From: Ashley Steele <asteele@smeinc.com>
Sent: Monday, April 24, 2017 9:50 AM
To: Turlington, Chad
Subject: FW: Line 22 Stream Crossing
Chad,
Let me know if this is what you need or if you need any additional information from us.
Thanks!
Ashley
From: Joey Lawler
Sent: Monday, April 24, 2017 9:45 AM
To: Ashley Steele <asteele@smeinc.com>
Subject: Line 22 Stream Crossing
Ashley — the original route of Line 22 crossed that stream in a more perpendicular manner. However, because the site is
a spray field for process water associated with a WWTP at the Dunbar Foods facility, the route had to be adjusted to
avoid the compliance boundary (the radius of the sprayer, as shown by that dashed blue line in Figure 12). There is also
an apartment complex and sewer line located just north, so the line cant be routed for a perpendicular crossing without
encroaching on those, or going back into the permitted spray area.
Hope that is sufficient — let me know - j
Joey Lawler, P.W.S.
Project Manager
*S&ME
ENGINEERING INTEGRITY
S&ME, Inc.
9751 Southern Pine Boulevard
Charlotte NC 28273 Map
Ph: 704.523.4726
Fax: 704.525.3953
Mobile: 704.604.6474
jlawler .smeinc.com
www.smeinc.com
This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply
and delete this electronic message and any attachments. Please consider the environment before printing this email.