Loading...
HomeMy WebLinkAbout20170402 Ver 1_Revised Impact Summary Table_20170421WETLAND PERMIT IMPACT SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (tt) 1 -L- 12+79 TO 15+16 24" Cored Slab Bridge 0.03 0.00 0.00 0.02 <0.01 0 0 0 0 0 TOTALS: 0.03 0.00 0.00 0.02 <0.01 0 0 0 0 0