Loading...
HomeMy WebLinkAbout20090575 Ver 1_Certification of Completion_20170417City of Greensboro DWQ# 09-0575 July 17, 2009 Page 4 of 4 DWQ Project No.: ()� - 051 County: �� �} LFCV—b Applicant: M.E U 4 V) A k1t� Project Name: L�AWOQV L _S Date of Issuance of 401 Water Quality Certification: 3 Llyd\i iv'. uwp artrnem of Environmental Quality Received APR 17 2017 Winston-Salem Regional Office Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I, kt,,wAN> & 1 , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signa Date A - I — i I I Registration No. 0--91511