet of buried effluent discharge line from the proposed WTP on Gregory Rd eastward to the west bank of the Brunswick River; 2) 400 ft of buried effluent discharge line from the river bank eastward to the discharge point; 3) a 35 -ft long diffuser pipe anchored to the river bed, with four discharge ports extending one ft above the river bottom; and 4) a row of pilings to mark the diffuser location and to support a debris deflector. The permit cover letter summarizes the additional components of the overall water supply project (wells, raw water lines, and treatment plant); these will be permitted under a separate CAMA General Permit and Section 404-401 Nationwide Permit. e. Are the proposed activities maintenance of an existing project, new work, or both? New project, partially using an existing wastewater effluent right-of- way/easement. f. What is the approximate total disturbed land area resulting from the proposed project? 7.5 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? P,,F--CPIif 2Gil 252-808-2808 .. 1.888-4RCOAST .. www.nccoastaimanagement.net Form DCM MP -1 (Page 4 of 5) APPLICATION for Major Development Permit T h. Describe location and type of existing and proposed discharges to waters of the state. The existing H2GO municipal wastewater treatment plant (formerly Belville WWTP) is a conventional tertiary treatment plant located on Chappel Loop Rd, with a discharge line to the Brunswick River and a diffuser located 360 ft offshore, at Lat = 34.2183, Lon = -77.9784. The proposed effluent discharge line for the reverse osmosis WTP reject water will terminate at a 4 -port diffuser located 150 ft south of the existing WWTP effluent diffuser, and about the same distance offshore. The RO WTP discharge will have an expected salinity of 25 to 32 g/L, slightly less than seawater, and within the natural range of salinities observed in the Brunswick River. The effluent will not contain treated municipal wastewater. i. Will wastewater or stormwater be discharged into a wetland? []Yes ®No EINA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information" In addition to this completed application form, (MP -1) the following items below, if applicable; must be submitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development.application. Please consult the application instruction booklet on how to properly prepare the required. items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name D.R. Horton Inc. Phone No, Address 503 Wando Park Blvd S #200, Mount Pleasant SC 29464 Name NC State Ports Authority Phone No. Address P.O. Box 9002 Wilmington, NC 28402 Name Betty P. Cheshire Phone No. Address 884 Cheshire Rd, Rocky Point, NC 28457 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NPDES Permit -- See Supporting Text Erosion & Sedimentation Plan -- See Supporting Text Waters of the State Easement for Subaqueous Pipeline -- See Supporting Text h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental. Policy �Act.-- . 252-808-2808 .. 1-888-4RCOAST :: www.nccoastaimanagement.net Fojm DCM MP -1 (Page 5 of 5) APPLICATION for Major Development Permit lication will allow only the development described in the application, f understand that any permit issued in response to this app' The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to nton the aforementioned lands in connection with evaluating information related to this permit application and follow-up eer monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 06 MARCH 2017 Print Name — Gerald Pottern, Mogensen Mitigation Inc. Signature Please indicate application attachments pertaining to your proposed project. pDCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ®DCM MP -3 Upland Development ®DCM MP -4 Structures Information "'-' (1 i '��'si t-8$3.4i2COAST :. tiv rain>.r,rccaa�,talmanag�mes�t.net Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) GCM WILMINGTON, titin 0 g 2017 Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. 1. Access O This section not applicable a Amount of material to be excavated from below NHW or NWL in b- Type of material to be excavated. Other River bottom sediment, sand & silt & organic material, no Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (i) Does the area to be excavated include coastal wetlands/marsh (NLW or (CW), submerged aquatic vegetation (SAV), shell bottom (SB), Not Applicable Breakwater shoreline N_WL) ❑CW ❑SAV ❑SB stabilization) Length (ii) Describe the purpose of the excavation in these areas: Excavate trench to install main diffuser header and connect it to 124 ft (top) Width installed below river bottom with four 3 -inch size duckbill type 40 ft (top) Avg. Existing 2. DISPOSAL OF EXCAVATED MATERIAL [I This section not applicable a. NA NA 9.6 ft at Depth Disposal area will be a rectangle approximately 100 feet owned by Brunswick Regional Water and Sewer near the wide by 200 feet long. Silt fence to be place around the wastewater treatment plant. The disposal area location is Diffuser Final Project shown on the attached figure to this form. c. (i) Do you claim title to disposal area? NA NA 9.6 ft at Depth (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? Not necessary, one-time excavation. Diffuser 1. EXCAVATION O This section not applicable a Amount of material to be excavated from below NHW or NWL in b- Type of material to be excavated. cubic yards River bottom sediment, sand & silt & organic material, no 470 cu.yds based on trench excavation dimensions shown in aquatic plants or shell bottom. Excavation to be — 5.5 feet Drawings below the existing river bottom C. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), Not Applicable or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the excavation in these areas: Excavate trench to install main diffuser header and connect it to the HDD -installed effluent line. Diffuser header and piping to be installed below river bottom with four 3 -inch size duckbill type diffuser protruding — 1 foot above the river botom 2. DISPOSAL OF EXCAVATED MATERIAL [I This section not applicable a. Location of disposal area. b Dimensions of disposal area. The excavated material will be disposed of at property Disposal area will be a rectangle approximately 100 feet owned by Brunswick Regional Water and Sewer near the wide by 200 feet long. Silt fence to be place around the wastewater treatment plant. The disposal area location is material. shown on the attached figure to this form. c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA ❑Yes ®No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? Not necessary, one-time excavation. e. (i) Does the disposal area include any coastal wetlands/marsh f (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No ❑NA or other wetlands (WL)? If any boxes are checked, provide the (ii) If yes, how much water area is affected? 252.808.2808 :: 1-888-4RCOAST .: a,n ,v,nccoastalmanagement.not revised: 12 26:06 RECEIVED Form DCM MP -2 (Excavation and Fill, Page 2 of 3) GCM b'IILMINGTQN, NC number of square feet affected. °k 02017 [-]CW N/A ❑SAV N/A ❑SB N/A ❑WL ®None (ii) Describe the purpose of disposal in these areas: N/A a. Type of shoreline stabilization. b. Length ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No DNA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. 4. OTHER FILL ACTIVITIES 0This section not applicable (Excluding Shoreline Stabilization) a M Will fill material be brouoht to the site? ®Yes ❑No DNA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water 470 cu.yds (iii) Dimensions of fill area 124 ft (top) x 40 ft (top) x 5.5 ft dee (iv) Purpose of fill Backfill excavated trench over RO line and diffuser pipe with stone fill and rip rap. Drawings provide specified materials to be used. 5. GENERAL submerged aquatic vegetation (SAV), shell bottom (Sti), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV DSB ❑WL ®None (ii) Describe the purpose of the fill in these areas: a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Excavated river bottom material (sand and silt will be placed on a Trench to be excavated with dragline, clamshell, or crane from a barge (with a skirt), transferred to trucks by Contractor barge. Divers to assist in direction pipe pull from the water and determined methods and hauled to the Owner's disposal site. in placing diffuser pipe and installing diffusers. Trench backfill Trench backfill material will be trucked in, transferred to the also to be deposited into the trench from a barge into the barge and deposited in the trench. Backfill material will be more trench using clamshell or barge crane. A turbidity curtain with stable and erosion resistant than the existing sand/silt/much temporary pilings will be used as part of construction as shown sediment removed. River bottom elevation to be approximately on the Drawings. the same as existing elevation after work is completed 252-808-2808 :: 1.888-4RCOAST :: w,w.nccoastalmana$Ementaaet revised: 12;26,06 -i 4 tg o Form DCM MP -3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL. UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. NA Buried effluent pipeline, 17,450 lin. ft. from WTP to River diffuser c. Density (give the number of residential units and the units per d. Size of area to be graded, filled, or disturbed including roads, acre). ditches, etc. NA 15,520 ft open cut x 20 ft ave width disturbed = 7.5 acres e. If the proposed project will disturb more than one acre of land, the f. List the materials (such as marl, paver stone, asphalt, or concrete) Division of Land Resources must receive an erosion and to be used for impervious surfaces. sedimentation control plan at least 30 days before land -disturbing NA activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes []No ❑NA (ii) If yes, list the date submitted: March 28, 2017 g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also be covered by impervious and/or built -upon surfaces, such as require a Stormwater Certification. pavement, building, rooftops, or to be used for vehicular driveways (i) Has a site development plan been submitted to the Division of or parking. Water Quality for review? none ❑Yes ®No ❑NA i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. none j. Describe proposed method of sewage disposal. NA I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). The proposed effluent discharge line for the WTP process wastewater will terminate at a diffuser located 150 ft south of the existing Belville WWTP effluent diffuser (Lat 34.2183, Lon -77.9784). The new discharge will have an expected salinity of 25 to 32 g/L, slightly less than seawater, and within the river's natural salinity range. It will not contain municipal wastewater. (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? []Yes ❑No ®NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑Yes ❑No ®NA If yes, attach appropriate documentation. R F7 C t: -j' 252-808-28082 n 1-888-4RCOAST :: www,nccoastalmanagement.net revised: 12/26106 Form DCM MP -3 (Upland idevelopment, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) The proposed WTP will treat brackish groundwater from the Lower PeeDee and Black Creek deep aquifers (currently unused) obtained from five pairs of proposed wells in the Leland area. This will not affect current or future use of the overlying freshwater aquifer. H2GO will no longer need to rely on Brunswick County for its regular water supply. An emergency water supply connection between the systems will be retained. o. When was the Iot(s) platted and recorded? The existing wastewater effluent discharge easement was platted and recorded in Aug 1989. n. (i) Will water be impounded? Dyes ®No ❑NA (ii) If yes, how many acres? NA p. If proposed development is a subdivision, will additional utilities be installed for this upland development? Oyes ❑No ®NA 252-8t)e-2808 1,8284RCOASTtvwv+r.mccoasf,.tatmana.9g�ateitf.rtet revised: 12/26%f36 Form DCM �MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA .CHARACTERISTICS , ®This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government ❑Private/Community ❑Yes []No c. (i) Dock(s) and/or pier(s) (ii) Number (iii) Length (iv) Width (v) Floating []Yes ❑No e. (i) Are Platforms included? ❑Yes ❑No If yes: (ii) Number (iii) Length (iv) Width (v) Floating []Yes []No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed (ii) Number of slips existing i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel ❑Open water; no dredging required []Other; please describe: k. Typical boat length: m. (i) Will the facility have tie pilings? ❑Yes ❑No (ii) If yes number of tie pilings? d. (i) Are Finger Piers included? ❑Yes ONO If yes: (ii) Number (iii) Length (iv) Width (v) Floating []Yes []No f. (i) Are Boatlifts included? []Yes ❑No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). I. (i) Will the facility be open to the general public? ❑Yes []No 252-808-2808 :: 1-888-4RCOAST :: www.necoastaimanagement.net revised: 12/27/06 Form DCM MP -4 (Structures, Page 2 of 4) 2. - D.O:CKING FACILITY/MARINA-OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No 252-808-2808 :: 1-888-4RCOAST :: www_necoastalmanagement.net revised: 12/27/06 Form DCM MP -4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes [:]No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ONO If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s): []Commercial ❑Public/Government ❑Private/Communky (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. if a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6, MOORING PILINGS and BUOYS []This section not applicable a. Is the structure(s): b. Number 4 pilings ❑Commercial ZPublic/Government ❑Private/Community c. Distance to be placed beyond shoreline 360 ft d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. Four pilings spaced approximately 12 feet apart, upstream of diffuser, with HDPE cross -beams to deflect debris, and solar -powered navigation lights to alert boaters. e. Arc of the swing NA wif 7. GENERAL C:ti IL-MINGTo-iN, NC 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12127106 Form DCM 1,1,1-4 (Ststacturzas, P'aSe 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 360 ft east Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 1500 ft e. (i) Will navigational aids be required as a result of the project? ®Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. The diffuser will not be visible from the water surface. Pilings at diffuser ends will have navigation lights to indicate an underwater hazard; see 6.d above. b. Proximity of structure(s) to adjacent docking facilities. 360 ft south d. Water depth at waterward end of structure at NLW or NWL 10-14 ft ►: t�THfR: ' p;Thls seeilon nbt app�toat a. Give complete description: The proposed effluent discharge line for the WTP process wastewater will directionally bored under the Brunswick Rline bed to a point about 350 feet from shore and 150 feet downstream of the existing WWTP discharge. The east end of this line will connect to a 35 -foot long diffuser pipe anchored to the river bed, with four discharge ports spaced 11 feet apart. The discharge ports will extend one foot above the river bed, angled upward and downstream at a 45 degree angle, each with a Tideflex rubber "duckbill' valve to keep out sediment. Pilings placed at the diffuser ends will be marked to warn boaters of this underwater hazard; and additional pilings will support a series of horizontal pipes to serve as a debris deflector. 06 Mapl 2Q17 252-3C8-2$08 .: '.•383-4RCOAST :: tvwysr.fyc oast ln3an ± v_m r+t,raot Text for CAMA Major Permit -- Brunswid (April 4, 2017) Form DCM MP -1: (TP Effluent Discice 5.c. Construction Methods, Sequence, Equipment: The new RO concentrate line diffuser pipe will be installed via open cut technology for the majority of the new line. Directional drilling will be used at four locations along the new RO concentrate line: • The first will be at Station 65+39 near the intersection of Two Pine Road and Eastwood Lane as shown on attached Drawings C-1.02 and C-1.03. This directionally drilled section will be approximately 700 feet long, beneath wetland GS. • The second will be at Station 110+35 near the intersection of Highway NC 133 and Morecamble Boulevard SE and Eastwood Lane as shown on attached Drawings C-1.04. This directionally drilled section will be approximately 290 feet long. • The third will be at Station 114+73 near the intersection of Highway NC 133 and the sewer lift station as shown on attached Drawings C-1.04. This directionally drilled section will be approximately 140 feet long. • The fourth directional drilling section is described below and is the only drilling section related to an Area of Concern under this CAMA major permit application (wetland GQ). The fourth directionally drilled pipe will be from a location approximately 275 feet east of Highway 133 and extend out approximately 800 feet to the submerged diffuser location. The proposed directionally drilled pipe profile is shown on Drawing C-1.05. The drilling pit will be set up on a high point elevation of approximately 20 feet msl and will be approximately 10 feet higher than the 100 year floodplain elevation. Fused PVC pipe (16 - inch diameter) will be used with fusing occurring on the shore in the existing H2GO utility easement. The drilling head will be advanced to the diffuser location. The PVC pipe will then be floated out onto the river and prevented from significant movement using floating barge(s) and/or temporary wood piles. The fused pipe will be pulled back from the water down into the borehole and back to the drilling pit in a controlled manner. The pipe will be filled with river water as it is pulled to sink the pipe to the bottom. At the end of the pull, the fused PVC pipe end will be located in the area where the 45 -degree elbow is shown on the Plan Sheets. The pipe end will be marked with a temporary float. The river bottom diffuser profile and depth is shown on Drawing C-1.05. The diffuser assembly will be installed "in the wet" by divers without the need for a cofferdam. A barge will be used to transport the 35 -foot long, HPDE diffuser assembly to the installation location. The diffuser assembly will include the 45 -degree elbow already attached. The bottom trench will be - 5.5 feet deep, 10 feet wide and 84 feet long. Top trench width to be 40 feet and top length to be 124 feet. The trench will be excavated in the existing river bottom to allow burial of the new diffuser assembly. Bottom trench excavation will be accomplished using a floating barge and long reach excavator bucket or clam -shell bucket (- 3.5 feet wide). A turbidity curtain will be installed surrounding the excavation and diffuser areas. A product cut sheet on the proposed turbidity curtain is attached. The bottom of the curtain is approximately 1 foot off the river bottom to avoid disturbing the river sediments in the curtain area. The turbidity curtain will be held in place by either bottom anchors or temporary wood piles driven into the river bottom. The excavating equipment will reach over the turbidity curtain. Once the trench is excavated and leveled using leveling rods, the diffuser assembly will be lowered in place by the crane and divers will manually guide the diffuser in position in the trench and connect the directionally drilled plain end pipe to the 45 -degree elbow. Connection details are showing in the attached Drawings. After connection of the two pipes, the divers will connect the duckbill diffusers and then stone on the barge(s) will be placed over the diffuser assembly to complete the installation. A product cut sheet on the diffuser assemblies ("duckbill") is attached. After the diffuser assembly is installed, the turbidity curtain will be removed. At this point the wood piles for the debris deflector will be installed by a pile driver or wet jetting technique to a depth of 20 feet below the river bottom with the top of the pile approximately 2 feet above high tide. The floating cross bars between the wood piles would then be attached and the warning signs installed. The four deflector piles will be located upstream of the approximate location of the four bottom diffuser duckbills thus identifying the location of the bottom diffusers. Once the deflector piles are installed the construction would be complete. It is anticipated that the direction drilling and diffuser installation work can be completed in approximately 3 to 4 weeks (depending on weather). 5.f. Land Disturbance Area: The entire length of the RO concentrate line is approximately 17,450 lineal feet (from starting point at WTP fence line to river diffuser). Of this length, approximately 1,930 feet will be directionally drilled. Thus, the length of line to be open cut is approximately 15,520 lineal feet. Based on an average open cut disturbance width of 20 feet along the open cut areas of the project length (15,520 ft) and including some disturbance for the directional drilling pits, the estimated land disturbance is 7.5 acres based on the attached drawings. However, the middle segment of the project from US -17 eastward to the Belville WWTP (approximately 6,300 ft) is being permitted and installed separately along with a new wastewater forcemain, in order to minimize construction impacts and costs. The two roadside ditch/stream crossings at Ploof Rd and Chappell Loop Rd are within this middle segment; neither is a CAMA Public Trust Water. Subtracting the land disturbance in this middle segment (2.9 acres) leaves 4.6 acres of "new" disturbed area. 5.g. Public Easement or Access Encroachment: H2GO's existing 30 -ft wide effluent discharge easement from NC -133 to the river is not open for public access to the river. Private lands border the effluent easement to the north and south, and to the east it crosses the Brunswick River floodplain (FEMA 1% base flood elevation = 9 feet, NAVD-88) which is owned by the NC State Ports Authority. The State Ports parcel extends approximately 90 feet inland from the outer edge of the tidal marsh in this area. The Cape Fear River Watch serves as steward for a conservation easement on this parcel. 6.a. Project Narrative: The proposed Brunswick H2GO Reverse Osmosis Water Treatment Plant (WTP) project is a potable water treatment plant using groundwater from five pairs of proposed wells tapping into the Lower PeeDee and Black Creek aquifers as sources. These aquifers contain brackish water and are not currently tapped for any other uses. Furthermore, they are separated from the shallower freshwater aquifer above (Castle Hayne) by dense confining layers. Withdrawal from the deep brackish aquifers should not affect existing or future private wells tapping into the freshwater aquifers (Groundwater Management Associates, 2013). The new WTP will connect to H2GO's existing water distribution system serving Leland, Belville, Navassa, and adjacent areas. 1-12GO will no longer routinely use Brunswick County for daily water supply, although an emergency connection will be maintained. This will free up approximately 2 MGD (current daily demand) of Brunswick County water for other customers. __- The WTP will be built with a 4.0 MGD initial capacity, and may be expanded to 8.0 MGD if needed in the future. The Reverse Osmosis (RO) process will use synthetic membranes and pressure to separate the raw water into approximately 80 percent potable fresh water and 20 percent concentrated RO reject (saline) wastewater. At 4.0 MGD operating capacity and 80% efficiency the WTP will require about 5.0 MGD of raw groundwater and will discharge 1.0 MGD of RO concentrate water. Based on the measured salinities of the two aquifers and expected RO treatment efficiency, the expected salinity of the RO reject wastewater to be discharged into the Brunswick River will be 25 to 32 g/L, or about 75 to 95 percent of seawater salinity. The proposed Brunswick River discharge site is the along the eastern edge of the H2GO service area, a tidal river with bi-directional flow and salinities varying from nearly fresh to at least 24 g/L in the proposed discharge area (Groundwater Management Associates, 2013) depending on tidal stage and freshwater inflow. The river is 1500 ft wide and 10 to 14 ft deep (depending on tide stage) in the discharge area, 360 feet out from the riverbank. It was artificially widened by the Army Corps of Engineers in the 1940s for storing retired military ships, creating a "bench" on either side of the original 400 foot wide channel. The proposed diffuser is a 35 ft long pipe anchored horizontally on the riverbed with four discharge port pipes protruding one foot above the riverbed and angled downstream at 45 degrees to achieve rapid mixing. Based on Cormix modeling under a variety of river flow conditions, the diffuser will achieve 40x or greater dilution within the first 10 meters from the port outlets. A Tideflex® rubber "duckbill" valve on each diffuser port will help keep out sediment. A row of four pilings will mark the diffuser location and support a debris deflector to help protect the diffuser ports from boats, anchors, and drifting logs. The effluent pipeline will extend approximately 17,150 feet from the proposed WTP site on Gregory Rd to the west bank of the Brunswick River. The majority of it will be installed alongside roadways (Gregory Rd, US-17, Ploof Rd, Chappel Loop Rd, and River Rd) and the remaining off-road segments will share the existing right-of- way with Brunswick H2GO's existing Belville wastewater treatment plant (WWTP) effluent discharge line. Most segments will be installed by trenching; other selected segments (including streams, ditches, wetlands, and the riverbank and riverbed areas) will be installed by directional drilling. The staging area for drilling near the riverbank will be above the 100-year flood hazard elevation of 9 ft (NAVD-88). The diffuser pipe and ports structure will be carried to the diffuser site on a barge, river sediment will be excavated to the specified depth (using turbidity curtains to contain turbidity), and the structure will be lowered to the bottom and connected to the buried dischage line by construction divers. Excavated sediment will be taken to an upland site for disposal, and concrete and ballast rock will be placed around the diffuser to anchor it. Construction methods and sequencing are described further in Form MP-1 Section 5.c. The ballast rock will provide a patch of hard substartum in a river reach dominated by silt and fine sand with minimal hard bottom habitat. This ballast rock may provide habitat for estuarine mollusks, crustaceans, bottom-dwelling fishes, and other aquatic life, although the low ambient oxygen concentrations that occur periodically at the bottom in this area may limit the habitat benefits of the placed rock. Five benthic samples collected from the proposed diffuser area in November 2013 using a LaMotte dredge (6 x 7.5 inches area x 3 inches deep) revealed very low abundance and diversity of benthic macroinvertebrates (William Kirby-Smith, Duke Marine Laboratory, 2014). Two of the five samples yielded no macroinvertebrates, and the other three samples yielded two Polychaete worms (Lumbineridae and Capitellidoe), one Marsh clam (Rangia), and one Amphipod (Gammaridae). The sediment from all five samples was primarily silt, clay, and fine sand with 16 to 18 percent organic matter, and exuded a hydrogen sulfide odor indicating anaerobic conditions. However, water quality samples taken in November 2013 at 8 to 10 foot depth revealed dissolved oxygen concentrations in the 6 to 8 mg/L range, and salinities in the 15 to 24 g/L (or PSU) range. Monthly salinity samples collected from Aug 2012 to Aug 2013 by NC-DWQ at 3 ft depth and 1,000 ft upstream of the discharge site ranged from 0.1 to 13.9 g/L. These data suggest a "salt wedge" effect in the Brunswick River, with seawater moving in and out with the tides in deeper water, and freshwater from the Cape Fear River and other feeder streams occupying the upper layers. Storms and seasonal dynamics (e.g. rapid surface cooling) result in occasional mixing of the layers. The artificial widening of the river in the 1940s has probably contributed to anaerobic bottom conditions by reducing flow velocities and increasing the hydraulic retention time. A SEPA Environmental Assessment (EA) for the project was circulated among state and federal agencies during 2015. Review comments regarding potential impacts from the discharge were received from National Marine Fisheries (F.Rohde), US Fish & Wildlife Service (J.Ellis), NC Natural Heritage Program (A.Weakley), NC Wildlife Resources Commission (M.Dunn), DENR Wilmington Regional Office, NC Division of Coastal Management (S.Staples), and NC Division of Marine Fisheries (S.Jenkins), among other agencies. After extensive consultation with agency biologists, all were satisfied that the discharge and diffuser as proposed would not be likely to adversely affect fisheries, shellfishes, wildlife, endangered species, or water quality in the receiving stream. The increase in salinity will be small and localized, and the species exposed to it are euryhaline species adapted to wide salinity fluctuations. Due to changes in the SEPA law in 2015, SEPA review was cancelled before the EA-FONSI was finalized, but the SEPA review comments and applicant responses are appended to this CAMA application. This CAMA Major Permit application addresses the impacts of the effluent discharge line from the proposed WTP on Gregory Rd to the proposed effluent diffuser in the river. This includes 10,600 ft of effluent pipeline along roadways, 6,550 ft off-road within an existing wastewater easement through residential neighborhoods, and 400 ft under the river bed. Plans and impact calculations presented herein are based on these project components. However, the middle segment between US -17 and the Belville WWTP (6,300 ft) is being permitted and built separately along with a parallel wastewater force main line, to minimize construction impacts and costs. Other components of the WTP project not included in this application include the five well sites (each 1.2 acres with two wells, a pump house, and perimeter fence), raw water lines from the wells to the WTP (32,400 feet), the WTP site facilities, and potable water connector into the H2GO distribution system. These will be permitted under a separate CAMA General Permit and Section 404-401 Nationwide Permit. 6.b. Site Plans showing proposed work and any previously authorized work. Utility engineering drawing plan sheets for the entire RO concentrate line and the river diffuser are attached to this permit application. 6.c. Project Location Maps. Figures depicting the project location are attached to this permit application. 6.g. State or Federal Permits Issued or in Review. The NPDES discharge permit application for the RO concentrate discharge into the Brunswick River was submitted on April 13, 2016. A draft permit was issued for public review and a public hearing conducted on January 12, 2017. Currently the permit is in final review and is expected to be issued near the end of April or in early May 2017. "' • As part of the RO concentrate line project, an Erosion and Sedimentation Control Permit was submitted to the NCDEQ Land Quality Section on February 28, 2017. A NCDOT Encroachment Agreement was also submitted to NCDOT on February 28, 2017. A Waters of the State subaqueous (river) easement for the directionally drilled pipe and diffuser pipe is being submitted to the North Carolina State Property Office for approval by the Council of State simultaneously with this CAMA Major permit submittal. 6.h. Agent Authorization Form. See attached signed authorization form from Bob Walker, the Executive Director of Brunswick Regional Water and Sewer 1-12GO. 6.i. Wetland Delineation Maps and Forms. See attached figures and description in supplemental section of 404/401 permit on the following pages. 6.j. AEC Hazard Notice for Oceanfront & Inlet Areas. Not Appliacble. 6.k. NC State Environmental Policy Act (SEPA) Compliance. The proposed project is exempt from the State Environmental Policy Act based on the SEPA Reform Act (HB - 795), as the project does not involve $10 million or more in state funding, and will not directly create substantial, permanent impacts on more than 10 acres of public lands. Form DCM MP -3: d. Area to be graded or disturbed: See response to Form MP -1 Item 5.f. above. e. Erosion & Sedimentation Control Plan: The erosion and sedimentation control plan was submitted on February 28, 2017 to NCDEQ's Land Quality Division by the Wooten Company. h. Site Development Plan: Not applicable. Utility construction does not require a site development plan. Form DCM MP -4: 6. Proposed Pilings: Description, Number, Markings: Attached Drawings C-1.05, 5-1.01, and 5-1.02 depict a proposed river deflector upstream of the new river bottom diffuser. Standard wood piles will be used to support a set of floating cross beams to deflect floating debris towards the center of the Brunswick river and away from the bottom diffusers. Four permanent piles will be installed through pile driving or wet jetting techniques to a depth approximately 20 feet below the depth of the river bottom and extend approximately 2 feet above high tide. Warning signs will mark each of the piles as shown on the detail on attached Drawing 5-1.02. ENVIRO-USA ANI �R1E_AIN klA\.`I,.1=': � ILRLR PRODUCT SPECIFICATION SHEET Enviro-USA's Floating Turbidity Barriers (also known as Turbidity Curtains or Silt Curtains) create a barrier to prevent turbid (cloudy) water from entering clear water. Floating Turbidity Barriers should be used to isolate active construction areas within or adjacent to a body of water to control and contain silt and sediment. APPLICATION: Type 3 Turbidity Barriers are ideal for tidal applications such as harbors, ports, Shorelines, and offshore where wind, current and tide changes are present. FLOATATION: 8" Polystyrene float with a buoyancy of 61 lbs/ft2, sufficient to keep the barrier at a minimal elevation of 3 inches above the water line. SKIRT DEPTH: Skirt depth will be based on project requirements 3ft thru loft. FABRIC: 22 oz/yd2 Nylon reinforced Vinyl Fabric (PVC) yellow in color, with UV inhibitors and a minimum grab tensile strength of 500 lbs. TOP TENSION CABLES: Dual (2 each) 5/16' galvanized top load carrying coated cables placed immediately below floatation (one on each side of the curtain). Cables are finished off at ASTM aluminum connectors in order to transfer and distribute any load across to other barriers. Breaking Strength is 10,000 lbs ger cable. BOTTOM LOAD CHAIN: 5/16" galvanized ballast and bottom load carrying chain, placed at bottom edge of skirt. Chain is finished off on both ends with stress plates and a 1 ton hook on one end and ring on other end, to allow sections to connect quickly and transfer any load. Chain is enclosed in a pocket. Breaking Strength 7,600 lbs. and weight is 1.00 lb/ft. CONNECTOR/ENDS: Top 18" consist of ASTM Marine Grade Aluminum Universal Slide connectors and grommets for lacing from below the connector to bottom edge of skirt. Extreme edges are reinforced with 5/8" poly rope. SEAMS: All horizontal seams are 100% heat welded and all vertical seams are 100% RF welded as recommended by fabric manufacturers. Added Features included: - Grab handle at every connector, Anchor point at connector, Zip -Ties for tying skirts together, Private labeling on every section if desired. Initial set up fee for silk screen on initial purchase. DOT- COMPLIANT: Enviro-USA's Type 3 Turbidity Curtains are compliant with most D.O.T.'s Type 3 — Heavy Duty and or Tidal Water requirements. Accessories that may be required for your job: Anchor Systems - In Water Piling Attachment System Anchor Systems - On Land Boom Separators Floating Marker Lights Absorbent Boom ` Floating Tow Bridle Absorbent Pads M11, 1 1-1 "WE GUARANTEE THE LOWEST PRICE IN THE USA" ENVIRO-USA - AMERICAN MANUFACTURER - PHONE: (321) 222-9551- WWW.ENVIRO-USA.COM Tidef teoxo".' Technical Data Technologies Tideflex' Widebill Effluent Diffuser Features & Benefits • Less expensive than standard duck bill check valve • Improved dilution • No need to oversize in order to reduce headloss • No additional headloss at peak flow Materials of Construction • Available in Buna-N, Neoprene, EPDM Tideflex Widebill Effluent Diffuser Valves are an innovative choice for effluent diffuser systems. The newly patented "widebill" check valve design has several unique benefits, the most significant being cost savings. Widebill Tideflex Diffusers are less expensive than a standard duck bill check valve. Also, the all -elastomer construction is flexible and non - fouling, making them suited for long-term, maintenance free service. Other major benefits of the Tideflex Widebill Effluent Diffuser include: • Elliptical Jet has greater width/depth ratio yielding better dilution. • Enhanced jet velocity at flows below peak flow for improved dilution. • No need to oversize Tideflex Diffusers to reduce headloss. • No additional headloss at peak flow (same headloss as fixed- diamter port/riser). • Widebill diffusers open to and beyond nominal pipe diame- ter at peak flow. • Easily retrofit to existing diffusers without oversizing Tideflex. • Smaller diameter risers also compound the cost savings. A 4" Tideflex Widebill Diffuser (left) next to a standard 4" Tideflex Diffuser (right). Tideflex Technologies , 600 N. Bell Ave., Carnegie, PA 15106 USA , 412-279-0044 Fax 412-279-7878 , www.tideflex.com f 3.00" ANSI 125/150# FLANGE DRILLING 4 HOLES 00.75" THRU ON A 06.00' BOLT CIRCLE 13.46" [342mm] 17.21" [437mm] �O PFF 3.00" SHORT RADIUS 45' ELBOW REINFORCED WITH INTERGRAL METAL WIRE FOR STRENGTH / AND SHOCK RESISTANCE E 2 E m 0 ITEM QTY. DESCRIPTION MATT 1 1 WIDE BILL TIDEFLEX DIFFUSER MUST BE SUPPLIED 2 1 FLANGE BACK—UP RING MUST BE SUPPLIED NOTES: 1. MAXIMUM BACK PRESSURE IMUST BE SUPPLIED ENTER 0 IF PRESSURE IN HEADER CANNOT DROP BELOW PRESSURE PRODUCED BY THE RECEIVING BODY OF WATER ENGINEER: XXXX PROJECT: XXXXX QUANTITY: XX HYDRAULIC CODE No: XXX 'M-' I ^ PRELIMINARY DRAWING E E N I NOT FOR APPROVAL PURPOSES SALES ORDER No:TXX—XXXX • 600 N. BELL AVE. CARNEGIE, PA. 15106 Tl&qteX..D info@tideflex.com 03.00" Technologies 412.279.0044 [76mm] PROPRIETARY NOTICE A Division of Red Valve Com any, Ine. fax 412.279.5410 THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF TIDEFLEX TECHNOLOGIES. TT PRODUCT:3" SER. 35W WIDE BILL DIFFUSER W/4Y ELBOW 07.50" [191mm] IT IS LOANED BY TIDEFLEX TECHNOLOGIES, SUBJECT TO THE CONDITIONS THAT IT PART No: 35DW—O3O—APPROVAL AND THE INFORMATION EMBODIED THEREIN SHALL BE USED ONLY FOR RECORD TT AND REFERENCE PURPOSES. IT SHALL NOT BE USED OR CAUSED TO BE USED IN DR. BY: DJJ DATE: 11-18-08 CHKD. BY: DATE: USTOMER: XXX ANY WAY PREJUDICIAL TO THE INTERESTS OF TIDEFLEX TECHNOLOGIES. IT SHALL REV NOT BE REPRODUCED OR COPIED IN WHOLE OR PART, OR DISCLOSED TO ANYONE CAD SCALE: FULL ORDER No: XXX WITHOUT THE DIRECTWRITTEN BEN PERMISSION OF RETURNED UPON RIDEFLEX EQUEST,TECHNOLOGIES AND TTS—DWG PLOT SCALE: .25 DWG No: Or 1 GEN GENERAL NOTES: i. HYDROGRAPHIC SURVEY - SEE CIVIL DRAWINGS FOR DATE 2. HORIZONTAL DATUM: NORTH CAROLINA STATE PLAN NAD83 3. VERTICAL DATUM: NAVD88 MEAN LOW LOW WATER ELEVATION: EL -2.5' NAVD88. MHW = .1.4' NAVD88; FLOOD HAZARD ZONE AE +9.0' NAVD88. 4. MATERIAL SHALL BE EXCAVATED BY BUCKET -TO -BARGE METHOD FROM THE EXCAVATION PRISM BY THE DREDGING CONTRACTOR AND PLACE IN AN APPROVED UPLANDS DISPOSAL BASIN. 5. EXCAVATION LIMITS SHALL BE BOX CUT. SLOUGHED MATERIAL SHALL BE REMOVED WITHIN THE LIMITS TO THE EXTENDS POSSIBLE. 6. NO OVERDEPTH DREDGING IS ALLOWED BELOW THE PERMITTED EXCAVATION DEPTH. 7. PAYMENT IS BASED ON MATERIAL REMOVED FROM WITHIN EXCAVATION PRISM WITH NO PAYMENT FOR OVERDREDGING, SIDESLOPE SLOUGHTING, ETC. 8. DIVING OPERATIONS PERFORMED BY THE CONTRACTOR AS REQUIRED FOR INSTALLATION OF GEOTEXTILE FABRIC, STONE, PIPE WEIGHTS, PIPE CONNECTIONS, ETC. SHALL MEET THE REQUIREMENTS OF 29 CFR, SUBCHAPTER L, 1910.401-1910.441 (OSHA] AND CARRY MARINETIME EMPLOYERS LIAILITY (MEL) COVERAGE AKA'JONES ACT'. SUBMIT EVIDENCE OF DIVER'S CERTIFICATIONS AND PROOF OF INSURANCE COVERAGE, FIRST-AID AND CPR CERTIFICATIONS, INCLUDING A CURRENT PHYSICAL STATING THAT THE DIVER IS FIT TO DIVE. 1. GEOTEXTILE STABILIZATION/SEPARATION FABRIC SHALL BE PLACED ON EXISTING SUBGRADE SURFACES PRIOR TO PLACEMENT OF STONE OR RIPRAP BACKFILL. 2. GEOTEXTILE STABILIZATIONISEPARATION FABRIC SHALL BE ONE OF THE FOLLOWING WOVEN, 100% HIGH -TENACITY POLYPROPYLENE SILT FILM YARDS GEOTEXTILES: A ADS GEOSYNTHETICS-31OW B. PROPEX - 315ST C. SKAPS - GC 130 D. CARTHAGE MILLS -FX -66 E. US FABRICS, INC. - U8315 F. WINFAB WILLACOOCHEE- WINFAB 315W G. TENCATE MIRAFI- MIRAFI 60OX 3. OVERLAP JOINTS A MINIMUM OF 24'. 4, FABRIC SHALL BE ANCHORED IN PLACE PRIOR TO BACKFILLING BY PLACING MOUNTS OF BOTTOM STONE OR SAND BAGS. 5. PLACE FABRIC LOOSELY USING FULL ROLLS RUNNING ALONG (HORIZONTAL) ON THE SLOPE TO REDUCE JOINTS AND NOT STRETCH FABRIC. STONE AND RIPRAP: 1. SLOPE PREPARATION AND GEOTEXTILE FABRIC SHALL BE INSTALLED BEFORE STONE/RIPRAP BACKFILLING, Z CLEAN STONE FILL: SHALL BE NCDOT #67 OR #5 STONE FILL (WASHED), SOUND, DURABLE GRANITE OR LIMESTONE ROCK. 3. RIPRAP SHALL BE NCDOT CLASS A RIPRAP AROUND DIFFUSER. 4, REMAINDER OF UPPER LAYER OF RIPRAP SHALL BE NCDOT CLASS 1 RIPRAP. 5. TOP LAYER OF RIPRAP SHALL BE 24' IN DEPTH. 6, STONE AND RIPRAP SHALL BE STORED AND HANDLED IN A MANNER TO PREVENT ACCUMULATION OF FINES. 7. MAXIMUM UNDERWATER FREE DROP OF STONE AND RIPRAP SHALL BE 3'. ANY STABILIZATION/SEPARATION FABRIC DAMAGED BY PLACING STONE/RIPRAP SHALL BE REPLACED PRIOR TO PLACING STONE BY CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 8. CONTRACTOR SHALL GRADE INITIAL STONE LEVELING LAYER AS REQUIRED TO PLACE LOWER PORTIONS OF PIPE WEIGHTS AT THE PROPER ELEVATION FOR INSTALLATION OF DIFFUSER MANIFOLD PIPE. 9. CONTRACTOR SHALL HAND PLACE RIPRAP AND STONE IN VICINITY OF VERTICAL DIFFUSER PIPES, 10. TIMBER PILES: A. BY PINE, ASTM D25, CLEAN -PEELED B. PRESSURE TREATEDTO 2.5 PCF CCA IN ACCORDANCE WITH AWPAC3AND C18 C. 11.8' MIN. TIP DIAMETER (37' TIP CIRCUMFERENCE); DRIVEN TIP DOWN. D. INSTALL BY VIBRATORY HAMMER, PILE HAMMER OR WATER JET. 11. FCAM: FOAM FOR FILLING PIPE SHALL BE LOW DENSITY (2 PCF), TWO-PART (POURABLE) LIQUID, EXPANDING, CLOSED CELL, RIGID URETHANE MARINE FOAM. 12. THREADED RODS: ASTM F1554, GRADE 55, HOT -DIPPED GALVANIZED IN ACCORDANCE WITH ASTM A153. 13, COMPOSITE LUMBER: SHALL MEET THE FOLLOWING CHARACTERISTICS: A. ABRASION RESISTANCE: 0.01' WEAR PER 1000 REVOLUTIONS PER ASTM D2394 B. HARDNESS: 1124 LBS. PER ASTM 0143 C. WATER ABSORPTION: 24 HOUR IMMERSION PER ASTM D1037 (UNSANDED SURFACE) - 1.7% D. SPECIFIC GRAVITY: 0.91 TO 0.95 PER ASTM D2395 E. COMPRESSION: 550 PSI DESIGN PER ASTM D198 (PARELLEL) 8 625 PSI DESIGN PER ASTM D143 (PERPENDICULAR) F. TENSILE STRENGTH: 250 PSI DESIGN PER ASTM D198 G. SHEAR STRENGTH: 200 PSI DESIGN PER ASTM D143 H. MODULUS OF RUPTURE: 250 PSI DESIGN PER ASTM D4761 I. MODULUS OF ELASTICITY: 100,000 PSI DESIGN PER ASTM D4761 SILTITURBIDITY BARRIER CURTAIN 1. TURBIDITY BARRIER SHALL BEA TYPE III, HEAVY DUTY, PERMEABLE, TURBIDITY BARRIER CURTAIN. COLOR: BRIGHT YELLOW OR 'INTERNATIONAL* ORANGE 2. CURTAIN SHALL EXTEND TO WITHIN V BETWEEN THE BOTTOM OF THE SKIRT AND EXISTING RIVER BOTTOM AT MEAN LOW WATER BUT SHALL NOT BE DEEPER THAN 10'. 3. FABRIC: 22 OZ PVC 4, FLOTATION: 8' TO 12', FLEXIBLE, WITH BUOYANT UNITS CONTAINED INDIVIDUAL FLOTATION SLEEVE OR COLLAR ATTACHED TO THE CURTAIN. MAINTAIN A MINIMUM CURTAIN FREEBOARD OF 3' ABOVE THE WATER SURFACE. 5. CABLE, TENSION: LOCATED BELOW FLOTATION AND ON BOTH SIDES OF THE CURTAIN. LINE LOADS SHALL BE FABRICATED INTO THE TOP OF THE FABRIC AND SHALL CONSIST OF WOVEN WEBBING OR VINYL -SHEATHED STEEL CABLE WITH A BREAK STRENGTH IN EXCESS OF 10,000 LBS. CONNECTING DEVICES SHALL BE OF EQUIVALENT STRENGTH. S. CHAIN BALLAST: THE SUPPLEMENTAL BOTTOM LOAD LINE SHALL CONSIST OF A CHAIN INCORPORATE INTO THE BOTTOM HEM OF THE CURTAIN WITH SUFFICIENT WEIGHT TO SERVE AS BALLAST TO HOLD THE CURTAIN IN A VERTICAL POSITION. 7. CONNECTION: BOLT ROPED ENDS, ALUMINUM CONNECTORS AT TOP AND #4 STAINLESS STEEL GROMMETS SPACED AT 12' ON CENTER AND FASTENED WITH PLASTIC WIRE TIES, STARTING BELOW THE CONNECTORS AND CONTINUING TO THE BOTTOM. 8, SEAMS: ALL SEAMS SHALL BE DIALECTRIC OR THERMALLY (VULCANIZED WELDED) BONDED TOGETHER AND DEVELOP THE FULL STRENGTH OF THE FABRIC. 9. STRESS PLATES: CHAIN LOADS DISTRIBUTED THROUGH %' X 3'X 6' ALUMINUM PLATES, BOLTED BACK-TO-EMCK ON EACH SIDE OF CURTAIN AND THEN TRANSFERRED FROM CURTAIN -TO -CURTAIN VIA HG HOOK AND RING FOR STRENGTH AND EASE OF ASSEMBLING. 10, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ANCHORAGE AND SETTING OF CURTAIN ANCHOR POINTS AS WELL AS PROVIDING AUTOMATIC FLASHING UGHTS FOR NAVIGATIONAL WARNING. 11. TURBIDITY BARRIER SHALL BE REMOVED AFTER ALL DREDGING AND FILL PLACEMENT OPERATIONS HAVE BEEN COMPLETED. 12. TURBIDITY BARRIER SHALL BE AS MANUFACTURED BY ENVIRO-USA, ABBCD, AER-FLOABASCO, ABSORBENTS INTERNATIONAL, ELASTEC, OR EQUIVALENT CURTAIN MANUFACTURER. PIPELINE ANCHOR WEIGHTS: 1. PIPELINE ANCHOR WEIGHTS SHALL CONSIST OF A TWO-PART, PRECAST BOLT -ON CONCRETE RIVER WEIGHT AS MANUFACTURED AND CERTIFIED BY NPCA A. MINIMUM CONCRETE STRENGTH AT 28 DAYS: 5,000 PSI B. ANCHOR WEIGHTS SHALL BE REINFORCED WITH REBAR TO PREVENT CRACKING DURING HANDLING, TIGHTENING AND MOVEMENT. C. MINIMUM DRY WEIGHT (IN AIR): 400 LBS. D. MINIMUM SUBMERGED WEIGHT (IN WATER): 235 LBS, E. MINIMUM CROSS-SECTION DIMENSIONS: 2'-0"X2'-0' 2, PROVIDE UNDER PAD/GASKET MATERIAL BETWEEN THE PIPE ANDTHE ANCHOR TO PROVIDE SNUG, NON -SUPPING FIT, CONSISTING OF 1/8' BLACK OR RED RUBBER OR 1/4' NEOPRENENE SPONGE PADDING TO PREVENT CONCRETE FROM CONTACTING PIPE SURFACE. MINIMUM WIDTH: BLOCK WIDTH H 2' 3. PROVIDE 1' DIAMETER STAINLESS STEEL BOLTS, NUTS AND WASHERS -ONE EACH SIDE TO CONNECT MATING HALVES. 4, PROVIDE A MINIMUM OF 2' GAP BETWEEN MATING BLOCKS TO ALLOW FOR TIGHTENING ON THE PIPE. 5. CONTRACTOR SHALL ADJUST EXCAVATION DEPTH IF LARGER/SMALL WEIGHT DIMENSIONS ARE PROPOSED. I 1 1 1 1 1 1 THREE (3) WARNING SIGNS ATTACHED k FACING UPSTEAM '1� ENLARGED DIFFUSER & DEFLECTOR PLAN TURBIDITY CURTAIN TYPE III 22 02. NYLON RE -OED NM'L STRESS BAND RL ATARON we slot - coNNTcroR , ACCOROING TO NEED CABLE #24 SAFETY MOO. STRESS Pt E IAP LN, 5/16 iN. CURTAIN Ch�IN ORIENTATION WHEN INSTALLED (TIDAL SITUATION - TYPE III] NOTES ANCHORING WTH BUOYS. ATTACH DIVES s HAT DpIT ON AT OUSK- AS SHONN, REMUVE5 ALL BUOY TO SHACKLE VIIRICAL FORCES FROM THE CURTNN. HENCE. THE CURTNN ) \ ti, I / OFF AT 100' ON OENTTA ) I BE VICABLE N MANLY WLL NOT SND FROM WIND OR CURRENT LOADS >\ CIMHNELS ONLY CHANUSEDNELS N-R+-�r�} 2. r i STANDARD CONTAINMENT SYSTEMS UGHT BUOY C4 ANCHOR (A5 5 RECOIME IDED BY YMTP SAa ME MOWFACTLIRER) Q RAYS 17^ CURGN - RNERBD , 0 o p o 0 0 o p o 0 O opo O 00 00� 4p00000 p0000 0 0 0 0 p o 0 o p o po 0 00 0 0 0 0 o p o 0 0 00 0 0 0 0 0 0 o p o 0 0 o p o 0 0 O O 0 Source: Adapted from American Boom and Barrier Corp. and VDOT Standard Sheets 2 DETAIL SUGGESTED SILT/TURBIDITY BARRIER CURTAIN 5-1.01 NOT TO SCALE ALTERNATIVELY, CONTRACTOR MAY SUPPORT CURTNN BY ORIMNG TEMPORARY TIMBER ANCHOR %LES. LEGEND __O- TEMPORARY TIMBER ANCHOR PILE AND TURBIDITY CURTAIN • PERMANENT TIMBER PILE s s Submerged SIGN (ATTACH TO RIVER DEBRIS Hazards DEFLECTOR AS REQUIRED) Stay Clear aZZ g "HAZARD MARKER" W WARNING SIGN Z O % 3'-D' ALUM. In �3'-0' N aH r BLACK LETTERS WHITE BACKING Q �QL) SUBMERGED r BLACK LETTERS 0 0 20 PIPING .a O. Y BLACK LETTERS N N Z g Z. w z W RECEIV DGM W16MINGt, x0z U ,-40U5; cx>tx.�I a 1 5 ZIx CO raL m azo zQ w 1�1 OV O V O 52 Ol LEGEND __O- TEMPORARY TIMBER ANCHOR PILE AND TURBIDITY CURTAIN • PERMANENT TIMBER PILE D N, N 3 DETAIL WARNING SIGNS 5-1.01 MOTTO SCALE A P R 0 4 2017 PRELIMINARY DO NOT USE FOR CONSTRUCTION �z Warning 39.5' x 39" W WA -22 BLACK ON YELLOW HAZARD WARNING Submerged SIGN (ATTACH TO RIVER DEBRIS Hazards DEFLECTOR AS REQUIRED) Stay Clear aZZ No Mooring "HAZARD MARKER" W WARNING SIGN 2' ORANGE REFLECTIVE % 3'-D' ALUM. BORDER �3'-0' N aH r BLACK LETTERS WHITE BACKING Q Z SUBMERGED r BLACK LETTERS 3 ¢ ANGE 20 PIPING .a O. Y BLACK LETTERS a DAYMARK SIGN O RECEIV DGM W16MINGt, D N, N 3 DETAIL WARNING SIGNS 5-1.01 MOTTO SCALE A P R 0 4 2017 PRELIMINARY DO NOT USE FOR CONSTRUCTION �z a0 U aZZ Q W F � Z N aH O as Q Z Q 3 ¢ C/) 20 0 .a O. O>,O9 L) a O x0z U U cx>tx.�I a 5 ZIx CO raL m DESIGNED BY: IRT DRAWN BY: sx$ CHECKED BY: JRT PROJECT NO.: 3081 -AB DATE: MARCH 2017 GALE: AS NOTED SHEET OF S-1.01 v/ l LT/ PIE v +16,72K' `COMPOSITE MOUNTING BLOCK PVC CAP (TYPICAL) EL+12.0 NAVD88 : EL& PROVIDE YELLOW 4•X4• COMPOSITE HD GALVANIZED HOOP PILE REFLECTIVE TAPE AT TOP MOUNTING BLOCK MAX. SPACING 0 AND AT EL +6.8 NAVD88 BFE EL +9.0' NAVD88 SOLAR POWERED NAVIGATION LIGHTS (UPSTREAM k WIDE WITH 1HRU BOLTING TO SUITE PILE DIAMETER PAINTED WITH REFLECTIVE PAINT (EA SIDE) DOWNSTREAM) ELEVATED COMPOSITE MOUNTING BLOCK TO AVOID DAMAGE FROM PAINTED WITH REFLECTIVE PAINT (EA SIDE) DEBRIS - AT INBOARD g 3- HOPE SPOOL (FL), FLANGE NCOUNTER-SINK ETOPH OUTBOARD PILE LOCATIONS A -A �( —PVC CAP (TYPICAL) s2.o1 EXCAVATIONz WIDTH - SEE PLAN 51.01 O Q REMOVE EXISTING UNCLASSIFIED MATERIAL wU FROM EXCAVATION CUT (INCLUDING SLOUGHED PROVIDE 4" YELLOW\/ /\ \ MATERIAL) BY BUCKET -TO -BARGE METHOD k ,a Z REFLECTIVE TAPE AT TOP \�/i ^�•T� AND AT EL +6.8 NAVD88 \�T\�\/`���j PROPERTY DISPOSE TE DISPOSAL ISPO AALTIEXCAVATION RIVER 4UDUNE I --I "`�z O SOLAR POWERED NAVIGATION LIGHTS UPSTREAMtooq Waminlg Waminlp\\�� _ 1 (-10'+/- NAVD88) h DOWNSTREAM) ELEVATED TO AVOID DAMAGE Su�merged Su merged i F"�z� ce FROM DEBRIS - AT INBOARD h OUTBOARD PILE H zartld55 H za LOCATIONS F/�i Z O Slay Clepr stay C r p 6/�\MZm\�, moi ,_ k No Moo ng No,Moor llr9 APPROX. SIDE 4-4 t1//�6k l �W �� �jI"SLOPED FROM (TYPICAL) - SEE PILES (TYPICAL) - SEE PL `COMPOSITE MOUNTING BLOCK 4'X4` COMPOSITE HOPE PIPE (IPS) - FOAM FILLED WITH END CAPS EL& 1 RIVER DEBRIS DEFLECTOR 4•X4• COMPOSITE HD GALVANIZED HOOP PILE MAX. SPACING 0 MOUNTING BLOCK MAX. SPACING 0 DIFFUSER HE1 MOUNTING BLOCK WIDE WITH 1HRU BOLTING TO SUITE PILE DIAMETER PAINTED WITH REFLECTIVE PAINT (EA SIDE) 5/8"0 THREADED ROD WITH COMPOSITE MOUNTING BLOCK T CLASS IRIP RAP PAINTED WITH REFLECTIVE PAINT (EA SIDE) :• 1 3- HOPE SPOOL (FL), FLANGE NCOUNTER-SINK ETOPH 24* RIP RAP ADAPTER & BRANCH SADDLE SEE CIVIL DWGS. 10" DIA HOPE PIPE SPACED) HDPE PIPE (IPS) - FOAM I I AMHW = +1.4 NAVD88y •�•I•- (IPS FILLED AT 4'-0" O.C. MAX FILLED WITH END CAPS �- 'r�i I END CAB WITHWATERLINE 'll - -_ Y.ti i i~�1i ��y:f• i�I�IL. ,�, 7: VARIES �� u _ f f - f��'I ����•;� r"--`, - - �.Yom. t�iL �f. \'NS • • \'��:}lrf�fs, 4"x4"x6` COMPOSITE BLOCK SPACER rr, r GG, 6�GG4r G'GY. �G��i'i'GG 1. "G-G`G G`=G 6G�. Gr -G GGi-iG-G•;. f! i M f 1 f i i f f O i i O ii ! I f! I f i I'?• f- F I. •'1► f I f- f i f• f f/ i I�i;iti�^ aPERATI• - - - - - - - - - - - -.. �LMLLW = -3.01 NAVDBBy EXISTIN :!•1 1 • 1 1 1 1 1 1• 1 067 STONE FILL AS 10" DIA. HDPE PIPE I 5/8"0 THREADED RDD WITH HDPE PIPE (IPS) - EMPTY 4"x4'x6" COMPOSITE HDPE END CAP-/ CONt/4N CTED (IPS) - EMPTY NUTS 6 WASHERS (HA. GALV.) (NO END CAPS) BLOCK SPACER 316TH Q SECTION COUNTER -SINK TOP; SPACED 1 STAINLESS STEEL AT 8'-0" O.C. MAX SCREWS AT 6" ON CENTER APPROX. MUDUNE (-10' 3 NAVD88) APPROX. MUDUNE k-10 ± NAVD88 '� DATUM NOTE: ELEVATIONS ARE BASED ON 0 a o f a I I ELEVA110N B -B TIDAL INFORMATION FROM USGS STATION 8658120. yzy{ z t71 I I I I I B-8 SECTION N L- A -A �.� �- PILES (TYPICAL) - SEE PL `COMPOSITE MOUNTING BLOCK —HD GALVANIZED HOOP PILE j:\ GUIDE (TYPICAL) HOPE PIPE (IPS) - FOAM FILLED WITH END CAPS EL& 1 RIVER DEBRIS DEFLECTOR ANCHOR WEIGHT 5-2.01 SCALE: 3/8" = 1'-O" MAX. SPACING 0 D.C.1 O.C. 1• WEIGHT ANCHOR WEIGHT MAX. SPACING 0 MAX. SPACING 0 DIFFUSER HE1 DIFFUSER HEADER 3-0 DUCK BILL DIFFUSER T CLASS IRIP RAP :• 1 3- HOPE SPOOL (FL), FLANGE 24* RIP RAP ADAPTER & BRANCH SADDLE SEE CIVIL DWGS. ..fy r•: iII I - •�•I•- ��•�LII' iI�=• •�•I�L� .c.1' fI�•''��••I•� • •`i ?117 �- 'r�i ti �. .fi:ailry.��.. 'll - -_ Y.ti i i~�1i ��y:f• i�I�IL. ,�, 7: �� -11 f f - f��'I ����•;� r"--`, - - �.Yom. t�iL �f. \'NS • • \'��:}lrf�fs, � ,,•rr^� rr -►r, >, rr► 1�i 4 S O f f i F® i ®! F -f i! f3f'i -�Y ti�`r )r f f i O b i f rr, r GG, 6�GG4r G'GY. �G��i'i'GG 1. "G-G`G G`=G 6G�. Gr -G GGi-iG-G•;. f! i M f 1 f i i f f O i i O ii ! I f! I f i I'?• f- F I. •'1► f I f- f i f• f f/ i I�i;iti�^ aPERATI• - - - - - - - - - - - -.. EXISTIN :!•1 1 • 1 1 1 1 1 1• 1 067 STONE FILL AS SEE CIVIL PIPE (IPS) FOR PIPE IREQUIRED GHT WELEVELING BASE 3 Q SECTION 1 �21 SECTION - TYPICAL EXCAVATION PRISM 5-2.01 NOT TO SCALE NCOOT CLASS A RIPRAP (HAND PL. AROUND VERTICAL DIFFUSER PIPE) NCDOT CLASS 1 RIP RAP -1 24" RIP RAP PROBABLE SLOUGHING OF CUT h SHIFTING (NO PAYMENT FOR OVER DEPTH EXCAVATION ALLOWED) EXCAVATION DEPTH ,L 2'-0't SOR. 3'0 DUCK Bill DIFFUSER W/ NEW ESTABLISHED 45' ELBOW RIPRAP RIVER BOTTOM (SEE CIVIL (-10' t NAVD88) " FID E SP60L (, FLANGE _ ADAPTER B BRANCH SADDLE - SEEK 1, DWGS. ,r j67 CLEAN STONE FILL) _ _ _ _ _ _ _ xc GEOTEXTILE STABILIZATION/ _ -` - SEPERATION FABRIC If - EXISTING SUBGRADEY___� I EXCAVATION) PE WEIGHTS. SEE GENERAL NOTES 12" MIN. /67 CLEAN DEPTH -SEE FOR WIGHT k PLAN FOR LAYOUT. STONE FILL AS REWIRED 2/52.01 FOR PIPE WEIGHT 20" DIA. HOPE DIFFUSER PIPE (IPS) LEVELING BASE (a1 SECTION - CONCENTRATE RIVER DIFFUSER 5-2.01 NOT TO SCALE 11'-0" (TYPICAL) NCDOT CLASS A RIPRAP - I,ANDPLACE AROUND VERTICAL DIFFUSER PIPE (TYPICAL) PIPE WEIGHTS (TYPICAL) - SF PLAN FOR SIZE AND SPACING NEW ESTABLISHED RIPRAP RNER BOTTOM (-10' t NAVD88) t °oz VHF DESIGNED BY: JRT DRAWN BY: SKS SCALE: AS NOTED SHEET OF PRELIMINARY FOR ICONSSTRUCTION S-2.01 t% `6 TBM-EIP fPt # 5810) EL=5.5260 N 171,999.60 E 2.303.007.444 - I 20 NCSt,k Fb&AurhMty \\I _' PVW3107A9956991 3 16" CONCENTRATE LINE / D H'°n"-L,r /�<( I - 3-� - ' 1' WETLAND AREA D DB 0a11l rc osl0 'I I ltl Pro of I BMm9s,Pccar9. 1--1--4----• i i I' I ' (SHADED) l/1 n B0 ROOH95o PG X29 nG1—Prtue ' \\ �//PlNt3lOnavvl6oL Rl = PMJ310720821011 .+ 2 / f�PP�x/ I 1 ' r I I I' , N 172,022.81rri ,+„ 5'•0" MIN. INSIDE/ , mnnda , : E 2,303,026.60 ` !� , I , fel Es. Dsduge war»;ngPua / S % under, Buff - 1 ryRIVER DISj'ANCE = 361.25' 1 t Z '^ EASEMENT. ',•, ape __�____t, '�', i mrn — �� _ —NLS _ _ MEAN HIGH WATER- +1.42' E d &&. Di. l Ape, ` IT s— -- ,___-__ tl t ( ` F=MARKERS MOUNTED �•` ` , _ - - 16'' CC PILING ' l n •--I rN�- i ' _ NLS --- ` r DISTA CE = 361.25' ' L 30 _ »ie--`it1 woods — r� (SEE PLAN SHEET 5-1.01 & , I 1' _.y__ ��•`` R"Forcr Mau Dis ha ge FORDETIL SIGNAGE) S-2.01 z4.: ,`f B porce Main gad,.rge Rebs l0 I , �'�ti ' y b` tvWrp(App^) , I FOR SIGNAGE) _ rL V g Temp SiB� IOzP• J 4VftrIP 'Bore Loab'on� �yyyTP ��\ $ `. Bad ow B� ' .� Pine + F- + m , Bore Lmtion ry \. ,j i .` ` 1 RIVER DEBRIS DEFLECTOR + m ' �„ Ewt Dische Lvu• , Ezisc Discharge LI e \ ^'{i„ , � S ; �`• " F TO CONSTRUCTED INSIDE, I \ \ I r tee EL-6.65•(Depth 657 t I , SILT CURTAIN L71 .. woods EL-18.70'(Depth 42-) '1 ` �� `�'l� o PERMANENT EASEMENT �. I O _ _ (SEE PLAN SHEET S-1.01 & I - \\\ DETAIL SHEET S-2.01) t Property of Berry0,.nm 1 •, I �� IQ '� `CC �'�.. ( :1 , DB 007M, PG 0701--\_�d� NCSbMlp�PnAurhon pM$ 310720812772 75' LAMA SETBACK PMJ 310720809699 40' PERMANENT �•' UTILITY EASEMENT 30' CAMA SETBACK 171,968.67 E2,303,452.88 `r�' I •1 ,� t I r NEW 16"-4S° BEND I I �` I �••�`� WARNING SIGN. (1) ONE SIGN FACING ITOWARDS BRUNSWICK RIVER. I , TEMP. PILINGS 30' TEMPORARY CONSTRUCTION I (SEE PIAN SHEET S-1.01 & NP. OF 8 �t I ' h ` DETAIL SHEET S-2.01 16" 0900 FUSIBLE PVC CONCENTRATELINE I' ,( \ j • �I� + EhSEM� �^ J \r i) ) BY HORIZONTAL DIRECTIONAL DRILL' r ` ' II tWARNING SIGN (2). ONE SIGN FACING UPSTREAM AND ONE SIGN FACING DOWN STREAM (SEE PLAN SHEET S-1.01 & DETAIL SHEET S-2.01) 100 YEAR FLOOD ELEVATION = +9.0' MEAN HIGH WATER LEVEL = +1.42' MEAN LOW LOW WATER LEVEL = -3.01' TOTAL WATER BODY LENGTH - 1,445' USGS STATION 8658120. DATA IS NAVD 88 — � 6 'st Grade I SSTI \ 16" RIDI FITTING, NP. TRANSITION E i FUSIBLE PVC i -� I I I I I + ie— jj 100 YEAR ROOD ELEIVAT[ON = +9.0' Bvsr or 0 i I 10 -- -15 i ---- 1 � I -20 I j 116+00 117+00 MEAN HIGH WATER LEVEL- +1.42'_ y ' .. t EavnngBD harge Lbu• �` I 118+00 119+00 rovv w ter (Sept 7, Z01711aOpm)—'- eL zuB• I i MEAN LOW LOW WATER LEVEL= 3.01' y n n n r � � Z Z 7 75 LF OF 16" C900 m PVC WITH JOINT .�. RESTRAINT :ONCENTRATF I INF d Ili 118+00 119+00 rovv w ter (Sept 7, Z01711aOpm)—'- eL zuB• I i MEAN LOW LOW WATER LEVEL= 3.01' y la n n n r � � Z Z - o p s SWC a _ �i Z Z ul Z �Wz C a W QZcz LL w MV— EL._14.5 ' E--V I Z LL r w LL $ I � { DIFFUSER o o2. Q I a b ' a a - la 2'-0 MIN . I. I� - o C a _ Z C a LL w MV— EL._14.5 ' E--V 1,445 LF+/- ofroW width of water body- _— ._.� r I LLJ Q 3 J Z 50' 25' 0 50' O W c2 I I SL 2 uC �Y -- ------ -- j- _ _ 20 ZL Z 3 ee co I ? I i m 15 5 Lu 0 Z + O LU O � u K N Q u Q _N W 0 Z F- J O W to Q K Z Lu Q Z Ln 0 u Lo W yr i SEAL _ 3787 0�ss ''SFS A. OP��Yk•In -5 DESIGNED BY' ----- IRC DRAWN BY: TK CHECKED BY: -10 JRC PROJECT NO.: 3081 -AB DATE: MAY 2017 -15 SCALE: VERT.: 1" - 5' -20 SHEET 7 OF 9 C-1.05 2'-0 MIN . I. MV— EL._14.5 ' E--V I { DIFFUSER 777 LF OF 16" FUSIBLE PVC 0900 DA 18 BY HORIZONTAL DIRECTIOP AL DRILLING 1 - - 120+00 121+00 122+00 123+00 124+00 15 5 Lu 0 Z + O LU O � u K N Q u Q _N W 0 Z F- J O W to Q K Z Lu Q Z Ln 0 u Lo W yr i SEAL _ 3787 0�ss ''SFS A. OP��Yk•In -5 DESIGNED BY' ----- IRC DRAWN BY: TK CHECKED BY: -10 JRC PROJECT NO.: 3081 -AB DATE: MAY 2017 -15 SCALE: VERT.: 1" - 5' -20 SHEET 7 OF 9 C-1.05 FINAL DRAWIN� NOT RELEASED FOR CONSTRUCTION BRUNSWICK REGIONAL WATER & SEWER H2GO NORTH CAROLINA CONTRACT I NEW 16" CONCENTRATE LINE FROM REVERSE OSMOSIS WATER TREATMENT PLANT TO BRUNSWICK RIVER lit • ".\. SfX ID 3 s 0 mrie 6 Rocky P. rit •310 2 ,•�•�,� Council No.kl 1 n y 210 6 a 133 ` 6 � Eas Arc dla 421�6 6� pstead � wmrn 3 3 _C 3 ■ %4 Hallshoro j$ • • SarM Ytield R� 5� 1 Rlae'galwo�d� �I f �� Castle � 17 NayM \ HII 16 76 31 30 Acma' / � Northwest '� .rrW!1 6 t • y 6 I 1� 3 um3/ 3White iIle�1 Bolton 1 6 Freemen palGo Csr hoanlxj 3 11 1 Brunswick We"a Rici Sandy cree k 1 HANG R • 6 TO 6 3rd t E Meca 76 a ssa �tB 10 130 y leiaWecmmow 1 1 rte. t • In 9 slvllls WIIIIII 1 1 B on L V! U S ' v/ 1143d3 '. 701 - _._ _.e 6 11 old k 5 0 QJ ECT A PI Wrghtsville , e MollIle r o �" l%Masnnho- Inlet Nekins 9 i + IO Wlanabow c� - ! 3 Iii WSONSOISLANDRO B R U N S Iii W P 1;2 421 (' 13 Bughlll t Dulah Ash Go n:°n ` Carolina Heath MW Sea Breeze I 1 arvmwlak \ 3 0 M1, + 10 F Arrdrrsan U- 8 —h 51. Pk. 1 \ PI!eway Bt,sr 7 170su I 3 PPY 178 Bolivia ono • _ Carolina Beach Boiling O Pond 11 3 001 l0 1 C La r \I 6 shalb 8 s smith3 JamSt. 1 �F!ue eC PLEASURE es t •v ISLAND ' Dogs 906 lirlssettown t% 17B 170 Sunset m Y7rt C ayua•rvrr elahuA 3 ng Varn 133 Fln mtown Nerool FL Y. c�r srore ne<. Aro° 9 * �# � 711 ng 3 rot • stn ortc nenke /nrnr loro.eal Qi_ int �,v p Seas de 79B( .L� H°m„n (�!/ ��Oak Islan SM17H ISLAND - 13 �, �- 0 �. Ocean Isle io Bezch �fe �. j .+ °e Beac Ook o RAID 1 GJY Beech iter HEAD /rlo ;d ISLAND ? Bay , '6"� Che try� PS -9 t Grove BBech 4p Lighrhov e ��CAPF FEAR �B¢8Ch 1 orth Myrtle Beach L GPI,��� On9 OId91d G hrh 0 Ocean Drive Beach 1'' - Crescent acorn VICINITY MAP NOT TO SCALE MAY 2017 DIRECTOR Bob Walker COMMISSIONERS BILI Browning, Chairman Ron ,Jenkins, Vice Chairman Carl Antos, Secretary .Jeff Gerken Trudy Trombley THE WOOTEN COMPANY 120 North Boylan Avenue Raleigh NC 27603-1423 919.828.0531 fax 919.834.3589 License Number: F-0115 G A Ai( iN�h tithr+ul __� ; "I idufl ort •t ._ - , e C Ln d 7 ' Waod�urn BePoilte _ I ' P .d�a— tt s ry -- - .16" CONCENTRATE LINE 16 CONCENTRATE LINE Existing 1 16, II Looe Road '...... . __: Concentrate Line ChaPPe r BRW&ppopHe�eZdG�U L BRWSHxGP 1�R0 Fadllty' a °°t�� ww \� -----------_____ r I 4 3 PROJECT AREA MA M WILMINGTON, NC NOT TO SCALE MAR 0 7 2017 C-0.01 / SHEET 1 OF 9 c 0 a ro 0 O O U 0 M Or V 0 O U x 3 � c Q O cc s.)O V °j3 c c U on 40 4, uooo 0o a'IL Qb wMI� Y�- INDEX TO DRAWINGS: C-0.01 COVER SHEET C-0.02 LOCATION MAP, INDEX TO DRAWINGS, GENERAL NOTES & LEGEND C-1.01 16" CONCENTRATE LINE - GREGORY ROAD - STA. 10+00 TO STA. 32+87+/- C-1.02 16" CONCENTRATE LINE - STA 40+65 TO STA. 67+50 C-1.03 16" CONCENTRATE LINE - STA 67+50 TO STA. 96+00 C-1.04 16" CONCENTRATE LINE - STA 96+00 TO STA. 117+50 C-1.05 16" CONCENTRATE LINE DISCHARGE INTO BRUNSWICK RIVER STA 117+50 TO STA. 127+00+/- C-1.06 EROSION CONTROL DETAILS C-1.07 SANITARY SEWER DETAILS Wetland Seed Mix Planting Schedule Planting Dates Grass Type PotmdslAcre Jan. l - Dec. 91 Switchgrass 27 & Redd Canary Grass 27 & Japanese Millet 27 Fertilizer 10.20.20 500 Lime 4,000 Upon wn- approval of the Owner, a different analysis of femlmer a y be used provided the 1-22 ratio is maintained and rhe rate of ap� eatlon is edlusred to provide the same amount of plant food for .nalys;a SFGFND SURVE WATER EWER fxLSIQiL arra rxlmvs NEW cxrsnrrc acw e„, wntravrn �„, rw� ®a rnmaaa.arta nw p.ew naEw�.an } (It mann O ® naglEtF MOM•+en pp Mgl®NxIAEASFa YwFa nnnvKn M ,,,. mar'rnE • �iry zea aEuwsE © �u, tia nno.o von (unto) Q mwstaoc • two sora orfs ... raw atuasEv sn(D-) O .0 rWt • C ,_ WarEM1 MEfEa • �„- -SS- wnscv r nuc r -..- rasa coon--trrss- •n uta - V cSS- 9 taotrnvarx eoaE s, tvn�aa� vu r muTILI IEs carmaaa.ur tarmac how E1305L2S4N_T94L p . )1( O..a swue txrstrvc "-� tan war ® Q ,nrwwxe amrsru �� t �mc,� tr«r. materna• � O ��,1^v mrtizxE, waoouxE r!xs.r!T. v�*ran, ® aernuuteox run morEma+ _______ Eaormtt uxE vct nrvn arttrr.-.®.� Al w.nn�xa nos. .__-___ acwror wav � mars a�n�cwreox - - - Ensmla unur. rvsErrem 5T4EM4_RAl1NAC_E -c- ccs ore .__.._.._.._ ansmucnox cssneur cx(umt htw DG as uxEvkn anury rwsoenr ,ar,,,n,t i IIwra'rsrrces � neEa cmc unuu"Eo raroaotes ma.ns[o EEnnaEs ® ws'non O zwa„rr<,rcr r�,zaw,m ea.s,�sr..a,2, �""" arsrew -'- rowmEauaE Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org EROSION CONTROL CONSTRUCTION SEQUENCE 1. Obtain and post copy of certificate of erosion control plan approval. 2. Clear site only as necessary to install erosion control devices as indicated on the drawings. Install temporary erosion control devices as shown on plans. 3. Notify Engineer and NCDENR, Land Quality Section at (910) 796-7215 for site inspection prior to commencing main construction operations. 4. Once erosion control devices are approved, begin construction operations. 5. Maintain erosion control devices as necessary during installation of sewer system Improvements; inspect devices after every rainfall event and cleanout traps and/or check dams when half full. 6. As construction progresses Install additional erosion control devices as Indicated on the drawings, called for in specifications, as needed, or as directed by Engineer. At the end of each workday, a trimeric dam shall be placed Immediately downstream of recently disturbed area. 7. Seed and mulch denuded areas within seven (7) calendar days: a. Upon completion of any phase of construction. b. When work will not proceed In an area within the above time fame. 8. After site is stabilized, request an Inspection by the Engineer. Upon approval of site stabilization, remove temporary erosion control devices, dress out area and seed and mulch. Permanent erosion control devices shall be Installed and approved by Engineer. EROSION CONTROL 1. Install silt fence over & around top of existing pipes and inlets at disturbed areas. 2. Install silt fence around spoil piles and along trenches to minimize sediment from entering roadside ditches and existing drainage outlets. 3. Provide erosion control measures around stock / waste piles and staging areas as needed or as directed by engineer. 4. Protect storm pipe inlets from sediment runoff from land disturbing activities with sit fence, stone check dam, or arc filter as appropriate for site conditions. S. Replace disturbed storm pipe outlet protection with equal or greater amount of rip -rap within 5 days of disturbance. 6. Where area around outlet is disturbed and no outlet protection exists, class "1" rip -rap shall be placed around pipe outlet as directed by Engineer. 7. Provide erosion control matting per specifications in ditches and swales where disturbed and/or as directed by Engineer, unless noted otherwise. 8. Contractor shall rebuild all ditches and banks disturbed during construction. Contactor shall install rolled erosion control product (matting) on all rebuilt ditches and banks to prevent erosion until permanent ground cover is established, see detail sheet. Z Z _O �op aV)U �LU tA cl�Z JOU aZ0 ZL` M ours prior to commencing constnxtlon activty. Contractor responsiblefor verifying exact location of these existing utilities. The cost to repair these fad-, if damaged, shall be the responsibility of the Contractor. Coordinate with utility owners as necessary. Costs associated are incidental. 2. Contractor shall contact the NC Department of Transportation prior to any work within NCDOT right-of-way. The NCDOT District Engineer for this project is Ben Hughes, (910) 251-2655. 3. Protect existing property corder markers. Replace disturbed property comers by a Professional land Surveyor. 4. Temporarily remove mbar Items as required for the installation of the utility. Minor Items shall include, but not be limited to, existing signs, mail boxes, storm sewer pipes, shrubs (under 6 ft in height), and trees (under 3 inch in dia.). Reinstall items to their original condition. Include cost in the per foot cost of the utility being installed. 5. Support, relocate, adjust or remove and replace existing utility poles, fences, culverts, pavement, utilities, curbing and other structures during construction. Repair damaged itenns to their original condition at no additional cost. Note, NODOT encroachment agreement, nor any of the other Permits in the project manual, provide permission to move existing utilities. Contractor to coordinate with utility providers to temporarily or permanently relocate as necessary. Contractor may be required to pay utility owner or their agent to move, support, or temporarity/permanently relocate in order to make the proposed improvements. These actions/requirements shall be fulfilled at no additional cost to the Owner. 6. 6 inches of NCDOT ABC aggregate shall be provided for the full width of unpaved driveways and other disturbed gravel areas. Contactor shall minimize disturbance. See unit price section of specification for payment. 7. Open cut paved driveways, sidewalks, and curb and gutter. Replace curb and gutter with new to match the existing cross section. Provide pavement patching per detail. All driveway and pavement/sidewalk/curb & gutter to be replaced Within three (3) days. 8. Contractor to provide valve markers for all valves, air release valves. Valve shall be marked MV and AV to correspond with the type of equipment. Valve markers shall also include a phone number to report problems or request water main locations. Costs for markers are to be included with the valve being installed. Markers located Within C/A portions of NCDOT roads stall be installed at R/W lines (0' offset). 9. Contractor shall verity the horizontal and vertical location and size of existing utilities a minimum of 300 feet in advance of laying activities. Notify the Engineer immediately if a potential conflict arises between the existing and proposed utilities 10. When trenching inside NCDOT right-of-way and within theoretical 1:1 slope from the edge of pavement to the bottom of the nearest excavation, shoring calculations and plan conforming to NCDOT requirements must be submitted to NCDOT. No work allowed until written approval is granted. 11. When removal of crosspipe is necessary for force main installation, remove crosspipe and reinstall if undamaged. If damaged, provide new pipe of same type and class material at no additional cost. Drainage crosspipe replacement must meet current NCDOT specifications. 12. Provide plastic identification tape for all new water mains per specification. Tape shall be buried continuously directly above the main and eighteen (18) Inches below finished grade. In addition, tater wire shall be Used to mark all PVC pipe, per specification. The wire shall be affixed to the pipe and tied off on valves. 13. Provide positive uniform grade for the water main towards air release valves in all cases. 14. Air release valve locations must be at high points of the main. The locations Indicated on the drawings may be adjusted to meet this requirement upon approval of the Engineer. Air release valves located within C/A portions of NCDOT roads shall be installed at RAW lines (0' offset). 15. Provide concrete thrust bucks at fittings in addition to restrained joints, unless otherwise noted. RIDI, C900 with joint restraint as approved by pipe manufacturer, or C900 fusible PVC may be used where restrained joint is required. Restraining systems which create a point load on the pipe will not be allowed. 16. No gasketed-type restrained joints will be allowed. 17. Installation of the utility Will be by open cut unless otherwise noted on plans. 18. Repair driveways to existing or better condition. 19. Minimum vertical separation between natural gas main, gas service lines and force main shall be T -O". Contractor shall expose all natural gas mains and gas service I'me to a depth of 2'-0" below existing gas lines prior to installation of new force main. Contact gas company at least 48 hours to beginning work in the vicinity of existing gas mains to coordinate inspection. 20. As required by the NCDOT encroachment agreement, the Contractor shall survey the existing ditches in the areas to be affected by the utility installation at a distance not to exceed 100 feet, to include grade breaks with tie-in to existing pipes. This survey shall be provided to NCDOT with corresponding benchmark documentation prior to commencement of any construction within NCDOT right-of-way. See Special Provisions #6 of NCDOT Encroachment Agreement. 21. When the force main alignment requires that the water be installed in the bottom or slopes of an existing ditch, the main shall be Installed with a minimum of 3'-0" of cover in all directions. The natural ground profile shown in the plans does not necessarily reflect all ditches or depressions. See Special Provisions #38 of NCDOT Encroachment Agreement valves shall not be placed in ditch line or front slope. 22. Requirements set forth in NCDOT Encroachment Agreements must be met and supersede all other requirements. 23. Interior of fittings shall be lined with Ceramapure. to Z 0 Ce a Z J 2 =UU WLu v = LL > u w�ZR Z �Z-u 30 Ln Q�Q N p� w 0 d Z O u QZWn OL_UJ us F• Ca U to 3 UU CL Z H _ C) J t0 Z - N CL Z 0 0 29 tVal Z Ln Z w ��-0 Ow le Z Q U U0 W U Z,ZW O �30� m n U Z W W •,,QjH.•CAR041 �� �0; OFESSIp •.;yy% ifQ - SEAL 7878 Q(/ %90F3 H • GPE•M DESIGNED BY: JF DRAWN BY: 1 CHECKED BY: JF PROJECT NO.: 3081-/ DATE: MAY 20 SCALE: AS NOTE SHEET 2 OF 9 C-0.02 a a e M Property of I Property of Property of V h !, / B S Associates LLC I /BSAssoHates LLC"b Wolf Summit Coe/C Z OB 01067, PG 0606 PINI 219718314095 `8�i DB 07124, PG 0884 «1 I DB 00193 PG 0941 P1NN1/9718308943 I PIN# 219718403987 I Z ` O 5 LOCATE IX. 16" CONCENTRATE 16 I c �u LINE PLUG FROM RO PIANT. — -'- — — — -�Li-I ., Z ---6. i i IS REMOVE AND INSTALL NEW __ -_ -. ---------- b I QRZ 16" CONCENTRATE LINE -�' _ ___ to+oo 1.. Y w Puss >� 0 —jou z w I lg&JII am m W rNng Past - — _ - - Gash n A mx M. Ges Main (App—) STONE CHECK DAM, 3 - ', Gregory N n Fvture Gregory Road Erteuion (Under Construction) - - _ _ _ _ . _ _ - _ - (SEE DETAIL) Road 3 _ _ - _ - AIN g ry - (Asphalt Pavement) m IL m .'. 3k4'Tele _..._ --------_.. ._ _.. - - "Handheld ' _ _ 29"R(p �e _y. -: (heh y_ 'rIH'RCP �fnv-21.93 'MW.INSIDE RAW_. ro' - - - _ _ __ __ ____ __ _.__ Ane - Di[rA __ .-- _ ___ _ _ _ _ -. `�.-- -. `. - ardl ..__ -- _._ _. _. _ _ _ _. _ X X -I 8 8 8 o O p -- ------ - O - O Gu o E!P H'ChaiNink Fenre �O In 1.37 O °P _ fn v"21.29 0p 8'Chain/nk Fere Tele pp -,/ Y- p ; S S -. .. i InvQl.l} O Ped ' O O Tele UP Ped LT/1 + ry 2-16" 45° BENDS + v 16" CONCENTRATE LINE + (5' INSIDE R/W, TYP.) + + ^ m � N m , AIR RELEASE MANHOLE ., -, _, Fenre Gare ry V` r !b l rd phone• Fenre care A Property of H2C0 -X—+n— i I - W Pet amore $ F JiAY ONE DRIVEWAY MUST REMAIN I6" CONCENTRATE LINE + 0 _ } - Q BRWS DB 03627 PG 0459 P f pe'ry"O property of ONE DRNEWi MUST REMAIN Lnr— Management Inc OPEN AT ALL TIMES WRING OPEN AT ALL TIMES WRING REPLACE/REMOVE Property of (5' INSIDE R/W, TYP.) ` CL - P/Ntr119718118244 T /BSAssociates LLC DB 01067, PG PINtr Thomas CS iv PWtr279718309359 WITH CONSTRUCTION. COORDINATE CONSTRUCTION- COORDINATE BOLLARDS R p ey Revocable Trust WITH PROPERTY OWNER. WITH PROPERTY OWNER. NEEDED FOR DB 03721, PG C INA'2171&30606 219778314095 P/Ntr 219718403335 CONSTRUCTION 803335 - I 30 °i I 30 3 w PROPOSED DAY w.. n Gra e! _ _ I °e ry E _ -- - W 25-------- �., _ _-- ----------- '-- ------ --- -- - ---- -. 25 ry --- -- "--- .----!--------f r----- -------- --' -"--- Ex tmgGr de ' 4'-0"' MIN. j ------- f COVER Ft 44" MIN. Z COVER 0 2 U 16" C900 PVC CONCENTRATE LINE 20 u y 0 5T0 DRAIN �PROX) �'' I6" C900 PVC CONCENTRATE LINE 2 = Ce w > O {' it 16" PLUG VAL " W O Z J :Y� \ 15 STBA010+OS+/ 1 45° BEND T 15 W v1 0 + i D FLu - QZ 00 w + S 16"•2215° VERT BEND Z ¢� w fV o STA. 1 +67+/- I .. ; I �.! Z CO L7 M 170 LF OF S6" 0900 ► C WITH JOINT d (-n I j w O 10 rn RESTRAINT CONCEI RATE LINE 10 w Z W 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 a 3 O a U Z 41 _I O Property of I Pr Property f �� o IMu Leland LLC P ° f petty o Oleary Holdings LLC I Aro Percy of I LWlnvestrnent Group LLC i � 'L \ � elle ♦ Pro f / J Z z l0 � � '0A W O O O O WollSummit Cual Co DB 00193 PG 0947 I PINtr 219778403987 DBP 02704, PG 0641 I SM 0027, PG 0210 PWtr 219778407827 DB 03287, PG BM0029, PG 0468 PfNN 2t971840B877 DB 02350, !°G 1387 I BM 0056, 19 0082 P/Np 279719500731 / Co Bs ° \ First Bank First J\ r ♦ DB 03110, PGmo 92 ' / P°' �F BM Q219% PG 0082 �GS ♦ 0 U Z O O Z r- /trw�- _LLJ - _ —___L - - — - - - tiny.-_Z PINI 219719.503661 '- \ (V Get Main A m ` ` - - Cas Main /App - - QY N ♦ Q I y � "" N Z U, ._ - J\ - ♦ _ `_^ (Asphalt Pavement) \ Gregory Road / `\ ��\ `-1 Z w io ,~„ N W — 8 \ f' _ _ ----------- _ Sp��r 1 ♦, RHconr F° o0 m 3 O U - W E/P Fenre - Rff - �' •— Fenn onumen V\b (° -S MIN, INSIDER/W- � -_.. -... ,.. T m Z m o UP Y--. o UP o O Fenre Gare �+ d }' P� + ry ry 16" CONCENTRATE LINE (5' INSIDE R/W, TYP.) COORDINATE DRIVEWAY CROSSING WITH PROPERTY OWNER \ Y'� \'PO) LOCATE IX. 16" CONCENTRATE �a°enr � fix+., •ytr �O ! ' LINE PLUG, REMOVE AND INSTALL k' NEW 16" CONCENTRATE LINE ♦ I , � End Fenn � `I/ Property of Stare Employees Credit Union DB 03619, PG 0947 PIN$ 219718408331 , �� " �`� ". •••^'•••.,. CAgOI Y9 i SEAL A L SEAL [?3187 3O 30 DESIGNED �I DRAWN BY: 25T SII CHECKED BY: r___� -t y,, 25 P PROJECT NO.. 3081- Existing Grade _-___ -__-_- --___ _}__ ____� ,- 8 __ _ _ ___t_____ Ex sting Gr de �________� ------- -------- '---------- - - ------ r----- ♦---�------'� 1 ! ! cP DATE: , 4'-0MIN. - : � {'. ! COVER Ex.uW.h'Li j ;i MAY 20 2 0 a.. Cas Mein ) 2 0 SCALE: " H RZ.: 1 t O . ! 16" C900 PVC CONCENTRATE LINE r VERT.: I"= 15\—� + � Ex tb"Comm�trate Line j I 15 SHEET 3 OF LF OF 16" C900 PVC WITH ]OII•�T � � I ESTRAINT CON ENTRATE LINE 4 �. C- 1 1 1 0 E.10 Fo� Man Le and) E 16•Fon�Man(Le/and) 1 0 a0 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+0 36+00 37+00 38+00 I& Q V Oz F.- Mein T ss W,,-,, w � t Fo- Mein Sewer V.1- (AVWIP.—) 2-16" 45- BENDSi Wtrr Min (Appm) 12"Fo- Main(App-) 72'Fo- Alm (App-) Z.FIFW - — -- — -- —w - ARVMV —Ch–a�ell Loop Road (SR 1524) (Appmx) Foroe Mam (Appro.) 'e - \Z�aFROM EOP' (App-) 29' FROM EOP 2% FROM EDP UP Goy M-22.05 -Di1h w d hipetya W-8"W.t,'M-(App-) W NLS I Maori Kiget -im A!� --T/Ped UP Pope'tya DB 00269, PG 0863 UP -4 PY,1310717220233 `MIN D 03249, PG 0698 16" -CCS -Es xr.,\ CS 1310713127,551 MIN. (TLP 114 UP Mbx Tel Ped �m 77- 0 We 8"Fo-MeioDi,.h.W + + lo- + toi Ri- (App -j 10' MIN. NDS SEPARATION L 11IS'PERMANENT1*I S' UTILITY EASEMENT 1-16"45- D �-ARVMH1-16" 22.5* BEND CONTRACTOR TO TRANSITION 16" CONTRACTOR TO TRANSITION 16" CONCENTRATE LINE FROM G-JP�kio, + Joe- IVLS Om 22' c - CONCENTRATE LINE FROM 29' j OFF EOP TO 29' OFF EOP OFF EDP TO 22' OFF EOP EIS Property of eieg 16" CONCENTRATE LINE 76- (n ft'ip-ya H-Jem ch" & SR Pr,�pety of ccs 4y 8 -A Count ClitpPelll,-opf'rope�LLC - DB �, PG- Woods Pir;131027MI07MM Phyff. DB dZ5* PG a3oo D8 a33a A: 1032 PW 310717116716 pmpetya Pm'3107M]3�4 Siolh- B,3- K Property of DB 036OZ PG 0952 I Meese R�' HM 0021, PG 0157 I IM0320717129074 Pirvl.71=118" In 8' 0.iriboik F- -j 8 5-J DB 01103, PG� P6,0310778310988 + 1L S'-Yse- a V-11 "V W.ming P- 16" CONCENTRATE CONTRACTOR TO LOCATE EXISTING Z"921"' 16�PLU & VALVE AND CONNECT 16" PLUG & VALVE AND CONNECT �C (SEE DETAIL) NEW 16" CONCENTRATE LINE N 16 0 NTRA E LINE II IL (5'-0" INSIDE FENCE) C ) n- Gibb NW' DB W'02;� A'�pwya Property PM1310718229071 Brunswick Zte;' Se-, DB 01�, PG 0297 II ` PM#310717079618 PYrO310718226335 Phr,#Xa7l�8332 12"Fo- Main(App-) 72'Fo- Alm (App-) Z.FIFW - — -- — -- —w - ARVMV —Ch–a�ell Loop Road (SR 1524) (Appmx) Foroe Mam (Appro.) 'e - \Z�aFROM EOP' (App-) 29' FROM EOP 2% FROM EDP UP Goy M-22.05 -Di1h w d hipetya W-8"W.t,'M-(App-) W NLS I Maori Kiget -im A!� --T/Ped UP Pope'tya DB 00269, PG 0863 UP -4 PY,1310717220233 `MIN D 03249, PG 0698 16" -CCS -Es xr.,\ CS 1310713127,551 MIN. (TLP 114 UP Mbx Tel Ped �m 77- 0 We 8"Fo-MeioDi,.h.W + + lo- + toi Ri- (App -j 10' MIN. NDS SEPARATION L 11IS'PERMANENT1*I S' UTILITY EASEMENT 1-16"45- D �-ARVMH1-16" 22.5* BEND CONTRACTOR TO TRANSITION 16" CONTRACTOR TO TRANSITION 16" CONCENTRATE LINE FROM G-JP�kio, + Joe- IVLS Om 22' c - CONCENTRATE LINE FROM 29' j OFF EOP TO 29' OFF EOP OFF EDP TO 22' OFF EOP EIS Property of eieg 16" CONCENTRATE LINE 76- (n ft'ip-ya H-Jem ch" & SR Pr,�pety of ccs 4y 8 -A Count ClitpPelll,-opf'rope�LLC - DB �, PG- Woods Pir;131027MI07MM Phyff. DB dZ5* PG a3oo D8 a33a A: 1032 PW 310717116716 pmpetya Pm'3107M]3�4 Siolh- B,3- K Property of DB 036OZ PG 0952 I Meese R�' HM 0021, PG 0157 I IM0320717129074 Pirvl.71=118" In 40+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 q c DB 01103, PG� P6,0310778310988 I Pirl.310718322021 S'-Yse- W.ming P- I Z"921"' 25 (SEE DETAIL) 4- — — — — — — — — — n- Gibb NW' DB W'02;� a D8 000ofl, PG 2014 PM1310718229071 M 12 1,. 25 PYrO310718226335 Phr,#Xa7l�8332 II Pin13107172=56 7 - - - - - - - - 12"Fo- Main (App-) 8'Fom Main (App-) — L G,.de 16" CONCENTRATE LINE 20 rp- 12M V..It (App-) pp-) I WM= Fo- fifitiri (A7,,) MIN M`iii ARVMH- III4`0' 8`F.-MarD-hw 20 It Fo-F Mi. AR MIN. . Ln tz i I -------- 16"Cr-- �I.Pj-(App-) -- - - - 16- C900 PVC CONCENTRATE LINE F (Ap-) I. LLJ---I"'--------- COVER 15 16" 45* BEND 16"45- SEND - FM 2-16"45° BENDS 1-16"45- BEND IT STA. 43+00 +/ STA 43+10 +/- + t ��A STA. _9 -t— 1-16" 22.5 - BEND + STA. 49+76+/- j is -1-06- CCS Lu Z + ': + + + + 0 I MIN. 135 LF OF 16" 3900 PVC WITH JOINT RESTRAINT CONCENTRATE LINE Lu IN SA SEPARATION — — — -------- -----r----- -- — — L0T 10 F------ USSA1110 10 59 LF OF 16" 3900 PVC WITH JOINT 50 LF OF 16- C900 PVC WITH JOINT RESTRAINT CONCENTRATE LINE RESTRAINT CONCENTRATE LINE 5 Do-PoREOP-G-11wo Mite 310718226053 Pro PNp- Ir -y.f 10 40+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 1xM11=1111 DBO17M,PGO268 BM 000, PG 0321 Pbo1310718310364 10' MIN. Force U.0 W-i'g SEPARK Pt 4— 16' CCSB �- Water b (APP^rxl S'-Ysewer Warning CS-4- 51.00 52+00 53+00 DB 01 W7, PG 076 PY,1310718323196 Inv -1694 N 1-76.38 Be, my -16.34 M-1 -'i .- T-16— 15.51 FH Ir cw - f--rAmp'Els Ir- \\ 1627 M SY gn S IT + -rwo Pine 11. c,,,o0 - o�awadr , - oco A- S.- -,I IN + 1,o 1614 un (Ab -d. -rod sswil, 0 To".866 &ik U 15' IS PLUG VALVE M"1916 tility . 86 Utility &BOX "ESS i f e, Loo ACMth M 08 02802 PG 1317 DB 01103, PG� P6,0310778310988 I Pirl.310718322021 S'-Yse- W.ming P- I Z"921"' (SEE DETAIL) 7h,=P�77,ofH tux C,��-"G W=p7z" a n- Gibb NW' DB W'02;� a D8 000ofl, PG 2014 PM1310718229071 M 12 1,. PYrO310718226335 Phr,#Xa7l�8332 II Pin13107172=56 II 16" CONCENTRATE LINE + M`iii ARVMH- 8`F.-MarD-hw r- Mho AR VMH - It Fo-F Mi. AR 8 F -m I I I F- Aizvmu Ln tz - -------- - - - - --- �I.Pj-(App-) -- - - - - - - - - - - - - - F (Ap-) I. LLJ---I"'--------- - FM - FM FM MFM Ln -1-06- CCS Lu Z BdkdleSe�E—mt 0 I MIN. Lu IN SA SEPARATION — — — -------- -----r----- -- — — L0T F------ USSA1110 < Do-PoREOP-G-11wo Mite 310718226053 Pro PNp- Ir -y.f IIi IIi P03 'm" g'-"%-oec f?02l.,PGll. 66 DB 03499, PG 0177 le, �4Ii -Z" =012WPG P7 -""0Ka169'8T"- MD8 0 PY[1131071=7031 Phr'31077=8mv Pyri 1310717220075 DO' OM PGO618 D11 Pin'3107MM74 FUZ3310017'71 14MW Plot 310777221054 G" An/3 Pf"9310717223" PYnI31077722M 1xM11=1111 DBO17M,PGO268 BM 000, PG 0321 Pbo1310718310364 10' MIN. Force U.0 W-i'g SEPARK Pt 4— 16' CCSB �- Water b (APP^rxl S'-Ysewer Warning CS-4- 51.00 52+00 53+00 DB 01 W7, PG 076 PY,1310718323196 Inv -1694 N 1-76.38 Be, my -16.34 M-1 -'i .- T-16— 15.51 FH Ir cw - f--rAmp'Els Ir- \\ 1627 M SY gn S IT + -rwo Pine 11. c,,,o0 - o�awadr , - oco A- S.- -,I IN + 1,o 1614 un (Ab -d. -rod sswil, 0 To".866 &ik U 15' IS PLUG VALVE M"1916 tility . 86 Utility &BOX "ESS i f e, Loo ACMth M 08 02802 PG 1317 DB 01103, PG� P6,0310778310988 I Pirl.310718322021 S'-Yse- W.ming P- AIR RELEASE MANHO (SEE DETAIL) II W=p7z" a DB 01089, PC 7161 PM1310718229071 1xM11=1111 DBO17M,PGO268 BM 000, PG 0321 Pbo1310718310364 10' MIN. Force U.0 W-i'g SEPARK Pt 4— 16' CCSB �- Water b (APP^rxl S'-Ysewer Warning CS-4- 51.00 52+00 53+00 DB 01 W7, PG 076 PY,1310718323196 Inv -1694 N 1-76.38 Be, my -16.34 M-1 -'i .- T-16— 15.51 FH Ir cw - f--rAmp'Els Ir- \\ 1627 M SY gn S IT + -rwo Pine 11. c,,,o0 - o�awadr , - oco A- S.- -,I IN + 1,o 1614 un (Ab -d. -rod sswil, 0 To".866 &ik U 15' IS PLUG VALVE M"1916 tility . 86 Utility &BOX "ESS i f e, Loo ACMth M 08 02802 PG 1317 DB 01103, PG� P6,0310778310988 I Pirl.310718322021 54+00 + tL�!--- - 16" RJOT - Exist FITTING, TYP. I i i Enist. Grade 20 1 20 J4' -O" MIN, CO 3 COVER -4 4'-0" MIN. FUSIBLE PVC 6" We- Li- (App-) ITRANSITION COVER (SEE DETAIL) iI 1 1 lo,16i28 16" 3900 PVC MIN. 11"Rcl TE LIN f 6'WL roFH 15 15 craw; se STA. 65+25+/- (App-) 10 10 MIN. + 5 + + + 174 LF OF 16" C900 PVC WITH JOINTo 211 LF OF 16" FUSIBLE PVC 1 RESTRAINT CONCENTRATE LINE G C BY HORIZONTAL DIRECTION DRILLING 0 0 -vu 55+00 5b+vu 54+UU 58+00 59+00 bU+UU b1+00 bz+vu b3+00 64+00 65+00 66+00 67+00 68+00 CD CD 0 LLj Ln Z + zi n tD Lu tA 0 Z LLI Lj Ln Z kD 0 + U 0 - l0 Q DRAWN BY: SCALE: HORZ.: 1"= VERT.: I' - SHEET 4 OF C-1.02 a Q M IE 1I�T�j' 1 1 1 I I Propertya t�� pm of 1 Property of 1 Property o/ Property of 1 Property o! 1 Property o! I Property of ���� \� Schwerta. BrvreM 3 1-'.` CenhyG ryP Greene, Trevor Bogas, Anthonyf Galog. fames Beatty, Le 7anyaR K Ber, M. -Th— 0—SNarrr OB 03786, PG 0872 /JJ '� C�.l •' etuxl Y^aM 1 OB 02931 PG 1.137 eC d -R I� DB 01648, PG 1170 DB 0137)PG 0125 DftaM76, PG 0507 I DB0227f1,PGOM2 i ��m,o( `gl \\ PIN/3107184213I1 1 DB 03157, PC 0098 1 PIN13107183262M 1 PN/3511, PG 112210 I PNI 310718322283 I PN131071d32B254 PINI 31071&329734 PN' 3107184X7205 8ai/ey, SaLhudinA a 1 3 (�`6 rrLayw� PNi370718315251 I Q DBx03502 PG W32 :SC II ��- 1 -� ',`i �J 1 1 1 I I 1 t PNi310718ffi0285 3 ]5"CMP l-1728 Cc Or CB tet`. 8"Forte Mein m K%VM S J, o \ Top -19.51 ' I I (Appmx) r] + 1 1 ^ I Pro rt , \ - 50' & O ry Freshwater 17wmss AeNx mv0w-1538 f38/ R w y� 1 E 1 I I x n AIR RELEASE MANHOLE 30' 36'RCP C 30 and 802493, ret Myra \ 10' Invin-16.89 (IS"") Woods F 8"Force Ma in Discharge OB 02493, PG 1233 I /nv-13.87 FOCWemug I _ 1 122 (SEE DETAIL) I NW'ver !Appmx) \`. ---`-- S' MIN. INSIDE----- -----i-�,T 1 I �- PN13tone4uz7s \ Past 30'CMP InwJ531 36"RCP--r-------L---�- -- --,-�� 1 Inv -14.76 EASEMENT E75IRebar)- - - O rDlamrbed/ Cftl /d - - - -woad — Ln 4a•uw'ryADrainage�semenr. - - - --- _-- --- N NLS -33 -- _ 2s. 1 g� Tree .a: SII Cdsr� �"-< w Pro !-.Y' + + + ter-, x-6• 6" a6-. a� As ha/eP vement Ware�Main A t - + s Hales Man'1 m. 6 Bldg {� I � n - - Pear Peadi Pear 1 n (� ) • _ (Ppmx/ , �. J I Pear g 6' Wwd Shexl �,gr.d 6' Woad - .d 1 1 Q V - '� Sand Se er A roxl DB @30H PG 0601. 3'HedgeJ 1 Ir ..y 1 4' Chainfink Fmre-1 1 6r � g, Privacy P1NI310718326I83� Fevre 1 I 16" PLUG VALVE & BOX I Fence 1 F `p __ -- w w - Two Pine Road E F Awe 1 Pmpe ty., 1 I I I Z w 36' FBSc I I I _ SSR 1592) ra�� 6, PG 0 0 1 1 fnw/53! J H ExistUHlity DBP2306,PG0607 Easement \ •\ I ^^ \q �rY� PNI310718318130 1 f}uperry o/ = LLu I `EJC Kerchum, All- H Propertyo/ Property of I 1 I I U AIH No. 5081 I +'Lo „ ( DB0 ,PG 0010 I Render, Gloria/ I Watk&m Adatthew Scott g Dinalrl I party of 1 Property./ Neal l/1 0 PN1310778329110 DB02542PG0198 DB 03589, PG 13% Ta lot Aftahwl et Pamefa Tep-19.73 I \\ (V - I PN/31071R319IA0 OB 010A59, AG 0325 Powell Carolyn/ 1 yD802010,1G0730 I emx D-eUeL C Q \ J- I PN1310718420120 PINI3107t842H41 I PM 3107I8422�t211 P -M, I8 07m DB02956PG0308 1 PN1310778WI62 25 1 I g 40' udbty & Drainage Easement IF / g _ - u LLJ = 1 °J / Els -71 10" . Cl,,Build LLC y , I DB 03104, PG 10.36 In lJ ! I'"`,- -- 116"RIDI (y/ j PN13IM4429534 Q I 10' MIN. 0J N ' H"Form Main Disdurge H"Form Main ro wwl SEPARATION Q (Appmx) K Z to Piver(Appm) +. Unde+ground F,0. f 16" CONCENTRATE LINE n o d s Eln-triml Cable 00 IL,. W Warning Post QU TRANSITION J• ,J < Z �� \ / •. 20 O 16" FUDI - - FITTING, TYP. - - E -Ex (SEE DETAIL) 4'-D" MIN. Prope _ -vI N I Forre Main I I 1 I g 40' udbty & Drainage Easement IF / g _ - - _ LLJ = 1 °J / Els -71 10" m I I Fenm m I J ! I'"`,- -- 116"RIDI (y/ j -I" - - -- --- 7F— I Cedar 6'Woad Pdvary Fm W o o d ' ; ✓�_Hx=r FITTING, NP. FUSIBLE PJC lnw14.17LU 36"RCP Shed 6'Wood P'vary f Fe- (&d) T _ _-T } 40 Ubbty & -- Oramage Easement 5' airdink Fe TRANSITION 4Grade = W U to �� \ / •. 20 (Begrn) 16" FUDI - - FITTING, TYP. - - E -Ex (SEE DETAIL) 4'-D" MIN. Prope � COVER I Forre Main I I Property./ \ I BxierPumpStabon I �'g/ (� derground) D,yl-Rona/dARtux \ y-` IFenme) 1 Fpem"d Pro -yo/ H.Aiping Weaver,C yet Karen p� DB02146, PC. 01% 1 DB O2(ML PG 0349 Property of y' / Hoperty o/ FEW 310718424164 I PN/310718425164 -803514 PG 0257 / C eila -402497, PG aW PN1310718426155 / PIN0310718422743 / \ O 0 00 + N w N w L—^ Z = J ~ w Lu U N CQ G 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 e�a ra GLC b f Clark 1 °J +r 2 = d UP I Fenm m I Underground ! I'"`,- -- 116"RIDI (y/ j -I" - - -- --- I �-._-• ( I i Exist Grade ---L - _ I I -_.-_--r-- --Ij�'-'-��A W o o d 20 ; ✓�_Hx=r FITTING, NP. FUSIBLE PJC AIR RELEASE MANHOLE (SEE DETAIL) Fe- (&d) T _ _-T } 40 Ubbty & -- Oramage Easement - - - - TRANSITION 4Grade -- - ---.- --F- -- - �� \ / •. 20 Woo d s 16" FUDI - - FITTING, TYP. - - E -Ex (SEE DETAIL) 4'-D" MIN. Prope r- I COVER I Forre Main I I Property./ \ 16`Warer[ a 35./! Ill and Andrews L -JC (App-,) n D,yl-Rona/dARtux \ y-` 15 - - - - - �wR�6 �' �j 16" PLUG VALVE I I 36"RCP 1nw13.93' 16" 0900 PVC CONCENTRATE LINE 1 5 DB 02295, PG 0743 PN 1310718429123 - - - - P1N1310719511764 cr.vrtysew \ i m { (APProx8"F—M- L J �, (App-) i & BOx I z STA. 72+69+/- $ I 2'-0MIN. !, j (Axsvme under Water) TRANSITION 4`0" MIN. 20 10 FUSIBLE PVC 1 10 '.� 6^(1 W ear une I (SEE DETAIL) COVER aG ----------- (SEE DETAIL) 16" RIDI FITTING, NP. I 5 i�+ $ 20 j I 5 d j 155 LF OF 16" 0900 PVC WITH ]DINT ! UG VALVE 490 LF OF 16" FUSIBLE PVC BY HORIZONTAL DIRECTION DRILLING RESTRAINT CONCENTRATE LINE l 1 O !' O O 0 00 + N w N w L—^ Z = J ~ w Lu U N CQ G 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 e�a ra GLC Clark Pnr mPear °J DB 03[04 PG 1036 2 = d UP PlN1310714429534 Fenm m I Underground (3 Ebr Cb/e \ D Electoral Cabk- W o o d Nneergmandh-perty / I Warning Pmt ChabOink AIR RELEASE MANHOLE (SEE DETAIL) Fe- (&d) T _ _-T } 40 Ubbty & -- Oramage Easement - 16" PLUG VALVE & BOX �d 4Grade .•—We t an ds 16" CONCENTRATE UNE m y FSectoral Bax (S-0" MIN. INSIDE EASEMENT) (High Volrge) oy s Waada �uP Cl ke rs LLC DB 03104 PG 1036 PIN1310714429511 F"Force Main O'.sdurge m River(Appmx) 8,,F0_ Mainro WW7P (APPnrx) ---- 30' UBlity Easement W e t 1 � � m H�n o DRne DB allM PG 0510 BMW" PG 0075 PNI31077%12191 \ DRrton Brc \ DB 03334 PG 0510 \ BM 0078, PG 0097 \ PN431071%28422 Wa o ds \\. Pnr mPear °J 6'Wood Pri vary 2 = d 1 DRH rfonolnc \ Fenm m I Underground = IST Ebr Cb/e \ / I Electoral Cabk- \ Nneergmandh-perty / I Warning Pmt ! Vaague; Angel Luis Bdgharry Sandy Harfanfrand/ I \L:,b DB 01071, PG 1219 I Taylor Stephanie Ammlet l 43777, PG �d 4Grade \7, PIN1310718429189 DB 0493 1 PN1310719520189 / "1 ' 3 - - - - -+ Woo d s 16" FUDI - - FITTING, TYP. - - E -Ex Prope I \ 1 / aminRID Andrew; Benr- Property./ \ 1 / and Andrews L -JC 1 D,yl-Rona/dARtux \ y-` DB 03216 . d DW- tam L \�� / PG 0973 DB 02295, PG 0743 PN 1310718429123 \�(, \ P1N1310719511764 II ' \ 31 !, j O TRANSITION 16" CONCENTRATE UNE m y FSectoral Bax (S-0" MIN. INSIDE EASEMENT) (High Volrge) oy s Waada �uP Cl ke rs LLC DB 03104 PG 1036 PIN1310714429511 F"Force Main O'.sdurge m River(Appmx) 8,,F0_ Mainro WW7P (APPnrx) ---- 30' UBlity Easement W e t 1 � � m H�n o DRne DB allM PG 0510 BMW" PG 0075 PNI31077%12191 \ DRrton Brc \ DB 03334 PG 0510 \ BM 0078, PG 0097 \ PN431071%28422 Wa o ds \\. Mn 0m-18.14 Main FIS w o e HM -Samuel and Halbn. Brittany Brooke Q' SD8037M, PG 0313 SM0048, PG 0327 r ti'1 \ PINI 310719529243 �\ SSMH Not H29 ✓// lnv N-1719 mOT wG Wand: 2 = DRH rfonolnc \ N Z DB 03334 PG 0510 = IST BMMM PGDO27 \ PN$ 310719529320 \ Mn 0m-18.14 Main FIS w o e HM -Samuel and Halbn. Brittany Brooke Q' SD8037M, PG 0313 SM0048, PG 0327 r ti'1 \ PINI 310719529243 �\ SSMH Not H29 ✓// lnv N-1719 '` Te/ Hand Hold 8 6' Woad -3 D �� Cable Ped i + P 'vary V a I Fevre n DRN rron lnc `\OB 4}134 PG 0.510 1 � + BM0040, PG POD PINI 37 07196202 95 •p \ I Crowe, M'h�1ReNx I Ba­j-tth-Yemx \ I and Crowe. Elimbefh I and Baum, Melinda f Ds aW7, PG 0828 DO 03NI, PG IM Bm 00m, Fc \ \ I G 0027 PINP7191211227 SM63 i PRVJO 96=44 lu mOT wG Wand: 2 = 30' UkUty E—wt N Z ---•- r'G = IST N '` Te/ Hand Hold 8 6' Woad -3 D �� Cable Ped i + P 'vary V a I Fevre n DRN rron lnc `\OB 4}134 PG 0.510 1 � + BM0040, PG POD PINI 37 07196202 95 •p \ I Crowe, M'h�1ReNx I Ba­j-tth-Yemx \ I and Crowe. Elimbefh I and Baum, Melinda f Ds aW7, PG 0828 DO 03NI, PG IM Bm 00m, Fc \ \ I G 0027 PINP7191211227 SM63 i PRVJO 96=44 lu 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00 96+00 Z 0 Lu Q Z OO =U W w x LL > LLI°C w Z v)z-1U wO H 3 Z + J LO Z Z 0 0) ce w iso LLJ Z I^ 3 U ZO L vo CD Q N Z LM O to 0 V z0 U tG _O u � u N N 3oW Z LYS Z w �30w mZ U Cc Cc m ".P,�Hr CA80Cr'e. j SEAL 37878 y��;YGINEEQ�pO� '•. S R .a 0 . DESIGNED BY DRAWN BY: CHECKED BY: l JF PROJECT NO.: 3081-! DATE: MAY 20' SCALE: HORZ.: 1 " = 5 VERT.: 1" = SHEET 5 OF 9 C-1.03 1 25 �d 4Grade ',. !:� I "1 ' 3 - - - - -+ I O - \ l 16" FUDI - - FITTING, TYP. - - E -Ex 2 5 of t G ffi --,----r_---i ode -:. _ - - ---� . ? I i ft1518LE WC 'i !, j 1 I TRANSITION 4`0" MIN. 20 FUSIBLE PVC 1 '.� 6^(1 W ear une I (SEE DETAIL) COVER ----------- (SEE DETAIL) 16" RIDI FITTING, NP. I 20 j ! 1 a"(1)Gravty sewer lnv-18.09• _ _ UG VALVE 418 m l 1 !' CONCENTRATE UNE j I li MIN. & x & BO 1 5 16" 0900 PVC i 16" PLUG VALVE I ! I l _ _ SFA. 94+42+/ 15 _ 1 & Box j tj I STA. 84+67+/- ! IT 1155 10 p j d G LF OF 16" C900 PVC WITH JOINTa-155 LF OF 16 0900 PVC WITH JOINT .I 10 d RESTRAINT CONCENTRATE UNE rn I j 935 LF OF 16" FUSIBLE PVC BY HORIIONTAL DIRECTION DRILLING I RESTRAINT CONCENTRATE LINE ' 5 l 5 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00 96+00 Z 0 Lu Q Z OO =U W w x LL > LLI°C w Z v)z-1U wO H 3 Z + J LO Z Z 0 0) ce w iso LLJ Z I^ 3 U ZO L vo CD Q N Z LM O to 0 V z0 U tG _O u � u N N 3oW Z LYS Z w �30w mZ U Cc Cc m ".P,�Hr CA80Cr'e. j SEAL 37878 y��;YGINEEQ�pO� '•. S R .a 0 . DESIGNED BY DRAWN BY: CHECKED BY: l JF PROJECT NO.: 3081-! DATE: MAY 20' SCALE: HORZ.: 1 " = 5 VERT.: 1" = SHEET 5 OF 9 C-1.03 U ZZ 0 op: N? LLJ V) W_ �-o ou Ottzw 0 Z LL 30 Pro f 1. Z 1'0'9 pwp�tyof arop; C-d SEAL U 37WW - 0 30 River Road SE (Hwy 133) pcpq—f Bm­kC­ty 0- Warning Past + OR H- Inc DO 0333£ PG 0610 W_ ro Ri- (App-) Woad Rd Lr, + (.-P.-/) OB 01021 PGO4WProp Licc (TY -P) C_ Main . Klw7p 0 WTP F.- 0 Pavement) 8,F- Mm DO 01M, PG IM z R (Asphalt -",mm(App­) WV • RM "Z PG 0035 25 BM 0040, PG 0098 DO aux 1,6= Hm0048 P, r-4--- - - - - - - - - - -- LLI Cp S-tyS.-(Afp , A Mm . KIVTF C/1 (App-) /1t H AM AWO, PG 0098 PINI 310719222404 25 Ice -RCP G,, I lApp-, IN 0 PINI 310779622397 PWO 310775625547 i0 pope tyo! D R Hc,,- Property or COVER 18-R, 16 RIDI 1�" PLUG VALVE M-22.82 II-Rcp f- W St A. 7,� SEE THIS 09.)L 00 4'-0" MIN. p DO , , SM 0076, PC Oozff"' 4'-0" MIN. 20 S EE7- F- Main (SEE DETAIL) PIV13107207&162 8 F M VVW7P -Ir -I COVER Fora Main + A I K _6"W.-Lj­? 20c 20 W- P. 20 ro River (11 - 8" F.- Mm (App-) 20 Wrwg pmt 01 tz C, 7..,CT I (A­2'bc1..RCP) STA. I 14+53+/-PS5.76' 'US - 0) 15 X'D -- - - - - - - - - - -- - - - --- - - - - - - - - - TRANSITION - - - - - - - - - - — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LLJ (SEE DETAIL) j STA. 116+32+/- Eio (2) F.- M- z: Ln V) F16- EIS EIS TRANSITION 16- in"1 IBa f 1 SEE DETAIL) STA. 114+69+ f MIN. Ers T_ 16' CCS En EJS RESTRAINT CONCENTRATE LINE E51 kA V) ---i LU Z 8 10 A 6'Wd 11hy + , STA. 109+87+/- I + 1. + Z V) + + + 6- CONCENTRATE LINE 16" 45- BEND + 16" 45c SEND 4 20' 1 _jw 10 STA. 109+92+/- (5'-0" MIN. INSIDE EASEMENT) 717 LU w + + + +1 10 135 LF OF 16- C9D0 PVC WITH JOINT LA U uj Ln 138 LF OF 16" 0900 PVC WITH JOINT RESTRAINT CONCENTRATE LINE BY HORIZONTAL DIRECTION DRILLING RESTRAINT CONCENTRATE LINE I In BY HORIZONTAL DIRECTION DRILLING rn RESTRAINT CONCENTRATE LINE In 5 5 Property of Pmpaty of huprtya Aapcc,y.f pmpff�v f FhpM a Ncpccb, -f p -;-y -f Aropcty a I p"ycya PmP­y a p,,,ya -pe-y f DRH�Lv �W 2b- A.. Y_ Ob. -Donald Oil hr�ftya DRH.�[- swbe', 54�ph­,­ Saltier, I D, ld and MkheVc Joseph Donald HcfecR-d,1Rc­ end Joseph �d Hafer, N -y E P-) H D R Hcl" L�l Pc— Tru Co -L, PG DB03"5, PG0739 C--, W -Y- I E,—C.-t­LtC,W� B �d Carver, Damthy OR 02", PC D R H,� W �dm Kcrth L Do aux PG 051 0 OR 030Z PG 0598 0028 �dg, Of- H I AMOO" PG OR dWO, 8mOm, PG PG 0075 DO a733( PG 010 and .Gmber/yA DB03747, PG0841 08 07K PG 0922 1 DO 03M, PG 12M OR M99, PG M6 D803334, a5jo BM 0048, FG OOV HM0048, PC 0027 j 0404 08 aW7, PC 0269 BM OOM, PC 0027 DO onit PG a5i BMWO �0028 -Z� -d DO 03141, PC 0538 BAfOO48, PGM28 PIN� 310779721331 PBV131071W I zm BU WM PG 0028 PINI 310719628377 SMOOM, PG 0027 BM OM PG 0027 BM0048, PG0027 SM0048, PGOW7 PflV3'07'�'22' FINI 310719622707 BM OOM, AG 0027 PRV13107IW8243 I PVV1310n9�9213 BM OOH,, PC 0028 PflV0310MMIT PINI 310719623214 PINI 31077962.3295 FIA4310719624275 PrN1310719625246 PINI 310719627275 PIMMM9629286 RVW - - j Rlw. — SamWySe­,(App� Sanitary Sewer (Appn SE f3jvd Morecamble Blvd SE morecainble U ZZ 0 op: N? LLJ V) W_ �-o ou Ottzw 0 Z LL 30 3& 1. Z 1'0'9 7m SEAL U 37WW - 0 30 River Road SE (Hwy 133) .......... 0- Warning Past + !DESIGNED BY: W_ ro Ri- (App-) Woad Rd Lr, + 8"F. ubwtyEasement C_ Main . Klw7p 0 WTP F.- 0 Pavement) 8,F- Mm Min z R (Asphalt -",mm(App­) WV & BOX DRHorton L,c 25 25 DO aux 1,6= Hm0048 P, r-4--- - - - - - - - - - -- LLI Cp S-tyS.-(Afp , A Mm . KIVTF C/1 (App-) /1t H 6 CCS 25 Ice -RCP G,, I lApp-, IN t ZI WE S r4 (18--0- MIN. OUTSIDE R/W) pope tyo! D R Hc,,- Property or COVER 18-R, 16 RIDI 1�" PLUG VALVE M-22.82 II-Rcp f- W St A. 7,� SEE THIS 09.)L 00 4'-0" MIN. p DO , , SM 0076, PC Oozff"' 4'-0" MIN. 20 S EE7- f.i (SEE DETAIL) PIV13107207&162 BM0044AGOW POVI 310720726NI COVER A I K _6"W.-Lj­? 20c 20 20 20 i 16" C900 PVC CONCENTRATE LINE 7..,CT I (A­2'bc1..RCP) STA. I 14+53+/-PS5.76' 'US + + 8 15 TRANSITION + + & BOX 15 (SEE DETAIL) j STA. 116+32+/- Eio 20 LF OF 16" C900 PVC WITH JOINT TRANSITION 16- in"1 IBa f 1 SEE DETAIL) STA. 114+69+ f MIN. RESTRAINT CONCENTRATE LINE 10 b 0. -Z IELM EL= N E 16" PLUG VALVE & BO 2-16" 45* BENDS STA. 109+95+/- Telephone --_ VI= 11-d Hole Z .12 -(App -1 Sou Mem &H Udfi�v E­mcct 8' F.- m'm . p (A - Epro) Cm WV NLS® + + I � 41' 1111\�/8 c6k_ + 1. Z 1'0'9 7m SEAL U 37WW - 0 15' unlity:GL River Road SE (Hwy 133) .......... 0- Warning Past + !DESIGNED BY: W_ ro Ri- (App-) Woad Rd Lr, + 8"F. ubwtyEasement C_ Main . Klw7p 0 WTP F.- 0 Pavement) 8,F- Mm Min z R (Asphalt -",mm(App­) WV & BOX DRHorton L,c 16" PLUG VALVE & BOX - -- - - - DO aux 1,6= Hm0048 P, r-4--- ,, % 19 -RCP, LLI Cp S-tyS.-(Afp , A Mm . KIVTF C/1 (App-) /1t H 6 CCS , Ice -RCP G,, I lApp-, IN + + I � 41' 1111\�/8 c6k_ + 1. Z 1'0'9 7m SEAL U 37WW - Main 3'Fc- M� Mch 15' unlity:GL 1p_ctya DR Hc- Inc .......... 0- Warning Past Ex t. Grade STA. 10+15+/- !DESIGNED BY: W_ ro Ri- (App-) Woad Rd Lr, + 8"F. ubwtyEasement m - . Klw7p 0 Uthfity Easement 0 Woodsma 5�0" MIN. INSIDE EASEMENT �4,4*r, 8,F- Mm I u z R 16" PLUG VALVE & BOX DRHorton L,c 16" PLUG VALVE & BOX - -- - - - DO aux 1,6= Hm0048 P, mm wp_t W.f�. ,, % 19 -RCP, PIN1310720712YU ( cox) S-tyS.-(Afp , A Mm . KIVTF C/1 (App-) /1t H 16- CONCENTRATE 114 , Ice -RCP G,, I lApp-, IN t ZI WE S r4 (18--0- MIN. OUTSIDE R/W) pope tyo! D R Hc,,- Property or COVER 18-R, 16 RIDI 1�" PLUG VALVE M-22.82 II-Rcp f- W St A. 7,� SEE THIS 09.)L 00 DO , , SM 0076, PC Oozff"' DRH­h,, DF09aX PG0510 20 S EE7- f.i (SEE DETAIL) PIV13107207&162 BM0044AGOW POVI 310720726NI I -uv I vq+vu lu]+uu I ub+uu 107+00 108+00 109+00 (APP"1_1 A ZMHN.52W Top -24.93q-2493 50' 25' 0 50, SEAL 1-0-17.05 37WW - PROJECT NO.. 1p_ctya DR Hc- Inc .......... F_ Main W.1-8 P-1 Shrub Row Ex t. Grade STA. 10+15+/- !DESIGNED BY: BM 0095, PG 0029 PMI 310270729085 Lr, + 8"F. ubwtyEasement Lf) . Klw7p 0 Uthfity Easement 0 (App-) UPI Traffic aro ds " z 8,F- Mm I u Pmp,dy,f to Ri- (App-) W- 1A11- DRHorton L,c 16" PLUG VALVE & BOX - -- - - - DO aux 1,6= Hm0048 P, mm wp_t W.f�. ,, % 19 -RCP, PIN1310720712YU ( cox) S-tyS.-(Afp , $aNta MH-47� , 107+00 108+00 109+00 Ku 0". m, 18" ". = LU �1 11 4 8 Sb- (Fc -d) pi- u W2-16" 45- w- + V1STA. 114+76+/- + D 51� 11* 5517 wec (App-) z Top -13.22 tcP,-(A 1-1-1543 arty Inv Out DRH.� 03 03334 PC a51Ok..4 WOON, PC 0028 PVV$ 310=717&M ply I Ln Z 0 LA W Ce 00OC2 0 U W W LL > LL, Z 0 Z LA (A W+ Z O z 5 =) LLJ Z W W CO LU U 0 Z 0" u z 0 Lu u < Z Z 0 u 0+ LD ID U z 2 0) V0 z w U0 U LA un 0 w u LLI z Y > ) Z Lu C, 0 caU z :D W m (APP"1_1 A ZMHN.52W Top -24.93q-2493 50' 25' 0 50, SEAL 1-0-17.05 37WW - PROJECT NO.. 1p_ctya DR Hc- Inc .......... F_ Main W.1-8 P-1 DBalm PGa510 Ex t. Grade STA. 10+15+/- !DESIGNED BY: BM 0095, PG 0029 PMI 310270729085 Lr, + 8"F. 16" FUDI Lf) . Klw7p 0 - G VALVE & BOX 0 (App-) UPI Traffic aro ds " z 16" CONCENTRATE LINE IN. INSIDE EASEMENT) I u EIES — -- W- 1A11- - - - - - - -- - - - V1 ZLLI Lu = _j V) Ku 0". m, 18" ". = LU �1 11 4 8 Sb- (Fc -d) pi- u W2-16" 45- w- + V1STA. 114+76+/- + D 51� 11* 5517 wec (App-) z Top -13.22 tcP,-(A 1-1-1543 arty Inv Out DRH.� 03 03334 PC a51Ok..4 WOON, PC 0028 PVV$ 310=717&M ply I Ln Z 0 LA W Ce 00OC2 0 U W W LL > LL, Z 0 Z LA (A W+ Z O z 5 =) LLJ Z W W CO LU U 0 Z 0" u z 0 Lu u < Z Z 0 u 0+ LD ID U z 2 0) V0 z w U0 U LA un 0 w u LLI z Y > ) Z Lu C, 0 caU z :D W m DRAWN BY ZL . .... ...... 50' 25' 0 50, SEAL 37WW - PROJECT NO.. .......... 25 Ex t. Grade STA. 10+15+/- !DESIGNED BY: DRAWN BY i I ILI! 16- PLUG VALVE & BOX T1w CHECKED BY JRC PROJECT NO.. 3081 -APO 25 Ex t. Grade STA. 10+15+/- J 16" FUDI 4 W- 1A11- i FITTING, F TYP. C-d� 25 16" RJDI 4'-0" MIN FITTING, TYP. Ice -RCP G,, I lApp-, IN COVER 18-R, 16 RIDI 1�" PLUG VALVE M-22.82 II-Rcp f- FUSIBLE IVC I TRANSITION 4� MIN. _��R I 20 In �2,p. L 1-21N FITTING, TYP. & BOX (SEE DETAIL) A I K _6"W.-Lj­? STA. 113+42+ 16" PLUG VALVE iF- 20 , 7..,CT I (A­2'bc1..RCP) STA. I 14+53+/-PS5.76' 'US 16- �UJG VALVE TRANSITION & BOX (SEE DETAIL) j STA. 116+32+/- TRANSITION 16- in"1 IBa f 1 SEE DETAIL) STA. 114+69+ f MIN. 15 STA. 109+87+/- _i. + 16" 45- BEND + 16" 45c SEND 10 STA. 109+92+/- STA. 114+73+/- + + + +1 10 135 LF OF 16- C9D0 PVC WITH JOINT d 287 LF OF 16" FUSIBLE PVC d 151 LF OF 16" 0900 PVC WITH JOINT 4 139 LF OF 16" FUSIBLE PVC 1d r 138 LF OF 16" 0900 PVC WITH JOINT RESTRAINT CONCENTRATE LINE BY HORIZONTAL DIRECTION DRILLING RESTRAINT CONCENTRATE LINE I In BY HORIZONTAL DIRECTION DRILLING rn RESTRAINT CONCENTRATE LINE In 5 5 DRAWN BY T1w CHECKED BY JRC PROJECT NO.. 3081 -APO MAY ZUI SCALE: HORZ.: 1"= 50 VERT: 1 " = ! SHEET 6 OF 9 r- i OA pdf2016.pltcfg 50. 0000 '/ in. tkeith 31612017 9:00:26 AM T. I Projects J Brunssvick-Re#Yonal- W&S-H2GO-3081 IAB-Water-Supply&Treatment-Plant I Sheets I ContractO I -C-23081 -AB.dgn C-1.05 Ln C) Ln 0 'q t - -------- --- f STA. 117+50 +/- L—D 133HS 33S EQ 0S+11L 'V -LS 3NI-1 H:).LVIN 16" PLUG VALVE 0 &BOX— --- F- z !i 0 STA. 1�8+05+/- j 118+00 L..8H STA. 118+25 +/- -/+SZ+811 YLS I I —ND. OON1939 119+00 -0- , 711 A. 12q+m u ----------- Z 7 u rn 'I I 'J 121+'W __T 122+06 J P 4 I 2 F. 1 91 0 E 0 +00 p Z r Zm z J IT STA. 126+02+/• 0 > 0 !1IR z M -A - ------- --- M!q ------- k 0 t FINAL DRAWING t.n Ln NOT RELEASED FOR CONSTRUCTION SEWER H2GO REVISIONS NORTH CAROLINA n BRUNSWICK REGIONAL WATER AND BRUNSWICK COUNTY CONTRACT I - NEW 16" CONCENTRATE z .5 % LINE FROM < 0 ;,a p REVERSE OSMOSIS WTP TO BRUNSWICK RIVER THE WOOTEN COMPANY 00 4� 16" CONCENTRATE LINE DISCHARGE INTO RIVER I I I I T E ' T Lri STA. 117+50 TO STA. 127+00+1- 120 NWh Bwl�, A,­,� U-1, NC 77603 ],V; 0 V (2) t' vErvT HOLES - - 7 A 1/2 �W �- LOP OF COVER A 1/2' BOTTOM OFY COVER P�1+q-j- I" R COLLAR NOTE. 2" SQUARE NUT PLAN FRAME AND COVER TO BE DEWEYEROS.. INC 1V." DIA. STEEL BAR RCR-. MH RCR-20D1, MH RCR -2001W (FOR SEALED MANHOLES IF REO'). -AS 2' SpDARE SOCKET ZS-I/A' SHOWN ON PUNS), OR APPROVED EOUA. DETAIL 2]-1/2" PLUG VALVE W WORM GEAR 1-1/2" OPERATOR AN 2" NUT MIND PLATE DWT. 4' PIR VALVE BOX SHALL NOT A-3/8•' 2a -t/2 UBE 3/0' ANCHOR BOLTS TO BOLT FRAME TO SPACER. 33_1/{• USE ROPE MASTIC SEAL BETWEEN FRAME h SPACER B' SECTION A -A 1 MANHOLE COVER AND FRAME C-1.07 NOT TO SCALE o�VALVE BOX 2 HO" X 2'-0" CONCRETE THREADED HOLES -4 AT 90' COLLAR N 2" SQUARE NUT Q. 1V." DIA. STEEL BAR BOLTS 2' SpDARE SOCKET ll///jl�f (CASTIRON) DETAIL CC - PLUG VALVE W WORM GEAR O OPERATOR AN 2" NUT MIND PLATE DWT. 4' PIR VALVE BOX SHALL NOT py COVTR E CONTACT VALVE OR MAIN. B' PLACE PEA GRAVEL UNDER BOX FOR SUPPORT 3/4' g' 9' D�� D 18" S( c e (MIN. NOTES: 1. and gland w/ 4aml polyethylene sheeting rap bolts 2. Where depth of valve operating nut is greater than 5', Contractor shall provide and Install extension stem using Manufacturer approved extension kit. Depth of extended operating nut shall be no greater than 2'. 5 PLUG VALVE BOX INSTALLATION C-1.07 NOT TO SCALE LAG BOLTS THREADED HOLES -4 AT 90' (TYP. OF 4) 4-1/211x1-3/4" STAINLESS STEEL (TYPE 316) HEX HEAD Q. THRUST COLLAR SHALL BE FORMED USING T4' EXTERIOR BOLTS F ll///jl�f TOP OF COVER DETAIL CC - - - - MIND PLATE DWT. 4' PIR 5/8' 4- 6- py COVTR E 2" O / B' /2 R 3/4' g' 9' L+9' p 2 ?„ MINIMUM AVERAGE WEIGHT L+3' 12' RING 190 COVER 120 3/4' 12' 18' L+9" TOTAL 310 18' T-11/4" 7/8' 18' 18' L+9" Y4" N 11/2 1'-11 I/2 L+9' L+3' 112 L/° 3111 Y°POLYVINYL GASKET BETWEEN 1 1/4" 24" 241 L+10' L+4' COVER AND FRAME SEAT - -LAG 1 1/2' 3Q' 24'• L+11' 2 �4" BOLTS a- 4' (TYP. OF 4) 9 THRUST COLLAR =2' 1/8"43/a" C-1.07 NOT TO SCALE 43 T-9 2 \ WATERTIGHT MANHOLE COVER AND FRAME \Z1.07 / NOT TO SCALE �x X a to'dA• I tz"rslm LA% A.` A•A 14' .w1-10' OLl d1 LESS � � M" u.L-12' W OR ORG1G X sEcnox x_ EldrL8Lrn9 13AB� RUN $� AmN ss PAD 2000 R 90L OAMD A GAWEL WRH MY) i) NOTES 1. BASED ON 200 PSI STATIC PRESSURE PLUS AWWA WATER HAMMER ALLOWANCE. 2. ALL BEARING SURFACES TO BE CARRIED TO UNDISTURBED GROUND. 3. THRUST BLOCKS TO BE USED AT ALL UNRESTRAINED ONES OPERATING UNDER PRESSURE. 4. KEEP ALL PIPING JOINTS CLEAR OF CONCRETE THRUST BLOCKS. 5. WRAP ALL FITTINGS IN 4 MIL POLYETHYLENE SHEETING. 6 THRUST BLOCKING C-1.07 NOT TO SCALE NOTE' ENDS OF CASING CAN BE SEALED USING MODEL AC ADVNPUCLSPEAS, AS MANUFACTURED C NRAPO ADVANCE ODOPROVED EQUAL. STEEL ENCASEMENT NOT TO SCALE (8) /4 RENAR 4 EACH WAY 0. THREADED GALVANIZED STEEL SEE TE ROD SCHEDULE' FOR QUANTITY AND SIZE OF THE ROD M.J. CAP OR OTHER M.J. FITTINGS Fes-- D W F_- / J A DA THREADED TAP� AND BRASS NIPPLE THRUST RING FOR 2' LINE EXTENSION N41E5: 1. NEOPRENE Boor KOR-N-SM OR EOUAL. To BE USED FOR USE IN PAVED AREAS FOR USE IN UNPAVED AREAS ON ALL PRECAST MRMG.ES WITH ALL TYPES OF PIPES, 2. PIPE CLAMP (300 -SERIES NON- MAGNETIC CORROSION -RESISTANT STEEL). 6" OR THICKNESS 3. EXPANSION BAD (KOREAN) 6061-F6 ALUMINUM ALLOY OF BASE MATERIAL 2 WITH A BLACK ANODIZED SURFACE R. USE STAINLESS STEEL DRIP PANS ON ALL MWNpLEs IN PAVEMENT PAVEMENT; VINYL OUTSIE PAVEMENt, 12" 12" S. COAs INTERIOR WITH TWO COAD OF COAL FAR FPOxY FRAME A COVER (SEE DETAIL), .01c A FINAL T. WIDEfWRAW MASUG, S. WRAP OUTSIDE OF 6A ROTEO AND UN ED AS SHOWN EO 6. PLL MANHOLES WRHIN NCDOT ROW SHALL BE 6" z CONSTRUCTED PER NCDOT STANDARDS. O Wx- MANHOLE RING k COVER W BIILA HOu5 WITH DRIP PAN AND RAW POURED IN PLACE CONCRETE NPRECENATED YARN GUARDS INSIDE MnNHOLE_ POURED E PLACE COLLAR 3000 PSI MIX OR FAME SEAL CONCRETE COLLAR ( ) USE 3/9" ANCIga (3000 PSI MIX) APPROVED PRECAST COLLAR BOLTS TO BOUT FRAME VALVE BOX TO SPACER, USE ROPE 6' Malt. i0R SPACER MASTIC SEAL CETwEEx VALVE VA V VALVE ORXMA N. SHOULD LACE PEAO TACT GRAVEL FRAME h SPACER PRECAST cogcafrE UNDER BOX FOR SUPPORT. TYPE -N" WSONRY GRADE ADJUSTMENT GATE VALVE aRTAR, 1" MAx1MUM - RINGS -MIN F ICH GRAVEL RINGS MM of 2j ECCENTRIC TAPER UNIT BUM RUBBER RASED RISER UNIT FLE%iBLE JdNT SEALANT IT 0 -RING T WIDE i WITH A B WIDE RUBBER _ oursDE NO CONCRETE SHALL TOUCH vgF<n5r {B' M,wHOLE jw SEE NarE 2 BOIL OR GLANDS. WRAP SECTIONS AS REOUIREO. + SEE NOTE 3 BLOCKING MIN. ASTM C126 INTEGRAL FLOOR. BEARING AREA=1 FT. S0. BOLTS & GLANDS W/ 4 MIL UNLESS SHOWN OTHERWISE. RISER UNIT POLYETHYLENE SHEETING. MINIMUM NUMBER OF JOINTS.' }, BASE UNIT e. .r 1. 2" GATE VALVES SHALL BE F.I.P. THREADS. CONNECTION TO THE PIPE SHALL Z I { py, BE MADE WITH BRASS NIPPLE AND SCH, 4D PVC F.LP.T, X SUP ADAPTERS. Q CONCRETE PIPE Fp BE 3 ONNECTED TO 2. GATE VALVES GREATER THAN 2" SHALL BE MECHANICAL JOINT. MANHOLE Mi1H LE NUES 3TRACER WIRE FROM TBOANDP SLEEVE k . IOM MAIN INTO VALVE X U. O NLES STAIS STEEL STRAP U L CONCRETE Z LJJ CONCRETE &SE A AGGREGATE EEO. NO ► O 3 PRECAST MANHOLE 4"`\ M.J. VALVE AND VALVE BOX C-1.07 NOT TO SCALE C -L07 NOT TO SCALE W S FINISH GRADE TO SLOPE AWAY FROM CASTING- _� NON-SHRINKCAS GROUP RING AROUND CASTING MANHOLE STEPS TO THE BOTTOM AT 12" ON CENTER 1/2" QUICK DISCONNECTING COUPLING 1-3/4" MASTIC SEALANT PRE -CST MANHOLE RISER SECTION - 5'LONG BACK-FLUSH HOSE - CORED HOLES FOR PIPE. STONE 3,000 P.S.I. CONCRETE FOOTING 12" STONE STANDARD MANHOLE FRAME AND COVER PRE -CYST FLAT SLAB TOP FINISH GRADE 5• ID MANHIXE. MIN VALVE CENTERED IN MANHOLE 1/2BALL VALVE ZHU* / 6" N. ATTR RCEMFOODDEL 9VE W/COMBINAFATIION Bµ{I- ED INLET, OR EQUAL / p 12"MTX 12"MAX 12" ME TEE OR 1' BALL V VE 16" MI x 16" W x 16" FL TEE AND 2" TAPPED BLIND FLANGE / NON -SHRINK GROUT - I a TO MAKE WATERPROOF CONCRETE FOOTINGAT RAV FORCE MAIN,1� RI DEPTH VARIES L A MOM Ii9' SEE PROFILE. STANDARD MANHOLE NOTE: GATE VALVES FRAME AND COVER L SHALL BE BRONZE, I \ \ R2E9PIM& �SFAT DESK. ` 8' CRUSHED STONE PLAN SECTION A -A NOTES 1. IF THE MANHOLE TOP IS ABOVE GRADE 4. IF OUTSIDE OF R/W, MANHOLE TOP CAST RING AND COVER 1N SLAB. MAY BE UP TO T ABOVE GRADE IF NEEDED FOR SPACING, WITH RING 2. MANHOLE INTERIOR SHALL RECEIVE 2 AND COVER CAST IN UD. COATS OF COAL TAR EPDXY COATING (21 MILS). S. ALL PIPING AND FITTINGS, IN THE MANHOLE, SHALL BE BRASS. 3. MANHOLE SHALL BE CONSTRUCTED TO 6. MANHOLE STEPS SHALL BE PLACED 6" O.C. WHEN DEPTH NCDOT STANDARDS AND H2O RATED, OF MANHOLE EXCEEDS 5 FEET. l AIR RELEASE MANHOLE (IN-LINE) NOT TO SCALE ARV I I ' DUAL ARV DETAIL STA (MOUNT TYP. TO SINGLE) 90. BRASS FITTING CAST IN RING AND COVER INTO TOP TO SAVE GRADE, IF NEEDED OR IF ABOVE GROUND WITHIN NCDOT CONTROLLED ACCESS /4 REBAR F0071NG THRUST COLLAR SHALL BE FORMED USING T4' EXTERIOR 1 FORCE MAIN I PLYWOOD AS PER COLLAR DIMENSIONS SHOWN. BE PIPE DLAM RDD SCHEME COUAB.J>y TIE ROD 9UA& SIZE LINE SIZE MIN, MIND PLATE DWT. 4' 2 5/8' 4- 6- L+8" L+2' B' 2 3/4' g' 9' L+9' L+3' 8' 2 3/4' B' 12' L+9' L+3' 12' 4 3/4' 12' 18' L+9" L+3' 18' 4 7/8' 18' 18' L+9" L+3' 20' 4 1' 20' 201 L+9' L+3' 24' 4 1 1/4" 24" 241 L+10' L+4' 30' 4 1 1/2' 3Q' 24'• L+11' L+5" • CONTRACTOR VERIFY DISTANCE W/COLLAR SUPPLIERS. 9 THRUST COLLAR C-1.07 NOT TO SCALE N41E5: 1. NEOPRENE Boor KOR-N-SM OR EOUAL. To BE USED FOR USE IN PAVED AREAS FOR USE IN UNPAVED AREAS ON ALL PRECAST MRMG.ES WITH ALL TYPES OF PIPES, 2. PIPE CLAMP (300 -SERIES NON- MAGNETIC CORROSION -RESISTANT STEEL). 6" OR THICKNESS 3. EXPANSION BAD (KOREAN) 6061-F6 ALUMINUM ALLOY OF BASE MATERIAL 2 WITH A BLACK ANODIZED SURFACE R. USE STAINLESS STEEL DRIP PANS ON ALL MWNpLEs IN PAVEMENT PAVEMENT; VINYL OUTSIE PAVEMENt, 12" 12" S. COAs INTERIOR WITH TWO COAD OF COAL FAR FPOxY FRAME A COVER (SEE DETAIL), .01c A FINAL T. WIDEfWRAW MASUG, S. WRAP OUTSIDE OF 6A ROTEO AND UN ED AS SHOWN EO 6. PLL MANHOLES WRHIN NCDOT ROW SHALL BE 6" z CONSTRUCTED PER NCDOT STANDARDS. O Wx- MANHOLE RING k COVER W BIILA HOu5 WITH DRIP PAN AND RAW POURED IN PLACE CONCRETE NPRECENATED YARN GUARDS INSIDE MnNHOLE_ POURED E PLACE COLLAR 3000 PSI MIX OR FAME SEAL CONCRETE COLLAR ( ) USE 3/9" ANCIga (3000 PSI MIX) APPROVED PRECAST COLLAR BOLTS TO BOUT FRAME VALVE BOX TO SPACER, USE ROPE 6' Malt. i0R SPACER MASTIC SEAL CETwEEx VALVE VA V VALVE ORXMA N. SHOULD LACE PEAO TACT GRAVEL FRAME h SPACER PRECAST cogcafrE UNDER BOX FOR SUPPORT. TYPE -N" WSONRY GRADE ADJUSTMENT GATE VALVE aRTAR, 1" MAx1MUM - RINGS -MIN F ICH GRAVEL RINGS MM of 2j ECCENTRIC TAPER UNIT BUM RUBBER RASED RISER UNIT FLE%iBLE JdNT SEALANT IT 0 -RING T WIDE i WITH A B WIDE RUBBER _ oursDE NO CONCRETE SHALL TOUCH vgF<n5r {B' M,wHOLE jw SEE NarE 2 BOIL OR GLANDS. WRAP SECTIONS AS REOUIREO. + SEE NOTE 3 BLOCKING MIN. ASTM C126 INTEGRAL FLOOR. BEARING AREA=1 FT. S0. BOLTS & GLANDS W/ 4 MIL UNLESS SHOWN OTHERWISE. RISER UNIT POLYETHYLENE SHEETING. MINIMUM NUMBER OF JOINTS.' }, BASE UNIT e. .r 1. 2" GATE VALVES SHALL BE F.I.P. THREADS. CONNECTION TO THE PIPE SHALL Z I { py, BE MADE WITH BRASS NIPPLE AND SCH, 4D PVC F.LP.T, X SUP ADAPTERS. Q CONCRETE PIPE Fp BE 3 ONNECTED TO 2. GATE VALVES GREATER THAN 2" SHALL BE MECHANICAL JOINT. MANHOLE Mi1H LE NUES 3TRACER WIRE FROM TBOANDP SLEEVE k . IOM MAIN INTO VALVE X U. O NLES STAIS STEEL STRAP U L CONCRETE Z LJJ CONCRETE &SE A AGGREGATE EEO. NO ► O 3 PRECAST MANHOLE 4"`\ M.J. VALVE AND VALVE BOX C-1.07 NOT TO SCALE C -L07 NOT TO SCALE W S FINISH GRADE TO SLOPE AWAY FROM CASTING- _� NON-SHRINKCAS GROUP RING AROUND CASTING MANHOLE STEPS TO THE BOTTOM AT 12" ON CENTER 1/2" QUICK DISCONNECTING COUPLING 1-3/4" MASTIC SEALANT PRE -CST MANHOLE RISER SECTION - 5'LONG BACK-FLUSH HOSE - CORED HOLES FOR PIPE. STONE 3,000 P.S.I. CONCRETE FOOTING 12" STONE STANDARD MANHOLE FRAME AND COVER PRE -CYST FLAT SLAB TOP FINISH GRADE 5• ID MANHIXE. MIN VALVE CENTERED IN MANHOLE 1/2BALL VALVE ZHU* / 6" N. ATTR RCEMFOODDEL 9VE W/COMBINAFATIION Bµ{I- ED INLET, OR EQUAL / p 12"MTX 12"MAX 12" ME TEE OR 1' BALL V VE 16" MI x 16" W x 16" FL TEE AND 2" TAPPED BLIND FLANGE / NON -SHRINK GROUT - I a TO MAKE WATERPROOF CONCRETE FOOTINGAT RAV FORCE MAIN,1� RI DEPTH VARIES L A MOM Ii9' SEE PROFILE. STANDARD MANHOLE NOTE: GATE VALVES FRAME AND COVER L SHALL BE BRONZE, I \ \ R2E9PIM& �SFAT DESK. ` 8' CRUSHED STONE PLAN SECTION A -A NOTES 1. IF THE MANHOLE TOP IS ABOVE GRADE 4. IF OUTSIDE OF R/W, MANHOLE TOP CAST RING AND COVER 1N SLAB. MAY BE UP TO T ABOVE GRADE IF NEEDED FOR SPACING, WITH RING 2. MANHOLE INTERIOR SHALL RECEIVE 2 AND COVER CAST IN UD. COATS OF COAL TAR EPDXY COATING (21 MILS). S. ALL PIPING AND FITTINGS, IN THE MANHOLE, SHALL BE BRASS. 3. MANHOLE SHALL BE CONSTRUCTED TO 6. MANHOLE STEPS SHALL BE PLACED 6" O.C. WHEN DEPTH NCDOT STANDARDS AND H2O RATED, OF MANHOLE EXCEEDS 5 FEET. l AIR RELEASE MANHOLE (IN-LINE) NOT TO SCALE ARV I I ' DUAL ARV DETAIL STA (MOUNT TYP. TO SINGLE) 90. BRASS FITTING CAST IN RING AND COVER INTO TOP TO SAVE GRADE, IF NEEDED OR IF ABOVE GROUND WITHIN NCDOT CONTROLLED ACCESS STANDARD MANHOLE RING AND COVER LABELED APPROPRIATELY SEE DETAIL FINISHED GRADE, DRAIN OR EQUAL) T 5] STONE 12" MINIMUM SINGLE ARV DETAIL NOTES 1. ALL PIPING AND FITTINGS, IN THE MANHOLE, SHALL BE BRASS. 2. CORPORATION STOP SHALL BE LOCATED IN THE TOP OF MAIN. 3. MANHOLE STEPS SHALL BE PLACED 16" O.C. WHEN DEPTH OF MANHOLE EXCEEDS 5 FEET. 4. LOCATE MANHOLE AT RON (0' OFFSET) WHEN WITHIN NCDOT R/W-C/A. S. MANHOLE SHALL BE CONSTRUCTED TO NCDOT STANDARDS AND BE H2O RATED. 10 AIR RELEASE MANHOLE OFFSET FROM MAIN C-1.07 NOT TO SCALE REVISED 02/168016 Q Owl Q Z Fe LIZ 14 U W Cn J L QQ 0 j W Z wm a UCC o Z LL Q 0 d % �2, } NCr z o <_ O z z Wz_O V) d' =,LTJ he O QQ LA U Id N 2, 11- (a1 z30w W � U mm - oPtH�CARp(fA,A :.QQOFESSIp�.",ti9 SEAL 7878 sS ' q FNQINEEQ ,,I AMTS, ......... DESIGNED BY: JA DRAWN BY: T CHECKED BY: Jp PROJECT NO.: 3080-A DATE: MAY 20' SCALE: AS NOTE SHEET OF C-1.07 \ F0071NG 1 FORCE MAIN I RISER SECTION OLE (EXTERIOR WALL) A STANDARD MANHOLE RING AND COVER LABELED APPROPRIATELY SEE DETAIL FINISHED GRADE, DRAIN OR EQUAL) T 5] STONE 12" MINIMUM SINGLE ARV DETAIL NOTES 1. ALL PIPING AND FITTINGS, IN THE MANHOLE, SHALL BE BRASS. 2. CORPORATION STOP SHALL BE LOCATED IN THE TOP OF MAIN. 3. MANHOLE STEPS SHALL BE PLACED 16" O.C. WHEN DEPTH OF MANHOLE EXCEEDS 5 FEET. 4. LOCATE MANHOLE AT RON (0' OFFSET) WHEN WITHIN NCDOT R/W-C/A. S. MANHOLE SHALL BE CONSTRUCTED TO NCDOT STANDARDS AND BE H2O RATED. 10 AIR RELEASE MANHOLE OFFSET FROM MAIN C-1.07 NOT TO SCALE REVISED 02/168016 Q Owl Q Z Fe LIZ 14 U W Cn J L QQ 0 j W Z wm a UCC o Z LL Q 0 d % �2, } NCr z o <_ O z z Wz_O V) d' =,LTJ he O QQ LA U Id N 2, 11- (a1 z30w W � U mm - oPtH�CARp(fA,A :.QQOFESSIp�.",ti9 SEAL 7878 sS ' q FNQINEEQ ,,I AMTS, ......... DESIGNED BY: JA DRAWN BY: T CHECKED BY: Jp PROJECT NO.: 3080-A DATE: MAY 20' SCALE: AS NOTE SHEET OF C-1.07 b O U T ACCOMODATE NEW CONSTRUCTION LARGE TRUCKS 100'MIN. EXISTING 70' MIN.30' MIN. ROADWAY I� 6" MIN. SECTION `12" MIN. NOTES: 1.) ENTRANCE APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABLIZED. 2.) CONSTRUCTION ENTRANCE SHALL BE PLACED FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. 3.) PERIODIC TOP DRESSING AND ROUTINE MAINTENANCE SHALL BE PROVIDED ON ENTRANCE AS REQUIRED. CONTRACTOR SHALL STOCKPILE FRESH STONE ON SITE. 4.) ANY MATERIAL THAT MAKES IT TO EXISTING PUBLIC ROADWAY SHALL BE REMOVED AND CLEANED IMMEDIATELY. l TEMPORARY CONSTRUCTION ENTRANCE C-1.06 NOT TO SCALE 15' Existing Slope CLASS B RIP RAP TOP ELEV, OF STORMWATER FILTER CLOTH �. 2 i v 12" OF NCDOT #5 OR #57 WASHED STONE 4'to 6' SIDE VIEW NOTES. HEIGHT AND WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. KEY RIP RAP INTO THE DAM FOR STABILIZATION. Existing Slope C L Va es i •y 6^-12" KEYED RIP RAP � S I � #5 WASHED STONE V FILTER CLOTH -1 FRONT VIEW N MAINTENANCE 1. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT C (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, J STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. v E 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM m HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO tl, CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, C AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO � DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. Q d 3 L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION � d N -mII='ILII L A _ L B o-Ii11=1III=ILII= -1n�-1111=ILII.=ILII= _ 3 =1111=ILII-II_n11=11il-ILII- _ - �� _lni-1111= � c a SPACING cc It. Qom; NOTE: DO NOT PLACE CHECK DAMS IN LIVE STREAMS. N C �4 m „ e 6- e a 5 CHECK DAM n d m K C-1.06 NOT TO SCALE F I E I - 1 APPROVED UV ;414 14 GAUGE WIRE ii = RESISTANT SILTj, MESH BACKING 1 i FILTERING FABRICS (6"X6" MAX OPNG.) SECURED TO WIRE SECURE WITH AT S" O.C. No. 8 STAPLE il,l: Di NOTES: 4"K4" TREATED LUMBER OR 1.33 LB/FT STEEL POSTS FOR AREAS OF EARTH BACKFILL, POSTS SHALL BE SET AT DEPTHS OF 4'-0" MIN I•) AND ANCHOR TRENCH IS TO BE 12x12" WITH FILL TO BE COMPACTED. PROVIDE ADEQUATE EXCAVATION AHEAD OF SILT FENCE TO ACT AS A 2•) VELOCITY BREAK AND SILT TRAP. CONTRACTOR SHALL MAINTAIN AND REMOVE BUILT UP SEDIMENT ON 3•) FENCE AT PERIODIC INTERVALS OR AS DIRECTED BY INSPECTOR. CONTRACTOR MAY USE ALTERNATE MATERIAL OR METHOD 4') UPON APPROVAL FROM ENGINEER. 2 SILT FENCE C-LOb NOT TO SCALE STAPLE LOCATIONS OYP.) 1 ACROSS M30DLE NETTING OR MATTING REMOVE SILT FENCE ABOVE DAM MAINTENANCE: SECTION 1. INSPECT STONE OUTLETS AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. CHECK THE STRUCTURE FOR EROSION, PIPING, AND ROC DISPLACEMENT. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN. 3. REMOVE STONE OUTLET AND UNSTABLE SEDIMENT DEPOSITS AND BRING AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. �3� STONE OUTLET C-1.06 I NOT TO SCALE MAINTENANCE 14 IF MIN. 1'-6" 2. LAY LINER FROM TOP OF DITCH OR CHANNEL AND UNROLL �- 14 GAUGE WIRE /ERLAP MOM REPAIR IMMEDIATELY. 3. BURY THE UPSLOPE END IN A SLOT 6" DEEP. PROVIDE 2, GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND MESH BACKING AS NOTED NEW PIPE LINE STATE ROAD -u------ IF f---- 4. MATTING SHALL BE 70% STRAW AND 30% COCONUT 3. ANY AREAS OF THE EROSION CONTROL MATTING THAT ARE DAMAGED BLANKET ENCASED IN A MEDIUM WEIGHT PLASTIC CITING (BOTH SIDES). CAVLim 057 WASHED STONE REPAIRED AND STAPLED. PLAN 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE �- APPROVED FULL FACE OF DAM 'I S.MONITOR AND REPAIR EROSION CONTROL MATTING AS NECESSARY UNTIL • Skp3 veenr FILTERING FABRIC 1? I r I BRRdiRR WN,mORa cenr Jun 2:1. l.b .rt fn.wea Slapef 3:1 a LL I R.ne, Mdyf - PLACE #5 STONE6 NP« t-, In, sslx slopes Nm dun 49 FILTER AGAINST FENCING WHERE REQUIRED OR AS Mn -,Pd How Zavf SILT FENCE CENTER OF DIRECTED BY THE ENGINEER. SILT FENCE T-17 MIN CONTINUES CLASS A 9" ANCHOR TRENCH, THROUGH DAM FRONT VIEW RIPRAP CARRY WIRE AND FABRICS" MIN. INTO 12" OF #67 2 TRENCH, BACKFILL WASHED 1(-,..:;: SOIL AND COMPACT STONE -I 1 NOTE: FLOW'. HEIGHT AND WIDTH DETERMINED -� ...IF BY EX TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. MAINTENANCE: SECTION 1. INSPECT STONE OUTLETS AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. CHECK THE STRUCTURE FOR EROSION, PIPING, AND ROC DISPLACEMENT. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN. 3. REMOVE STONE OUTLET AND UNSTABLE SEDIMENT DEPOSITS AND BRING AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. �3� STONE OUTLET C-1.06 I NOT TO SCALE INSTALLATION OF LINES; MAINTENANCE 14 IF MIN. 1'-6" 2. LAY LINER FROM TOP OF DITCH OR CHANNEL AND UNROLL RC -Q DANA /ERLAP MOM REPAIR IMMEDIATELY. 3. BURY THE UPSLOPE END IN A SLOT 6" DEEP. PROVIDE 2, GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND STAPLES AND OVERLAP AS SHOWN ABOVE. AS NOTED NEW PIPE LINE STATE ROAD -u------ IF f---- 4. MATTING SHALL BE 70% STRAW AND 30% COCONUT 3. ANY AREAS OF THE EROSION CONTROL MATTING THAT ARE DAMAGED BLANKET ENCASED IN A MEDIUM WEIGHT PLASTIC CITING (BOTH SIDES). CAVLim 7." REPAIRED AND STAPLED. PLAN INSTALLATION OF LINES; MAINTENANCE 1. APPLY LIME, FERTILIZER, AND SEED BEFORE LAYING UNER. 1. INSPECT EROSION CONTROL MATTING AT LEAST WEEKLY AND 2. LAY LINER FROM TOP OF DITCH OR CHANNEL AND UNROLL AFTER EACH SIGNIFICANT (1/2 INCH OR LARGER) RAIN FALL EVENT. IT DOWNGRADE, DO NOT STRETCH OR LEAVE WRINKLES. REPAIR IMMEDIATELY. 3. BURY THE UPSLOPE END IN A SLOT 6" DEEP. PROVIDE 2, GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND STAPLES AND OVERLAP AS SHOWN ABOVE. EROSION MUST NOT OCCUR BENEATH MATTING. 4. MATTING SHALL BE 70% STRAW AND 30% COCONUT 3. ANY AREAS OF THE EROSION CONTROL MATTING THAT ARE DAMAGED BLANKET ENCASED IN A MEDIUM WEIGHT PLASTIC CITING (BOTH SIDES). OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE 7." REPAIRED AND STAPLED. U�- CULVERT 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE NEW PIPE LINE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 4.0' MM. S.MONITOR AND REPAIR EROSION CONTROL MATTING AS NECESSARY UNTIL • Skp3 veenr GROUND COVER IS ESTABLISHED. 6 TEMPORARY DITCH LINER C-1.06 NOT TO SCALE I BRRdiRR WN,mORa EBAA MEGALUG SERIES 2000PV (TYP.) MECHANICAL 30INT RESTRAINT DUCTILE IRON FITTING MAXIMUM ANGLE 45° DIRECT BURY A4�OSISLepvc PVC 0i CULVERT AS NO PI PE LINE •WGF ' PROFILE ^24' MIN FOR CROSSING OF SANITARY SEWER PIPE LINE UNDER CULVERT 16w9 -n Wr.D \ S-11-6n611W.-Tlme D.I. PIPE PROM RESTRAINED Dme Fn F-Eae dem XII D.I. PIPE 7.5' MIN. FROM WINGWALLi HEADWALL/PIPE END NEW PIPE LINE GRADE -1 -- CULVERT _ CONC. R a5vnea fm: 7a.y, EE DETANCASEMENT IL NOTEDSO' �- o SFATE ROAD - -CL- 7." No. U�- CULVERT AS NOTED NEW PIPE LINE PLAN 4.0' MM. PROR� NOTTEDDOON PLANSSWISE R.].D.I. PIPE LINE AROUND END OF CULVERT 7 INSTALLATION OF PIPE LINE AT CULVERT C -L06 NOT TO SCALE 1 5' 1 DIA. VARIES V I OBOTTOM F PIP PIPE %K\//�\//��//�i�/ice �1\��//��D/i �^ - SUBGREXCAVATE DDETO FIRM NOTES: CONCRETE SHALL BE 3,000 P.S.I. CONCRETE ENCASEMENT NOT REQUIRED WHEN EXISTING PIPE IS AT LEAST TWO (2) FEET UNDER C OF NEW PIPE BOTTOM. PIP PIPE OTA. 12" 12" END VIEW / y l DIRECT BURY FUSIBLE PVC TRANSITION/ 10 CONCRETE ENCASEMENT FOR PIPE CROSSING C -L06 NOT TO SCALE C -L06 NOT TO SCALE u c. -.a seelua,tr.• I Vte Anf S-11-6n611W.-Tlme D.I. PIPE Ueacrl Ike Dme Fn F-Eae dem yrm am.ea �DO i R a5vnea fm: 7a.y, �orc HIB orclh o Wm N[QWI 7." No. Z - D n ,ww,,,rc P F. xd J O E •CTAG. ,rtmmn 9 A ry IPouP as aa, F.a d.e Mr Hopes ve 10• « • Skp3 veenr 7 dTf s9 kngal WfN dun 7:1 I BRRdiRR WN,mORa cenr Jun 2:1. l.b .rt fn.wea Slapef 3:1 a LL 7,di, for skpes R.ne, Mdyf Bfmrr dmn 30 eet k,�n All ala ertff NP« t-, In, sslx slopes Nm dun 49 I. dryf Mn -,Pd How Zavf ,"„•,v „i". "e mqn nny wnomy dstlm rorxaor orxn vae.gx,ficc anmaf,,,.,Wecartplwn 1 Ra,nred vela Pm demo6nm,c rnca«�fnd ober TM": h Iaered 30' fiom from arena f,w faeurc xnlen ,w rcesn,ebk ehem n,l,ble. E,nhcrvmaerulfr«RPiw moa ne l«frta sB•n«n smrm dn,ns e,w suefma tyles ro resavble,he,vtias, m,kbl< Corcrtn -.11 mgr h I-Iled m 1,od co 1 wim sulfa weef.-n&, «bofien. )1 04hwpR bFfsbrfBy;Yi WMf Regwrtmmv fn av m n In pmiorn noon. Tee Perna,llws rtaawn Ran dR zo sae miNmvm,r tiv Oircear oPOW'O delemmrcf dm ahv BMPr pmaide v,km Note: Provide per charts above unless more stringent directions are given by plans and/or specifications. GROUND STABILIZATION REQUIREMENTS NOT TO SCALE Nous: 1. If lomfee within NppCaaDOT R/W, r -A, z. nroi eeLl-Twim ut must Yrep . tersectlt- atsphake pH from Me N t .-d e viaalalll. (Pemwnen[ « temponrv) Dig, Engineer « as NOT on drawing. GA MENIr� � PAVEMENT +j _112�12'I 113'I2'I C B�1T SHALL SAW CUT TO - CILEEAOt1WEDGE (TYP.) A A A O O ASPHALT UNPAVED ROADS -E ASPHALT PAVED ROADS PAVED DRIVE (NON -STATE ROADS) A AREA TO BE TAMPED. EXIST..ENT B. 6- CRUSHED (ABC) STONE. �,'r` G M `32' PAVEMET s ly E� s-12• C. 2" BITUMINOUS CONCRETE 71 1 SURFACE COURSE SF 9.5A - D. R' CRUSHED (ABC) STONE. E. NEW CONCRETE Y- THICKER 12" MIN. OR TO NEAREST 301NT tF THAN EfUSTBIG CONCRETE, BUT JOINT IS WITHIN NO CAEE LESS THAN 6IMCMES 5'-0" OF CUT. THIO(' PROVIDE EXPANSION ]CIM AT EDGE OF F. 25' BITUMINOUS CONCRETE SURFACE O O EXISTING CONCRETE COURSE TYPE SF 9.SA G. 2" BITUMINOUS CONCRETE SURFACE ASPNAIT PRIVATE COURSE TYPE S 9.58 PAVED ROADS CONC0.ETE DRIVE (NC, STATE ROADS) H. 6' B 25.08 BITUMINDUS CONCRETE BASE RSE. I. CLASS "I' MATERIAL PLACED 6' THIO( LAYERS Note: COMP TO 95%. See s,-ift,dors for 9nvel erroef. r8� PAVEMENT REPLACEMENT C-1.06 NOT TO SCALE CONCRETE THRUST BLOCK MECHANICAL JOINT CAP CONCRETE THRUST COLLAR g I. 5'-0" MINIMUM S' MIN. V D.I. PIPE ZZ �DO i U o LLj m•,rc n."E•,"m•P•„Al wmmrPn, o.f a".,, m. a,onm QRZ n .fid ;ylw.a ea ro ls.a n D n ,ww,,,rc P F. xd J O E •CTAG. ,rtmmn 9 A ry IPouP as aa, F.a d.e / Z C`I fbrgmna ca.nv"A mr Plfce.+tlrys 0 J Z L` I BRRdiRR WN,mORa (EACH SIDE) LL �o nimmuq.w..ne mare m«fro,m an,m td 1 Ra,nred vela Pm demo6nm,c rnca«�fnd ober TM": h Iaered 30' fiom from arena f,w faeurc xnlen ,w rcesn,ebk ehem n,l,ble. E,nhcrvmaerulfr«RPiw moa ne l«frta sB•n«n smrm dn,ns e,w suefma tyles ro resavble,he,vtias, m,kbl< Corcrtn -.11 mgr h I-Iled m 1,od co 1 wim sulfa weef.-n&, «bofien. )1 04hwpR bFfsbrfBy;Yi WMf Regwrtmmv fn av m n In pmiorn noon. Tee Perna,llws rtaawn Ran dR zo sae miNmvm,r tiv Oircear oPOW'O delemmrcf dm ahv BMPr pmaide v,km Note: Provide per charts above unless more stringent directions are given by plans and/or specifications. GROUND STABILIZATION REQUIREMENTS NOT TO SCALE Nous: 1. If lomfee within NppCaaDOT R/W, r -A, z. nroi eeLl-Twim ut must Yrep . tersectlt- atsphake pH from Me N t .-d e viaalalll. (Pemwnen[ « temponrv) Dig, Engineer « as NOT on drawing. GA MENIr� � PAVEMENT +j _112�12'I 113'I2'I C B�1T SHALL SAW CUT TO - CILEEAOt1WEDGE (TYP.) A A A O O ASPHALT UNPAVED ROADS -E ASPHALT PAVED ROADS PAVED DRIVE (NON -STATE ROADS) A AREA TO BE TAMPED. EXIST..ENT B. 6- CRUSHED (ABC) STONE. �,'r` G M `32' PAVEMET s ly E� s-12• C. 2" BITUMINOUS CONCRETE 71 1 SURFACE COURSE SF 9.5A - D. R' CRUSHED (ABC) STONE. E. NEW CONCRETE Y- THICKER 12" MIN. OR TO NEAREST 301NT tF THAN EfUSTBIG CONCRETE, BUT JOINT IS WITHIN NO CAEE LESS THAN 6IMCMES 5'-0" OF CUT. THIO(' PROVIDE EXPANSION ]CIM AT EDGE OF F. 25' BITUMINOUS CONCRETE SURFACE O O EXISTING CONCRETE COURSE TYPE SF 9.SA G. 2" BITUMINOUS CONCRETE SURFACE ASPNAIT PRIVATE COURSE TYPE S 9.58 PAVED ROADS CONC0.ETE DRIVE (NC, STATE ROADS) H. 6' B 25.08 BITUMINDUS CONCRETE BASE RSE. I. CLASS "I' MATERIAL PLACED 6' THIO( LAYERS Note: COMP TO 95%. See s,-ift,dors for 9nvel erroef. r8� PAVEMENT REPLACEMENT C-1.06 NOT TO SCALE CONCRETE THRUST BLOCK MECHANICAL JOINT CAP CONCRETE THRUST COLLAR g I. 5'-0" MINIMUM S' MIN. D.I. PIPE � j L 1'-2"xl'-2" CONCRETE PAD UNDISTUF V THREADED TO BE POURED SO THAT NO SOIL RODS (EACH SIDE) FITTINGS OR FLANGES ARE COVERED NOTE: THIS DETAIL SMALL APPLY TO TEMPORARY CAPPING. PERMANENT DEAD END LINES TO BE EQUIPPED WITH BLOW OFF ASSEMBLY. END CAPPING NOT TO SCALE Z d U W�'q 0 9 uj g m � o 2 J Cq 2v RYAN = LL Ce I- Lae y Lu Z_ 3z-rU In Q3 J z Z z III: Ce NJ DO Z Q 3 U z to O Z U O 0 yy��zzjj 7 Z W - aO in Ce F0 O y j Qb W W �uuy+w Z U_ Z aj 0 °C �ca z m ••Ha CAROf ?OPSfESSIo`r'19�': •o SEAL i 78� Y1 •^ qy f:I;GINE�P�v 3� ••�� 8 RfrrG f DESIGNED BY. 1 DRAWN BY: CHECKED BY: 3081 DATE: MAY 2■ SCALE: AS N01 SHEET _S OF C -1.0C D.I. PIPE i A _ o THREADIED RODS I� A - J I I (EACH SIDE) o td Cz z D.I. PIPE � j L 1'-2"xl'-2" CONCRETE PAD UNDISTUF V THREADED TO BE POURED SO THAT NO SOIL RODS (EACH SIDE) FITTINGS OR FLANGES ARE COVERED NOTE: THIS DETAIL SMALL APPLY TO TEMPORARY CAPPING. PERMANENT DEAD END LINES TO BE EQUIPPED WITH BLOW OFF ASSEMBLY. END CAPPING NOT TO SCALE Z d U W�'q 0 9 uj g m � o 2 J Cq 2v RYAN = LL Ce I- Lae y Lu Z_ 3z-rU In Q3 J z Z z III: Ce NJ DO Z Q 3 U z to O Z U O 0 yy��zzjj 7 Z W - aO in Ce F0 O y j Qb W W �uuy+w Z U_ Z aj 0 °C �ca z m ••Ha CAROf ?OPSfESSIo`r'19�': •o SEAL i 78� Y1 •^ qy f:I;GINE�P�v 3� ••�� 8 RfrrG f DESIGNED BY. 1 DRAWN BY: CHECKED BY: 3081 DATE: MAY 2■ SCALE: AS N01 SHEET _S OF C -1.0C 16" PLUG VALVE &BOX - 7 16" PLUG BEGIN STA. 52+35+/- dxr Optic Pasf III `` PP Gaellne(A'.' II 16" CON�m� TEMPORARY BORE PIT / 30' x 40'x 30' DEPTH, APPROX. & 48'-5" FROM EDP EOP - "4 USHwy 17 Ocean Hiwa g Y hE BENDS AWhalt Patnmrnt Cl 14m-28.80 I 1 1.-26.98 I Sign TEMPORARY BORE PIT 1 Asphalt Paoea-1 10'x 10' x 30' DEPTH, APPROX. -C 36'-9" FROM EOP I PIT - BORE PIT ---- (Rox. LOCATI ON) LOCATION)- m-22 ]4 FH Es. 30 b 16' Paralld Fora Maims (Approx) (lrlard) V Ex. 30' Water Line (Approz) 2.16" 450 BENDS �------' -- TEMPORARY BORE PIT 6 CSS . 30' x30' x 11' DEPTH, APPROX. ,.f.,� - & 32'-9" FROM EOP !gnat' -- Pale-• EOP sign •Oru Way" Saul Sign PROVIDE 207 LF OF 36" STEEL ENCASEMENT PIPE z 19 W/ MIN. WALL THICKNESS OF 0.375" wm-v z (WRAPPED IN POLYETHYLENE) AND 16" RJDI D -In 24. - _ - - CONCENTRATE LINE BY DRY BORE & )ACK 1no0.2t-24.u45 (WRAPPED IN POLYETHYLENE) ]5"ROP y 15 -RCP PROVIDE 95 LF OF 36" STEEL ENCASEMENT PIPE CB TEMPORARY BORE PIT US Hwy 17inat p t High way E w W/ MIN. WALL THICKNESS OF0.375" 1-25.12 10'x 40'X 11' DEPTH, APPROX. W (WRAPPED IN POLYETHYLENE) AND 16" RIDI & 46' FROM EOP = CONCENTRATE LINE BY DRY BORE & JACK Er' 30- C&G EOP (WRAPPED IN POLYETHYLENE) (Typ') _ - _ - _ .. _ . ....._ _. _ _ _ _ _ _ ... _ . LU EOP_ - -� - - _ NLS BEGIN TRANSITIONF b Opht P W _—_— ---- -----------� �/ - - _ ---- - CONCENTRATE LINEFROM42 -_ -------------------------- _ _ _ \ _ _ 4C . _ _ INSIDE INSIDE (� 58+50+/ -) TO _ - _- - 2-16" 45° BENDS _ _185'_ _ (STA.60+26+/-) 1 _ __ _ =SPok __ IN 1 - _ _ !✓SCP Q --------3t"�'ORCENVRN _'_1p - Pine ' Signal `- —26' __ ___� - _ __ __E85s }B'Dte)14' \1x.1912 iii Pole - - . _ _ W PI he Lid -.. • P'rnr 12, Plnr '1g- 28 " p (Ar rd-oal°e) r ..^ .. k 14' 14' Oak 20' pine, Pier ({'r Oak -Pine Pint 30''. .�IBS{ Pine I'm" 1 , Oak 'C.J✓ Pfnt —r^ M FM —' S W �(na I'1 __ 1 R/W T FM FM '•I Woad Frvz 11 ___ Ay ..- _---- Y I� 8"Wafer lmefAPpmz)___ _ NLS \1 M FH •� C Ea. Fora Mein PP ad Guy A I Rl O BRW5-H2G0 I , x'17 r Curb& Gutter, 7yp. 5 a'Imarf' n li (Appr°z.la°tion) t (�Cp07kM°Jcnr� _ 8"Watn line (Mpproil z Sign "South Starr Bank' �' 'r ^r / (Pout burin) Frntt` II ICV Pn .3 19ti yy .. r B.E.Ad.c W o o d a Asphalt Parking fQ W a o d s I O 12" FORCE MAIN (SEE SHT 6 FOR 12" FORCE MAIN U I(SEE SHT 6 FOR PLAN AND PROFILE Property1 ) �l pr°Prh'1 7 PLAN AND PROFILE) WRS Crntn 1, LLC V I Pin x 0x70002416 O O Oleande, Prapertio, LLC (South Seale Bank) Pin 10470004103 Property of Thor Management' Uc Pin 10470004104 TBM (East Coast Surveying) Project Control #9 Ex. PK Nail Elev=25.99' N=171,997.46 rE=2,299,474 I � I 40 35 30 25 20 15 10 UTILITIES ARE NOT LOCATED WITHIN 1 I - BORE PIT, SEE PLAN VIEW ABOVE -. )... 16"-22.5° I �, wal line V RT BEND : 16"-22.5° i(AE.ppy)r +02+/- VERT BEND STA. 54+71+/- M2,-0„ MIIN.. L14 �— W V _ W EOP' I EOP RCP � uppna 8`0" MIN. - '45° BEND A.54+83+/- -- I Z o �0H LU / RECEIVING PIT - BORE PIT ---- (Rox. LOCATI ON) LOCATION)- JOO V I -- -. )... 16"-22.5° I �, wal line V RT BEND : 16"-22.5° i(AE.ppy)r +02+/- VERT BEND STA. 54+71+/- M2,-0„ MIIN.. L14 �— W V _ W EOP' I EOP RCP � uppna 8`0" MIN. - '45° BEND A.54+83+/- -- I BORE PIT -- (APPROX. LOCATION) --- - Ex. Grade at 16'C—a- Li- 4'-0" inc4' 0" MW. COVER 16"-22.5° VERT BEND --- STA. 54+70+/- o+ �t 16"-45° BEND m + STA. 54+79+/- sa - - 0 83 LF OF 16" RIDI - y- - 207 LF OF 36" STEEL ENCASEMENT PIPE - 4:I — + CONCENTRATE LINE W/ MIN. WALL THICKNESS OF 0.375" AND + + WRAPPED IN 16" RJDI CONCENTRATE LINE BY DRY POLYETHYLENE ta- BORE AND JACK ' + - ; 40 LF OI ¢ _ _ 95 LF OF 36" STEEL ENCASEMENT PIPE r^ I -CONCEM (WRAPPED IN POLYETHYLENE) W/ MIN._---------- WALL THICKNESS OF 0.375" AND 16" RIDI I 111 CONCENTRATE LINE BY DRY BORE AND JACK (WRAPPED IN POLYETHYLENE) I 54+00 55+00 56+00 57+00 STA.57+14+/- -- -,_ l-16" C900 PVC CONCENTRATE LINE 58+00 59+00 60+00 -.. 61+00 1 1 I 0 1n Z O L CE Z O Lo ¢ f U O Z to Cc L ~ W EFJ Cc U.1 O CCi2 0 + Z� Z kn Q Q C`"l S0 1L0 a a � 3 u~J rn IL Z W W J Q Z WI-- Ne O 3 w w Cc z W m$ cn z � � O z M ;'o"`"Ess : 60 o' + 2 SEAL y 3787 :E 2SS INE": p+: DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NO.: 3Q DATE: -OCTOBERa SCALE: HORZ.: V. VERT.: 1' SHEET 7 OF 7 Z o �0H LU / Qa(n ,I Q W (n IZ Z JOO Z W UL BORE PIT -- (APPROX. LOCATION) --- - Ex. Grade at 16'C—a- Li- 4'-0" inc4' 0" MW. COVER 16"-22.5° VERT BEND --- STA. 54+70+/- o+ �t 16"-45° BEND m + STA. 54+79+/- sa - - 0 83 LF OF 16" RIDI - y- - 207 LF OF 36" STEEL ENCASEMENT PIPE - 4:I — + CONCENTRATE LINE W/ MIN. WALL THICKNESS OF 0.375" AND + + WRAPPED IN 16" RJDI CONCENTRATE LINE BY DRY POLYETHYLENE ta- BORE AND JACK ' + - ; 40 LF OI ¢ _ _ 95 LF OF 36" STEEL ENCASEMENT PIPE r^ I -CONCEM (WRAPPED IN POLYETHYLENE) W/ MIN._---------- WALL THICKNESS OF 0.375" AND 16" RIDI I 111 CONCENTRATE LINE BY DRY BORE AND JACK (WRAPPED IN POLYETHYLENE) I 54+00 55+00 56+00 57+00 STA.57+14+/- -- -,_ l-16" C900 PVC CONCENTRATE LINE 58+00 59+00 60+00 -.. 61+00 1 1 I 0 1n Z O L CE Z O Lo ¢ f U O Z to Cc L ~ W EFJ Cc U.1 O CCi2 0 + Z� Z kn Q Q C`"l S0 1L0 a a � 3 u~J rn IL Z W W J Q Z WI-- Ne O 3 w w Cc z W m$ cn z � � O z M ;'o"`"Ess : 60 o' + 2 SEAL y 3787 :E 2SS INE": p+: DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NO.: 3Q DATE: -OCTOBERa SCALE: HORZ.: V. VERT.: 1' SHEET 7 OF 7 198 LF OF 16" FUSIBLE PVC (0900-DR18) ^` BY HORIZONTAL DIRECTIONAL DRILLING ? - ` (SEE PROFILE THIS SHEET) EOP V hway P ocean HIS — - US Hwy 17 _ Asphalt Pova " y Z 5 - ' O I j y _ _ ¢cc wcr �+°¢N 16"-4 BEND _ �O JOU 16" CONCENTRATE LINEZO e� [ine . __ '• " (3'-0" MIN. SEPARATION) 12"-45cr �' APpros.l ' 3 �0 - -- B D is- PLO(; -Hqr x -TB'f4 p..- i Z CALVE _ " _ . A - - - — HA �of AND APtL `�• �� 1 - — -- _-` T - '�" I ��. _ VJTHORNE(Fufure Plmf R Apts)TS. LL v _ C \ \ Pin R 09I00039 PP Warning1bat' \., 20' PERMANENT - Rm-24.42 �_A\ a Vv '\V ,M UTILITY EASEMENT SIB 1 \ & BOX \ - \ G 2" PLU VALVE\ \ X_ SEPARATION M , , - - ��2" PLUG - (C/L to UL) R I \• 4 VALVE 16" CONCENTRATE LINE \ / �� \ g W/ &BOX - ' I G' Rim-2389n(el \ \\ ,�d` (3'-0" MIN. SEPARATION) + 0 12" FORCE MAIN r 1-1n-1932 (75'CMP) RWM-DislurBrO f 1I Q % 1;1.0T R/W Frnre (5'-0' MIN. SEPARATION 3Ct ?STA. - ' S tnv 0ut-79.22tls•cMPI FROM EX. FORCE MAIN) )1 C� :\\ 1 - 30'Iltifity Eaumenl 0 P"RE.M.C. Asyhd]Parking . f1l 198 LF OF 12" FUSIBLE PVC (0900-DR18) 1 O .\ \ , _ 16"-45° BEND BY HORIZONTAL DIRECTIONAL DRILLING ~' I Ex. Drop fnlrt:_ \ q \ (SEE PROFILE THIS SHEET) ,, �1 Rim -2361 12 FORCE MAIN V 1n O Inv 1-19,51 05 "CMP) <\ \ \4 \ \ y 2-16" 45° BENDS [y 1- 0u1-19.49 (15" CMP) \ �1 Pmperfy of Ex. Farre Main FNB 90HT11EA9i BR WS-H2GO FNB 5" ITHEASi CIL Diu1r Pin R 0470004106 , T _ - § I Pin R04]0004106 �. ,.. ."' t- 7♦0a-- • '.. p Ex. Dray lnht Rim -23.44 12"-45° BEND Ino 1n-19... (""CMP) mob.. 1" 0.1-19,80 tls'CMPI -� 16" CONCENTRATE LINE i s�i 1 (3'•0" MIN. SEPARATION) 2.12" 45° BENDS - a', 1 ' •Public [toW l �RPZ 12" FORCE MAIN SEE SHEET 9 k Ex. i L'. II gyp" 78+00 MATCH SNE TBM (East Coast Surveying) ProJed Control #9 Ex. PK Nall Elev=25.99' N=171,997.46 E=2,299,474 MAINTAIN POSITIVE GRADE FROM LOW POINT TO HIGH POINT, 50' 25' 0 50' LOCATE ARV AT HIGH POINT. I --- -- j , I r i r Y r 35 35 r I 30 I - - - -- - - - ._. i- 30 I Er.Gwdr at l2"Fmtt Main _______... __---- _. �._. : T — - Ex. Gmdr t 12' Fnrre Mai '" i 25 t r —_—_ _ _-- "F- ---.___ t.�__.___.-,�_y__,1--___ � E.Grade at_]y2•Forre M°in orre Main - .. - R]DI (A tz'wt Ex.F \ /; ! 1210900 + (6"R1DI) (Apprax) t (Apprlx4 _-.'� v\ Si /^Ex.Gradeatt6'CmiantraleUne --- 12- 61�...._..----! FITTING, TYP. , PVC MA[N �Y- - ',' 75 "RC 12 R1DI ' ! FORCE `� --- x x - \ - _�__- I I -0 t 16" R1DI ------ .---- 20 . ,> n FITTING, TYP.. -- -,-- l e>� ` t : , e,. G.dr an6"Con—W, Lm,' l ___ _._ 1 ._- ___ —__ ( :R-1 I (a 12x)yt - ___-_._ _...- _-.__ ___.._.___—. I_ COVERIN.-- - _— (t _- _20 18" '_ Bt BOXUG VALVE ',:.,t MIN. 1 (App -1 P' / 18" MIN. X , , - 12" FORCE MAIN ( ttt�`'' i (i j {� / _ 16 C900 PVC CONCENTRATE LINE 16" 0900 PVC _CONCENTRATE LINE I I (16- PLUG VE) MIN. 0900 PVC 1 76" 0900 PVC CON __ .�. r— __ __- - _ _ _ �__�__-._ 15 _- � I I _ - STA. 69+os+/- i I ceNrRnnrE LINE I I 15 _ I FUSIBLE PVC TO j. ! -. -r DIP TRANSITION j FUSIBLE PVC TO 12" 45° BEND MIN. I I _ -- !r - _ mw -._. •-_-.- -- I _ --- _^._:,.-- --TI -- N- ---- 1 I o � '---___(1_6_" -45-° -BE-ND )DI TRANSITION (SEE DETAIL) STA. 76 /- 2"PLUG VALVE 5* BEND j1 12" 45 BEND ) ----_ 4(16" PLUG VALVE) 10 TA. 76+67N/-& BOX (6"45 BND) + STA. 76+72+/- i5i + - e __—__145LFOF2"JDI 145 LF OF RDL 197 LFOF 12" FUSIBat' - 5i FORCE MAIN BY HORIZONTAL DIRECTION ONDRILLING t; FORCE MAIN 118 LF OF 12 R1DI 0 .li 120 LF OF 16" R]DI ! j FORCE MAIN ._-- - -. f -- + CONCENTRATE LINE -t- - ----- . _----- --__-- --- - --... ---- 1 e 155 LF OF 116" RIDI -5 197 LF OF 16 i__. d CONCENTRATE FUSIBLE PVC < _ . _. 155 LF OF 16" R]DI __ ._._-_ _____._ _ 1 1 - -_-- " BY HORIZONTAL DIRECTION DRILLING "'"-- I -n '- _ y______ ! r CONCENTRATE MAIN G '-... _�..__ t—__-_ - __ ___ -__ 7- rn MAIN--..__.__..-,------G-� -. 5 -10 -10 66+00 67+00 66+00 69+00 70+00 71+00 - 72+00 73+00 74+00 75+D0 76+00 77+00 7Rinn 9n z >O W Cr 8 2 a yc- G C H E 0 0 _ a z ¢<O LuZ r Z J 2 Z W U Lu Cr w o+ o + 00 a z CE o C) H U) O Z Z 0 a Q ¢ Z Y ZO F- U CD cc U ccO Ll - U_ 3 N m `"�PSHES31 Cr'Y" fQQ �C':• % SEAL ,1% 37878 9•yeSQINEGPPP����G DRAWN BY: CHECKED BY: JA 308' DATE: OCTOBER 20M SCALE: HORZ.: 1'= VERT.: 1'- SHEET '°SHEET 8 OF 2- 8 8 to ■ 6- N u ,6 v 9 35 30 25 20 15 r10 5 MATCH LINE STA. 78+00 - SEE SHEET 8 � I � 1' 20' PERMANENT I UTILITY EASEMENT Prapereyq � I g.5' o HAWTHORNE f LELAND APTS, CLC \i Iwmre 12" FORCE MAIN I Pm x 047W4700OA43 2 / 02 / 79+00 �' � / I i Propertyq 16"-6NCENTRATE LINE / i I " I/ I MATT HOLDINGS P n # 04800013 PraROAD, LLC yer y (3'-0" MIN. SEPARATION) / t ' FNBSOIITHEA57 / Pin # 0970004106 DUAL AIR RELEASE J TEMPORARY CONCSTRUCTION t EASEMENT50' x 60' MANHOLE (IN-LINE) ( ) / (SEE DETAIL) TEMPORARY BORE PIT a' 20'x 40'x 10' DEPTH, APPROX. / & 29'_5" FROM EDP / CONTRACTOR SHALL DEFLECT 16" CONCENTRATE uJ 80+00 2-12" 45° BENDS LINE AROUND EXISTING AIR RELEASE MANHOLE uJ / '_ craael Dr 60' 2-I6" 45° BENDS PROVIDE 68 LF OF 36" STEEL ENCASEMENT PIPE , / , . W/ MIN. WALL THICKNESS OF 0.375"utility Road SE (WRAPPED IN POLYETHYLENE) AND 16" RJDI Ploof Roa(S.R. 1556 - 80' RWall, " � EleaMwl Bldg Chain-linkJenre - W P—i 20' CONCENTRATE LINE BY DRY BORE & JAIX 30' t - • Bldg Bldg Sign _ _ �g ui PPE Utility F mrn-1 20'`� X (WRA D IN POLYETHYLENE) Per B.E.M.C. bkGay I Cana Mon U T MIN. '^ Ex. Gm une aae Mmm i S,xxr- -- �- —.,- _ ! G. crow D. t �- — . — . — . - _ _--- Fenn---x�XX _ X—X ;_ X X _ _ _ a/-�IyX-.�-XX _ _ x 's� X_�=j(__j'(X_—X ? X PP x'_ ` - Rlw_ O a- - aWkSB«r ___— - - ��� ---- — _� - - - - Ex,G.?AW. (Approxi �_.�� _ _ _ _ _ 24 TapRCP•Zt:91 '..i -- _ ------ - 4 - - — --Ex. 6'WamL _ 'l N �"LBCC - _ W Ex.6'Wam Gne w ----- -- - ---- - TopRCP CP -21.36 _ _ _ trove _ -_ __._ - _ .._ - ____.__.__-_- Er Wom Serra ( x) ° - __ -_ __-_ __ EOP 2-12" 45° BENDS I b vd r u B 6'M I 1r _ _ _. Ex. Force Main 10.5' I Asphdl Pamnent 2- Morn sdx, n il /°mnis.ss i 2-16"45°BENDS vdxe_ I _-_-- -Er. Fwae MWn—A-AL__ _ - _. .__10'FROM EOP_____.__ .__ ____________________.�, _w_____ _ 16"C,5 Ex. 12'Wafer Gne -. 5 _. `z 12" ,S _�P=p _ `FSS--- �- "- , 111 _ /12 FSB WRIW PP _inirt975...; _ _ __ MIN __-__ 'i I 79"53 ' p b_/��j�Wend In° -2010 BENDS 5° 8 bI I .. _ 24' RCi 5'u0' ' I i Chan link X C aX—�-"JS F•I Ir END $ n 1 -18.08 i � $ � 8, Fena ' •• w lii.g. PROVIDE 74 LF OF 24" STEEL ENCASEMENT PIPE 12" FORCE MAIN 16" CONCENTRATE LINE Rim-Io.e3 = W,� MIN. WALL THICKNESS OF 0.312" 2.12" 45° BENDS 1r 8:25 R4'-Eostl /nPv.00 D4'-Fa..tl R'm-2 z .ea V wood 10'-0" MIN. OFF EDP Ina"1 '1'(24 '-East) (5'-0'MIN.INSIDER/W) ( ) Irm47.87(14'-west! Inv17.00(24'-W 0 In -1 35(2!"-W.0 1.-16.33 I �.. (WWRAPPED IN POLYETHYLENE) AND I Fence 12' _r MAIN BY DRY BORE fl JACK li 12" FORCE MAIN (WRAPPED IN POLYETHYLENE) y' I' i -- FG�h1°'"I i (S-0" MIN. INSIDE RIMI TEMPORARY RECEIVING PIT _ Q 60' ____ _____ Eaament PW.t l9q ProL- q 1 Propertyq ______________ F 20' x 30' x 9' DEPTH, APPROX. $ Al - - I t r Property of I Property of Propertyq Wilmington West Properfks, LLC Timothy blm,ix Ricmbwk SprnmbCynth'a Lanur & 9.5' FROM EDP (� AGR ENTERPRISES, INC Dxaid D. Endres Will,. & Robert Dobo Pin 9 04800016 Pin # 04800018 Pin 9 09800015 _ Ex. ssMH I TBM (East Coast Sl1Neying) Pin # 0470003607 Pln 104800017 Pin x 04800@0 Project Control #9 'so, R79v Ex. PK Nail �'¢" Elev=25.99' N=171,997.46 MAINTAINPOSCTIVE GRADE FROM LOW POINT TO HIGH POINT, E=2,299,474 LOCATE ARV AT HIGH POINT, Iy I I 74 LF OF 24 STEEL ENCASEMENT PIPE �± (WRAPPED IN POLYETHYLENE) - i I....� W/ MIN. WALL THICKNESS OF 0.312" (� AND 12" RIDI FORCE MAIN BY DRY BORE I w w "+' AND JACK (WRAPPED IN POLYETHYLENE) _ a S 0, 'I BORE PIT - N - <(APPROX. LOCATION) R Er. Grade W 12' Force Mm I Ex Gns fine (Approx I , 1 C900 PVC FORCE MAIN -- II �(�,(Typ-) IN. 16" C900 PVC CONCENTRATE LINE _ 20 LF OF 12' &}6"R]D[145-BEND) 12" 45° BEND (16" 45%SD BEND) ( , 12" 45° BEND STA. 81+48+/- ,�__�:_-- 16" 45%D BEND)-- ----- 12" 45° BEND--- --"---- - _—t STA. 80+72+/- (16" 45%SD BEND) STA. 81+50+/- 1 I I I 68 LF OF 36" STEEL ENCASEMENT PIPE (WRAPPED IN POLYETHYLENE)—_-- W/ MIN. WALL THICKNESS OF 0,375" j 16" RIDI CENTRATE LINE AND WRePOFfICNNPOI E AND NFK I BY DRY BORE AND JACK I 3 PIT LOCATION)I 50' 25' 0 50' 35 30 �— E. Grafi at li' Fours Main - 7 I ^I T� --------- Ex Grade nt 16 G hak Line urn ggg��x _ I f ••' J _. j ApP aM Ser ra—N Ma 1F¢� r) E. Grade 016"Co.entrarc line . adr a2 nrce m -� 4'-0" MIN. ErGr COVER I ' '. 18,. I MIN. 12" C900 PVC FORCE MAIN 12" 45° BEND I6 45° BEND) STA. 82+30+/- 12" 45° BEND --- 45%SD BEND STA 82+28+/- _ I � '-- 210 LF OF 12" RJDI - -�-- FORCE MAIN WRAPPED IN POLYETHYLENE � I 82+00 83+00 16" C900 PNC CONCENTRATE LINE , SCALE: HORZ.:1' VERT.: 1' j -- 212 LF OF 16"RJDI -10 .+. 61 LF OF 12" RJDI -FORCE MAIN + CONCENTRATE LINE �m 1 WRAPPED IN iPOLYETHYLENE W q 74+00 80+00 81+0 3 PIT LOCATION)I 50' 25' 0 50' 35 30 �— E. Grafi at li' Fours Main - 7 I ^I T� --------- Ex Grade nt 16 G hak Line urn ggg��x _ I f ••' J _. j ApP aM Ser ra—N Ma 1F¢� r) E. Grade 016"Co.entrarc line . adr a2 nrce m -� 4'-0" MIN. ErGr COVER I ' '. 18,. I MIN. 12" C900 PVC FORCE MAIN 12" 45° BEND I6 45° BEND) STA. 82+30+/- 12" 45° BEND --- 45%SD BEND STA 82+28+/- _ I � '-- 210 LF OF 12" RJDI - -�-- FORCE MAIN WRAPPED IN POLYETHYLENE � I 82+00 83+00 16" C900 PNC CONCENTRATE LINE , SCALE: HORZ.:1' VERT.: 1' j o -10 .+. 61 LF OF 12" RJDI -FORCE MAIN + 1 Y.. �m 1 a a ' G --79 LF OF 16' RJDI -I-_ I W q CONCENTRATE MAIN I I i C:) T . —T-- 1' Lu I I I JL 84+00 85+00 86+00 87+00 B8+D0 89+00 _ 90+00 91+00 92+00 t: 20 15 10 (y7 0 Lu Cc Z W Z � Q J 2 W cc cc cc LL I 0 ~ UCJ 0H F U U) ZO O F CL Z � Q 7 CL Z z Q Ia- LLI W cc 0CrO rn LL U N 2 ccm SEAL 37878 2 ��i5c DESIGNED BY A DRAWN BY: CHECKED BY: J 0 DATE: OCTOBER 24 SCALE: HORZ.:1' VERT.: 1' -5 o -10 �m O W q r 2 C) C:) T . Lu Z W Z � Q J 2 W cc cc cc LL I 0 ~ UCJ 0H F U U) ZO O F CL Z � Q 7 CL Z z Q Ia- LLI W cc 0CrO rn LL U N 2 ccm SEAL 37878 2 ��i5c DESIGNED BY A DRAWN BY: CHECKED BY: J 0 DATE: OCTOBER 24 SCALE: HORZ.:1' VERT.: 1' -5 SHEET 9 OF 4 9 -10 O ti Co Q LOP Ino -19.0.5' !n>r is- CM Inu-14.98 !no -14.61 - _ STA. 92+.-T XW u W X=X—X b z Chain Link J $ $ a ., fno-9.85 g & H Aip-Rap —+.-----Ex. e.aer®z6• Ex. OM Well? — 16" CONCENTRATE LINE 12" FORCE MAIN Woo d s `r TBM (East Coast Surveying) Project Control *9 Ex. PK Nall Elev=25.99' N=171,997.46 E=2,299,474 35 30 25 20 12.R1DI__��, { FUSIBLE PVC TO FITTING, TYP. 15 DIP TRANSITION Ex. Pond E.M.C. E.M.C. Chain-link/entt I Guy GaL X) PP Woods — G les -16.16 N� ES W- Ex- 6' Water line \ Forre Main - r Ex. Forre Mm'n � 10' I C1mn out —L Chain LiX ��+�+11111 Few ,ZnZZ Ex. FM ° Service Line Property of 'rad: P. & Cynthia P. Henry Pin a 04800014 b Asphalt Parking 18' RCP Chain -lick fm Gas Marker Inw19.95 —X—X Fl ]lw Coo, Conc Hdaowl EOP rRtpip <— X Rtp-Pl$ Ino-Il.p 8 12"CMP CB In° -23. 15 Property of Fart: P. Henry Pin a 048000011 Property of 5 & G Pres ' Company Pin 8 04800006 PloofRoad SE (S.R. 1556 - 80'R W) Ex. Gas Linr Ex. Car66 Gutty pp./ Gay — X—X 18" CMP Inr-18.83 EOP I Inr^19.50 16" CSS !n>r is- CM MP - _ STA. 92+.-T XW u XXT—XX X=X—X b d $ Chain Link J $ $ a Frntt g u Ino -23.21 —+.-----Ex. e.aer®z6• Ex. OM Well? — 16" CONCENTRATE LINE 12" FORCE MAIN (10'-0" MIN. OFF EDP) (5'-0" MIN. INSIDE R/W) ;, 4C.'D-0" MIN. Property of Southern Equipment Company, LLC Pin a 0480/1007 , I VALVE & BOX i I Ex 48' MP 10 _ STA. 92+.-T Ex Grady W 16 ""-- 1_ - _ 12" PLUG VALVE & BOX 16" PLUG VALVE & BOX ------�-._--"—�- ---r"-.,.- —> --fit_ _— -- t--- -=- --- - r --- —+.-----Ex. e.aer®z6• STA. 94+77+/- 6'-0" Ez. 18- CMP ;, 4C.'D-0" MIN. MIN. ! STA, 94+69+/- I i Ex. 12 MP I Inw z4 IAppe ' VE `-_ /�, A (MP k TApPro.O L 1 I 0 t 12" R3DI _ I(16"R)DI) c. F -- r--.. senora w/ o FUSIBLE PVC TO ISI - DIP TRA NSITION 4---- — MINS. I - - -- ---- — 12" C ----- -- Asphalt Parking AIR RELEASE MANHOLE Ex. Gas Linr (16" CONCENTRATE LINE) SEE DETAIL Ly � O QOj I %Z.yf Wil", ilhr Cooper" Pin 109"1601 — TBM _ Wno ds _� R/W PP wl Guy W G. Ditch PP 8'x6"is — \4' Ex. 6" AsterLinr y1' EOP 2-1204"t-1 -12 45° '1 1za Asphalt Parcmrnt Ex. Frau MOP 6.5' BENDS ( 11 Pte. I 2-16" 45° BENDS — — — — — — — NLS I I Ex. SSMH -DiftN- W o o d s - Rim -24.93 CS to 13,82 PPS X5 0" MIN. X PP PP Irm-22.]4 g Chan Li k $ Frncr X Gummy t O ' I Er. FM $ersnce Line o ) 8 Ino -19.92 N PP w/ Gu AIR RELEASE MANHOLE y (12" FM - SEE DETAIL) I I aP f4 '1t °m Ro k Or Property °f Shirley Troy CONTRACTOR SHALL SUPPORT � Ino -I9.54 \II " Pins 0380000301 POWER POLE AS NECESSARY \ /l FOR CONSTRUCTION �2n 12" FORCE MAIN (3'-0" MIN. INSIDE a`+� y n Ex. SSMH 5 Rim -24.51 PERMANENT UTILITY EASEMENT) I n \�\F 1't + 16" CONCENTRATE LINE l '�^ % ' \ Watn 5rr"ire �',si (5-0" MIN. OUTSIDE R/W) (Apmpw) / ^ V 15' PERMANENT UTILITY wv 5 EASEMENT (OUTSIDE F-M M i\ f 3' k R/W) TAPProx.A ` , 5 / J 06X00 ) 1 / �Ne 'P�GN NOTE: MAINTAIN POSITIVE GRADE FROM LOW POINT TO HIGH POINT, LOCATE ARV AT HIGH POINT. 50' 25' 0 50' I I � I 35 AIR REL" MANHOLE t (12 FURL# MAIN A. _ ! 30 ST103+ +J ! AIR MANHOLE _ _...._ (16" CON TE LINE) a V STA. 103+ 0+/- E Grade at 12'FarreM �r-�''��4 25 �✓ 1 ---- 20 I III I I1 I ex Far Main onunnafe � — — MIN. Z Z LULI U QyU �W¢ 1- Q W z cc 0 00 X zCC LL LL H-4 n+ 61LF OF 16" R1DI'. . I, CONCENTRATE _--4—MAIN _- ...._..._.._ i I i I i I I I i I 96+00 _ 97+00 98+00 - 99+00 i 100+00 105+00 15 yFL O Q C) Lu Lu Z O U UJI Z = Z J r ¢ (.007 z m W Lu W O ¢ Lu 0 0 a W C7 U 3 F CL a Q Lu Z O 0 O N ¢ W U. er O - 0 co VJ LL v 3 r z oc m " �H.rCrMerGe�,. `'�P '•ESS! . 7 "'.. SEAL i 7 37W8 B � e, 4,Fs. R�r.SPG,, ry4 LO DESIGNED BY: DRAWN BY: CHECKED BY: 5 0 I 1 -10 I 106+00 40 DATE: OCTOBER 2( SCALE: HORZ.: 1'= VERT.: 1' SHEET 10 OF Z 10 16" PLUG VALVE & BOX i I Ex 48' MP 10 _ STA. 92+.-T 57+/- Inc -985, --�---- _ 12" PLUG VALVE & BOX 16" PLUG VALVE & BOX 62+64+/- STA. STA. 94+77+/- 6'-0" 12" PLUG VALVE & BOX 5 MIN. ! STA, 94+69+/- i + + + m � I 0 84I2" RIDIMAIN- FORCE a BY HORIZONTAL166 LF OF DIRECTION 2" FUSIBLE PVC d rn _.7— DRILLING_rii 145 LF OF 12" RJDI _ ____ - -- --�,—FORCE MAIN --_ + +, R 5$ + 76 LF OF 16" RJDIL..._..___— d CONCENTRATE d 181 LF OF 16" FUSIBLE PVC d 155 LF OF 16" RJDI MAIN ! BY HORIZONTAL DIRECTION DRILLING CONCENTRATE MAIN -10 I 92+00 93+00 94+00 95+00 Asphalt Parking AIR RELEASE MANHOLE Ex. Gas Linr (16" CONCENTRATE LINE) SEE DETAIL Ly � O QOj I %Z.yf Wil", ilhr Cooper" Pin 109"1601 — TBM _ Wno ds _� R/W PP wl Guy W G. Ditch PP 8'x6"is — \4' Ex. 6" AsterLinr y1' EOP 2-1204"t-1 -12 45° '1 1za Asphalt Parcmrnt Ex. Frau MOP 6.5' BENDS ( 11 Pte. I 2-16" 45° BENDS — — — — — — — NLS I I Ex. SSMH -DiftN- W o o d s - Rim -24.93 CS to 13,82 PPS X5 0" MIN. X PP PP Irm-22.]4 g Chan Li k $ Frncr X Gummy t O ' I Er. FM $ersnce Line o ) 8 Ino -19.92 N PP w/ Gu AIR RELEASE MANHOLE y (12" FM - SEE DETAIL) I I aP f4 '1t °m Ro k Or Property °f Shirley Troy CONTRACTOR SHALL SUPPORT � Ino -I9.54 \II " Pins 0380000301 POWER POLE AS NECESSARY \ /l FOR CONSTRUCTION �2n 12" FORCE MAIN (3'-0" MIN. INSIDE a`+� y n Ex. SSMH 5 Rim -24.51 PERMANENT UTILITY EASEMENT) I n \�\F 1't + 16" CONCENTRATE LINE l '�^ % ' \ Watn 5rr"ire �',si (5-0" MIN. OUTSIDE R/W) (Apmpw) / ^ V 15' PERMANENT UTILITY wv 5 EASEMENT (OUTSIDE F-M M i\ f 3' k R/W) TAPProx.A ` , 5 / J 06X00 ) 1 / �Ne 'P�GN NOTE: MAINTAIN POSITIVE GRADE FROM LOW POINT TO HIGH POINT, LOCATE ARV AT HIGH POINT. 50' 25' 0 50' I I � I 35 AIR REL" MANHOLE t (12 FURL# MAIN A. _ ! 30 ST103+ +J ! AIR MANHOLE _ _...._ (16" CON TE LINE) a V STA. 103+ 0+/- E Grade at 12'FarreM �r-�''��4 25 �✓ 1 ---- 20 I III I I1 I ex Far Main onunnafe � — — MIN. Z Z LULI U QyU �W¢ 1- Q W z cc 0 00 X zCC LL LL H-4 n+ 61LF OF 16" R1DI'. . I, CONCENTRATE _--4—MAIN _- ...._..._.._ i I i I i I I I i I 96+00 _ 97+00 98+00 - 99+00 i 100+00 105+00 15 yFL O Q C) Lu Lu Z O U UJI Z = Z J r ¢ (.007 z m W Lu W O ¢ Lu 0 0 a W C7 U 3 F CL a Q Lu Z O 0 O N ¢ W U. er O - 0 co VJ LL v 3 r z oc m " �H.rCrMerGe�,. `'�P '•ESS! . 7 "'.. SEAL i 7 37W8 B � e, 4,Fs. R�r.SPG,, ry4 LO DESIGNED BY: DRAWN BY: CHECKED BY: 5 0 I 1 -10 I 106+00 40 DATE: OCTOBER 2( SCALE: HORZ.: 1'= VERT.: 1' SHEET 10 OF Z 10 1 U. Co Q, m -r P,p f Demaynr & G— Babson p& Pin 4 03800015 S 01 Ex. SSMH Rim -23.24 Rim -23.25 1 1 Q CO EASEMENT (OUTSIDE rr// In>r18.19 RA , _ __ 5, _ _�,.�.1__ J ' i Gp Ex. SSMH II II EOP SII IIS �b Soil a 0 � \ Rim -23.02 Line fApprax) W a:RBFT_FM X� b \ S 0 1 LLx . SP .. Fbn Ootic Csble PfN8219720978433 /illll fop LL L IF'p IP So - 5 4- (Am—) uppa ) \ 110+00 \ ~ NLS �F a ' ,16"11.25°VERT BEND)_ to'Farn BEND) - j f A ) 93 LF OF 16" FUDI 1 I 1 1 Fibs Optic Cabf, lnv-li WamrnQ Post �0,1h,.d Pomer Linrs CONCENTRATE N I I (Approx) -r P,p f Demaynr & G— Babson p& Pin 4 03800015 S TBM (East Coast Surveying) Project Control *9 Ex. PK Nail Elev=25.99' N=171,997.46 Em2,299,474 8 Warning Post CON�ACTCITR TO TRANSITION 16" CONTRAE LINE & 12"FORCEOM 23'OFF EDP TO 29' E Woods Woods g 01 Ex. SSMH Rim -23.24 Rim -23.25 1 1 Q CO EASEMENT (OUTSIDE rr// In>r18.19 RA , _ __ 5, _ _�,.�.1__ II II_-zz: IIII — Ditch— ' i s Ex. SSM II II EOP SII IIS �b Soil a — ���I Invl].00 W 8' Wafer Line fApprax) W a:RBFT_FM — 1 LLx . SP .. Fbn Ootic Csble TBM (East Coast Surveying) Project Control *9 Ex. PK Nail Elev=25.99' N=171,997.46 Em2,299,474 8 Warning Post CON�ACTCITR TO TRANSITION 16" CONTRAE LINE & 12"FORCEOM 23'OFF EDP TO 29' E Woods Woods g n 15' PERMANENT UTILITY II EASEMENT (OUTSIDE 3 MANHOLE R/WI ' C s Ex. SSM STA. 106+81+ N 1 t'o R, -24+ -- -- I MIN. Southern EgWpt Company LLC 1 LLx DB 02098, PG 0977 MB 0814, PG 0309 1 PfN8219720978433 /illll lT] LL TBM (East Coast Surveying) Project Control *9 Ex. PK Nail Elev=25.99' N=171,997.46 Em2,299,474 8 Warning Post CON�ACTCITR TO TRANSITION 16" CONTRAE LINE & 12"FORCEOM 23'OFF EDP TO 29' E Woods Woods g 16" PLUG VALVE & BOX (' DUAL AIR RELEASE ( / 3 MANHOLE i ' (SEE DETAIL) s Ex. SSM STA. 106+81+ 145 LF OF 12" RIDI t'o R, -24+ -- -- I MIN. JO0 1 LLx QZOZ r 5S r �i a 167 LF OF 12" FUSIBLE PVC r^ LL ~ OF 16" R]DI __— 155 LF r^- CONCENTRATE MAIN FORCE MAIN So - 5 4- (Am—) uppa ) m " - PP m/ Guy NLS 16" CONCENTRATE LINE 12" FORCE MAIN 29' OFF EDP (3'-0" MIN. SEPARATION 16" CONCENTRATE LINE FROM 16" CONCENTRATE LINE) (9' OUTSIDE R/W) Prwerty Of Gmrge & Dorothy Ochman Pin 903800020 Woods Samtary Seuzr —55 Inv -]8.85 ._ —_-----__ Ez. Ditrh — EOP j Chappell Loop Road (S.R. 1524 - 60' R/W) A rgwt Pa <mrnt 25' FROM EDP 1 W — W 8" Water Urm (Approx) _y _ FM Fora Main (APP=)FM PP./ Gr y FH _ _=— _ -- — _ —NLS _ v a !nv-17.56 Peape"Y of B—ick Reg= Watn & Sr Pin t N800003 Fiber Opti, came ^� 2-12" 45° Waming Post W a a d s CONTRACTOR TO TRANSITION 16" CONCENTRATE LINE & 12" FORCE MAIN FROM 29' OFF EDP TO 25' OF EDP I � I I I I I I I I L 2-16" 45° BENDS san��aey srsar, EOP � Chain-fiafe — 16" PLUG VALVE & BOX 16" PLUG (5`0' MIN. INSIDE FENCE) CONTRACTOR SHALL LOCATE EX. 10"FORCE MAIN AND CONNECT NEW 12" FORCE MAIN VIA 12" x 10" REDUCER 1—i fn 0 00E cc —�&. FM Valve I Pr°J Nnh I runsw,.0_ Bick Regional W-& s—, I pin 401900019 MAINTAIN POSITIVE GRADE FROM LOW POINT TO HIGH POINT, LOCATE ARV AT HIGH POINT. 50' 25' 0 50' 15 16" PLUG VALVE & BOX (' Z z 106+74+/_ 12" PLUG VALVE & BOX 35 ¢W� a¢ ' O I STA. 106+81+ 145 LF OF 12" RIDI C) LU -- -- I MIN. JO0 1 LLx QZOZ LL 101 LF OF 12" RIDI a 167 LF OF 12" FUSIBLE PVC r^ LL ~ OF 16" R]DI __— 155 LF r^- CONCENTRATE MAIN Prwerty Of Gmrge & Dorothy Ochman Pin 903800020 Woods Samtary Seuzr —55 Inv -]8.85 ._ —_-----__ Ez. Ditrh — EOP j Chappell Loop Road (S.R. 1524 - 60' R/W) A rgwt Pa <mrnt 25' FROM EDP 1 W — W 8" Water Urm (Approx) _y _ FM Fora Main (APP=)FM PP./ Gr y FH _ _=— _ -- — _ —NLS _ v a !nv-17.56 Peape"Y of B—ick Reg= Watn & Sr Pin t N800003 Fiber Opti, came ^� 2-12" 45° Waming Post W a a d s CONTRACTOR TO TRANSITION 16" CONCENTRATE LINE & 12" FORCE MAIN FROM 29' OFF EDP TO 25' OF EDP I � I I I I I I I I L 2-16" 45° BENDS san��aey srsar, EOP � Chain-fiafe — 16" PLUG VALVE & BOX 16" PLUG (5`0' MIN. INSIDE FENCE) CONTRACTOR SHALL LOCATE EX. 10"FORCE MAIN AND CONNECT NEW 12" FORCE MAIN VIA 12" x 10" REDUCER 1—i fn 0 00E cc —�&. FM Valve I Pr°J Nnh I runsw,.0_ Bick Regional W-& s—, I pin 401900019 MAINTAIN POSITIVE GRADE FROM LOW POINT TO HIGH POINT, LOCATE ARV AT HIGH POINT. 50' 25' 0 50' 15 16" PLUG VALVE & BOX (' —STA. 106+74+/_ 12" PLUG VALVE & BOX 35 O ' O I STA. 106+81+ 145 LF OF 12" RIDI t x - - ---I-- -- -- I MIN. 10 1 LLx 0 101 LF OF 12" RIDI a 167 LF OF 12" FUSIBLE PVC r^ ~ OF 16" R]DI __— 155 LF r^- CONCENTRATE MAIN FORCE MAIN BY HORIZONTAL DIRECTION DRIL 5 4- 109+00 _ 110+00 g a ' ,16"11.25°VERT BEND)_ to'Farn BEND) - j f A ) 93 LF OF 16" FUDI 0 CONCENTRATE d 182 LF OF 16" FUSIBLE PVC BY HORIZONTAL DIRECTION DRII i STA. 108+88+/- I � I -10 I 106+00 107+00 108+00 111+00 112+00 _ 113+D0 114+00 115+DO STA. 108+88+/- ! j n 35 O ' O 145 LF OF 12" RIDI t x - - ---I-- -- -- i FORCE MAIN 1 LLx + I + ~ OF 16" R]DI __— 155 LF r^- CONCENTRATE MAIN d _--- 4- 109+00 _ 110+00 111+00 112+00 _ 113+D0 114+00 115+DO I i -10 116+00 117+00 118+00 119+00 120+DO TF ii t W � 4 Z U Z 0 Q Cl) CO 0 Z� Q Z_ 0 Q r Cn W H cc 0 """Qt, ,y,,,CAR04 SEAL J!O/17878�/]JL� :94FS••R:••;p ";46- DESIGNED ;4` DESIGNED BY: DRAWN BY: CHECKED BY: 30 DATE: OCTOBER'S SCALE: HORZ.:1' . VERT.: 1" SHEET 11 OF 11 j 35 i t x - - ---I-- -- -- i 30 1 LLx 25 12" 11.25 ° VERT BEND. u (16' 11.25° VERT BEND) ' STA. 117+12+/- _ / `x \ 12" 11.25 ° VERT BEND W.to ser,nte (Appe'x) ,16"11.25°VERT BEND)_ to'Farn BEND) - j f A ) Ma TA. 116+94+/- pprnz: 12" PLUG VALVE20 36" & BOX (no-v.7s 12"x 10" REDUCER i STA. 108+88+/- 2--0" j ,' 16" PLUG VALVE & BOX MIN. STA. 108+96+/- 15 ' I �10'Force Main (Approxi ! 12" 45° BEND' + STA.117+70+/- 12" 45° BEND - + STA. 717+63+/- ! 10 i. d 129 LF OF 12" I �^ + +'! FORCE MAIN:, +', 145 LF OF 16" R)DI 5 -- - G --- -- _ CONCENTRATE MAIN _ a -,--_ _ ---.-. ---_ ,_.... _.__.. - --- -I -- - ,------ _. - - 0 I � i 5 I i -10 116+00 117+00 118+00 119+00 120+DO TF ii t W � 4 Z U Z 0 Q Cl) CO 0 Z� Q Z_ 0 Q r Cn W H cc 0 """Qt, ,y,,,CAR04 SEAL J!O/17878�/]JL� :94FS••R:••;p ";46- DESIGNED ;4` DESIGNED BY: DRAWN BY: CHECKED BY: 30 DATE: OCTOBER'S SCALE: HORZ.:1' . VERT.: 1" SHEET 11 OF 11 -t-/, , GENERAL NOTES GENERAL NOTES: SILT/TURBIDITY BARRIER CURTAIN 1, HYDROGRAPHIC SURVEY- SEE CIVIL DRAWINGS FOR DATE 1. TURBIDIN BARRIER SHALL BE A TYPE III, HEAVY DUTY,PERMEABLE, TURBIDITY BARRIER CURTAIN. 2, HORIZONTAL DATUM: NORTH CAROLINA STATE PLAN NA083 COLOR: BRIGHT YELLOW OR 'INTERNATIONAL' ORANGE 3, VERTICAL DATUM: NAVD88 MEAN LOW LOW WATER ELEVATION: EL -2.5' NAVD88. MHW = 2_ CURTAIN SHALL EXTEND TO WITHIN 1' BETWEEN THE BOTTOM OF THE SKIRT AND EXISTING RIVER -1 4' NAVD88; FLOOD HAZARD ZONE AE *9.0' NAVD88. BOTTOM AT MEAN LOW WATER BUT SHALL NOT BE DEEPER THAN 10'. 4. MATERIAL SHALL BE EXCAVATED BY BUCKET -TO -BARGE METHOD FROM THE EXCAVATION 3. FABRIC: 22 OZ PVC PRISM BY THE DREDGING CONTRACTOR AND PLACE IN AN APPROVED UPLANDS 4_ FLOTATION: S' TO 12', FLEXIBLE, WITH BUOYANT UNITS CONTAINED INDIVIDUAL FLOTATION SLEEVE DISPOSAL BASIN. OR COLLAR ATTACHED TO THE CURTAIN. MAINTAIN A MINIMUM CURTAIN FREEBOARD OF 3' ABOVE THE WATER SURFACE. S. EXCAVATION LIMITS SHALL BE BOX CUT. SLOUGHED MATERIAL SHALL BE REMOVED 5. CABLE, TENSION: LOCATED BELOW FLOTATION AND ON BOTH SIDES OF THE CURTAIN. LINE LOADS WITHIN THE LIMITS TO THE EXTENDS POSSIBLE. SHALL BE FABRICATED INTO THE TOP OF THE FABRIC AND SHALL CONSIST OF WOVEN WEBBING OR 6. NO OVERDEPTH DREDGING IS ALLOWED BELOW THE PERMITTED EXCAVATION DEPTH. VINYL -SHEATHED STEEL CABLE WITH A BREAK STRENGTH IN EXCESS OF 10,000 LBS. CONNECTING 7. PAYMENT IS BASED ON MATERIAL REMOVED FROM WITHIN EXCAVATION PRISM WITH NO DEVICES SHALL BE OF EQUIVALENT STRENGTH. PAYMENT FOR OVERDREDGING, SIDESLOPE SLOUGHTING, ETC. 6. CHAIN BALLAST: THE SUPPLEMENTAL BOTTOM LOAD LINE SHALL CONSIST OF A CHAIN INCORPORATE INTO THE BOTTOM HEM OF THE CURTAIN WITH SUFFICIENT WEIGHT TO SERVE AS 8. DIVING OPERATIONS PERFORMED BY THE CONTRACTOR AS REQUIRED FOR BALLAST TO HOLD THE CURTAIN IN A VERTICAL POSITION. INSTALLATION OF GEOTEXTILE FABRIC, STONE, PIPE WEIGHTS, PIPE CONNECTIONS, ETC. 7, CONNECTION: BOLT ROPED ENDS, ALUMINUM CONNECTORS AT TOP AND M4 STAINLESS STEEL SHALL MEET THE REQUIREMENTS OF 29 CFR, SUBCHAPTER L 1910.401-1910.441 [OSHA) GROMMETS SPACED AT 12' ON CENTER AND FASTENED WITH PLASTIC WIRE TIES, STARTING RINETIME EMPLOYERS LIAILITY MEL COVERAGE AKA ACT'. AND CARRY MA (MEL) BELOW THE CONNECTORS AND CONTINUING TO THE BOTTOM. SUBMIT EVIDENCE OF DIVER'S CERTIFICATIONS AND PROOF OF INSURANCE COVERAGE, 8 SEAMS: ALL SEAMS SHALL BE DIALECTRIC OR THERMALLY (VULCANIZED WELDED) BONDED FIRST-AID AND CPR CERTIFICATIONS, INCLUDING A CURRENT PHYSICAL STATING THAT TOGETHER AND DEVELOP THE FULL STRENGTH OF THE FABRIC. THE DIVER IS FIT TO DIVE. 9, STRESS PLATES: CHAIN LOADS DISTRIBUTED THROUGH Vs' X 3'X W ALUMINUM PLATES, BOLTED GEOTEXTILE STABILIZATION/SEPARATION FABRIC: BACK-TO-BACK ON EACH SIDE OF CURTAIN AND THEN TRANSFERRED FROM CURTAIN -TO -CURTAIN 1. GEOTEXTILE STABILIZATION/SEPARATION FABRIC SHALL BE PLACED ON EXISTING VIA HG HOOK AND RING FOR STRENGTH AND EASE OF ASSEMBLING. SUBGRADE SURFACES PRIOR TO PLACEMENT OF STONE OR RIPRAP BACKFILL. 10, CONTRACTOR SHALL BE RESPONSIBLE FOR ALLANCHORAGE AND SETTING OF CURTAIN ANCHOR 2. GEOTEXTILE STABILIZATION/SEPARATION FABRIC SHALL BE ONE OF THE FOLLOWING POINTS AS WELL AS PROVIDING AUTOMATIC FLASHING LIGHTS FOR NAVIGATIONAL WARNING. WOVEN, 100% HIGH -TENACITY POLYPROPYLENE SILT FILM YARDS GEOTEXTILES. 1L TURBIDITY BARRIER SHALL BE REMOVED AFTER ALL DREDGING AND FILL PLACEMENT OPERATIONS HAVE BEEN COMPLETED. A. ADS GEOSYNTHETICS - 316W 12, TURBIDITY BARRIER SHALL BE AS MANUFACTURED BY ENVIRO-USA, ABBCD, AER -FUO ABASCO, B. PROPER- 315ST ABSORBENTS INTERNATIONAL, ELASTEC, OR EQUIVALENT CURTAIN MANUFACTURER. C. SKAPS-GC130 D. CARTHAGE MILLS - FX -66 PIPELINE ANCHOR WEIGHTS: E. US FABRICS, INC.-US315 1. PIPELINE ANCHOR WEIGHTS SHALL CONSIST OF A TWO-PART, PRECAST BOLT -ON CONCRETE RIVER WEIGHT AS MANUFACTURED AND CERTIFIED BY NPCA. F. WINFAS WILLACOOCHEE - WINFAB 315W A. MINIMUM CONCRETE STRENGTH AT 28 DAYS: 5,000 PSI G. TENCATE MIRAFI - MIRAFI 60OX B. ANCHOR WEIGHTS SHALL BE REINFORCED WITH REBAR TO PREVENT CRACKING DURING 3. OVERLAP JOINTS A MINIMUM OF 24". HANDLING, TIGHTENING AND MOVEMENT. 4. FABRIC SHALL BE ANCHORED IN PLACE PRIOR TO BACKFILLING BY PLACING MOUNTS OF C. MINIMUM DRY WEIGHT (IN AIR): 400 LBS. BOTTOM STONE OR SAND BAGS. D. MINIMUM SUBMERGED WEIGHT (IN WATER): 235 LBS. 5. PLACE FABRIC LOOSELY USING FULL ROLLS RUNNING ALONG (HORIZONTAL) ON THE E. MINIMUM CROSS-SECTION DIMENSIONS: 2'-0'K2'-0' SLOPE TO REDUCE JOINTS AND NOT STRETCH FABRIC. 2. PROVIDE UNDER PAD/GASKET MATERIAL BETWEEN THE PIPE AND THE ANCHOR TO PROVIDE A SNUG, NON -SLIPPING FIT, CONSISTING OF 1/8' BLACK OR RED RUBBER OR 1/4' NEOPRENENE STONE AND RIPRAP: SPONGE PADDING TO PREVENT CONCRETE FROM CONTACTING PIPE SURFACE. MINIMUM WIDTH: BLOCK WIDTH + 2- 1. SLOPE PREPARATION AND GEOTEXTILE FABRIC SHALL BE INSTALLED BEFORE 3. PROVIDE 1' DIAMETER STAINLESS STEEL BOLTS, NUTS AND WASHERS - ONE EACH SIDE TO STONE/RIPRAP BACKFILLING. CONNECT MATING HALVES. 2. CLEAN STONEFILL: SHALL BE NCDOT M67 OR M5 STONE FILL (WASHED), SOUND, DURABLE 4. PROVIDE A MINIMUM OF 2' GAP BETWEEN MATING BLOCKS TO ALLOW FOR TIGHTENING ON THE GRANITE OR LIMESTONE ROCK. PIPE. 3, RIPRAP SHALL BE NCDOT CLASS A RIPRAP AROUND DIFFUSER. 5. CONTRACTOR SHALL ADJUST EXCAVATION DEPTH IF LARGER/SMALL WEIGHT DIMENSIONS ARE 4. REMAINDER OF UPPER LAYER OF RIPRAP SHALL BE NCDOT CLASS 1 RIPRAP. PROPOSED. S. TOP LAYER OF RIPRAP SHALL BE 24' IN DEPTH. 6. STONE AND RIPRAP SHALL BE STORED AND HANDLED IN A MANNER TO PREVENT ACCUMULATION OF FINES. 7. MAXIMUM UNDERWATER FREE DROP OF STONE AND RIPRAP SHALL BE 3'. ANY STABILIZATION/SEPARATION FABRIC DAMAGED BY PLACING STONE/RIPRAP SHALL BE REPLACED PRIOR TO PLACING STONE BY CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 8. CONTRACTOR SHALL GRADE INITIAL STONE LEVELING LAYER AS REQUIRED TO PLACE LOWER PORTIONS OF PIPE WEIGHTS AT THE PROPER ELEVATION FOR INSTALLATION OF DIFFUSER MANIFOLD PIPE. 9. CONTRACTOR SHALL HAND PLACE RIPRAP AND STONE IN VICINITY OF VERTICAL DIFFUSER PIPES. 10, TIMBER PILES: A. BY PINE, ASTM D25, CLEAN -PEELED B. PRESSURE TREATED TO 2.5 PCF CCA IN ACCORDANCE WITH AWPA C3 AND C18 C. 11.8' MIN. TIP DIAMETER (37' TIP CIRCUMFERENCE); DRIVEN TIP DOWN. D. INSTALL BY VIBRATORY HAMMER, PILE HAMMER OR WATER JET. 11. FOAM. FOAM FOR FILLING PIPE SHALL BELOW DENSITY (2 PCF), TWO-PART (POURABLE) LIQUID, EXPANDING, CLOSED CELL, RIGID URETHANE MARINE FOAM. 12. THREADED RODS: ASTM F1554, GRADE 55, HOT -DIPPED GALVANIZED IN ACCORDANCE WITH ASTM Al 53, 13. COMPOSITE LUMBER: SHALL MEET THE FOLLOWING CHARACTERISTICS. A. ABRASION RESISTANCE: 0.01' WEAR PER 1000 REVOLUTIONS PER ASTM D2394 B. HARDNESS'. 1124LBS. PER ASTM D143 C. WATER ABSORPTION: 24 HOUR IMMERSION PER ASTM D1037(UNSANDED SURFACE) - 1.7% D. SPECIFIC GRAVITY: 0.91 TO 0.95 PER ASTM D2395 E. COMPRESSION: 550 PSI DESIGN PER ASTM D198 (PARELLEL) 8 625 PSI DESIGN PER ASTM D143 (PERPENDICULAR) F. TENSILE STRENGTH: 250 PSI DESIGN PER ASTM D198 G, SHEAR STRENGTH: 200 PSI DESIGN PER ASTM D143 H. MODULUS OF RUPTURE: 250 PSI DESIGN PER ASTM D4761 I. MODULUS OF ELASTICITY: 100,000 PSI DESIGN PER ASTM D4761 APPROXIMATE TOP OF-. SLOUGHED SIDE SLOPE - SEE 3/S2.01 z 0 10z 0 � \ ~zo Z 0-4 o r�� N \ \ 16' DIA FPVC PIPE w Qw - SEE CIVIL DINGS. 11 _p" \ 0.! 0 � RYP.) v \ RIVER DEBRIS DCTOR 1 - SEE 1/S2.01 3 52.01 52.01 1 2'A 1 I Oe TURBIDITY CURTAIN PIPE ��� - SEE 2/31.01 (TYPICAL OF OF 12 EA.) \ EXCAVATION LIMITS - SEE 4/S2,01 1 - SEE 3/S2.01 1 DIA. HDPE DIFFU I )„ PIPE (IPS) - SEE CIVIL DWGS. \ THRUST BLOCK - SEE \ \ CIVIL DWGS. ENLARGED DIFFUSER & DEFLECTOR PLAN 5-1.01 SCALE: 1" = 10'-0" 10' S' 0 10' 20' SCALE: 1" 10" TURBIDITY CURTAIN TYPE III 22 OL MELON REMORCED MWYL STRESS MO PYC SLOT - C0N1rCm TLDATATON --vll 3.1 or FT - ACC ORDING TO NEED CABLE M24 SAFETY HOOK STRESS PLATE SAP UNK 6/16 W. CURTAIN CHUN ORIENTATION WHEN INSTALLED (TIDAL SITUATION - TYPE IIn WE! ANCHwIvwxORING ATTA04 LINES AWO Anc SH" �S�ALL�� P011C1 :AOM -ME am TO SHACKLE A7' OTF AY MWN) 000' YFm1GL \ I "ice 1 ON CEMTfa SNµ- 8E WILL WTENT SGi DSFROM WINO OR z USEOCHA4IN ONLY r STM40NO CONT MtENT SYSTEMS UWM BUoY O 5 a (Ag wall SLIIPACE W Pa.. F RXIMEilDED Iif TKE MWUFAcnAER) d NIL Ir Cu"Aw law®FA -w 0 0 0 0 0 0 o p o 0 0 0 0 00 e 0 0 0 0 ev o 0 0 o p o v o 0 0 o v p e o o poo 0 o 0 0 0 o poo p v o 0 Source: Adapted from American Boom and harrier Corp. and VDOT Standard Sheets vii Z 00 DETAIL SILT/TURBIDITY BARRIER CURTAIN 5-1.01 NOT TO SCALE ALTERNATIVELY, CONTRACTOR MAY SUPPORT CURTAIN BY DRIVING TEMPORARY TIMBER ANCHOR PILES. W Y' p�3 8 oil's QI-C O02= O= 01. 0 co DESIGNED BY: IRT DRAWN BY: SKS CHECKED BY: IRT PROJECT NO.: 3081 -AB neTs A31NU1 CL SHEET OF PRELIMINARY DO NOT USE FOR CONSTRUCTION S-1.01 llu� F � z 0402 �v ¢ V) W Pa.. F Qcn 0. a -w CL O 04 F 4 z O) ¢ 3 ¢ z vii Z 00 a a O C � N �O U U ZvcL U W 7 tL z m W m W Y' p�3 8 oil's QI-C O02= O= 01. 0 co DESIGNED BY: IRT DRAWN BY: SKS CHECKED BY: IRT PROJECT NO.: 3081 -AB neTs A31NU1 CL SHEET OF PRELIMINARY DO NOT USE FOR CONSTRUCTION S-1.01 T +120' NAM_ A 414.5 LLW rLBFE EL +9.0' Q NAV088 a HD GALVANIZED HOOP PILE— GUIDE WITH THRU BOLTING TO SUITE PILE DIAMETER 1 uuW = at 4 n 4'x4'x6' COMPOSITE - BLOCK SPACER Muw = -2.5 _ NAVD88 - S x pl, y� F r�� I I SEC11ON A -A CAP NAVIGATION LIGHTS (UPSTREAM B DOWNSTREAM) ELEVATED TO AVOID DAMAGE FROM DEBRIS - AT INBOARD g OUTBOARD PILE LOCATIONS 4'X4' COMPOSITE— MOUNTING BLOCK PAINTED WITH REFLECTIVE PAINT (EA SIDE) 10' DIA HDPE PIPET] (IPS) - FOAM FILLED NTH END CAPS I 1 0' DIA. HDPE PIPE - (IPS) - EMPTY NCDOT CLASS 1 RIP RAP 24' RIP RAP ---I 067 CLEAN STONE FILL- . GEOTEXTILE STABILIZATION/ - SEPERARON FABRIC EXISTING SUBGRADE� 067 STONE FILL AS REQUIRED FOR PIPE WEIGHT LEVELING BASE (TYPICAL) - SEE 5/8.0 THREADED ROD WITH NUTS & WASHERS (H.D. GALV.) COUNTER -SINK TOP; SPACED AT 4'-0' O.C. MAX 5/8'0 THREADED ROD NTH—' NUTS h WASHERS (H.D. GALV.) COUNTER -SINK TOP; SPACED AT 8'-0' O.C. MAX 0 7'-6' O.C. ANCHOR WEIGHT MAX. SPACING O GRADE VARIES COMPOSITE MOUNTING BLOCK HOPE PIPE (IPS) - FOAM FILLED NTH END CAPS HDPE PIPE (IPS) - EMPTY (NO END CAPS) PILES (TYPICAL) - SIE \ `COMPOSITE MOUNTING BLOCK HDPE PIPE (IPS) - FOAM NO GALVANIZED HOOP PILE FILLED NTH END CAPS GUIDE (TYPICAL) PLAN RIVER DEBRIS DEFLECTOR 5-2.01 SCALE: 3/8" = 1'-O" 6' DIA. FPVC PIPE 16' PIPE W/ 45' BEND 3'0 DUCK BILL DIFFUSER W/ 45' ELBOW (SEE CIVIL DWGS.)-\ 20' x 16' REDUCER 3- HDPE SPOOL (FL), ADAPTER k BRANCH - SEE CIVIL DWGS. �lI♦lq (TYPICAL) - SEE 5'-6' O.C. (TYP., U.N.O.) ANCHOR WEIGHT MAX. SPACING 0 0 �- - — EXCAVATION DEPTH 20' DIA. HDPE DIFFUSER SEE CIVIL PIPE (IPS) SECTION - CONCENTRATE RIVER DIFFUSER s01 SCALE: 3/8" =1'-a' —.1— 11tV In - XL mm W.V1 �`—APPROX. SIDE REMOVE EXISTING UNCLASSIFIED MATERIAL O L U FROM EXCAVATION CUT (INCLUDING SLOUGHED SLOPED FROM PROBABLE SLOUGHING OF MATERIAL) BY BUCKET -TO -BARGE METHOD k /�/�\(\\�//��`�/� PROPERTY DISPOSE OF EXCAVATION MATERIAL IN UPLANDS OFF SITE DISPOSAL AREA APPROX. EXIST. rRIVER MUDLINE 77TimTiTi7r7-r17-A-_ I SEE CIVIL DWGS 2'-0'1: SQR. �`—APPROX. SIDE O L U H SLOPED FROM PROBABLE SLOUGHING OF 3'0 DUCK BILL /�/�\(\\�//��`�/� NGDOT CLASS 1 RIP RAP CUT do SHIFTING FNO EDEPTH DIFFUSER W/ 45' NEW ESTABLISHED 24' RIP RAP OR OVERPAYMENT ELBOW (SEE CIVIL RIPRAP RIVER BOTTOM 3a EXCAVATION ALLOWED HDPE END CAP CONNECTED NTH %j\//jam/j�/ �/ 1HOPE SPOOL (FL), FLANGE V- APTER 0 BRANCH 1/4' OA. 316 Dr. EXCAVATION DEPTH STAINLESS STEEL az \\// SEE CIVIL SCREWS AT 6' ON SEE CML DWCS. y, _ _ _ _ CENTER �\ 4'x4'x6' COMPOSITE EXCAVATION 12' MIN. #67 STONE FILL DEPTH K WEIGHTS. SEE GENERAL NOTES BLOCK SPACER �z1 SECTION - TYPICAL EXCAVATION PRISM 20' DIA. HDPE DIFFUSER PIPE (IPS) Q SECTION - CONCENTRATE RIVER DIFFUSER 5-1.01 NOT TO SCALE SEE CIVIL DWGS 2'-0'1: SQR. 11'-0' (TYPICAL) NCDOT CLASS A RIPRAP - -NEW ESTABLISHED HANDPLACE AROUND VERTICAL I RIPRAP RIVER BOTTOM DIFFUSER PIPE (TYPICAL) —PIPE WEIGHTS (TYPICAL) - SEE PLAN FOR SIZE AND SPACING z O <�T,nU �aa CI h °zz a �O� v1 �/14 0 ce NCDOT CLASS A O L U H RIPRAP (HAND PLACE 3'0 DUCK BILL NGDOT CLASS 1 RIP RAP AROUND VERTICAL DIFFUSER W/ 45' NEW ESTABLISHED 24' RIP RAP DIFFUSER PIPE) ELBOW (SEE CIVIL RIPRAP RIVER BOTTOM 3a z z DWGS.) oo - 0 <J� 1HOPE SPOOL (FL), FLANGE V- APTER 0 BRANCH oC ,9Cl Dr. 0zW UU u > i x az INV. ELEV. /67 CLEAN STONE FILL SEE CML DWCS. y, _ _ _ _ GEOTEXTILE STABILIZATION/�/J SEPERATION FABRIC / EXISTING SUBGRADE EXCAVATION 12' MIN. #67 STONE FILL DEPTH K WEIGHTS. SEE GENERAL NOTES AS REWIRED FOR PIPE - SEE CIVIL FOR WIGHT Mt PLAN FOR LAYOUT. WEIGHT LEVELING BASE 20' DIA. HDPE DIFFUSER PIPE (IPS) Q SECTION - CONCENTRATE RIVER DIFFUSER 5-2.01 NOT TO SCALE 11'-0' (TYPICAL) NCDOT CLASS A RIPRAP - -NEW ESTABLISHED HANDPLACE AROUND VERTICAL I RIPRAP RIVER BOTTOM DIFFUSER PIPE (TYPICAL) —PIPE WEIGHTS (TYPICAL) - SEE PLAN FOR SIZE AND SPACING z O <�T,nU �aa CI h °zz a �O� v1 �/14 0 ce afro WOi t¢T ►a- F DESIGNED BY: IRT DATE: MARCH 2017 SCALE: AS NOTED SI11(P.T OF PRELIMINARY FOR CONSSTRUCTION S-2.01 O L U H z aF N z� Q Q 3a z z z O oo L) U V) O 0zW UU u > az �a afro WOi t¢T ►a- F DESIGNED BY: IRT DATE: MARCH 2017 SCALE: AS NOTED SI11(P.T OF PRELIMINARY FOR CONSSTRUCTION S-2.01