Loading...
HomeMy WebLinkAbout20170272 Ver 1_More Info Received_20170419Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 4/19/2017 6:27:42 AM (Supplemental Submital) Approve by Montalvo, Sheri A 4/19/2017 2:52:00 PM (NON -DOT Project) rpplern v ental Information Upl Staff Review: Updated ID#: 20170272 Updated Version: 1 Reviewers Email Address: Sue.Home\Afood@ncdenr.gov Submitted Information: Is this a public transportation project? r Yes r No What type of project is this? r Existing Project r Pre -Application Information Existing Project Information: ID# 20170272 DMRDAU Min-ber (exanple 20150001) Version: 1 Project Name: Bedford Hills Subdivision County: Alamance Name: Chris Oliver Mo is subnit ing the infornetion? Email Address: chris.oliver@summitde.net Describe the Revised PCN package per USACE/NCDEQ comments. attachments: Please upload all files that need to be submited. 2017-04-17 PCN_FINAL.pdf Response to Comments Letter.pdf 14-0243—PCN- PLAN SET_Revised.pdf Only pdf files are accepted. PF By checking the box and signing box below, I certify that: .. I hovo union +ri io orri ir�+o �nl1 rnmr.lo+o infnrm�+inn nn +hic fnrm 318.66KB 130.94KB 101.23MB Water Resources ENVIRONMENTAL QUALITY I II— yivcn LI—, awui aic, anu —IIFIcic unvi nia uuii ILI uua iui iii, • I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the Supplemental Information form. Signature: April 18, 2017 Mr. David E. Bailey, PWS Regulatory Project Manager U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Ms. Sue Homewood NCDEQ - Division of Water Resources Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 RE: Notification of Unauthorized Activity/Permit Noncompliance Action ID – 2016 02190 Bedford Hills Subdivision Alamance County Dear Ms. Homewood & Mr. Bailey, On behalf of our client and the applicant, Green Level Group, LLC, Summit Design and Engineering Services is providing to you responses to comments from your review on March 20, 2017 following our submittal of the PCN and plans on March 14, 2017. Summit Design and Engineering Services will be more than happy to address and provide any clarification needed on the attached responses and looks forward to discussing these matters with you further. Sincerely, SUMMIT DESIGN AND ENGINEERING SERVICES Chris Oliver, E.I. Land Development Dept. Comments Provided by David Bailey on March 20, 2017 1. The proposed cumulative loss of waters of the US (i.e. footprint of fill in streams due to culverts = 149 linear feet) is very close to the compensatory mitigation threshold of 150 linear feet. Our experience in the Piedmont is that proposed impacts approaching the 150 linear foot threshold often exceed it due to surveying errors in the field, culvert lengths delivered on-site, etc. Further, your original PCN submittal on 1/10/2017 proposed only 133 linear feet of fill in streams due to culverts. As such, can additional avoidance measures be taken to reduce the proposed loss of waters of the US from culvert fill? If so, please update the PCN and plan sheets accordingly. If not, please describe why additional avoidance is not practicable per Nationwide Permit Condition 23(a). The increase in proposed impact between submittals was caused by road grade and end wall design constraints not anticipated in the original design. However, the culvert design has been revised such that the pipe/end wall intersection now has a 105° skew on the southeastern end in order to shorten the culvert length. The shoulder section and sidewalk location has also been revised from the typical road section to shorten the culvert length and overall stream impact at the crossing. The proposed cumulative loss of waters of the US has been revised to be 140 linear feet. 2. The rip rap footprint does not appear to show up on the crossing 1 (i.e. northern crossing) plan sheet (Sheet D-10). Please add this footprint to the plan sheet to clearly show the 27 linear feet of rip rap impacts proposed. The rip rap footprint has been added to the detail on the stream crossing detail sheet (Sheet D-8). 3. Please update plan sheet C-17 to show the proposed dewatering footprint in the stream. Sheet C-18 (originally C-17) has been updated to show the proposed dewatering footprint in the stream. Comments Provided by Sue Homewood on April 4, 2017 1. Please provide the Division a copy of your response to March 20, 2017 request for more information from the US Army Corps of Engineers requesting additional information [15A NCAC 02H .0502(c)]. Responses provided above. 2. The PCN indicates that the length of culvert for Crossing #2 will be 83 feet however the culvert report submitted with the PCN indicates the length will be 88 feet. Please clarify the discrepancy. The length of culvert for Crossing #2 has been revised to be 77 feet, and the culvert report has been updated accordingly. Please see revised documents attached. 3. The plans submitted with the PCN form show fill lines, temporary sediment basins, and permanent constructed wetlands that are immediately adjacent to jurisdictional wetlands and state regulated buffers. Please indicate whether these features/measures can be reasonably constructed and permanently maintained (note that stormwater measures require permanent maintenance access) without any impacts to adjacent areas. We understand that the referenced improvements are immediately adjacent to regulated streams buffers and or wetlands. There will be silt fence staked and placed at these limits per the previously issued and approved erosion control plans, thereby restricting the ability for the contractor to unintentionally disturb the wetland areas and/or stream buffers beyond those limits. As noted, the proposed constructed wetlands are where fill is the tightest around the existing environmental features, however these slopes/embankments are not severe and only 5’ feet high or less. We have reminded the contractor to be mindful of the limits and if they require additional working room, to adjust the dam location accordingly and we can modify the constructed wetland volume and size as needed upon final construction. Currently these areas will serve as only sediment basins and we will collect the as-built data of the dams prior to final conversions such that the design can be adjusted if needed. Any required maintenance should be easily conducted around these slopes due to the low dam heights and the low levels of actual impounded water since it’s a wetland and not a wet detention basin. Permanent stormwater access easements have been added to the plans (see Sheet C-8). 4. A number of lots are shown to include jurisdictional wetlands within the lot limits. Please note that the 401 issued to this project will required that deed notifications be filed on these lots to indicate to future owners that any disturbance to these will require proper authorizations. If lots have already been recorded, please indicate so in your response to this letter. Lots for Phase II have not been recorded. Deed notifications filed on Lots 209- 216, 222, 223, 226, and 227 will indicate to future owners that any disturbance to jurisdictional wetlands will require proper authorizations. 5. Issuance of a water quality certification for a proposed project requires that existing uses are not removed or degraded. On December 16, 2016, the Division issued a Notice of Violation (NOV) for wetland standard violations as a result of lot fill into a wetland. The NOV required that the wetland boundary be clearly flagged and for an inspection to be scheduled with DWR and the USACE. Please provide a response as outlined in the NOV. Per email correspondence on 4/17/17, an inspection with DWR and the USACE will be scheduled as soon as possible. Page 1 of 10 PCN Form – Version 1.4 January 2009 Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: 2b. County: 2c. Nearest municipality / town: 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Bedford Hills Subdivision Alamance Green Level Bedford Hills Green Level Group DB:3501 PG:696-705 James Parker Jr. 504 Meadowlands Drive Hillsborough, NC 27278 919-732-5055 919-732-6676 jimparker16@gmail.com 29 Page 2 of 10 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Chad Abbott,PE Summit Design and Engineering Services 504 Meadowlands Drive Hillsborough, NC 919-732-3883 chad.abbott@summitde.net Page 3 of 10 PCN Form – Version 1.4 January 2009 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: Longitude: 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: 3e. Describe the overall project in detail, including the type of equipment to be used: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes No Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. 8896882186 -79.3411 82 Otter Creek, UT to Otter Creek WS-II; HQW,NSW Cape Fear The Phase I portion of the site has been constructed and impact to UT to Otter Creek has occurred . Home builder is in the process of building homes on Phase I lots. Phase II remains in pre-development condition, with large portions of wooded area, and only small areas of impervious surfaces. Currently UT to Otter Creek has two stream crossings, the unpermited Phase I crossing, and an pre-development crossing used for farm traffic. 6.82 Propose of the project is to build a single family residential subdivision. Phase I of the project currently"in process", consisting of a residential subdivision with 94 lots. During this phase an unpermitted stream crossing of UT Three Oaks Jurisdictional streams and wetlands determined December 12, 2016. Erosion Control Permit (NCDENR) Stormwater, construction, and buffer authorization permits issued the Town of Green Level. Phase I is the phase that is already built and is currently requesting an after the fact permit. . Phase II is in the design and preliminary permitting stages and hereby requesting authorization to impact streams. 36.13523 5,322 Sue Homewood (NCDEQ) Chris Sheats Page 4 of 10 PCN Form – Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams – tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 W2 W3 W4 W5 W6 2g.Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 S2 S3 S4 S5 S6 3h. Total stream and tributary impacts 3i. Comments: Choose one Choose one Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - Culvert UT to Otter Creek PER Corps 7 66 UT to Otter Creek 7 27 UT to Otter Creek 7 94 UT to Otter Creek 18 74 UT to Otter Creek 18 20 UT to Otter Creek 18 110 391 S1-S3isanafter the fact permit.S4-S6 is the proposed stream crossing in Phase 2.S2andS5 rip rap to be keyed into stream bed.Stream impacts counted toward mitigation threshold include S1 and S4. Total mitigable stream impact is 140 LF. - - - - - - Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one P P T P P T Rip Rap Dewatering Footprint Culvert Rip Rap Dewatering Footprint PER PER PER PER PER Corps Corps Corps Corps Corps Page 4 of 10 PCN Form – Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams – tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 W2 W3 W4 W5 W6 2g.Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 S2 S3 S4 S5 S6 3h. Total stream and tributary impacts 3i. Comments: Choose one Choose one Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - Culvert Removal UT to Otter Creek PER Corps 12 21 UT to Otter Creek 12 50 UT to Otter Creek 12 5 UT to Otter Creek 12 20 96 S1-S2arefor culvert removal.S3-S4arefor sewer pipe installation. Total mitigable stream impact on this page is 0 LF.See Page 4A for total mitigable stream impact. - - - - - - Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one P T P T Dewatering Footprint Sewer Pipe Installation Dewatering Footprint PER PER PER Corps Corps Corps Page 5 of 10 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 O2 O3 O4 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) 5a. Pond ID number 5b. Proposed use or purpose of pond Flooded Filled Excavated Flooded Filled Excavated P1 P2 5f.Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a.Project is in which protected basin? Neuse Tar-Pamlico Catawba Randleman Other: 6b. Buffer Impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 B2 B3 B4 B5 B6 6h.Total Buffer Impacts: 6i. Comments: Choose one Choose Choose one Yes/No - - - - Choose one Choose one Choose one Choose Choose Choose Choose one - - - - - - Yes/No Yes/No Yes/No Yes/No Yes/No ) Page 6 of 10 PCN Form – Version 1.4 January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Type: Type: Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. The stream bisects the property and crossing it was inevitable. The 1st impact to occurs at the top of the stream upon coming onto our property to minimize impacts to the greater established downstream portions. The 2nd stream impact also coincides with a roadway crossing. There is also a pump station just on the other side of the stream that serves Ph I. Placing the 2nd crossing here allows much of Ph 2 to sewer to the pump station while utilizing the impacts for the road. We also need another conxn between the 2 phases for connectivity and emergency services. Both impacts associated with access drives and utilities have been designed to be as least intrusive as possible, utilizing blanket matting on adjacent slopes to prevent loss of sediment into the stream as well as plunge pools at the outlets instead of rip rap pads to allow water to dissipate flows as well as deep pools at the outlets of the pipe. We have also tried to install pipes that will fit within the stream cross section to avoid the contractor needing to widen the channel at the stream inlets and outlets. Choose one Choose one Choose one Choose one Page 7 of 10 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f.Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 10 PCN Form – Version 1.4 January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No Permitted by Town ofGreen Level and will be sent to them accordingly 29.9 The Town ofGreen Level reviewed and approved the Stormwater Management Plan for Phase I of this project which includes the analysis of the proposed storm sewer network for the 2-, 10-, and 25-yr storm events as well as the Wet Detention Pond BMP, which was designed to control and treat runoff from the first inch of rainfall. A Stormwater Management plan will be submitted to the Town of Green Level for Phase II of this project Town of Green Level Town of Green Level Page 9 of 10 PCN Form – Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. A permanent culvert was placed over approximately 75 feet of stream (impacts S-1-S-2). In addition to the culvert, a discharge of unauthorized fill occurred in approximately 0.1 acres of wetlands due to development along Donelson way. The wetland impacts will be resolved by restoring erosion control devices to effective working order. The wetland will be re-flagged to its pre-development limits. After a site inspection by USACE/DWR, restoration activities will begin, including but not limited to the removal of all fill material, and replanting of wetland flora. The town ofGreen Level's stormwater policy requires the site to meet TSS standards, as well as capture and control the first inch of precipitation, therefore protecting downstream water quality. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ X Yes X No ❑ habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish and Wildlife Services IPaC tool. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? South Atlantic Fish Management Council GIS map 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC Historic preservation Office GIS service map. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: No Development will take place within the 100 year floodplain. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Mapping Center A na ure Applicant/Agent's Printed Name gate (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 PCN ADDITIONAL AREA FOR EXPLANATIONS/COMMENTS: D.1a. Avoidance and Minimization: The stream bisects the property and crossing it was inevitable. The 1st impact to occurs at the top of the stream upon coming onto our property to minimize impacts to the greater established downstream portions. The 2nd stream impact also coincides with a roadway crossing. Near the 2nd Crossing, there is a pump station that serves Ph I and will serve all of the proposed Ph 2. All of the property will sewer to the pumpstation and an impact in this vicinity would be needed for that also. Placing the 2nd crossing as we have chosen, allows much of Ph 2 to sewer to the pump station within the proposed impacts for the road thereby minimizing total impacts needed by combining the two. A second connection is also needed between the 2 phases for connectivity and emergency services. As you are aware, there was an old, farm or logging crossing consistent of a 24” pipe. This crossing was not proposed to be used or upgraded due to the fact that the same or similar amount of impact would be required due to the size and unknown installation methods of this pipe. The total impact would also need to be much longer than the existing pipe and therefore negate any benefits of trying to utilize it. This area and impact is being proposed to be returned to a vegetated riparian buffer and re-established stream section such that the previous impact will be completely removed and void. There was no existing permit in place and we do not know the origin of the pipe or crossing. Lastly, due to the need to collect stormwater from the development for treatment, the existing and many of the proposed stormwater treatment facilities are located in this lower portion of the site and would require access for maintenance, which the road impact and crossing also helps to provide. Therefore, the proposed impact has a greater use and aids in minimizing potential supplemental impacts that could have been needed for the sewer and stormwater purposes. D.1b. Specific Measures taken to avoid or minimize the proposed impacts through construction techniques: Both impacts associated with access drives and utilities have been designed to be as least intrusive as possible, utilizing blanket matting on adjacent slopes to prevent loss of sediment into the stream as well as plunge pools at the outlets instead of rip rap pads to allow water to dissipate flows as well as deep pools at the outlets of the pipe. We have also tried to install pipes that will fit within the stream cross section to avoid the contractor needing to widen the channel at the stream inlets and outlets. Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Apr 17 2017 Road Crossing #2 - 2-54inch PIPES Invert Elev Dn (ft) = 611.00 Pipe Length (ft) = 73.94 Slope (%) = 3.04 Invert Elev Up (ft) = 613.25 Rise (in) = 54.0 Shape = Circular Span (in) = 54.0 No. Barrels = 2 n-Value = 0.013 Culvert Type = Circular Concrete Culvert Entrance = Groove end w/headwall (C) Coeff. K,M,c,Y,k = 0.0018, 2, 0.0292, 0.74, 0.2 Embankment Top Elevation (ft) = 620.75 Top Width (ft) = 30.00 Crest Width (ft) = 60.00 Calculations Qmin (cfs) = 272.34 Qmax (cfs) = 272.34 Tailwater Elev (ft) = Critical Highlighted Qtotal (cfs) = 272.34 Qpipe (cfs) = 272.34 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 10.47 Veloc Up (ft/s) = 10.47 HGL Dn (ft) = 614.43 HGL Up (ft) = 616.68 Hw Elev (ft) = 618.65 Hw/D (ft) = 1.20 Flow Regime = Inlet Control SHEET INDEX COVER SHEET C-1 EXISTING CONDITIONS & DEMOLITION PLAN C-2 PLAT/OVERALL PLAN C-3 BEDFORD 11ILLS PHASE 11 SITE & UTILITY PLAN C-4 SEDIMENT & EROSION CONTROL PLAN (PHASE I A) C-5 SEDIMENT & EROSION CONTROL PLAN (PHASE I B) C-6 TOWN OF GREEN LEVEL GRADING & STORM DRAINAGE PLAN C-7 GRADING & STORM DRAINAGE PLAN C-8 ALAMANCE COUNTY, NORTH CAROLINA 11 II PCN SUBMISSION DATE: 03/03/17 19 v VI *11 1 ii -AN 0049) PIRG-fFI-16F! REVISED PCN SUBMISSION DATE: 04/18/17 11 „ 1111 11 1 1 11 (ll ITC n I I I,pll 0 nig n n 11 C1r-1fl/n nn nl n GF1, nl n ISI n nln nnrlCll C � -1 1-1�OUTFALL "A" & ROAD "GIDEON PLACE" PLAN AND PROFILE C-18 Pilnl!@ GF Af'A�Ijl IF C'ITC U nnn n1A0nV nCTn II C` n 1) C`Tr1nnA nn n Inl n!'%C ncTA II C% n ' 1A//STC® ME=A II C n A C` n K11 -r nV C`F1A/Cn nCTA II C• n C EROSION CONTROL DETAILS D-6 EROSION CONTROL DETAILS D-7 STREAM CROSSING DETAILS D-8 n 01n = NOT INCLUDED IN PLAN SET GENERAL NOTES: 1. CONSTRUCTION ON THIS PROJECT SHALL BE IN ACCORDANCE WITH THE CITY/TOWN/COUNTY STANDARD DETAILS, CODE OF ORDINANCES AND STANDARD SPECIFICATIONS IF APPLICABLE. 2. ALL SITE WORK, AT A MINIMUM, SHALL BE PERFORMED IN ACCORDANCE WITH THE 2012 NCDOT ROADWAY STANDARD DRAWINGS AND STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES UNLESS OTHERWISE NOTED OR DIRECTED. 3. CONSTRUCTION ON THIS PROJECT SHALL BE IN ACCORDANCE WITH ALL APPLICABLE AND THE MOST CURRENT TOWN, COUNTY, STATE, NCDOT AND UTILITY PROVIDER STANDARDS, SPECIFICATIONS AND BUILDING CODES. 4. UNDERGROUND UTILITIES MAY EXIST ON, ALONG OR WITHIN CONFLICT OF THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING NC 811 OR THE APPROPRIATE UTILITY COMPANIES PRIOR TO ANY EXCAVATION. 5. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE DEMOLITION OF ALL EXISTING ON SITE ITEMS, ABOVE AND BELOW GROUND. THE CONTRACTOR IS ALSO RESPONSIBLE FOR REMOVAL OF ALL WASTE RESULTING FROM DEMOLITION, AS WELL AS GRADING AND FILLING OF ALL DEPRESSIONS TO INSURE THE SITE REMAINS AESTHETICALLY ACCEPTABLE. 6. THE CONTRACTOR SHALL OBSERVE ALL REQUIRED SAFETY PRECAUTIONS IN THE PERFORMANCE OF ALL WORK IN ACCORDANCE WITH OSHA. 7. THE CONTRACTOR SHALL GRADE, SEED AND SOD OR OTHERWISE PROVIDE TEMPORARY AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, ESPECIALLY SLOPES. SEE EROSION CONTROL INSTRUCTIONS, IF APPLICABLE. 8. WORK WITHIN PUBLIC RIGHT-OF-WAYS SHALL BE IN ACCORDANCE WITH ALL STATE AND LOCAL REQUIREMENTS, NOTIFICATIONS, STANDARDS AND POLICIES. 9. ANY SUBSTITUTIONS, CHANGES, OR MODIFICATIONS SHALL BE APPROVED BY THE PROJECT ENGINEER, PLANNING DEPARTMENT STAFF, AND DEVELOPER PRIOR TO INSTALLATION/CONSTRUCTION OF CORRESPONDING ITEMS. 10. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACQUIRING ALL PERMITS NECESSARY FOR CONSTRUCTION. THE CONTRACTOR SHALL READ ALL PERMITS AND ENSURE THAT CONSTRUCTION COMPLIES WITH THE PERMITS. REQUIRED PERMITS AND REVIEWS MAY INCLUDE, BUT ARE NOT LIMITED TO: CITY/COUNTY APPROVALS/PERMITS, CITY FIRE DEPARTMENT, SOLID WASTE REVIEWS, NCDOT PERMITS, DRIVEWAY PERMITS, RIGHT OF WAY ENCROACHMENT AGREEMENTS, SOIL AND EROSION CONTROL PERMITS, NCDENR PERMITS, WATER PERMITS, SEWER PERMITS, ENVIRONMENTAL PERMITS, WETLAND DISTURBANCE PERMITS, STREAM CROSSING PERMITS, POWER EASEMENT ENCROACHMENT AGREEMENTS, USACE/DWQ PERMITS, STORMWATER PERMITS, ZONING APPROVAL, AND BUILDING CODE APPROVALS/PERMITS, IF THE CONTRACTOR HAS QUESTIONS ABOUT PERMIT LANGUAGE, OR THE NEED FOR A PERMIT, HE MUST CONTACT THE DEVELOPER AND THE ENGINEER PRIOR TO BEGINNING CONSTRUCTION. Know what's below. Cal before you dig. CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. OWNER/ DEVELOPER: GREEN LEVEL GROUP LLC JAMES PARKER JR. 504 MEADOWLANDS DRIVE HILLSBOROUGH, NC 27278 (919) 732-6676 JIMPARKER16@GMAIL.COM SURVEY INFORMATION PROVIDED BY: SUMMIT DESIGN AND ENGINEERING SERVICES 504 MEADOWLANDS DRIVE HILLSBOROUGH, NC 27278 PHONE: (919) 732-3883 FAX: (919) 732-6676 CIVIL & SITE ENGINEER CONTACT: SUMMIT DESIGN & ENGINEERING SERVICES CHAD ABBOTT, P.E. 504 MEADOWLAND DRIVE HILLSBOROUGH, NC 27278 (919) 732-3883 (PHONE) (919) 732-6676 (FAX) CHAD.ABBOTT@SUMMITDE.NET SITE LOCATION MAP NOT TO SCALE PUBLIC SERVICES CONTACTS W1 w 00 �ZZ-Fz---= W p�m ELECTRIC - DUKE ENERGY W OCJ Q �°W=QI-NJO�"" O LL U } Z W Q W W WOa-W � DIANA WALKER WATER - TOWN OF GREEN LEVEL W V Q (336) 222-5582 RODNEY GUNN LLC, � DIANA.WALKER@DUKE-ENERGY.COM (336) 578-3443 0.. OC,7 ° Qh-Q-�wg�QQ�O JU �, RDGUNN@GREENLEVELNC.COM CABLE - TIME WARNER CABLE U � (855) 243-8892 SEWER - TOWN OF GREEN LEVEL F' 7 W JF�[DZOO 0 W Q RODNEY GUNN SOLID WASTE (336) 578-3443 & RECYCLING - REPUBLIC WASTE SERVICES RDGUNN@GREENLEVELNC.COM LL o (336) 299-0815 STORMWATER - MACCONNELL & ASSOCIATES, PC GAS - PSNC GARY MACCONNELL `z (877) 776-2427 (919) 467-1239 M U GSM MACASSOC@BELLSOUTH.NET U N UI 0� W W1 w 00 �ZZ-Fz---= W p�m z� N Q WQ°�Z J W ZwOLLO O W OCJ Q �°W=QI-NJO�"" O LL U } Z W Q W W WOa-W � V] LL O6'KQ W V Q Q -11 -: Zvpmza V `'� QOU Q W 1 LLC, � o W r � X LL OZUQOIz. tz 0.. OC,7 ° Qh-Q-�wg�QQ�O JU �, U c V~OZtn4- OQOWD O a W U � '0 Lo _� F' 7 W JF�[DZOO 0 W Q 0 �a a U a U � V �+ o 2 LL o Q ® �- W W 4 W `z U z 0 M U W ♦' U N UI z �- 00o1 -- --Qo zco 6 X rn co , Q apcocn U) C .� N CO � N � N CD CD c: 9- @> J > - mom E W 0 I W U Lo �=>3 J cn 0 W O a� (f) U CD w Z LL ° W Z U) o Z) W W 0- 0- I` (0 L0 0� W W1 w 00 �ZZ-Fz---= W p�m z� N Q WQ°�Z J W ZwOLLO O W OCJ Q �°W=QI-NJO�"" O LL U } Z W Q W W WOa-W � V] LL O6'KQ W V Q Q -11 -: Zvpmza V `'� QOU Q W 1 LLC, � o W r � X LL OZUQOIz. tz 0.. OC,7 ° Qh-Q-�wg�QQ�O JU �, U c V~OZtn4- OQOWD O a W Q cQ w Z Z °° Q Q Q W U !� '0 Lo _� F' 7 W JF�[DZOO 0 0� W W W w W W z Q Q I - Q c7 z 1 LNU o W r w r� V 67 x W T O U U z !� z Lo _� W W Q 0 �a a U a U � V �+ o 2 LL o U �' U F-1 hal w �I 1 LNU N r� V 67 x W Z r ^ �v Jl z Z !� Z [� rx T 0 w - Z � V �+ W Z ro Q ® J W W 4 W `z U z 0 M U W ♦' U N r z �- m zco 6 X rn co , Q apcocn U) C .� N CO � N � N c: 9- @> > - mom E 0 I U Lo �=>3 F-1 hal w �I 1 r� V Z r ^ �v Jl H !� Z [� 0 0 W ® Z � V �+ Q Q ® J W W 4 W U z 0 Z W LLJ U PROJECT NO. 14-0243 DRAWING NAME: 14-0243 TS SHEET NO. W W '2 V J SYMBOL LEGEND LU wW �O �ZZ�F--2 BENCHMARK O IRON PIN SET • IRON PIN FOUND *1 CONIFEROUS SHRUB W � gwa�¢zaOmaa DECIDUOUS SHRUB # CONIFEROUS TREE 0 DECIDUOUS TREE �, HANDICAP O¢iOW.t,-OZO55a MAILBOX O POST k SIGN 0,, SANITARY CLEANOUT QS SANITARY MANHOLE W CURB CUT .AL WETLANDS BOUNDARY D FLARED END SECTION ® STORM INLET (2 STORM MANHOLE EJ ELECTRIC BOX -4 GUY WIRE ANCHOR * LIGHT POLE O ELECTRIC MANHOLE p ELECTRIC METER C POWER POLE p GAS METER ov VN GAS VALVE co TELEPHONE BOX T TELEPHONE MANHOLE ©I CABLE N RISER L A LL o FIRE HYDRANT LO O m WATER MANHOLE WA WATER METER M WATER VALVE J e V�f f, i /6,/,/ �; 1z "I J i I f jJ � / j �, , __� � ./ % j� \ \ / 1 / 12" CPP /__18" CPP CORMIC AND ANA RONE DB 2365 PG 963 1.03 AC --- - _---,, Z_ _ -j fI198 � 9 / 99, _4_ �- ^ I - � , f( I /-'-�`.. , 101 l �s Wsu ! I )) !( i 1 \ \ 102 ; , ,. - , 103 I i I 1 w� �� D� 04 i ! S / r � �� ) - , \ �� �-_- `J , i 1 1 \ 11 __ \ \ � I- _ ", 1 / /I a - ; . -', '/`'•sem':-- ~ .- ' '� � ��I �j'" 90 � SURVEY / EXISTING CONDITIONS NOTES: i,r I g1 N 1. SITE CONDITIONS TAKEN FROM SURVEY BY SUMMIT DESIGN & ENGINEERING SERVICES DATED 1-4-2017. j - � 1 / \ �, FIELD VERIFY EXISTING CONDITIONS BY DETAILED SITE INSPECTION PRIOR TO SUBMITTING BID AND l am'%l f �d s s BEGINNING CONSTRUCTION. �/I ,r 92 � \,", . ./ ; ' , \ � \ !� 1 2. THIS PROPERTY IS WITHIN THE CAPE FEAR RIVER BASIN. �/ L� \ 94 w / 'IN I) a 3. THE TAX PARCEL IDENTIFICATION NUMBERS FOR THE SUBJECT TRACTS IS 1702-20-8099. \ ° !. \ ws ys � 4. THE ASSIGNED STREET ADDRESS FOR THE SUBJECT PROPERTY IS 1927 N. NC 49 HWY., GREEN LEVEL, NC 95 1 �11 �r t � as 27217 - s1 _ �p - 5. THE AREA OF THIS PROPERTY WAS DETERMINED BY THE COORDINATE COMPUTATION METHOD. f '`y k r o $-7 \4 ��� 6. DISTANCES SHOWN HEREON ARE HORIZONTAL GROUND DISTANCES UNLESS NOTED OTHERWISE. / ( \, `� 122 ' } r" 1'\\,\ �O 7. ANY UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED IN REFERENCE TO A ONE CALL TICKET { \ "� NUMBER A091210913, FROM THE NORTH CAROLINA ONE CALL CENTER, 1-800-632-4949. 121 V \� �,N t �\ , N 1 tr \ , iv PHASE 9 a a>b ,pO 8. THIS SURVEY IS IN REFERENCE TO DEED BOOK 3501, PG 696-700, ALAMANCE COUNTY REGISTER OF DEEDS. NEER /'� vv -7Q 9. THE REFERENCE BEARING FOR THIS DRAWING IS BASED UPON THE NORTH CAROLINA STATE PLANE V l�O� /� �ti COORDINATE SYSTEM. 118 _R �',� \ �� _RUC I ��nl �f�� g5 /' 10. ELEVATIONS SHOWN ARE BASED ON THE NAVD 88 DATUM. ONE- FOOT AND FIVE-FOOT CONTOUR \ " `) � ,/�� INTERVALS ARE SHOWN. "\_ \. '� 4 � 124 f U / 1 THIS I LOCATED WITHIN THE LIMITS OF THE TOWN OF GREEN LEVEL NORTH CAROLINA. t� -- �,,. � � 1 T S PROPERTY S OC , 11 1. 1a4 '1`� \ �� \, �_ �I1. 12. THIS PROPERTY HAS DIRECT ACCESS TO NC 49 AND MEBANE-ROGERS ROAD, PUBLICLY DEDICATED z,5 f' �✓ « \\I STREETS. 14 2 t 1 \`clu-- I ' 14 ; r 13. THIS PROPERTY IS LOCATED WITHIN THE FLOOD HAZARD ZONE AS SHOWN ON DFIRM PANELS 3710889600) V JL5 \ , t / N \ _ \ i } \ V \ W71 �' S \, ` DATED SEPTEMBER 6, 2006. 4 •� a a \ / \ 105 y 11 ~ , � 14 %� --" �� 14. THE CONTRACTOR SHALL MAINTAIN ANY EXISTING ACCESSES TO ADJACENT RESIDENCES, BUSINESSES 1 1 � i� \ 11 1 1 V , I - _ ��� CJ 'a r ` h J ` 12 \ ' \.,. 3 ' \ 140 �N \ o AND PROPERTIES AT ALL TIMES. 82 6P, \ 1 O \0 \ - -- ; r ., ` ,, ,\ \� - r r i ��-'', 15. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS NECESSARY FOR \ hp6` ° 1 ` __ 1 1 i, \ 9 I 11+CONSTRUCTION/DEMOLITION. fi 110 1,I I' ,�' 1 __� J 1 12 r� 1 .. . n 4 \ •�..\ -M�ar ` \ / _• Z_ /%' % r V. / y \. 10 151 �i �� s' ! 11 o I t i " 3 =r. : `` �, / �\ 53 28 , s ` i \ P Q / /� / f i n 1' 10 ~' / I , �: R%„ „z ,.� ` '\,- `\ 138 / •'`-" a0 /'f B 1 0 f`✓ / __ \ / 2 , ._-....' ` r? \ - ._____ _ i .'`. . _ "- n : 149 '^.,.. t ` / / 1 �. / 1 // 11 I/ �f _/ / � CAROL U \ ,� ,- `4,, , , A \ ; `\ fr, ! \ 4 1 J \` IN#88968 76 \ ( / i > ; t 1 i� / s l1.1 �, / (/ 693 PG 193 \ / _ 0 j 5 �1 o/ >f .. b \ s `j(t t� .r^`' i .. __� - - ), f ! ,,, , 1T / \�\ " / 156 / 1 \� \ , .\ \ f -`--- __...�.._ ___ _,_,,.. "'R / f f ++t. ..'.- 4 \ \ \. \\ '-'"'.- \ I Al i' Yg �d j { rr f / i% - A1111111111 ."/ f - - ____ ___ _/1 "�> "_/,� / � / / / � I - IN, 1�11� 4r,_911 / � /­ -,-- --- �, - ,,,,,_­" . �,,!,;, I / _ _._. / ,-- -, Z' - "-I '\ 01� o - �\ 1 f / I �,,, �'j / �/ "" ., I �,', , I C 1 .• 890 ` 2 '� .� A A .. - _... / ,� . vx .;�� �� 16 "� % .i 1 d. !' ,� �.: \ 14' \' \ \ , \ �'�,,, / '"""�.' /� i ! 1 i } „ ,". .; ° -,...,4 .Y E _ \\ 0 3 �, rr' f P ./ ,1• / l / / -�� y \ \ \ }} f s ,Y1,' 3J9SS6„ 1 y 1 / J'� l 1 -^:r -its ^•••.:• I - - s 13 �� ''' ''/1 ' �� f /` .. �� N \ ..,i l )) , A C\\ I� // ,F . i0�� r" e \..\ `�� J,/' i ill / µ \ 1 I 4 \ f ' fff j y // �� / / 1 \� / / ,r //_ / . 4 i ---- ` \"`.'„ �` ` i 1 \ , + ^,,�• ' //� / / / /, j *' .zi.: ^r, \ `l `•o, -- \0 16 •,s�% , 132! ., T VER EAD'EL C ICt \ ` ' > --•�,' 1 \\, f % a ;, 44 1 1 c . ,, �. _.. TO �E REM CD) ! � � t ' 1 I \ M t /' . -% '. '� ' i` i i� ' ,- \ , �. , t 1 v f . , !. �'�± i s h r I ,,�� \ J J �\ 1 l t ,/ [ •, a \\`., r^ �\" \ �' 4 133 4 Q1l j 1 f .� 4 �\ �..). ---- / �1`\ i\ -✓ rr \ V, o' F �. _ -��� A �' f '" a,� \ -24" MP -1 V=61'421 \ �\\' \__. LA \ \ 1 \ _` \ \ `\ 24°c nvv` 61a.\�'\` 6 CODY J CLEMMONS y \ ` v i y �, _� ' k Kt I� �y y �� �,,�/ DB 3350 PG 372 �r \ \ o sr \ `- 63p ` \ \\ \•\ r . \\ \ , . '1 BUILDING `-��_ v g5 /t �' 27.79 AC *CONTRACTOR TO \ J y s. .v i. - - _,_ __ . A , \ �\ ` \� 1 / f 75 \ i \ _ \ _ e.�> \ \ \ e \ PHASE LINE \\ ° ,\ r o ' t REMOVE ALL EXISTING \ \ `. - ___ ___ _ �. A� ' �., y\A \V '�� STRUCTURES \ i E�3a_ __-_- 1-1 ' S` f cg r/ l 1 S 1 s' 1 I `,., `�•`\ •`�3 `a. ' IP RI - ! `' t ./ ,J �� t '14 �•' j'� 4 t '` k r'�P "'O? _. \ `� \ a t, ! { __....A .�._. V .�-- '_�. , ��,k U nCE. row ,� 1 :,a, ,2� a .i«, "'� � _''-•-�''r / ' //,r r'� �� u�, o, � � / / I! \ _1\1 / y� t C�NTFk C OR(TO /� % - /` \ ' r §.. % o !" « /! ✓ % l �/ 0 REMOVE L GRAVEL \. \\ f - ,.,, 'I I r \ 1 1 t, : �, ���f ! , (/1 'I \ y 640- '1, 1 \�i 1, 1 r,.,' " ,_ t' . ' r"r�r,!/ / `' . 1 � � / C r DR, , e',� _ �, t.VES W HIN SITE \ �`�^� '~\ ~` \ �\ �,: \ i ' `: ° �, / / i % f �% L `v\y`�� - e !, ,� �j\ } _ j i O �. ' t 64g._*, \ ~"�'.''•. _..__.�. , (y \ ~...� �Y� : `,, i j/ rl�t j t // ..'�' r t ( \ - v v, _• v �� -- v 2 \ \ l \ 1 N 1 x \ it t J j �+` 3 Q y t` � f - V\ �jt \� i\ a .l si w.Av 1- \ 1 t a BUILDING/ i \ \" \ \// \ \ �;� \ o PHASE 2 � 6 �, \\ O �`, f` f l/ l1. 5. f \ / tJ /) f/ \ \ , 1. `\ \ ..__ J 1 f ���, ' \ ,` 1 " \ \ /T/ _ s I ,f, , �j! f x j\ I f �`', \ \.. //`/j' `"'`.� `0.,. �'`,` a''"'-,-.. `�-^• v "..-. -...,%`� �`--..-_.. _- ��`\f/ /`�� � / � ,,,,* ��, . , _', - , / A !,�(� ;,a-''1' A\ \ 1 \ Ja ,, ,: 1�,, �A`�.,,' ...-� ,// 'i'��i:!,!',.`'. �/' „ ,, I ` / * • `^�, \ \ \ - -- t 1 \ i t) j i � : 1 4 �✓ / s j-�/..' X 1 x -__ / / \ `� ` , ~•, \ ? 0 3 \ -' \ 1 � '` \\ 1_ =' %/ FLOOD ZONE 'AE' J �\ \ \_-ii.r2•-- �__._... l ' (IO `� ( �� �/%- C, `i I, \ � �, r \ - ``,••.�,;` ., .:.-� f;.i i',, _%1�" < i-� ✓"'` a ,' a�. x I e, V yv '� i 1 �V� - i r r, c" ti \, \ A T jr l /� ~�1 .,,� �'�`-� .,_\.•4 ^�. \ \\, \ \""�• , \ !l lj i J \, ` t 1 1 1` \ �' �`'`' `".,,� `",,, .. r !%f t t x r .; //J t j/ d} \ \ \ \� V ` f / /J` ' % / l ! I t / „ Ili �f � 5y� /f / \ / !!! \ t , // Q , / 4 r' �W Dry ! i r \\ � �r \ \` \ \ ,` `•• /; ?J ," / r' i f / f/ f �. CSD / ,/ I / f I' 0 i -•. `-..•, k { y / / / o r 7 I r I N .,+. # h, i J f / 1 =oma 1 / \ \ \- S /.' 1' / f f! I ( l i 1 r 1 IC ' / ! ) % , \ \ \ ) /� \ / r RWt /! f / �J/t� v j w �\ �.�`_'a / / I , \\�:��,���, / ( , r _/�' / ) / j% ='y ."� \ \ I / , ��" r _,�,',�, �1�1­1�11' -11,11.111, , " ,.,\ \\ -�'�\) ._...✓f / ,/`-. ( / ., / / f l//;'./"-: _ A,/ -:=Z yam/ / , f j i jt �/. 1 •� , ^ !y . / ,' �',r .'�' N _ / ^' - f r' ..-..- "'f - f -/ fes. t"'--•-_ =. _-,`.���",�-,.dam,:_.. /_v/� j// ///�/' / ' i l (f '1 ' ' l , ' , { f f ". I �J •` �`�,�. -,^, .,\ JI /� / -,.../ •r' f _ �. r < �-_=.-.> ' `_ -�- ..;wee_ ` I,,;,,_.-.�•.•" j • 7 • , e , � • Y , . � I k 4 - 1 o \ Y .r \� .\` �\ 11 } ! J / `rte �,,"`r %-_'�� i�� /';� ,'-� /''� r�-.."®„�-� Y j 1 _ �^ ' • 'e `' e i ` y fi W iS t / F� D L \ j �/ f. /f > %/ ! �l t�,m!� /, f' �`" i ^ j . ' 1 ��m I _ //' j }11 f .. `\.` { f i % /� /, .�lrr ,.,.....,�"� t ;/-.' i , �"' /f."" ` p,'' .- -,.i /' i .'''� ./' ,t • _I. - . �• t- ' i. P a: „r` .. I / / , J ( ��r , ; \�, I - * . "', ,,*��,�._, ", If �",,', ­ ,,, �> �� I �� 1 s. "I, l r�! / f �/// �r � � _� __:: '' bk- ,-r,,,/ � � / _'����__.�.� ; ' (11 \ \\ �.� � �� � ; t`-..... �l .r-`' w % ,/ / ✓ %' , / /'''' %'.,''" ,,!`/,.r' ^'"'� '/"�*•, f --- i j ,_,•-._._ i 4.,.•�._,,--.--• \, 4�'\, \. \ WE• LAND \ , z'. t 2z- ►► �. r f> \1 '11`�.. ////J " �,, `1 ,f ob f //' yr/ I J , r1 / / ,r • ` f"� 1 Ol I 1 r,...r r,/•' �,.. j �� � �`�. \ ,\ � \ 4 �' <, � ry Sa. ,.� `"\ / / -- , ,,,,,.' ,---^', / r ,; -- �,,,.. - �,, / /. / /j{ t// /,/I/> f> f ,° �,,..t.•'+l. e,' 1e"""� `' /' ,_,a..,:-- x"24 _e\ �'` `5. '�.' \ 7',3; \r%_ '� ,( ., '11y /, ' \ \ K \ - -- �;, r/, / r - f /// J rj i !r r /�/ , ; �� f, / \ Z -- __� _- s�o ' , q ;, \ \ l A, DEMOLITION NOTES: ti, - _. - --- b& y - f j JJ / J Jj, l j / r' / \ __\ , �, 6 ` , ° s i\ ��\... .�.,�-`�••� ._ -- .._._.�--- --'��, i' , �''// �/�� >'`,lr -'- �: !' /J %/ { . ,f / l ,�'/ ,� j .,�,` _'\ -6t6 `•��1 - `\ ��'\ \ \ i mss, > \ o`\ I .' BE IN ACCORDANCE WITH ✓ _ _ .f h5 �, ,/ J� j l I lI \ \ \ 1. ALL DEMOLITION, TRANSPORT, AND DISPOSAL OF WASTE MATERIALS SHALL - /',�,�` ":: �'0 / / / I ' I I Jr / /� ` �. -- `" k \ ` '. \ \ ' & , ALL APPLICABLE TOWN, COUNTY, STATE AND FEDERAL REGULATIONS. 1 _. „ �_ e__ r r .% 1 ' 1 1 �\ -e _ > ( _ �� \ i `\% 2. REGULATED MATERIALS SUCH AS ASBESTOS, LEAD, ETC. MAY EXIST ON SITE AND SHALL BE IDENTIFIED f BUILDING �-- !> / /i ` FSF . r f f f J / / r t lr } ! I , - \ \ / / i11" AND A PLAN FOR DEMOLITION AND DISPOSAL PRESENTED TO AND APPROVED BY THE CITY/COUNTY - --'''� '_ - r� 50� l i I / \ \ \ __r- -- A ✓ ? AND OWNERS PRIOR TO COMMENCING DEMOLITION ON CORRESPONDING STRUCTURES. --- '' 1 j l s a/ 11_ - -' 1_ _ , � r f % ! / ( 1 1` \, - � �B3p__ _" 1 /' �j i / 1121.68 - / �� / ' \ - f t / 6 f 3. THE LOCATIONS OF ALL EXISTING FEATURES SHOWN ON THIS SHEET WERE PROVIDED AS PART OF THE j d ______ �/ ~ - / / / r / t� \ `-__ -.•, _ / it ° SURVEY REFERENCED ON THIS SHEET. OTHER UNIDENTIFIED UTILITIES OR SITE FEATURES MAY EXIST f a/ _E; S_. TM --- - _ __ _. ___� / ��'� '` -'' ' j l \ ``�,`` � � - - --_ __. �� / / f % I d: \ AND SPECIAL CARE SHALL BE EXERCISED DURING ANY SUBGRADE WORK OR DEMOLITION TO PREVENT i/ ( / / \ 1) % / - _ _�� _ ___ ,,� / /f / `i , / � ! \ o \ �:., s�` _ b' �� j f / % / f%f� / `() U = UNINTENDED LOSS OF SERVICE TO SURROUNDING PROPERTIES. / - ----._-._.___ __.,�.__ „�_ ,�✓"' ,,, - /" /, / �' f t/,'/// f ')cr \ e\\.. "^�`� �'^-�.�.., __. �\ -.�.. _..._. ..�__.._. �.,.� i f / 1 t % /f G. / I/ _� /. ._,✓ f -11 11 't >! / /� _'`"--"""'••� /\ ;f f/ * fr ,� -./ r ,/f f`'' / / / / \ ` `\ ` '''^.,�- `'""�- �� '-` ..� ''4.,•,\. t �( ( �,j! �/ r ,,h,�' `\ J., 4. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS FOR WORK IN THE NCDOT RIGHTS OF / / _w \/ /f ! /// \ ` �`� , \ \ ! S t l \•l11 WAY. ANY DAMAGED INFRASTRUCTURE IN THE RIGHTS-OF-WAY CAUSED BY CONSTRUCTION ACTIVITIES / �5 - _--_ �_ / f f /• f - \ I f \ `` MUST BE REPAIRED TO NCDOT STANDARDS. THIS INCLUDES, BUT IS NOT LIMITED TO UTILITIES, CURB & _- ' _ ry `, I A \ \ r4 "" s / - -. y \ % ; { �' {/ 1 \ 1 `\ / O y GUTTER, PAVEMENT, SIGNS AND ROADSIDE SWALES. M __� ___� ____._ _� s89, s.99, - __ - ` o` f \ , f� J8„ "' ✓' - r-___ __ _ y "~---_-___ -'f /1 j \\ 1 ) 1 j ' a I r= 5. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN, IF REQUIRED BY ENCROACHMENT PERMIT TO W ' f%t-`'� - --_-�- ___.p_,_ � 1 ; �� � � NCDOT FOR APPROVAL PRIOR TO ANY WORK WITHIN THE NCDOT RIGHT-OF-WAY. ,� / _ /% \ \ � 1 1t \ \ >t _,_ I "\ J 6. ALL UTILITIES ARE TO BE REMOVED, DISPOSED OF, AND/OR ABANDONED PER THE CORRESPONDING / f 650- - �_ _ ._,~ \ ! \ L , 1 \ SERVICE PROVIDERS GUIDELINES. Y ~''� k / FF °� 1 _ , / 1 v� _ vv v /! i MARTIN CLAYTON / 8-� , ----_ - - / DB 2739 PG 357 '__ _ ---.� _. /' / /, / 17.84 AC11 -11 -II, . 11 - � , - �6pA' `� I/ *WETLANDS DELINEATED 12/01/16 BY • M 5,N /'` ``� ,S ' RONALD AND PHYLLIS PIERCE ,/ �, '� ! �.I THREE OAKS ENGINEERING, DETERMINED - _ °� ® --- DB 1380 PG 804 ; ,- ���" ' 12/12/16 BY USACE BRANTLEY SPENCER JR v----z'`� 5.62 AC ` P 1 - \\' DB 2213 G 66 v \ _ " GRAPHIC SCALE Know what's b@IOW. \.- 50 0 25 50 100 200 Call before you dig. ,'I " � j / / (IN FEET) / /' 1 inch = 100 ft. - 0 LU wW �O �ZZ�F--2 r/a r-Q� �z OOw�Zm a�zr WEw0<0 O� 'J N 0 CL Z¢Z���UF- W F- Q KO O W W U=¢>: 2 c2 'J W M <wwOa 'H,� [-I W � gwa�¢zaOmaa Q z oz�u�Oi0Z5i-�� �;�W 3:m 3: m C7 ��W O¢iOW.t,-OZO55a z dWzz77?5oQa=L) a U Z >, AH z Z W w I~ ti W Z < 94W a CAU Z T_ VW W s Z M O W 2W } m - �- U U Z L15 LO O Q co O Q i� W 6- U i� W a U i� o m L A LL o ! LO O m Y Q � � M � ' m >, O I O 4i -0:E J C U yd 2m Nd N._ W UDn2>r W J C3 W O W U Z Of LL _ W Z U) p Z) I- r- O �Ilj_ co N r - 0 LU wW �O �ZZ�F--2 r/a r-Q� �z OOw�Zm a�zr WEw0<0 O� 'J N of O Qd' OFw_-} fn W -,LLL) (JU W Z Z¢Z���UF- W F- Q KO O W W U=¢>: 2 c2 'J W M <wwOa 'H,� [-I W � gwa�¢zaOmaa Q z oz�u�Oi0Z5i-�� �;�W Z' 22zC)C)Z nW-Zz O o gF-¢ �J-,, = 50 C7 ��W O¢iOW.t,-OZO55a z dWzz77?5oQa=L) a NZUza2=>0U=W F- iW........7777P5mZOD 0 CD W f_ .1!�I U W I=1 U n N to Of z Z a F_ Z >, AH z Z W w w V� W Z < 94W a CAU Z U o O W s Z M O W 2W } m - �- U U Z L15 LO O Q O Q d �: (n i� W 6- U i� W a U i� o m L A LL o 10.0 H CD V) .1!�I U W I=1 x n N to W z Z �(•n, F_ Z >, AH z Z W = Z Q V� W Z m 0t` 94W z CAU Z U o O W s Z M O 4) t` Z I - <, a Z x m (n ! LO O m Y Q � � M m >, M Z (h O m � •p5 4i -0:E C U yd 2m Nd N._ UDn2>r 10.0 H V) .1!�I W I=1 n U z Z �(•n, F_ Z AH z Z o W U op Z Q V� Q �Dp 94W d' W CAU Z ZZ O �: of V==c!� PROJECT NO. 14-0243 DRAWING NAME: 14-0243_XC SHEET NO. C-2 W ' W Z 0 F_ d-- ES 4 Z0- 0 Z - 0z 00 V Z � O W 0 U UJ 0 w Zo�zw0r w W wOQp�Udz 1� F+1 ZWp WFW_-}�¢ WUZ OQ Z W ¢ pwuWO.oa> � C/1 W=L W,ON1 C WZ-')a � Q�n.w- vwo-,, �w�aaz om Q w z Ozw6oz°=-w'T D U ✓~ W a z op=ZOZWLLWDO ZU } W LL J a ap¢gw�wa¢�o u C7 oaw�=c�jW-zpma w M- U U � co [—+� re > Lij ui U ti ti W Z m v r r 04 W w u U M W H Z w (D Q 00 O w F- F- m (f) C) w w 0 uj N W 0 _ Q ' a ti co d F- Lo d U as LU U w 2 CL o N Cl) m oUc� O O o mZti-o m ao�E J moa, E U) W N N U U S nLO=>3 w J C/) CI W O > 0 w w U CD Z W W W a � cn o w w 0- IZ f� CD ILL d M N r U UJ 0 w Zo�zw0r w W wOQp�Udz 1� F+1 ZWp WFW_-}�¢ WUZ OQ Z W ¢ pwuWO.oa> � C/1 W=L W,ON1 C WZ-')a � Q�n.w- vwo-,, �w�aaz om Q w z Ozw6oz°=-w'T D U ✓~ W a z op=ZOZWLLWDO ZU } W LL J a ap¢gw�wa¢�o u C7 oaw�=c�jW-zpma w M- U Lu w L) �0 nzzgc �z==ioww tz�J W F�imZ00 U w � w 1� F+1 1- Ul S A� Fi•� N tp X W Z Q U Z �0 J W [—+� re > Lij ui U W Q W Z m v '� 04 W w u U M W H Z r, (D Q z w w F- F- m (f) C) w w LL Lo � uj N W 0 _ Q ' a ti co d F- Lo d U as LU U w 2 CL o SEAL MSI F� w � 1� F+1 U Ul Z A� Fi•� N tp X W Z Q V� Z �0 J W [—+� re > Lij ui U W — W Z m v '� 04 W u U M r, ~ z m r X Lo (n #Q LL Lo � W 0 _ Q ' a ti co U c: C N- 0 a N Cl) m oUc� >' o mZti-o m ao�E _ moa, E U) N N U U S nLO=>3 MSI F� w 1� F+1 1 V Z Z A� Fi•� 0 w U °A Z Q V� a �0 J W [—+� �w U J 0 Lij ui U F (5 PROJECT NO. 14-0243 DRAWING NAME: 14-0243S SHEET NO. C-3 i UTILITY NOTES: ' 1. ALL NEW UTILITIES SHALL BE LOCATED UNDERGROUND. 2. ALL PUBLIC UTILITIES AND CONNECTIONS TO PUBLIC UTILITIES SHALL CONFORM TO THE TOWN OF GREEN LEVEL STANDARDS AND SPECIFICATIONS. 3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS NECESSARY FOR / CONSTRUCTION. 4. PRIOR TO THE CONSTRUCTION OF ANY WATER OR SEWER MAIN EXTENSIONS, THE ' yy ENGINEER OF RECORD SHALL BE CONTACTED BY THE GENERAL CONTRACTOR TO DISCUSS CERTIFICATION REQUIREMENTS. FAILURE TO CONTACT THE ENGINEER OF RECORD OR PROVIDE ANY OF THE REQUESTED DOCUMENTATION DISCUSSED MAY RESULT IN THE INABILITY OF THE ENGINEER TO CERTIFY THE LINE. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF THE LOCATION AND/OR RELOCATION OF ALL EXISTING UTILITIES WITH THE APPROPRIATE UTILITY, / AGENCY OR COMPANY. 6. THE CONTRACTOR SHALL COORDINATE ALL UTILITY CONNECTIONS AND DISTURBANCES WITH EXISTING USERS AND TOWN OF GREEN LEVEL SO THAT ANY It SERVICE INTERRUPTIONS ARE MINIMAL. 7. RELATION OF WATER MAINS TO SEWERS: 10' HORIZ. / UTILITIES LEGEND: EXIST I PROPOSED WoQ����zm �4 N WATER VALVE N_ <— W 0"W, >-zof-w4m Y FIRE HYDRANT I'M 13 WATER METER u z 0--.,9, L,-, z w gti Y FIRE DEPT. CONNECTION (FDC) U <U cr U 10 W K,O�Ozyl— REDUCER Q0Zwwoa3Q�v [ PLUG & BLOCK � i 1-1 MECHANICAL JOINT/ BEND = m 0 04 POST INDICATOR VALVE (PIV) r` AIR RELEASE VALVE (ARV) �S 0 SANITARY SEWER MANHOLE co C 0 SEWER CLEAN OUT ® - CURB INLET ® z 2 DROP INLET ® Q JUNCTION BOX D7 v FLARED END SECTION (FES) w w EXISTING WATER MAIN W O W— PROPOSED WATER MAIN / SERVICE —G—G— w EXISTING GAS MAIN c— � >; PROPOSED GAS MAIN M OHE-- EXISTING OVERHEAD ELECTRIC —OHE 2 Z N Use PROPOSED UNDERGROUND ELECTRIC -----SS SS EXISTING SEWER MAIN i SS PROPOSED SEWER MAIN / SERVICE —SDS SDS EXISTING STORM PIPE - PROPOSED STORM PIPE Ex 8" AC W/L Know what's below. 0111 before you dig. CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. 18 VERT. y I \I---- x�„<���,�ri/- �/,�-���- x \ISL \ 1-/ SS M M og 5S \ CONSTRUCTED WETLAND #1 Q 26 CONSTRUCTED w ,t WETLAND #2 66 � / 1 sQ ffZ, "Al 3 H, ss 019 L!J I uti � was �O S� SS / UO \ ss 111 SS 349 62 3 \ 33 41 f --- \ 48 CONSTRUCTED `.. 3 / O 308 M 34 O \ / � � 344 � /\' O 22 7 WETLAND #3 '0 �rk\ J'r 326 y F J �/ O 10 i CONSTRUCTED wQ- = ss s l / 330 /� \ �.. WETLAND #4 yj \ 3 \ wz \ �/' vQ- 0 O o... --- J 3� SS 3 s :ws O PN gM \ 239 \ NOTE: sM / Mg0 ss 5G �— CROSSWALKS SHALL BE INSTALLED AT INTERSECTIONS / s WHERE RAMPS ARE SHOWN. ALL STRIPING SHALL BE PER SV 24 \ \ / NCDOT STANDARDS AND SPECIFICATIONS. rnSM \\ 25 sssn \ MARTIN CLAYTON DB 2739 PG 357 17.84 AC RONALD AND PHYLLIS PIERCE / DB 1380 PG 804 BRANTLEY SPENCER JR / / 5.62 AC DB 2213 PG 661 1.7 AC 1 0 GRAPHIC SCALE 40 0 20 40 80 160 (IN FEET) 1 inch= 80 ft. H U W H U W W W w z W : r U U z Lo N Z � -Wi Q Q 'S d U') W L11 L ch CL U a U o LL o 0322 / ''lllllililll���\ 00 U,1 w �Zz��= f� W WoQ����zm Q }UpUW yK�WUZ 0 LL O Oc? w N_ <— W 0"W, >-zof-w4m LL� x <W �: � 2O�w }VOm°z¢ Q a o U nd a� O m a w F L� u z 0--.,9, L,-, z w gti a m U <U cr U 10 W K,O�Ozyl— W Q0Zwwoa3Q�v � U � W W Z = m 0 r` ti W t U M C 0 AH - °A z 2 U W OQ m oo OQr W O S1 c6 N M w � c— � p M O 2 Z N CL C i O m m n: 0 - N J W W —i W 0 W > ry U (9 w Z LL. W W Z> Q > 7 O CLa. I` GO LO d M N H U W H U W W W w z W : r U U z Lo N Z � -Wi Q Q 'S d U') W L11 L ch CL U a U o LL o 0322 / ''lllllililll���\ 00 U,1 w �Zz��= f� W WoQ����zm Q }UpUW yK�WUZ 0 LL O Oc? w N_ <— W 0"W, >-zof-w4m LL� x <W �: � 2O�w }VOm°z¢ Q a o U nd a� O m a w F L� u z 0--.,9, L,-, z w gti a =O�F-=X W w u- J z U <U cr U 10 W K,O�Ozyl— W Q0Zwwoa3Q�v � �Zuzz=Og~OWW �»wgIx�mz0o H U W H U W W W w z W : r U U z Lo N Z � -Wi Q Q 'S d U') W L11 L ch CL U a U o LL o 0322 / ''lllllililll���\ H H v U inx x W � a W W Z = m 0 c� W t U M C 0 AH - °A z 2 U J OQ m - 00 W O S1 c6 N M w N N W M T 2 Z N CL C i O S m m n: 0 - N H H u� Z 0 AH W U °A z 2 U J OQ w CAU Z Z Z w Ow w UGC=� PROJECT NO. 14-0243 DRAWING NAME: 14-0243_S_PH2 SHEET NO. C-4 EROSION CONTROL & MAINTENANCE PLAN NOTES: 1. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS, SPECIFICATIONS AND DETAILS OF THE NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL OR LATEST EDITION AND BE APPROVED BY NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL AND NATURAL RESOURCES PRIOR TO ANY AND ALL GRADING AND/OR CONSTRUCTION OF PROPOSED SITE. THE APPLICANT HAS THE RESPONSIBILITY TO CONTACT, VERIFY AND ADHERE TO ALL NCDENR SPECIFICATIONS AND CHECKLIST REQUIREMENTS OF THE STATE, WHICH CAN BE REVIEWED AT THE NCDENR WEBSITE AS FOLLOWS: HTTP://PORTAL.NCD EN R.ORG/WEB/LR/HOME 2. RETAIN FLOATABLE WIND BLOWN MATERIALS ON SITE BY STORING ALL TRASH AND BUILDING MATERIAL WASTE IN ENCLOSURES UNTIL DISPOSAL AT OFF-SITE FACILITIES. CHECK ADJACENT AREAS DAILY AND PICK UP CONSTRUCTION WASTE MATERIALS AND DEBRIS THAT HAVE BLOWN OR WASHED OFF SITE. 3. PERMANENTLY STABILIZE ALL SURFACE AREA WITHIN AND ADJACENT TO THIS SITE THAT IS DISTURBED BY VEHICLES, GRADING AND OTHER CONSTRUCTION FOR THE PROPOSED FACILITY. STABILIZATION IS OBTAINED WHEN THE DISTURBED SURFACE IS COVERED WITH STRUCTURES, PAVING AND OR PERENNIAL VEGETATION HAVING A UNIFORM COVERAGE DENSITY OF AT LEAST 70%. APPLY A MINIMUM 4" OF THE STOCK PILED TOPSOIL TO ALL DISTURBED AREAS PRIOR TO SEEDING. STABILIZATION OF ALL DISTURBED AREA IS REQUIRED BEFORE TERMINATION OF MAINTENANCE AND REMOVAL OF EROSION CONTROL MEASURES. 4. CONTRACTORS SHALL INSPECT EROSION CONTROL MEASURES AT LEAST ONCE EVERY 14 DAYS AND WITHIN 24 HOURS AFTER A STORM EVENT OF 1/2 INCH OR GREATER. DAMAGED MEASURES THAT PROVE TO BE INEFFECTIVE SHALL BE REPLACED WITH MORE EFFECTIVE MEASURES OR ADDITIONAL MEASURES WITHIN SEVEN DAYS. REPEATED FAILURE OF A CONTROL MEASURE REQUIRES INSTALLATION OF A MORE SUITABLE DEVICE TO PREVENT DISCHARGE OF SEDIMENT FROM THE CONSTRUCTION SITE. 5. INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE EROSION CONTROL INSPECTOR. CONTRACTOR TO VERIFY REQUIREMENTS PRIOR TO BEGINNING ANY WORK ON PROJECT SITE. 6. CARE SHALL BE TAKEN TO MINIMIZE THE ENCROACHMENT OF SEDIMENT INTO ALL STORM DRAIN APPURTENANCES, PUBLIC ROADS, AND ONTO PRIVATE PROPERTY UNTIL IMPERVIOUS MATERIAL (ROAD/PARKING AREA SURFACE) IS APPLIED OR UNTIL PROPOSED LANDSCAPE HAS BEEN ESTABLISHED. 7. REFER TO DETAIL SHEET FOR SILT FENCE CONSTRUCTION. 8. ALL AREAS NOT SHOWN AS PAVEMENT OR BUILDING UNDER FINAL CONSTRUCTION SHALL BE TEMPORARILY AND PERMANENTLY SEEDED AS REQUIRED. 9. ALL GRASS SLOPES WHICH EXCEED 3:1 (H:V) SHALL UTILIZE NORTH AMERICAN GREEN (NAG) CONSTRUCTION PRODUCTS TURF REINFORCEMENT MATS SC150 OR APPROVED EQUAL UNLESS OTHERWISE SPECIFIED ON PLANS. MATS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND STANDARDS. CONTRACTOR SHALL COORDINATE INSTALLATION INSPECTION WITH MANUFACTURER. PHASE I CONSTRUCTION SEQUENCE: 1. OBTAIN APPROVED SET OF CONSTRUCTION DRAWINGS. A GRADING PERMIT FROM NCDENR WILL BE REQUIRED BEFORE THE ONSET OF ANY GRADING ACTIVITY. KEEP A COPY OF THIS PERMIT ONSITE THROUGHOUT CONSTRUCTION, CONTACT NCDENR LAND QUALITY SECTION @ (336) 771-5000 PRIOR TO INITIATING LAND DISTURBING ACTIVITIES TO SCHEDULE A PRECONSTRUCTION MEETING. 2. CLEAR ONLY AS NECESSARY TO INSTALL THE EROSION CONTROL DEVICES AS SHOWN ON THIS PLAN. INSTALL SILT FENCING AND ALL SILT FENCE OUTLETS AS SHOWN, AND PROVIDE SUPPLEMENTAL OUTLETS AS NEEDED IN LOCATIONS WHERE FIELD CONDITIONS INDICATE AREAS WHERE SITE RUNOFF WILL POND. 3. INSTALL TEMPORARY CONSTRUCTION ENTRANCE/EXIT AND MAINTAIN PER THE NOTES ON THIS SHEET AND IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL GUIDELINES. ALL CONSTRUCTION TRAFFIC MUST ENTER AND EXIT THE PROPERTY AT THIS LOCATION. 4. TREE PROTECTION FENCING SHALL BE INSTALLED ALONG THE ENTIRE LENGTH OF THE CLEARING /DISTURBANCE LIMITS WHERE THE LIMITS ARE ADJACENT TO EXISTING VEGETATION AND NO SILT FENCE IS REQUIRED. BEDFORD HILLS PHASE 2 SKIMMER BASIN SCHEDULE 11512017 MINIMUM SIZING FOR TEMPORARY DIVERSION SCHEDULE PHASE 9 WOQOOU(=S2m NAME DEPTH SLOPE (%) Q10cfs V10 UNS FLOW DEPTH (ft 1 SHEAR STRESS MATTING AREA TREATED AC DISTRUBED AREA (AC) DRAINAGE AREA (AC) 7.82 1. SKIMMER BASIN #3 TO SKIMMER 01 7.82 W Q10: (CIA) (0.45*7.03 Ir hr*7.82 AC) 24.75 TD -1 1-00 2.70% 1.91 3.98 0-49 0.83 NAG -S75 0.45 TD 2 2.00 2.77% 28.57 7.96 1.34 2.31 NAG-SC150 6.77 WEIR WIDTH (FT) 614.00 17 TO SKIMMER 02 REQUIRED 625.00 BOTTOM TRAP ELEV (FT) SURFACE AREA (SF): 325*Q10 TD 4 2-00 3.25% 3428 8.74 1.4 2.84 NAG-SC250 8.13 TD -6 1.00 3.53% 3.62 1 5:2 0:59 1.30 NAG -S150 0.86 D a 12,5 TO SKIMMER #3 �a U aa, U `C\100 F4 616.00 TD -7 1.50 1:85% 6:11 1 4.66 1 0.81 0,93 NAG-SI60 1.45 TD 5 1,50 2.6396 7:33 1 6-45 0.92 1.51 NAG -5150 1.74 1.6 BAFFLE SPACING (FT) C $ bi TO SKIMMER #4 VARIES BASIN DEWATERING TIME (DAYS 2 TD -9 2 2.13% 2193 1 6:69 1 1,28 1 1.70 NAG-SC150 5.2 TD 11 1.25 2.82% 42.15 1 8.77 1 1.55 1 2.7 1 NAG -5@150 9.99 BEDFORD HILLS PHASE 2 SKIMMER BASIN SCHEDULE 11512017 SKIMMER BASIN SCHEDULE 11512017 WOQOOU(=S2m PHASE O I. SKIMMER BASIN #4 PHASE 1 W (7 DRAINAGE AREA (AC) 1. SKIMMER BASIN#1 Z OZ W �0Zcn XP DISTRUBED AREA (AC) DRAINAGE AREA (AC) 7.82 1. SKIMMER BASIN #3 DISTRUBED AREA (AC) 7.82 W Q10: (CIA) (0.45*7.03 Ir hr*7.82 AC) 24.75 BASIN INFORMATION 3.58 PROVIDED 612.50 SURFACE AREA (SF): 435*Q10 BASIN INFORMATION REQUIRED 34,239 PROVIDED @623.50 SURFACE AREA SF): 325*Q25 8,044 13,546 VOLUME (CF): 1,800*DIST, AC 14,080 22;772 DEPTH (FT) 2 2 WEIR WIDTH (FT) 614.00 17 TOP BANK ELEV (FT) REQUIRED 625.00 BOTTOM TRAP ELEV (FT) SURFACE AREA (SF): 325*Q10 621;50 WEIR ELEV (FT) 4 623.50 SKIMMER SIZE N 2.5 Z5 ORIFACE SIZE DIA (IN) 2.21 2.2 BAFFLE SPACING (FT) 2 I VARIES BASIN DEWATERING TIME (DAYS) 21 3 BEDFORD HILLS - PHASE 1 (UNDER CONSTRUCTION) BEDFORD HILLS PHASE 2 SKIMMER BASIN SCHEDULE 11512017 SKIMMER BASIN SCHEDULE WOQOOU(=S2m 11512017 O I. SKIMMER BASIN #4 PHASE 1 W (7 DRAINAGE AREA (AC) 16.95 Z OZ W �0Zcn XP DISTRUBED AREA (AC) 16.95 G 1. SKIMMER BASIN #3 53.63 V5 P 5o owHo -oma 0 0 W Q W Z Z O Q 4 w V �ZUZZZ: }@]X2 DRAINAGE AREA (AC) BASIN INFORMATION 3.58 PROVIDED 612.50 SURFACE AREA (SF): 435*Q10 D#STRUBED AREA (AC) 34,239 3.58 61,026 95,492 Q10: (CIA) (0.45*7.03 /ter*3.53 AC) 2 11.33 WEIR WIDTH (FT) CI?W 30 TOP BANK ELEV (FT) M 614.00 BOTTOM TRAP ELEV (FT) BASIN INFORMATION REQUIRED PROVIDED 614.50 SURFACE AREA (SF): 325*Q10 5 3,682 4 4,446 VOLUME (CF):1800*D1ST. AEC BASIN DEWATERING TIME (DAYS) 2 6,446 7,005 DEPTH (FT) Q 2 2 WEIR WIDTH (FT) D a 12,5 TOP BANK ELEV (FT) �a U aa, U `C\100 F4 616.00 BOTTOM TRAP ELEV (FT) c5 M =ZM 612:5 WEIR ELEV N 615.1 SKIMMER SIZE ON) 2 2 ORIFACE SIZE DIA (IN) 1.6 1.6 BAFFLE SPACING (FT) C $ bi VARIES BASIN DEWATERING TIME (DAYS 2 3 CONTRACTOR SHALL INSTALL 8" SANITARY SEWER AT CREEK CROSSING IN SAME WORKING DAY AND UNDER DRY CONDITIONS TO REDUCE STREAM DISTURBANCE. CONTRACTOR TO TEMPORARILY DAM STREAM WITH SANDBAGS TO INSTALL PIPE AND BACKFILL THIS AREA TO MATCH PRE-EXISTING CONDITIONS. SEED AND MULCH THE DISTURBED AREA ONCE SEWER MAIN INSTALLATION IS COMPLETE. PUMP(s) OF ADEQUATE CAPACITY TO MAINTAIN DOWNSTREAM FLOW CONSISTENT WITF PRE -DEVELOPMENT ACTIVITIES. PUMP(s J/ L, ; I 3- SH LL BE LOCATED IN P 5. INSTALL TEMPORARY SKIMMER BASINS. PROVIDE PROPER SURFACE AREAS VOLUMES, AND OTHER DIMENSIONS AS NOTED IN THEIR GRAVEL CONTRUCTI ASAND OX MEE INC ASSOCIATED SCHEDULES. AREAS AROUND BASINS SHALL ALSO BE MODIFIED TO ALLOW CONSTRUCTION OF FILL SLOPES WHILE ENTRANCE; - MINIMUM DIAMETER FOF ;, .: MAINTAINING THE REQUIRED PERIMETER SEDIMENT CONTROL AS SHOWN. \ h, -- FUEL SPILL o bs� i MIN o .. +..� �e� - REQUIREMENTS 6. INSTALL TEMPORARY DIVERSIONS DOWN SLOPE FROM THE CONSTRUCTION ACTIVITIES THAT DISTURB SITE SOILS AND DIRECT AS ' �j f �� �� I �' NEEDED TO PROMOTE POSITIVE DRAINAGE TO THE APPROPRIATE BASINS AS SHOWN ON THE PLANS. / ' ll 7. TEMPORARILY SEED, MULCH, ANCHOR AND STABILIZE ALL EROSION CONTROL DEVICES IMMEDIATELY AFTER CONSTRUCTION. INSURE A THAT DIVERSION TRANSITION AREAS INTO SEDIMENT BASINS ARE LINED AND STABILIZED AND THAT DIVERSIONS AND LINING EXTEND INTO ` \ \' T % E 1 INSET s� �F 1 �� / I � / 1 (� SCALE: " = 40' BASINS. r �Y a ( ' '�!l' f �. "`�� ' � 2:1 SLOPE CONTRACTOR SHALL TAKE SPECIAL CARE 8. WHEN THE EROSION CONTROL DEVICES ARE COMPLETE AND FUNCTIONING AND VEGETATION IS ESTABLISHED, CONTACT THE EROSION TO REMOVE THE EXISTING 24" PIPE TO CONTROL OFFICER FOR ONSITE INSPECTION AND APPROVAL. / fj > 4 \� ., / r '_- ND DISTURBANCE, THEN �. �� > > 4 I ,% '�`--. - �` ' USE BLANKET MATTING TO MINIMIZE THE LA N GRUBBING OF THE VEGETATION AND MAINTAIN ALL EROSION CONTROL MEASURES AS NEEDED. BEGIN DEMOLITION 0 6s ' 1 ✓' S IMMER DA -,4_82 ✓/A�. STABILIZE 2:1 SLOPE MINIMALLY RE -GRADE THIS AREA TO MATCH _ 9. BEGIN CLEARING AND G U % � � so � � ., 'Y 1 J 1 f { i` f --. f � l � ,. , THE SURROUNDING AREA. SEED AND „ OF OTHER SITE ITEMS AS SHOWN ON THIS SHEET. DISPOSE OF ALL WASTE MATERIALS IN ACCORDANCE WITH THE APPROVED SOLID \ - ) MULCH THE DISTURBED AREA ONCE RE IT WASTE MANAGEMENT PLAN AND ALL APPLICABLE GUIDELINES OF ALAMANCE COUNTY'S SOLID WASTE MANAGEMENT ORDINANCE. r ! / ,; t 12�TTkMP Y/ s $ / SEE INSET "A" GRADING IS COMPLETE. NO HEAVY Oc , jf -` 0�5 so j i I /. ' , LOPE DRAI�L f EQUIPMENT SHALL BE USED FOR THIS AND INSPECTION OF EROSION CONTROL DEVICES AFTER RUNOFF PRODUCING STORM EVENTS. NO DISTURBED w -- ' 1 r j 10. CONTINUE MAINTENANCE ' ` ) i I / --•-_,__._ _ _C3g 1$"' OR�CRY yo WORK R MOR THAN 14 CALENDAR DAYS AFTER COMPLETION / / i BEDFORD HILLS PHASE 2 SKIMMER BASIN SCHEDULE 11512017 PHASE WOQOOU(=S2m ��� �„ d>oa�%zW3LLo O I. SKIMMER BASIN #4 ' 1 W (7 DRAINAGE AREA (AC) 16.95 Z OZ W �0Zcn XP DISTRUBED AREA (AC) 16.95 G Q10: (CIA) 0.457.0 kYhr*16:95 AC) 53.63 V5 P 5o owHo -oma 0 0 W Q W Z Z O Q 4 w V �ZUZZZ: }@]X2 U BASIN INFORMATION REQUIRED PROVIDED 612.50 SURFACE AREA (SF): 435*Q10 23,327 34,239 VOLUME (CF): 3,600*DIST. AC 61,026 95,492 DEPTH (FT) 2 3 WEIR WIDTH (FT) CI?W 30 TOP BANK ELEV (FT) M 614.00 BOTTOM TRAP ELEV (FT) Z 609-5 WEIR ELEV 612-85 SKIMMER SIZE (IN) 5 5 ORIFACE SIZE DIA (IN) 4 4 BAFFLE SPACING (FT) VARIES BASIN DEWATERING TIME (DAYS) 2 3 AREA IS TO BE LEFT WITHOUT PROTECTIVE COVER (MULCH OR STRAW / TACK) FO E , OF CONSTRUCTION OR DEVELOPMENT ACTIVITIES. DURING CONSTRUCTION OR DEVELOPMENT ACTIVITIES, ANY DISTURBED AREAS Q. �^ ¢ ' J ¢ `i �• ; o SHALL BE PROTECTED AND STABILIZED ACCORDING TO THE STABILIZATION TIMEFRAME CHART SHOWN BELOW. DISTURBED AREAS FOR (j O / / / \ /. / (j !D_ ' , 63 /` I 5'L X 4'W X 22" D ANY PORTION OF THE SITE SHALL BE STABILIZED WITHIN 7 DAYS UPON COMPLETION OF CONSTRUCTION OR DEVELOPMENT ACTIVITIES IN N �Q f,% 1 r /� , r � � 1r�/� i � � 1 ,� T , �' � ,. y ` -,.._ / f/ �Nro � -., CLASS B RIPRAP THAT AREA. v i ;1 �` , tI� PLUNGE POOL 11. NO SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHOUT APPROVAL OF THE EROSION CONTROL INSPECTOR. i /� ¢ / _ �' �` �` �• ', �/S ' EX. BUILDINGS ( r �.�' T, J'C: ✓ �s��1 ,:: L i 4" PVC SCHEDULE / 4_ 1 t k � 12. OBTAIN APPROVAL OF PHASE 1 EROSION CONTROL ITEMS FROM EROSION CONTROL INSPECTOR, THEN PROCEED TO PHASE 2. / G (TO E REMOED}( I y o Lltljf� �--"� 5 \ �` �' ` ,� 1 l u. �' + ' `c' 40 OUTLET PIPE CONSTRUCTION ENTRANCE NOTES: �""•ti. 1`� s'y I g,, \ C Z`� •, /I �A, Lk N •k fla � (� Oii,c ' V� r!`I' `` O/ -,,�• , / � z y r r ,•�?a'' L•;»VV� f'7 , ,I ` / `.� f O �? 1 A/ _l USE BLANKET MATTING TO 1. CONSTRUCTION ENTRANCE SHALL BE 25' MINIMUM WIDTH AND 50' MINIMUM LENGTH AND 6" MINIMUM / ,I a STABILIZE 2:1 SLOPE THICKNESS OF STONE ""E WITH GEOTEXTILE UNDERLINER. REFER TO THE 'loom, ( 1.5-3.5) COARSE AGGREGATE �� TOWN OR STATE FOR ANY ADDITIONAL REQUIREMENTS. / f / 2. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF o5e I. j vvv �� �� �, .� MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1.5"-3.5" STONE, AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT OF ANY STRUCTURE USED TO TRAP f 1 i� <o��, / f � � / 7 / � x rE SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES OR SITE ONTO % -- 1 °� ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. EX. BUILDING ? I i �`�� "�� \ ", d31 EXISTING CULVERT TO BE REMOVED o ' ' T 4 \ r (TO B REMOVED r 1 ( �� D 1 ' ( 4" PVC 3. IN WET CONDITIONS WHEELS MUST BE CLEANED TO REMOVE MUD PRIOR TO ENTRANCE ONTO PUBLIC / /^ j / J �/ J" /{ ( , ¢ j ; t t �� EkBA # Dk � AC �� 8 ? r SCHEDULE 40 RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA WITH CRUSHED STONE / / / , t• / `. ' I p WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN LOCATED PER THE CITY OR - ) �..,\ ,� ` OUTLET PIPE O 2 1i#"TEMPORA e �� SEE INSET "B" STATE REQUIREMENTS. .__ SLOPE D 40L o GRAVEL DRIVEWAYS (TO BE REMOVED) 640---_ (, /" ,°' I/ ` EG VEL • _ - '�` vv� t / � / V r TO -BE IREk4OVE P ��/ \ <o % / / SLOPE lh TIN\ / f• \ (l S�. ' '`', \\ .. 1� 1 `'\ 648 ✓ .--648 ```F.., ._....,..,._-..,_. ~� ~```. �, 1 ., r { `E. f 1} RIPAR17 F / `� '�° 1 � ,,� ` ,�"`. � �r� V X68513• ",./--._..."� � t �� `•`. ��`? �� � 650N 41 .. 662 lPm A I j k y ( EX BB LDINGS \ L / 660 (TO BE REMOVED) / �� �\\ '10 r --_L ,� STABILIZATION TIMEFRAMES.51 Site Area Description Stabilization Timeframe Exceptions F `�� „�66a s / r ! - f r ^W i / / ` �; j "nom _ _",._ //r/ '2�//j �%-% �_ / e _° .__ .,.��'•-...-.. `'` `\ \ '-. �'b,�_ --_..r-- ,.-----`'\ �` � ..--- -` -__--.`.. '_"- 7-1_ .__.--. e-_ -'""`./..».-�/ .--�„ -//-'l-/ J �-664- ditches 6 ditches and slopes-_•_6b?5.- 6ryaT�/1„,/•^1' /F//,,�tf/�/, /% / ///l�f /_'✓ O�j'�` 'i/ •/f.'ir6fiX`J,;,;.�•'-�' 6�`_ 50y-r"/"f _.'___ _._ /'.--, �F J'S;1\ ... f -i " -"'�_f -�__="✓_ _ 4' 'f O .I,lj Perimeter dikes, swales, 7days None High Quality Water (HQW) D _6119- 7 days None i b I . $ /Zones 0• BASI03_6 and are not sthdays are allowed � 666 7 days for slopes greater than 50' _656Slopes steeper than 3:1 7days eeper than 2:1, 14 If slopes are 10' Or less In length Slopes 3:1 or flatter 14 days in length 4. 'a5K �y\ - ''�.,• '`\. �`^.,.,_... _ _.___,_- - _.�.---- "._..-- / e- __&5'� ._.._- r, � / / /' .f•r r .-�� !`.^"-" ®-ev. _ s �., ��. � f.••! ` � r�-`i �,•_..:,� C: : � ct�� i�'.. t" F,, All other areas with slopes 14 days None, except for perimeters and / �� �- - -- �__ /j; f ' r //'_ _ .___`��^ - _, _ C� �` r /�✓` i flatter than 4:1 HQW Zones 53 24" -'_^,.. ., \•. 'a•.. r•T" � .,---' ___,...,_. ---652 ,/,./''- A .'/` l "'/' / J I ✓ / � r. !`" f s'' - _ _...,- /\� �� /'-- ""--^-_. w _ 'f �,� ^ • 1J 6so / '� / j✓ 1 1� r'�r_ �`! �> •UJU(IICQ I WETLAI C %- �\ / / / / / / i (140•fi 0. BEi QIST RB r 64q Know what's below. 0111 before you dig. 51X4'WX22"D CLASS B RIPRAP PLUNGE POOL USE BLANKET MATTING TO STABILIZE 2:1 SLOPE 22.2 LF OF 12" OUTLET PIPE @0.5% INV UP=612.00 INV DOWN=611.89 DRAIN- -648 RAIN- TD-1 1 X626` 6r it b3�.� ti�w TEMPORA Y l � SLOPE 0RAIN� 2�f SL PE M / \ i O LD/SF LDISF LD/SF LD/SF --�°�� LD/SF LD/SFS lD/SF -±- LDISF is/ - dS/Ol dS/0'1 SQA _ \ < -- - _ LD �..- LD/SAF""`• +_ -NgLS� �..a... 5+-+ _ Y, _ (.SLOPE DR91DI- TD-9 3' RISER TOP=612.50 NOTE: BLANKET MATTING OF NAG -S150 OR EQUIVALENT IS REQUIRED ON ALL SEDIMENT BASINS SLOPES THAT BORDER JURISDICTIONAL WETLANDS, AND RIPARIAN BUFFERS. TOTAL DISTURBED AREA 1,941,156 SF (44.56 AC) 3' RISER TOP=614.50 -5'LX4'WX22"D CLASS B RIPRAP PLUNGE POOL BLANKET MATTING TO 1ILIZE 2:1 SLOPE INSET 'IBI' SCALE: I" = 40' PUMP(s) OF ADEQUATE CAPACITY TO MAINTAIN DOWNSTREAM FLOWS CONSISTENT WITH PRE -DEVELOPMENT ACTIVITIES. PUMP(s) SHALL BE LOCATED IN A SAND BOX MEETING MINIMUM DIAMETER FOR FUEL SPILL REQUIREMENTS. MMER BASIN #4 DA: 16.95 AC. USE BLANKET MATTING TO STABILIZE 2:1 SLOPE 51X4'WX22"D CLASS B RIPRAP PLUNGE POOL PUMP INTAKE - TEMP. SANDBAGS TO DAM STREAM DURING PIPE REMOVAL GRAPHIC SCALE 50 0 25 50 100 200 27.9 LF OF 15" OUTLET PIPE @ 1.79% INV UP= 609.50 INV DOWN=609.00 (IN FEET) I inch = 100 ft. I_ w w 00 �zZ�~= (Sa WOQOOU(=S2m ��� �„ d>oa�%zW3LLo O a ' 1 W (7 ¢tea~3vomZa Q Z OZ W �0Zcn XP W 3 OO=ZOZZ-W- E�E-o G �U Q�;?WOZ(DO OZ V5 P 5o owHo -oma 0 0 W Q W Z Z O Q 4 w V �ZUZZZ: }@]X2 U U � m A� W O� Wca Z Q a co Z CI?W W W W M = v W Z a U � Z w W 1- F- 00 o Q W Z D a 0 u1 I- LO �a U aa, U `C\100 F4 02-, d c5 M =ZM > N O O a o > _ N =O j J C $ bi �d U W J�2>� W J 0 W O CO W U C7 Z LL W Z to Q Z) F- ry W W EL M I` 1 CO 1L01-t1C,)1Cd- I_ w w 00 �zZ�~= (Sa WOQOOU(=S2m ��� �„ d>oa�%zW3LLo UOU- _WJnWUZ 5w.0au0U= �C7(4 � rr-oZ=PZ�ra Ow0v�awWonw•, 1 W (7 ¢tea~3vomZa Q Z OZ W �0Zcn XP W 3 OO=ZOZZ-W- E�E-o G �U Q�;?WOZ(DO OZ V5 P 5o owHo -oma 0 0 W Q W Z Z O Q 4 w V �ZUZZZ: }@]X2 U E I_ U w U W H 0 x w r� V Z Z Z Z U E >, Z A� W O� Wca Z Q a co Z CI?W W W W M = v W Z a U � Z W 1- F- m r- V)) 0 W W Z D a S d u1 I- LO �a U aa, U `C\100 F4 02-, IL o F� H w U MSI 0 x w r� V Z Z Z Z E >, Z A� W O� Wca Z o co Z CI?W cc M = v Z O Z Z W U � o, X D a °rD C) N `C\100 F4 c5 M =ZM > N a o > _ N =O j C $ bi �d U U J�2>� F� H MSI r� V Z Z 0.4 Z A� W O� Z V� O J W 'qT W Z Z O Z Z W U r PROJECT NO. 14-0243 DRAWING NAME: 14-0243 EC SHEET NO. C-5 r W Z W O^ <U) 0- 0 W< 06 CL Zp W � F- oZ WO cn U , EROSION CONTROL & MAINTENANCE PLAN NOTES: 1. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS, SPECIFICATIONS AND DETAILS OF THE NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL OR LATEST EDITION AND BE APPROVED BY NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL AND NATURAL RESOURCES PRIOR TO ANY AND ALL GRADING AND/OR CONSTRUCTION OF PROPOSED SITE. THE APPLICANT HAS THE RESPONSIBILITY TO CONTACT, VERIFY AND ADHERE TO ALL NCDENR SPECIFICATIONS AND CHECKLIST REQUIREMENTS OF THE STATE, WHICH CAN BE REVIEWED AT THE NCDENR WEBSITE AS FOLLOWS: HTTP://PORTAL. NCD EN R.ORG/WEB/LR/HOME 2. RETAIN FLOATABLE WIND BLOWN MATERIALS ON SITE BY STORING ALL TRASH AND BUILDING MATERIAL WASTE IN ENCLOSURES UNTIL DISPOSAL AT OFF-SITE FACILITIES. CHECK ADJACENT AREAS DAILY AND PICK UP CONSTRUCTION WASTE MATERIALS AND DEBRIS THAT HAVE BLOWN OR WASHED OFF SITE. 3. PERMANENTLY STABILIZE ALL SURFACE AREA WITHIN AND ADJACENT TO THIS SITE THAT IS DISTURBED BY VEHICLES, GRADING AND OTHER CONSTRUCTION FOR THE PROPOSED FACILITY. STABILIZATION IS OBTAINED WHEN THE DISTURBED SURFACE IS COVERED WITH STRUCTURES, PAVING AND OR PERENNIAL VEGETATION HAVING A UNIFORM COVERAGE DENSITY OF AT LEAST 70%. APPLY A MINIMUM 4" OF THE STOCK PILED TOPSOIL TO ALL DISTURBED AREAS PRIOR TO SEEDING. STABILIZATION OF ALL DISTURBED AREA IS REQUIRED BEFORE TERMINATION OF MAINTENANCE AND REMOVAL OF EROSION CONTROL MEASURES. 4. CONTRACTORS SHALL INSPECT POLLUTION CONTROL MEASURES AT LEAST ONCE EVERY 14 DAYS AND WITHIN 24 HOURS AFTER A STORM EVENT OF 1/2 INCH OR GREATER. DAMAGED MEASURES THAT PROVE TO BE INEFFECTIVE SHALL BE REPLACED WITH MORE EFFECTIVE MEASURES OR ADDITIONAL MEASURES WITHIN SEVEN DAYS. REPEATED FAILURE OF A CONTROL MEASURE REQUIRES INSTALLATION OF A MORE SUITABLE DEVICE TO PREVENT DISCHARGE OF POLLUTANTS FROM THE CONSTRUCTION SITE. 5. INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE TOWN OR COUNTY. CONTRACTOR TO VERIFY REQUIREMENTS PRIOR TO BEGINNING ANY WORK ON PROJECT SITE. 6. CARE SHALL BE TAKEN TO MINIMIZE THE ENCROACHMENT OF SEDIMENT INTO ALL STORM DRAIN APPURTENANCES, PUBLIC ROADS, AND ONTO PRIVATE PROPERTY UNTIL IMPERVIOUS MATERIAL (ROAD/PARKING AREA SURFACE) IS APPLIED OR UNTIL PROPOSED LANDSCAPE HAS BEEN ESTABLISHED. 7. REFER TO DETAIL SHEET D-5 FOR SILT FENCE CONSTRUCTION. 8. ALL AREAS NOT SHOWN AS PAVEMENT OR BUILDING UNDER FINAL CONSTRUCTION SHALL BE TEMPORARILY AND PERMANENTLY SEEDED AS REQUIRED. SEE LANDSCAPE PLAN FOR AREAS WHERE PERMANENT SEEDING WILL NOT APPLY. 9. ALL GRASS SLOPES WHICH EXCEED 3:1 (H:V) SHALL UTILIZE NORTH AMERICAN GREEN (NAG) CONSTRUCTION PRODUCTS TURF REINFORCEMENT MATS SC150 OR APPROVED EQUAL UNLESS OTHERWISE SPECIFIED ON PLANS. MATS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND STANDARDS, CONTRACTOR SHALL COORDINATE INSTALLATION INSPECTION WITH MANUFACTURER. PHASE 2 CONSTRUCTION SEQUENCE: 1. AFTER COMPLETION AND APPROVAL FOR PHASE 1 MEASURES, PROCEED WITH PHASE 2. 2. BEGIN GRADING OF SITE AS SHOWN, WHILE ADJUSTING DIVERSION DITCHES AS NECESSARY TO DIRECT RUN-OFF WITHIN THE DISTURBED AREAS TO APPROPRIATE SKIMMER BASINS. STABILIZE ALL AREAS AS THEY ARE BROUGHT UP TO FINAL GRADE. 3. RELOCATE / RE-ESTABLISH TEMPORARY DIVERSION DITCHES AT END OF WORKDAY TO NEW CONSTRUCTED TOP OF SLOPE SUCH THAT DRAINAGE AREA TO BASIN IS MAXIMIZED AND UPLAND AREAS CAPTURED BY SILT FENCING ARE MINIMIZED. INSTALL TEMPORARY SLOPE DRAINS TO CONVEY WATER DOWN THE FILL SLOPE TO THE BASIN. UPON COMPLETION OF THE BUILDING PADS, MAINTAIN A DIVERSION AT TOP OF SLOPE UNTIL PAVEMENT IS INSTALLED AND GRASSED AREAS ARE STABILIZED. 4. INSTALL 2-54" RCP PIPES FOR STREAM CROSSING. ISOLATE STREAM USING TEMPORARY SANDBAGS TO DAM THE CREEK DURING CROSS PIPE INSTALLATION. PROVIDE PUMP(S) OF ADEQUATE CAPACITY TO MAINTAIN DOWNSTREAM FLOWS CONSISTENT WITH PRE -DEVELOPMENT ACTIVITIES. PUMP(S) SHALL BE LOCATED IN A SAND BOX MEETING MINIMUM DIAMETER FOR FUEL SPILL REQUIREMENTS. PROVIDE EROSION CONTROL MEASURES AS SHOWN ON THIS SHEET AND STREAM CROSSING DETAIL SHEET PRIOR TO PIPE INSTALLATION, 5. ONCE GRADING IS NEAR COMPLETE AND ROADS ARE BROUGHT TO SUB -GRADE, INSTALL SANITARY SEWER AND STORM DRAINAGE. 6. ONCE STORM STRUCTURES ARE INSTALLED, PROVIDE INLET PROTECTION TO PREVENT SEDIMENT FROM ENTERING THE STRUCTURES AND STORM DRAINAGE SYSTEM. INSTALL WATER MAINS AND DRY UTILITIES. 7. CONSTRUCT ROADWAYS AND COMPLETE ALL NECESSARY GRADING, STABILIZE ALL REMAINING DISTURBED AREAS AND CONTINUE TO MAINTAIN ALL EROSION CONTROL MEASURES. 8. ONCE SITE IS STABILIZED AND PERMISSION IS GIVEN BY THE EROSION CONTROL INSPECTOR, CONVERT SKIMMER BASINS TO PERMANENT PONDS ACCORDING TO DESIGN DETAILS SHOWN ON THE CONSTRUCTED WETLANDS DETAIL SHEETS. 9. ONCE THE CONSTRUCTED WETLANDS AREAS ARE STABILIZED, CALL FOR FINAL EROSION CONTROL INSPECTION AND SIGN -OFF. 10. AFTER FINAL INSPECTION AND APPROVAL, REMOVE ANY REMAINING EROSION CONTROL MEASURES, SMOOTH GRADE, SEED AND MULCH THESE AREAS. CONSTRUCTION ENTRANCE NOTES: 1 2. CONSTRUCTION ENTRANCE SHALL BE 25' MINIMUM WIDTH AND 50' MINIMUM LENGTH AND 6" MINIMUM THICKNESS OF STONE (1.5"-3.5") COARSE AGGREGATE WITH GEOTEXTILE UNDERLINER. REFER TO THE TOWN OR STATE FOR ANY ADDITIONAL REQUIREMENTS. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1.5"-3.5" STONE, AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT OF ANY STRUCTURE USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES OR SITE ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 3. IN WET CONDITIONS WHEELS MUST BE CLEANED TO REMOVE MUD PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN LOCATED PER THE CITY OR STATE REQUIREMENTS. NOTE: IF SITE CONDITIONS PERMIT, IT MAY BE POSSIBLE TO RETAIN A LARGER SIZED USED IN PHASE 1. MINIMUM SIZING FOR TEMPORARY DIVERSION SCHEDULE PHASE 2 EROSION CONTROL LEGEND: NAME DEPTH SLOPE f%} Q10 (cts) Vt0 ifps} FLOW DEPTH CIt} SHEAR STRESS MATTING AREA TREATED. AC / st Q JUNCTION BOX If slopes are 10' or less in length ® TO SKIMMER 91 and are not steeper than 2:1, 14 WEIR ELEV BASIN INFORMATION days are allowed TD -1113 100 2-61% 2.23 4.12 0.52 085 NAG -S75 0.49 TD -28 1.00 3.66% 1.92 4.35 047 1.07 NAG-SC150 0.42 BOTTOM TRAP ELEV (FT) Pipes Outlets 621.5 TO SKIMMER #2 PLUNGE POOL SKIMMER SIZE (IN) 2.5 MOWN OP -3 FES TO SKIMMER #1 TD 4B1 1.00 1 4.64% 0.92 1 3.98 0.34 0.98 NAG-SC250 0.2 TD 6B1 1.50 1 2.16% 2.45 1 4.56 0.73 0.98 NAG -S150 0.55 6 24 3 TO SKIMMER #3 OP -6 FES TO SKIMMER #4 59.10 18.03 28 11 TD -78 1 1.50 1 3.32% 6:11 5.73 0.81 1.68 NAG -S150 0.15 TD -813 1 1.50 1 3.01% 7.33 5.73 0.8 1.50 NAG -5160 0.2 TD -12B 1.00 1 1.00% 0.50 1.93 1 0.36 022 NAG -5150 0.12 TO SKIMMER 94 TD -98 1-5 1 2.38% 6.07 1 4.99 1 0.78 1.16 1 NAG-SC150 1'.33 TD -1115 1.5 1 4.69% 10.51 1 7.45 1 0.84 2.46 1 NAG-SC150 2-3 NOTE: IF SITE CONDITIONS PERMIT, IT MAY BE POSSIBLE TO RETAIN A LARGER SIZED USED IN PHASE 1. Timeframe Exceptions Perimeter dikes, swales, EROSION CONTROL LEGEND: None ditches and slopes LENGTH (ft) WIDTH (ft) EXIST / PROPOSED None ® In 0 CURB INLET N DROP INLET / Q Q JUNCTION BOX If slopes are 10' or less in length ® 130 FLARED END SECTION (FES) and are not steeper than 2:1, 14 CATCH BASIN INLET PROTECTION ROCK PIPE INLET PROTECTION STRAW WATTLE / SILT DIKE SILT FENCE OUTLET CONSTRUCTION ENTRANCE / EXIT -SD-SDS EXISTING STORM PIPE PROPOSED STORM PIPE LD LIMITS OF DISTURBANCE LD/TP � LD/TP ® LIMITS OF DISTURBANCE & TREE PROTECTION FENCE SF SF SILT FENCE TP TP TREE PROTECTION FENCE ====> ===> ====> DIVERSION DITCH 100 EXISTING MAJOR CONTOUR -- 100 - - - EXISTING MINOR CONTOUR 100 PROPOSED MAJOR CONTOUR 100 PROPOSED MINOR CONTOUR !'Y' WOODS LINE NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. Know what's below. Call before you dig. N_ ��o^ 5� STABILIZATION TIMEFRAMES Site Area Description Stabilization Timeframe Exceptions Perimeter dikes, swales, 7 days None ditches and slopes LENGTH (ft) WIDTH (ft) High Quality Water (HQW) 7 days None Zones DISTRUBED AREA (AC) 5.14 TOP BANK ELEV (FT) Q10-. (CIA) (0.65*7.03 uVhr*9.14 AC) If slopes are 10' or less in length Slopes steeper than 3:1 7 days and are not steeper than 2:1, 14 WEIR ELEV BASIN INFORMATION days are allowed Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' 13,546 VOLUME (CF): 1,800*DIST. AC in length All other areas with slopes 14 days None, except for perimeters and flatter than 4:1 WEIR WIDTH (FT) HQW Zones NOTE: BLANKET MATTING OF NAG -S150 OR EQUIVALENT IS REQUIRED ON ALL SEDIMENT BASINS SLOPES THAT BORDER JURISDICTIONAL WETLANDS, AND RIPARIAN BUFFERS. BEDFORD HELLS PHASE 2 PHASE 2B OUTLET PROTECTION 1/5/2017 PHASE 4 4,446 NAME DIVERSION (Cf) Vhf s LENGTH (ft) WIDTH (ft) PLUNGE POOL DEPTH (in) ZONE STONE TYPE WEIR WIDTH (FT) DISTRUBED AREA (AC) 5.14 TOP BANK ELEV (FT) Q10-. (CIA) (0.65*7.03 uVhr*9.14 AC) 41.64 BOTTOM TRAP ELEV (FT) oa0.�=W0Z-P QWZZ 8�3:P0 612.5 WEIR ELEV BASIN INFORMATION REQUIRED PROVIDED @623.50 SURFACE AREA (SF)_ 325*Q25 13,534 13,546 VOLUME (CF): 1,800*DIST. AC 16,444 22,772 DEPTH (FT) 2 2 WEIR WIDTH (FT) W W 17 TOP BANK ELEV (FT) 625.00 BOTTOM TRAP ELEV (FT) Pipes Outlets 621.5 WEIR ELEV PLUNGE POOL SKIMMER SIZE (IN) 2.5 MOWN OP -3 FES TO SKIMMER #1 41.97 17.17 24 9 24 3 Class 1 -Med. OP -4 FES TO SKIMMER #2 16.09 7.30 24 9 24 3 Class 1 -Med. OP -5 FES TO SKIMMER #.3 13.65 8.64 16 6 24 3 Class 1 -Med. OP -6 FES TO SKIMMER #4 59.10 18.03 28 11 24 3 Class 1 -Med. BEDFORD HELLS PHASE 2 SKIMMER BASIN SCHEDULE 1/5/2017 PHASE 4 4,446 4,446 VOLUME (CF): 1,800"DIST. AC 1. SIQMMER BASIN #1 7,005 DEPTH (FT) DRAINAGE AREA (AC) 9.14 WEIR WIDTH (FT) DISTRUBED AREA (AC) 5.14 TOP BANK ELEV (FT) Q10-. (CIA) (0.65*7.03 uVhr*9.14 AC) 41.64 BOTTOM TRAP ELEV (FT) oa0.�=W0Z-P QWZZ 8�3:P0 612.5 WEIR ELEV BASIN INFORMATION REQUIRED PROVIDED @623.50 SURFACE AREA (SF)_ 325*Q25 13,534 13,546 VOLUME (CF): 1,800*DIST. AC 16,444 22,772 DEPTH (FT) 2 2 WEIR WIDTH (FT) W W 17 TOP BANK ELEV (FT) 625.00 BOTTOM TRAP ELEV (FT) Q 621.5 WEIR ELEV 623.5 SKIMMER SIZE (IN) 2.5 2.5 ORIFACE SIZE DIA IN 2.3 2.3 BAFFLE SPACING (FT) VARIES BASIN DEWATERING TIME (DAYS) 2 3 (2) 18" TEMPORARY SLOPE DRAINS 12" TEMPORARY SLOPE DRAIN SKIMMER BASIN #1 DA: 9.14 AC. USE BLANKET MATTING TO STABILIZE 2:1 SLOPE 5'LX4'WX22"D CLASS B RIPRAP PLUNGE POOL TOP OF BANK USE BLANKET MATTING TO STABILIZE 2:1 SLOPE ,k S2:1 SLOPE KIMMER BASIN #2 DA:8.18 AC 15" TEMPORARY SLOPE DRAIN 18" TEMPORARY SLOPE DRAIN CONTRACTOR SHALL TAKE SPECIAL CARE TO REMOVE THE EXISTING 24" PIPE TO MINIMIZE THE LAND DISTURBANCE, THEN MINIMALLY RE -GRADE THIS AREA TO MATCH F, THE SURROUNDING AREA. SEED AND .MULCH THE DISTURBED AREA ONCE RE ��'', GRADING IS COMPLETE. NO HEAVY 1 UIPMENT SHALL BE USED FOR THIS BEDFORD HILLS PHASE 2 SKIMMER BASIN SCHEDULE 1/512017 PHASE It 4,446 4,446 VOLUME (CF): 1,800"DIST. AC 1 _ SKIMMER BASIN #2 7,005 DEPTH (FT) DRAINAGE AREA (AC) 8.18 WEIR WIDTH (FT) DISTRUBED AREA (AC) (APPROX 2.82 AC IMPERVIOUS) BAB TOP BANK ELEV (FT) Q1 0: (CIA) (0.65'7.03 n/hr*& IS AC) 34.68 BOTTOM TRAP ELEV (FT) oa0.�=W0Z-P QWZZ 8�3:P0 612.5 WEIR ELEV BASIN INFORMATION REQUIRED PROVIDED ?621.50 SURFACE AREA (SF): 325*Q25 12,060 12,172 VOLUME (CF): 1,800*DIST. AC 14,730 21,233 DEPTH (FT) 2 2 WEIR WIDTH (FT) W W 15 TOP BANK ELEV (FT) 623.00 BOTTOM TRAP ELEV (FT) Q 619.5 WEIR ELEV 621-5 SKIMMER SIZE ON) 2.5 2.5 ORIFACE SIZE DIA (IN) 2.2 2.2 BAFFLE SPACING (FT) VARIES BASIN' DEWATERING TIME (DAYS) 2 3 51X4'WX22"D CLASS B RIPRAP PLUNGE POOL 2 -54" RCP PIPES FOR STREAM CROSSING SEE STREAM CROSSING DETAIL SHEET SKIMMER BASIN #4 DA:17.14 TOTAL DISTURBED AREA 1,941,156 SF 44.56 AC) :3.14 AC KET MATTING TO 2:1 SLOPE r-- OP -5 2:1 SLOPE KET TO 2:1 SLOPE &(1)18" )RARY DRAIN BASIN INFORMATION REQUIRED PROVIDED @614.50 SURFACE AREA (SF): 325"Q10 4,446 4,446 VOLUME (CF): 1,800"DIST. AC 5,650 7,005 DEPTH (FT) 2 2 WEIR WIDTH (FT) DISTRUBED AREA (AC) (APPROX 5.37 AC IMPERVIOUS) 12.5 TOP BANK ELEV (FT) Q10: (GIA) (0.65`7.03 i►1, *l7.14 AC) 616.00 BOTTOM TRAP ELEV (FT) oa0.�=W0Z-P QWZZ 8�3:P0 612.5 WEIR ELEV 615.1 SKIMMER SIZE (IN) 2 2. ORIFACE SIZE DIA (IN) 1.5 1.5 BAFFLE SPACING (FT) 95,492 VARIES BASIN DEWATERING TIME (DAYS) 21 3 BEDFORD HILLS PHASE 2 SKIMMER BASIN SCHEDULE 1/512017 PHASE II O O Q W FnW- v W<3:E0 Z O�C7rW 1 _ SKIMMER BASIN #4 W alaaFzUOmz¢ DRAINAGE AREA (AC) 17.14 DISTRUBED AREA (AC) (APPROX 5.37 AC IMPERVIOUS) 17.14 C Q10: (GIA) (0.65`7.03 i►1, *l7.14 AC) 59.38 U v �w oa0.�=W0Z-P QWZZ 8�3:P0 °A U BASIN INFORMATION REQUIRED PROVIDED @612.50 SURFACE AREA (SF): 435`Q25 34,174 34,239 VOLUME CF): 3,600*DIST. AC 61,694 95,492 DEPTH (FT) 2 3 WEIR WIDTH (FT) W W 30 TOP BANK ELEV (FT) 614.00 BOTTOM TRAP ELEV (FT) Q 609.5 WEIR ELEV 612.85 SKIMMER SIZE (N 5 5 ORIFACE SIZE DIA N) 4 4 BAFFLE SPACING (FT) VARIES BASIN DEWATERING TIME (DAYS) 2 3 (1)18"&(1)12" TEMPORARY SLOPE DRAIN 51X4'WX22"D CLASS B RIPRAP PLUNGE POOL GRAPHIC SCALE 50 0 25 50 100 200 (IN FEET) I inch = 100 ft. H W w 0i0 �ZZ�F=-= W 1u0�00vazm O O Q W FnW- v W<3:E0 Z O�C7rW F xowxz f J =HX<W10a� W alaaFzUOmz¢ 'U Q ¢ a O 'S '" a0 C A~ o gPagW=ira¢0zo U v �w oa0.�=W0Z-P QWZZ 8�3:P0 °A U � :Z1W JI -}i 2120❑ �0 ►�/ J W �AJ c 0 r, ti Z ul t U N M W W Lu Lu `- W - Z Q a� <F W o X 2 CO O Q CL 00 N M } O U )Q U Z Z 3: a. L N 10 0 oQ U m� Z CY) 'OU a- 0- 02 LL o 0 0 m c 2 .0 �'� U J L) p O J�2> W W J 0 W o 0 � > w U 0 Z LL W W Q >Z> In Q =) I - Of X W W IZ 0 - ti W L0 00 N �j H W w 0i0 �ZZ�F=-= W 1u0�00vazm O O Q W FnW- v W<3:E0 Z O�C7rW F xowxz f J =HX<W10a� W alaaFzUOmz¢ 'U Q ¢ a O a W D U O C. L 0 W S Z o?F0hz0=W X '" a0 Q OZ (M Z 0 Z h -LL JQO A~ o gPagW=ira¢0zo U v �w oa0.�=W0Z-P QWZZ 8�3:P0 °A W0Z000 ,<T,0, W U :Z1W JI -}i 2120❑ H (D U H x Lu W H Z 2 A~ Z) o W °A Wco ZaI- U h �0 ►�/ J W �AJ c 0 Z Q Z ul t U N M W W Lu Lu h W - Z Q a� <F 49 o X 2 LOLLLO w CL 00 N M } O U )Q U Z Z 3: a. L N 10 0 oQ U m� Z CY) 'OU a- 0- 02 LL o �I IlllllllllllllllllllllljW (D H x Lu c!) C7 Z Z A~ Z) o W °A Wco ZaI- U h �0 ►�/ J W �AJ c 0 Z �U� Z ul t U N M G m h a� 49 o X LOLLLO CL 00 N M C14 n D N 00 O C) N Ucv m� Z CY) 'OU o o E m c 2 .0 �'� U L) p O J�2> 1-4 0-4 w c!) C7 Z Z A~ Z) o W °A Z a U� Q �0 ►�/ J W �AJ � Z 0 Z �U� _� PROJECT NO. 14-0243 DRAWING NAME: 14-0243 EC -2 SHEET NO. C-6 i__%, I-- N W W 2Q 0 W U)Z Z� Q Z� O� VJ W O W U 2 ti ti w f`' •� r r r 0 f CI -115 " ti r/PI A.12+ 56 N bN.WAY 642 CI -28 j s sr 660 ` w �� r0 h Qp�. nj n�. Sp s ui cn O J9 _ p 19 CC - 4J \ N Z , t\ � *` w o !rJ \ \ \-.Z LL 0f CI -41 00 O s q C/)oc� LO LO � � I 11° ry a5`° yso, �Fj� • '�:� s / � t� t� �� ss V �� ' \ � ( � � ` q o " CD^ W w n. /i 08 r 61 i i , CI -14 i Cb d' M CV 648 � o z a wow w oo x N��i zo U = Z m �. CI 42°woz I N l ��� � / Q \ s O / � i � 1' i \ (�J., \ � �� 41 S �+- o � � 0 I � �G r7 p a���Y �N�O x mow=f °v� OW Owu T- 2.vW W 6Z ,g LL=ommawwOa °� CI 13 s A 4j T 18+75.05 STEAMBOA E a t `6\ \ o� , HORSE LANE w raeoxvmi ov0 o 50 O }mmoza awr OO 0 �- _ w ',, ... 0 .,_- yS � / .._.--._..._.�. �� ' O� '', � `.J ," r ,• � � ,•• ,, � � �„:-.....- � � �' � O Va o m x U w O z 5v°� >�lluxiOo� °mom `-.CI43,.__.w t{ O-zvzx=gomw ys J 1 140>>w f_5mz0o r - i I CI -45 �° � 1 1 i 0 Zr / w `J f t - '9 _61 i J I ui c9 LLj F - YR w e �> / �Gj 1 jf CD I �. F , i t I ` - ss V �a w w / CI 15 Cpl.a. � o F ”\v 66^ 5 0 � � � N ti a I n_p� irk i' o a U a U � � u. o R� \ ti / r i a 1 � t n_. C� o N \ Y� \ / a . i : y \} 0_7" YJ O 0 'J � r`VJ ^_ / ✓ • Ot i �= CI-4 N : �.� 664 , 7 J ! _ M .r / A_ LL r �0 6` R r o r i � k i o CO I \r uj,t 0z ui 700, , O , � I �m t f -y f i '1 G T7 ,. 664 I/ ,` 2 \ - � 0 9 \ -� � � PI ST +05 ,#1�ON 4 RS i , ` A. �70 ZW+AL LACE & STORM DRAINAGE NOTES: ° coo 0 Cl) 1. THIS PROPERTY IS WITHIN THE BACK CREEK -HAW RIVER) WATERSHED IN THE CAPE FEAR BASIN JB 0 h 2. ALL PIPE TO BE INSTALLED ON-SITE AND IN THE RIGHTS OF WAY SHALL MEET OR EXCEED THE NCDOT ASTM AND \ �0`5� $'^, s ' 66 J / ami LD LL AASHTO SPECIFICATION REQUIREMENTS FOR SUCH PIPE MATERIAL. CONTRACTOR SHALL VERIFY APPROVAL WITH / *, ss ;j y5 00 W NCDOT FOR ALL PIPE MATERIALS TO BE USED IN THE RIGHT OF WAY. \ 6 '', F ._ - ' `� %t� v,"00 ((n > N w c 3. ALL WORK WITHIN NCDOT ROW SHALL COMPLY w/ 2012 NCDOT STANDARD SPECIFICATIONS FOR ROADS AND ' ; ' "t, -� ' " 1 M U N \' `O 0 6 1 `�. GJ h I a c mai STRUCTURES, NCDOT STANDARD DRAWINGS, AND THE MUTCD STANDARDS. �. ASF % 00� F 5� ; ,'��Xo 55 6� 4j' , —' f0 z � o > a _ / _ E 4. ALL ON-SITE PIPE SHALL BE INSTALLED MEETING COVER, BACKFILL AND BEDDING REQUIREMENTS PER THE MANUFACTURER'S RECOMMENDATIONS. 0 J in Z > 5. NCDOT PRE -CAST DRAINAGE STRUCTURES / MANHOLES CAN BE USED IN LIEU OF NCDOT STANDARD BRICK OR ,/ -„ tCO � CONCRETE CATCH BASINS. ANY DEVIATION FROM THE SPECIFIED STRUCTURES SHALL BE APPROVED BY ENGINEER ( P. PRIOR TO INSTALLATION AND SHALL MAINTAIN COMPLIANCE WITH ALL CORRESPONDING NCDOT MATERIAL, �o 2• -.ted DRAWING & DETAILED SPECIFICATIONS. 6 \ 0 \ CI 101 'o5e 6. CONTRACTOR SHALL FIELD VERIFY THAT PROPOSED GRADES MATCH EXISTING PAVEMENT AT ALL CONNECTION/TIE \sem ! \` o0 5 1 5� e moo` Fri POINTS PRIOR TO FINAL LIFT OF ASPHALT. CONTRACTOR SHALL NOTIFY ENGINEER IF DISCREPANCY OCCURS. s 7. PROPOSED CONTOUR LINES REPRESENT FINISHED GRADE ELEVATIONS. CONTOUR LINES MAY BE FIELD ADJUSTED'�'`,, ✓ / \gro AT THEIR BEGINNING, ENDING AND AT STRUCTURES IN ORDER TO PROVIDE A PROPER TIE-IN AND POSITIVE � `� 6j� \ I W DRAINAGE. 8. CONTRACTOR SHALL FIELD VERIFY TIE OUT POINTS, PROPOSED INVERTS, FFE'S & FINISHED SURFACES PRIOR TO \ 'F .r,X ' 660" CONSTRUCTION TO AVOID CONFLICTS. CONTACT ENGINEER IF DISCREPANCIES ARE FOUND. 9. TOWN PLANNING DEPARTMENT STAFF WILL SHALL BE CONTACTED TO INSPECT TREE PROTECTION FENCING \ `L BEFORE GRADING WORK BEGINS. CI -100 <�s� 1b JS/j U 10. THE TOWN OF GREEN LEVEL MUST APPROVE THE STORMWATER MANAGEMENT PLAN FOR THIS PROJECT PRIOR TO Q <o �4jb` ' Z z BEGINNING CONSTRUCTION. / --660--` i r �� ! F- 11. CONTRACTOR SHALL MONITOR, MAINTAIN, MOVE AND/OR ADD SILT FENCE, SILT FENCE OUTLETS, AND J -HOOKS AS <F� l l NEEDED BASED ON FIELD AND RUNOFF CONDITIONS AND AS DIRECTED BY THE ENGINEER AND/OR STATE o sT ko _ I �n) Qd !� �+— REPRESENTATIVE. O O 12. A SEDIMENTATION AND EROSION CONTROL PLAN MUST BE SUBMITTED TO AND APPROVED BY NCDEQ ANDA \ ' ` s ' 659.5 ZONING COMPLIANCE PERMIT FROM THE TOWN OF GREEN LEVEL WILL BE REQUIRED PRIOR TO THE ISSUANCE OFA W LAND -DISTURBANCE PERMIT. SKIMMER BASIN TO WETLAND CONSTRUCTION SEQUENCE: \�o C.1 \ 6 0 AT THE COMPLETION OF CONSTRUCTION SITE IS STABILIZED AND WITH 6s '' �� � �, \ O Q 13, IF AN OFFSITE SOIL SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED AREA FOR THE SPOIL/BORROW SITE PERMISSION OF THE EROSION CONTROL INSPECTOR,THE SKIMMER BASINS Z • �A MUST BE INCLUDED IN THE LAND -DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE ALREADY HAS SHALL BE CONVERTED INTO STORMWATER WETLAND BASINS. THE FOLLOWING _.-_`y ""�' jos 0 A LAND -DISTURBING PERMIT. STEPS SHALL BE FOLLOWED: r ' Q 1) DEWATER THE BASINS \ '� V ^ r 14. SEE WETLAND DETAIL SHEET FOR DETAILED NUTRIENT AND PEAK FLOW CALCULATIONS. 2) REMOVE DEPOSITED SEDIMENT AND PROPERLY DISPOSE OF o / J 3) ADJUST GRADES AS NECESSARY TO MATCH PLANS, HAVE AREASsT �osF% �/ O W z 15. ALL REQUIRED STORM DRAINAGE AND BMP EASEMENTS TO BE PLATTED UPON FINAL CONSTRUCTION OF NEW SURVEYED TO VERIFY SIZES ARE SUFFICIENT BY ENGINEER AND TO d7 <o NOTE: BUILDING PADS AND THEIR Know what's below. �' w CONVEYANCES. PREPARE AS -BUILT CERTIFICATIONS. 1 4) PLANT AREA WITH SELECTED PLANTS mT o5 ELEVATIONS REPRESENT 6" BELOW Q O 16. ALL 2:1 SLOPES ON SITE SHALL BE MATTED AND PREPARED TO ENSURE VEGETATIVE COVER. ALL GRASS SLOPES 5) INSTALL SOD TO SLOPES \ 4 THE FINISHED FLOOR SLAB ELEVATION Cal I before you dig. Z ^ Z Z Q z �°7sF FOR EACH LOT w Q WHICH EXCEED 3:1 (H:V) SHALL UTILIZE NORTH AMERICAN GREEN (NAG) CONSTRUCTION PRODUCTS TURF 6) WATER PLANTS AS NECESSARY TO HELP ESTABLISHMENT \ O W W � J REINFORCEMENT MATS SC150 OR APPROVED EQUAL UNLESS OTHERWISE SPECIFIED ON PLANS. MATS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND STANDARDS. CONTRACTOR SHALL COORDINATE V 2 (5 (D LL INSTALLATION INSPECTION WITH MANUFACTURER. THE FOLLOWING SHALL BE APPROVED BY THE COUNTY PRIOR TO ISSUING A' 17. ALL UTILITY TRENCHING, BACKFILL, AND SUB -GRADE COMPACTION EFFORTS SHALL MEET/EXCEED NCDOT CERTIFICATE OF OCCUPANCY FOR A SINGLE FAMILY RESIDENCE THAT DRAINSi / PROJECT N0. REQUIREMENTS AND SPECIFICATIONS. INTO A STORMWATER CONTROL MEASURE: \ 1) THE ENGINEER OF RECORD SHALL REQUEST A FINAL INSPECTION BY THE 18. THE EARTHWORK ON THIS PLAN DOES NOT NECESSARILY BALANCE; OFFSITE BORROW OR WASTE MAY BE STORMWATER ADMINISTRATOR AND CORRECT ANY NOTED DEFICIENCIES. \ ds _. / 14-0243 REQUIRED. 2) PROVIDE A CONSTRUCTION CERTIFICATION SEALED BY A PROFESSIONAL ENGINEER THAT THE PROJECT WAS INSPECTED AND CONSTRUCTED IN GRAPHIC SCALE DRAWING NAME: 19. PER NORTH CAROLINA BUILDING CODE APPENDIX J ALL FILL SHALL AT A MINIMUM MEET 90% STANDARD PROCTOR ACCORDANCE WITH THE APPROVED STORMWATER PLANS.25 0 12.5 25 50 100 DENSITY PER ASTM D 1557. ALL OTHER PORTIONS OF EARTHWORK AND GRADING AT A MINIMUM SHALL ADHERE TO 3) SUBMIT AS -BUILT RECORD DRAWINGS SEALED BY A PROFESSIONAL `4, 14-0243 EC -2 �1 NINE THIS CODE SECTION. BUT IN NO WAY SHALL SUPERCEDE THE SITE SPECIFIC GEO-TECHINICAL RECOMMENDATIONS. ENGINEER. \ \ IN FEET SHEET NO. I inch= 50 ft. LL C-7 U � m ti r` w 00 o Q 0 0 J W W J � a W o U C� w Z L W Z <C 3: U) O w w M CL w w no =ZZ�H2 W wo�0,02W, zm z zw°wW>UX, 26 v_�w�LLO N ¢ � -ow=Zi -yOU� W OwLLUd>Z��w� LL=O=mwdww-aw �� W g�aa�3vomza w� az C7Q ID "o "o=UUOao�oW2 ray Z wt: V) y=� a'F - W7 § zp0 z'ZUL Xw� O 0� '_ C7 O (f) Lu W � � z ",),L, U � Z <")a)wu=i$�3ow W awzzoyoga=� �z0zx=>Oaw �=mow r-3mzoo U LU F- x Q w w w w z z O w < w ti } ❑ F- 1— CO (/) N z LO Q Q �a �w �w a. U a C) ❑ L o \\� WH 03 03 242 y U x H x w Z T W W cu Z `7c W t Cl) U � 0 N Z a ie N to ca� � a � 'r— Cl) y 00 ❑ N M M D U N C > 0 @Z^'NO N a.p �F'E N 2O t4 C 2 .0 o? y U U � U-) > F� Mei W z 1 Z U 0 Z } ry z 0 o Ax w U) oa o 0.4 C) Q z VC) � a Q > z [� W o Z z C) w J °�_� c0- PROJECT NO. 14-0243 DRAWING NAME: 14-0243 EC-2 SHEET NO. C-8 Know what's below. Call before you dig. 660 655 650 645 640 635 630 625 620 200 I O 202 LF 30" @ 0.50% L20 494.765 fA +62.25 DONELSON WAY Uzi = ST . 10+00 GIDEON PLACES 0 RIM = 642.50' \ m ti INV IN = 635.98 / n PT: 14+56.03 F -z �LL Z,Z o ¢UQ >j�Q¢C70 INV OUT = 635.88' Sidewalk A �W z j.r.� r' 00 6" GATE VALVE W F- Q CI -6 W W Z = co L) RIM = 643.46' INV IN = 637.50 (DI -1) � INV IN = 636.32' (CI -5) 211 WZW INV OUT = 636.22' s � STORM DRAINAGE 136.3 LF 30" @ 5.47% \ EASEMENT W Z rn J rn L7 ° L cXo W Know what's below. Call before you dig. 660 655 650 645 640 635 630 625 620 200 I I 201 I 202 LF 30" @ 0.50% L20 494.765 RIM = 641.52' CI -3A RIM = 642.50' \ RIM = 631.55' INV IN = 625.40' ti INV IN = 635.98 4' Conc. PT: 14+56.03 F -z �LL Z,Z o ¢UQ >j�Q¢C70 INV OUT = 635.88' Sidewalk i-45.00 LF 30" @ 0.50% ec�ni 11+00 SS Line Table: Alignments Line # �- CI -3 Direction L20 494.765 RIM = 641.52' m INV IN = 635.66' \ RIM = 631.55' INV IN = 625.40' ti INV OUT = 635.56' Z==OWoF-=X 00 zOZF-wU �-3 W _I z O F -z �LL Z,Z o ¢UQ >j�Q¢C70 8"x6" TEE QyzzU)0<: z F0 LD Ian A �W z j.r.� r' 00 6" GATE VALVE W F- Q Vii W W Z = co L) (.0 r- � Q 211 WZW W s � M n Line Table: Alignments Line # Length Direction L20 494.765 N490 37' 16.95"E i 203 204 C -2A RIM FL=633.08 GIDEON PLACE INV OUT = 630.51' I (50' R/W, 24" Rolled Curb, 30 LF 15" @ 0.50% 31 B -B) 13+43.50 r FL=633.40 SS SW SSW s SS SS MH 199 iS M -218.95 LF 30" @3.2 4% SS N CI -2 SIM = 635.15' . INV IN = 628.46'(CI-3) INV IN - 630.36'jCl-2A) INV OUT = 628.36' USACE WETLAND GIDEON PLACE PLAN & PROFILE 13+00 205 FL=632.78 r 1_ SAC STA. 13+94.76 206 1 � O 6" PVC Water line S WS ~ Cf 6" GATE VALVE F.H. N Q -FL=632.18 207 SS MH 199A FL=6y88 kro\ ✓ Sanitary 108.9 LF 30" @ 2.72% CI -1 ewer %\ I RIM = 631.55' ,9 INV IN = 625.40' INV OUT = 625.30' s STORM DIIINAGE ' \ EA EMENT 141.6 LF 36" @ 1.27% � 209 208 STORM `D / EPSEMENj _ FES -114 C " -Qe= 628. p \ CONSTRUCTED WETLAND #1 GRAPHIC SCALE 20 0 10 20 40 80 ( IN FEET) 1 inch= 40 ft. 9+00 10+00 11+00 12+00 10*uv EX. PHASE I S.S. OUTFALL WITH 20' EASEMENT. 660 I 645 655 I 640 650 I 635 645 I 630 640 I 625 635 I 620 630 I 615 625 I 610 620 -oo 6" Force Main WETLAND #1 SANITARY SEWER OUTFALL "A" PLAN & PROFILE SMSS d \-ko\\e 205 i GRAPHIC SCALE 20 0 10 20 40 80 ( IN FEET) 1 inch= 40 ft. 10+00 11+00 12+00 13+00 645 640 635 630 625 620 615 610 -13+50 rTT 209 ----141.6 LF 36" @ 1.27% � � STORM DRAINAGE O U EASEMENT m CI -1 \ RIM = 631.55' INV IN = 625.40' ti OUT = 625.30' SMSS d \-ko\\e 205 i GRAPHIC SCALE 20 0 10 20 40 80 ( IN FEET) 1 inch= 40 ft. 10+00 11+00 12+00 13+00 645 640 635 630 625 620 615 610 -13+50 rTT W 0 W No �-ux, x r Qw w0 OOU5Zm LLPzr=��wQo ri o z " Q > O U o- m F rn w 3�a��x��o� a <w >zoomQw Q ¢ cn S ti ti Z==OWoF-=X 00 zOZF-wU �-3 W _I z O F -z �LL Z,Z o ¢UQ >j�Q¢C70 W QyzzU)0<: z F0 LD Ian A �W z j.r.� r' 00 O W F- Q Vii W W Z = co L) (.0 r- z Q WZW W s � M n w O O W Z rn J rn L7 ° L cXo W W H m r CO N M W W C '-'ti20 N M ID H 0 � W 0 W W O N Z r 12 n U a U aD o o J D �- � I m W U) O U JLS> WU' 0 ry CLGi Fn Z LL _ W 0 cn O � f - W W CL 0- r-_ Olfi eF M N f U W 0 W No �-ux, x r Qw w0 OOU5Zm LLPzr=��wQo ri o z " Q > z zwLDw~>-1aw0z Q0.'�F-}Qy��ti0 N Q� O °=o"'¢=oN� F rn w 3�a��x��o� a <w >zoomQw Q ¢ cn S z pzw��z�=wWF- W LL ry Z==OWoF-=X 00 zOZF-wU �-3 W _I z O F -z �LL Z,Z o ¢UQ >j�Q¢C70 W QyzzU)0<: z F0 LD Ian A �W z j.r.� zUzZs=ioWtow >' z Q U w �CU r S z z U) 0 Z X W H Z O A �W z j.r.� OC >' z Q Vii W W Z = co L) (.0 r- z Q WZW W s � M n w W m W Z rn rn L7 ° L cXo W W 1-- H m r CO N M W W C '-'ti20 N M ID H 0 � W 0 W U) O N Z r 12 n U a U aD o o = S 03 242 (1/1111111 Fri F�1 w �CU r N z z U) 0 Z X W H Z O A �W z j.r.� OC >' z Q Vii W W Z = co L) (.0 r- z ZAvz WZW W s � M n m rn rn L7 ° L cXo W M C '-'ti20 N M ID M U N C C O N Z r 12 in aD a55 -E D �- � I m U JLS> Fri F�1 w F.1 z r z z H H Z O A �W z j.r.� O � z Q Vii d �p J W 4 Lu ZAvz WZW W MM O ((.7 D Z Q Q J J < W LL J F - LL � O p0� li CL W 06 W Z (5 Q z F Z Q 0) PROJECT NO. 14-0243 DRAWING NAME: 14-0243 P -B PH2 SHEET NO. C-18 v vm H z y H 0 0 DETAIL SHOWING TYPES OF GRATES USE ACCORDING TO WATER FLOW, 1r 2'_1144 234 11/2"� z OO Q ¢ � . z m o mzT=� �2„ a �I v 00=C7� __ z Do n rr " n n n TYPE G TYPE E TYPE F A A 1 rr� I 9%g" ooa=z O - ¢ v z1�-vr T1 _ r ~=~cc Zw 0014 �y D - ► WATER FLOW --■- SAG WATER FLOW -- I 9oOi CnF-LLOJ Cr ¢ -G H (Maximum fill) 10' - Class II pipe a- 0 0 z -------------------------------- 20' - Class III pipe W O � o •- •• 30' - Class IV pipe ----------------------- in r�gn 1-1 SECTION B-8 -- -I•I ----------------------------------- 1g�n 21/11 z 70 M z -► WATER FLOW -" SAG -�-- WATER FLOW -- 0.020 0 0 C r SHEET 3 OF 3 SECTION A -A LL= m M mCn O = TYPE "F1-1 " TYPE "E" TYPE "G" TYPE - E z = z Q Op SECTION - AA , 0% O 0.196 9 RAISED FLOW ARROW O RAISED FLOW ARROW P 2" -� HIGH 2 O ^ Cr D N D HIGH D _[y Q W z '4 A O i n N Z COz A z 11/2 xm 0.222 12-G2 2-N1 @ 8" FILL FACE 2 01,1_11 �tl ® o �rr �r^ 3m" I O Hi: W LU CJ'3 to CO v ,r 1 r+ Int- 11.2 nR W W O Z a,� 112 rr 1 �4' ►I i� 2' 11 �4 T'gn -'-•I -I '11VIM �Ir '2' 11" 1n la 2r-2" r SECTION A -A 3'-9" 1.434 1 III FLOW SNE N * (Minimum fill) TYPE - F ,TYPE G SECTION A -A pipe SHEET 2 OF 2 SHEET 2 OF 2 and < 60" 1840.031 HOPE ~17' * (Maximum 840.03 v_ am H � H' Z =000 17- -n M z = -� = C)>n m mzM =17'00 z , , a -n O "A> 0) H �I � O Z FLEXIBLE PIPE Round Corruaated Steel Pipe 2 2/3 x 142 corrugation ** Diameter Minimum cover Maximum Heiaht of Cover (feet) inches inches (Ga) 16 14 12 10 8 12 12 204 256 15 12 182 204 18 12 135 169 239 21 12 115 145 204 24 12100 126 178 30 12 79 100 142 36 12 65 83 117 152 42 12 55 70 100 130 160 48 12 48 61 87 113 139 54 12 54 77 100 123 60 12 69 90 111 66 12 81 100 7212 74 91 78 12 81 Round Corrugated Aluminum Pipe 2 2/3 x 11 corrugation ** Diameter Minimum cover Maximum Hei ht of Cover (feet) inches inches (Ga) 18 14 12 10 B 12 12 123 155 218 281 344 15 12 98 123 174 224 275 18 12 81 102 144 187 228 21 12 69 87 123 160 195 24 12 60 76 108 139 171 27 12 67 95 123 151 30 12 80 85 111 136 36 12 50 71 92 113 42 12 60 78 96 48 12 52 68 84 54 12 46 50 74 60 12 60 62 6612 51 72 12 41 * FOR DIFFERENT CORRUGATIONS AND ARCH PIPES REFER TO ROADWAY DESIGN MANUAL OR MANUFACTURERS SPECIFICATION, REFER TO THE FOLLOWING FOR PIPE SPECIFICATIONS CSP - AASHTO M36 CAAP - AASHTO M196 HDPE - AASHTO M294 PVC - ASTM F949 or AASHTO M304 NOTES: FILL HEIGHTS SHOWN WERE CALCULATED USING AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 1' MINIMUM COVER FOR ALL SIDE DRAIN PIPE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS Cb 0 z T2 OR T3 TOP & BOTTOM 64 12 X WITH NO RISER * �2„ d D A ® RCP - * (Minimum 69 DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN A B C G M TOP SLAB DIMENSIONS E F 2' for Class III & Class II REFER TO THE FOLLOWING FOR PIPE SPECIFICATIONS BAR -W NO. LENGTH TOTAL LBS. CU.YDS. CONC. TOP BOTTOM SLAB SLAB IN BOXI T07AL CONC. Z* (Maximum fill) 10' - Class II pipe RCP - AASHTO M17D 2'•2" -• -- 20' - Class III pipe -• •- •• 30' - Class IV pipe •• -• -- 40' - Class V pipe = Z -- 0.281 (For fills > 40' & < 80' use LRFD Direct 69sign Method) NOTES: FILL HEIGHTS SHOWN WERE CALCULATED USING 0.020 * FILL HEIGHT IS MEASURED FROM THE TOP OF THE PIPE TO THE BOTTOM OF THE PAVEMENT STRUCTURE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 1' MINIMUM COVER FOR ALL SIDE DRAIN PIPE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS SHEET 3 OF 3 ss O®s ® 1 15" Q 00 Z35 0 12 SPA. @ 9" 2-N2, SECTION - AA , 0% 2-N3, 2-N4 0.196 z'-41�" PLAN 0.281 1-4 0.963 1.244 0.031 O.G47 18" 3'-0" 2'-2" 3`-3" 3'-3" 1-4 ® _ 0.227 0.222 12-G2 2-N1 @ 8" FILL FACE 1.065 B 2-B � 0.049 24" 0.281 0.281 r � 0.044 0.065 24" 3'-0" 2r-2" 1I 3'-9" 1.434 1 III FLOW SNE N * (Minimum fill) 2' for pipe diameters ? 12" and < 60" 3:D HOPE ~17' * (Maximum fill) 20' for pipe diameters 5 24" 4 11-611 Fm1 4'-1" 3 4'-1" 45 for pipe diameters 2 30" and 5 60" 36" mn 2'-2" 3'-10" 5'-3" 4'-9' 1'-8" 4'-4" 4 2'-0" 4 4`-," 3 4'-1" PVC (Minimum fill) 2 for pipe diameters _ 12 and 536" � v * (Maximum fill) 30' for pipe diameters ? 12" and < 36" -( Z v 0.508 2.152 2.880 0.240 0.371 48" 3'-0" 2'-2" 5'-0" a) V) D * FILL HEIGHT IS MEASURED FROM THE TOP OF THE PIPE 2' 8" 4 3'-3" rSH- 3'-3 TO THE BOTTOM OF THE PAVEMENT STRUCTURE 0.583 2.415 2.998 0.319 M 5411 3'-0" 2'-2" 5'-7" 6'-3- 2'-7" 3'-6" 4 3'-0" 6 Round Corrugated Aluminum Pipe 2 2/3 x 11 corrugation ** Diameter Minimum cover Maximum Hei ht of Cover (feet) inches inches (Ga) 18 14 12 10 B 12 12 123 155 218 281 344 15 12 98 123 174 224 275 18 12 81 102 144 187 228 21 12 69 87 123 160 195 24 12 60 76 108 139 171 27 12 67 95 123 151 30 12 80 85 111 136 36 12 50 71 92 113 42 12 60 78 96 48 12 52 68 84 54 12 46 50 74 60 12 60 62 6612 51 72 12 41 * FOR DIFFERENT CORRUGATIONS AND ARCH PIPES REFER TO ROADWAY DESIGN MANUAL OR MANUFACTURERS SPECIFICATION, REFER TO THE FOLLOWING FOR PIPE SPECIFICATIONS CSP - AASHTO M36 CAAP - AASHTO M196 HDPE - AASHTO M294 PVC - ASTM F949 or AASHTO M304 NOTES: FILL HEIGHTS SHOWN WERE CALCULATED USING AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 1' MINIMUM COVER FOR ALL SIDE DRAIN PIPE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS Cb 0 10° 2,r�r-� T2 OR T3 TOP & BOTTOM RIGID PIPE X WITH NO RISER * �2„ d D A ® RCP - * (Minimum fill) 1' for Class IV & CLASS V DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN A B C G j..� TOP SLAB DIMENSIONS E F 2' for Class III & Class II REFER TO THE FOLLOWING FOR PIPE SPECIFICATIONS BAR -W NO. LENGTH TOTAL LBS. CU.YDS. CONC. TOP BOTTOM SLAB SLAB IN BOXI T07AL CONC. Z* (Maximum fill) 10' - Class II pipe RCP - AASHTO M17D 2'•2" -• -- 20' - Class III pipe -• •- •• 30' - Class IV pipe •• -• -- 40' - Class V pipe -- -- 0.281 (For fills > 40' & < 80' use LRFD Direct 69sign Method) NOTES: FILL HEIGHTS SHOWN WERE CALCULATED USING 0.020 * FILL HEIGHT IS MEASURED FROM THE TOP OF THE PIPE TO THE BOTTOM OF THE PAVEMENT STRUCTURE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 1' MINIMUM COVER FOR ALL SIDE DRAIN PIPE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS SHEET 3 OF 3 ss O®s ® 1 6' TD I 1340.23 FRAME I 1„XUKATE & HOOD R a PLAN rn wLL CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES m a o -•-TOP ELEVATION EXPANSION JOINT -7 USE ON FLAT GRADES 2% AND UNDER EXPANSION JOINT 3 0 m 3'-0" DEPRESSED GUTTER LINE PLAN OF TOP SLAB SECTION S -S z ELEVATION Z r0 NORMAL CURB AND GUTTER ON LIGHT GRADES W ir-I Cn TOP ELEVATION NORMAL GUTTER LINE C/) B" E #B "W" BARS #4 AR N �EXPANSION JOINT USE ON GRADES OVER 2% a z _� -- T v C 10" MAX 8'-0„ C3 EXPANSION JOINT = v #4 BARS rrU„ 1Y2,r 6„-..}-+.� 1, 0, � DEPRESSED GUTTER LINE 00 = ELEVATION rn N SECTION R- R DOWEL NORMAL CURB AND GUTTER ON STEEP GRADES N z IF, z0 O 7J v v m H -V wn o mzo-44 =-n>>m =Cn000 z"a -T1 )C)" ��DT+ Cn O Z O o f° H DOZz M 0 H C' S HC D r- 0 z M Z D 01 n 0 M M -i > M g m R1 z z G7 CO v 0 0> �r �r 'E - RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT z O O W p~C CD LL JaHZ O O O = QU=0►0-I F- CnF=-LLOJ ZoHC` �> D. H 11 W 0 Cr O LL vz 1.4 3 CO) w c m - o a =- aF Qv= 0 v 0 M H m J 0 Z W MM 10" 2,. 10° 2,r�r-� T2 OR T3 TOP & BOTTOM MINI" DIMENSIONS AND QUANTITIES FOR BRICK CATCH BASIN BASED ON MIN. HEIGHT X WITH NO RISER * �2„ d D A T5 @ 6" TOP & BOTTOM H PIPE D DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN A B C G MIN. HEIGHT H TOP SLAB DIMENSIONS E F BARS -U N0. LENGTH BARS -V NO. LENGTH BAR -W NO. LENGTH TOTAL LBS. CU.YDS. CONC. TOP BOTTOM SLAB SLAB IN BOXI T07AL CONC. BRICK MASONRY a17CK MNA.RICK IN WALLS CNCMJE mNpM1TE DEDUCTIONS ONE PIPE C.M. R.C. 12" 3'-0" 2'•2" -• -- 2'-9" -• •- •• -- •• -• -- -- -- -- 0.281 0.281 0.883 1.164 0.020 0.042 1511 3'-0" 2'-2" 15" 3'-0" Z35 0 12 SPA. @ 9" 2-N2, SECTION - AA , 0% 2-N3, 2-N4 0.196 z'-41�" PLAN 0.281 0.281 0.963 1.244 0.031 O.G47 18" 3'-0" 2'-2" 3`-3" 3'-3" 2-V, @ 1'-4' N STR. FACE OR G3 0.227 0.222 12-G2 2-N1 @ 8" FILL FACE 1.065 B 2-B � 0.049 24" 0.281 0.281 1.043 1.324 0.044 0.065 24" 3'-0" 2r-2" 1I 3'-9" 1.434 1 III FLOW SNE 30" 3'-6" 3'-6" 3'-8" 1s 4'-3" 0.281 0.281 1.204 1.485 0.078 0.121 30" 3'-0" 2'-2" 3'-4" 36" 4'-3" V-2" 41.4" 4 11-611 3 4'-1" 3 4'-1" 45 0.147 0.374 0.521 1.606 2.217 0.122 0.184 36" 3'-0" 2'-2" 3'-10" 5'-3" 4'-9' 1'-8" 4'-4" 4 2'-0" 4 4`-," 3 4'-1" 49 0.187 0.415 0.602 1.914 2.518 0.178 0.261 42" 3'-0" 2'-2" 4'-5" B' -S" 1'-5" 3'-6" 4 1'-9" 3 3'-3" 3 3'-3' 38 0.135 0.373 0.508 2.152 2.880 0.240 0.371 48" 3'-0" 2'-2" 5'-0" 5'-9" 2'-0" 3'-8" 4 2' 8" 4 3'-3" 3 3'-3 41 0.173 0.410 0.583 2.415 2.998 0.319 0.477 5411 3'-0" 2'-2" 5'-7" 6'-3- 2'-7" 3'-6" 4 3'-0" 6 3 -3' 3 3'-3" 47 0.211 0.448 0.658 2.808 3.465 0.398 0.595 - RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT z O O W p~C CD LL JaHZ O O O = QU=0►0-I F- CnF=-LLOJ ZoHC` �> D. H 11 W 0 Cr O LL vz 1.4 3 CO) w c m - o a =- aF Qv= 0 v 0 M H m J 0 Z W MM 10" 2,. 10° 2,r�r-� T2 OR T3 TOP & BOTTOM Zr, MIN TWO PIPES 81.111 �2„ d D A T5 @ 6" TOP & BOTTOM H THREE PIPES 11'-11"I I hZ•7 cc U 11 16"- I I 6 SPA. @ 9" 1Br a1@B„ OOO = Z R IN SHPENOT OWNH" i TOP OFS FOOTING m I Z1 0.036 18" ul O 1- LL O J T N 0.703 Z2 c�Z�2 O iv Q H 0 O O ac Z '> 2'-3" 3'- ' 1 0.085 PES5'1 F- 6 I7-8 -� 1 0.127 THREEPIPE 0.024 15" T4 Z35 0 12 SPA. @ 9" 2-N2, SECTION - AA , 0% 2-N3, 2-N4 0.196 z'-41�" PLAN SEE STD. # 838.45 FOR GENERAL NOTES. .0 0.023 0.036 16" 16'-2" TWO PIPES 2'-8" 2'-9" 23'-10" THREE PIPES 3`-3" 3'-6" 2-V, @ 1'-4' N STR. FACE OR G3 0.227 0.222 12-G2 2-N1 @ 8" FILL FACE 1.065 B 2-B � 0.049 24" 1 1-V1 STR. FACE ^ I p 1 40. 2-82 4'-0" a �. 3" DRAINS 0.296 1I ABOVE 1.434 1 III FLOW SNE - RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT z O O W p~C CD LL JaHZ O O O = QU=0►0-I F- CnF=-LLOJ ZoHC` �> D. H 11 W 0 Cr O LL vz 1.4 3 CO) w c m - o a =- aF Qv= 0 v 0 M H m J 0 Z W MM 10" 2,. 10° 2,r�r-� O Cn H �¢ Zr, MIN FILL FACE I �2„ d D A -� FILL. FACE H BOTTOM WALL PER SLAB FT. HT. FOP 1¢"7x171 KXWT. H hZ•7 cc U R.C. W rN "N"@ 9' 1Br a1@B„ OOO = Z 0.015 SHPENOT OWNH" 15"2-3 "00 W Q Q LL - @ WING WALL 811 0.036 18" ul O 1- LL O J T N 0.703 0.0331 �-�- - T4 O iv Q H 0 O O ac Z '> 2'-3" 0.614 ' 1 0.085 30" 3'-0" F- 6 � T5 @ 6" -� 1 0.127 w O 0.024 15" 2'-3" V- 0 12 3' 0 SECTION - AA 3'-3" SECTION - BB 0.196 0.204 SEE STD. # 838.45 FOR GENERAL NOTES. 0.902 i _ 6 - m CONST. JT. 2.03 2 -Bt 5 SPA. @9" FILL 1 2 SPA. @ 1'-9" STR. FACE 2 -Ni, 2-N3, 2-N4 4-N1 @ 8" FILL FACE FACE 2-1-11, 1-H2 B --J 3 SPA. @ 1'-2" FILL H2 ELEVATION FACE 3-1,11, 1-1-12 V2 2 SPA. @ 1'-6" FILL FACE N2 1-Y2, 1-V3, 1-V4 z z z z Z1 3'-5" 1 I N4 3YZ°-j {� Z2 3r_Or` V4 7 m i. cr Z3 21.7,1 Hi JI p n a o 4'-11" 611 HK. H1 a N H2 2'-11" 11.1 ,1 �T�T T4 r,Z„ "H" BARS "N" BARS "Z" BARS WING ELEVATION "H", "N", & "Z" BAR DIMENSIONS ARE OUT TO OUT. W J Y J co O O c7 Z , z W w 3 W H �F-a- o W - �. 0 V Lti Z w Qva m W I- 0 IL -j W H O W In oc ir O LL OF 2 .22 v v M N -13 H' Z 77 co 0, >"O 17- M =-► =-T,>>M _ z HOOT O DDD OD � H 0 Z m (') Z C O Z 111 C) _ N "'I m cv vA 0 0 v -U D M Z z r 0 O= OF 1 .14 ^." WEEP HOLES Y PLAN WITH GRATE & FRAME REMOVED SECTION X -X ,vranut anl.auc IP ELEVATION 840.16 FRAI NATE (SEE NOTE) z 00 �< Q<'3 - Ha:DU 0 0 = Z C 40Cr0N LIJF- CnF=-LL0 CC Z O H cc H LL .1O 0 Z 0 Cr H O QLL J J ELI Qr m CA CC 1Z� F- C9 F- W z Q 0 M s C/? V. J 0 ® LL (J� O z = W I.. W oil v v r" H 0 z >000 ro„�0 Mz =� =-nDDm - =(n 00 z1..1Qr�1 nnDD <? (n H O Z 0 Z Z H (n N = M N M c 0 C- C D Z 0) 0)r�v M = M O z r w .m. 0 -1T X O MANHOLE D L; 54 c4 PLAN OPTIONALOLE COVEN & FRAME #4 BARS 8 C. TO C. BRICK MAY BE USED TO ADJUST FRAME & COVER TO SURFACE ELEVATION MAX. 1' OUTLET PIPE SI- EOBF _ ti _ - SECTION C -C OR D -D SECTION X -X SECTION Y -Y GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.68. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. CONSTRUCT WITH PIPE CROWNS MATCHING, SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. 78M STONE IN A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. MAX. PIPE THIS SIDE - 18" m SECTION Y -Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT H) DIMENSIONS PIPEI SPAN OF BOX I WIDTH & PIPE I MIN. HEIGHT CUBIC YARDS GONG. IN BOX DEDUCTIONS FOR ONE PIPE D A B H BOTTOM WALL PER SLAB FT. HT. FOP 1¢"7x171 KXWT. H C.Y. R.C. 12" 3'-0" 2'-0" 2 -0" 0.222 0.222 0.592 0.015 1 0.028 15"2-3 N0. LENGTH 0.648 0.023 0.036 18" WALL/ FT. OF NT. 2'-6 0.703 0.0331 0.049 24"3'-0" 2'-0" 2'-3" 0.614 0.059 1 0.085 30" 3'-0" 2'-0" 3'-6" 0.222 0.222 0.925 0.092 1 0.127 #4 BAR N Fes=- i DOWEL GENERAL NOTES: CHAMFER ALL EXPOSED CORNERS 1". USE CLASS "B" CONCRETE THROUGHOUT. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS ATI2" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS TO CONSTRUCT THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. PROVIDE ALL JUNCTION BOXES OVER 3'-8" IN DEPTH WITH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. ADJUST THE STEEL, CONCRETE AND BRICK MASONRY QUANTITIES TO INCLUDE THE ADDITION OF THE MANHOLE (I.E. DIAGONAL BARS SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE HEIONT BRICK MASONRY, OPENING IN TOP SLAB.) MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION IS 12 FEET. -r- # fl r e. - DOWEL ' DOWEL z O(n F- Q Qa He U 00 c5 = Z Uj cc Z LL QU=®1.04 H COF= W -OJ oo(Hna Z ,>� ~ H CL Q O O LL W O J FZ4Zw ~ a. H �CLm ®�Q QC0 G O z W co W Z:N (na�- H J 0 W � HEET 1 OF 1 840.14 IO T1 TWO PIPES 8,_1,1 v I T2 OR T3 TOP & BOTTOM 2-"G' 10' Z 1M "O THREE PIPES 11'-1,"I O i T5 @ 6" TOP & BOTTOM t" f F- ,y. �-� ,'-10x6" 2"�-yr 2„�t- �'a ZE i 11x'- I 1 6 SPA. @ 9" II II -2r, FILL FACE 2 z F- _ rH Cl) "Z" BARS IN - FILL FACE I,,,1 w C7 U 1m4 z -I = D _ I TOP OF FOOTING - EE ' „N„ 6 9., „V,r@ 1 r _6„ O O d = z O O Cl) o '° I Z1 DETAIL @ IN 'WALL W= Z LL - = m I ro PIPE NOT "H" U O = Z H'OD d Z2 Y1 @ 1._4„ 8" -6' SHOWN N Z' T4 _ Z O O H .9 @ WING WALL _ .L '� N LL J C1= ]0 Z 1 3, _ 1 „ TWO 12" O O C0 D D D� I PIPES �5" i'-6" 1 T4 N Z H DC 1 7:8" 'Q a I,�7'-8" THREE_ Z3 6 T" ' ' 'I I ~ r O z I ( PIPES T4 T5 @ 6" T 8 4-- 1 0 614"� - 5 SPA. @ 9" 2-N2, 3,_0„ i 12,- , 2-N3, 2-N4 " e" FF2F'--4ill" PLAN SECTION - BB SECTION - AA 3"0" SEE STD. # 838.45 FOR GENERAL NOTES. O BILL OF MATERIAL FOR ENDWALL W �g 16'-2" TWO PIPES REINF. STEEL 2 PIPES 3 PIPES Y M _ 23'-10" THREE PIPES 4„ BAR SIZE LENGTH N0. IFIF NO. ESR J CO C 2-V1 @ 1'-4" iV 2-02 OR G3 �` B1 #4 5'-6" a 29 12 44 0 CO Z Z STR. FAC 2-N1 @ 8" FILL FACE I 82 #4 4'-8" 4 12 4 12 =O 3' 0) r o w B 2-01 a N B3 #4 6'-0" 4 16 8 32 II- Z M H I 1-V1 STR. FACE + '�' w PIPE NOT 61 #7 8'-2" - - �. W ' Q0 Cl) `n SHOWN G2 #7 15'-10" 2 86 Z W -1 ITi iv IO. ( i� 10. �` 2 -BZ 9 1It: I a G3 #7 23'-6" - 2 96 W IL v Cn _ V_ J ti _ I SLOPE Hi #4 5'-6" 10 37 10 37 Q I- d. 1"A A 01 r a i s IA bW' 1 °i r 3" B DRAINS H2 #4 3' 6" 4 9 4 9 C W_ -H m 6 ABOVE r Z m N N v I I 7 FLOW LLINE cc M 0 0 L N1 #4 7'-1111 8 42 12 63 O t� L() 01 033 6" - ' 6" - N3 #4 5'-8" 4 75 4 15 0 W -++ I TAPER DETAIL z 0 io CONST. JT. I 2.83 2 -Bt N4 #4 4'-9" 4 13 4 13 ,Q CL t -q Ti #4 11'-10" H M B 4. JN, @ 8" FILL FACE 5 SPA. @9" FILL T2 #4 19'-6" 6 78 - - W F�- ((i 2 SPA. @ 1'-9" STR. FACE 2-N1, 2-N3, 2-N4 T3 #4 27% 2' - - 6 108 = 4 R1 CZ ELEVATION FACE 2 -Hl, 1-H2 T4 #4 5'-3" 8 21 6 21 H a ' Z H2 T5 #4 2'-8" 64 107 96 180 J 0 W 3 SPA. @ 1'-2" FILL (0 p z z z z FACE 3 -Ht, 1-H2 VZ 2 SPA. @ 1'•8" V1 #4 5'-9" 4 15 6 23 Z Z m 0 = 21 3'-6" N2 FILL FACE V2 #4 4'-10" 2 6 2 6 W Z O 31*z �- 14 I I 1-Y2, 1-V3, 1-V4 V3 #4 3'-11" 2 5 2 5 W 0 O 11- c_ e _ Z2 3'-0" I N4 V4 #4 3'-1" 2 4 2 4 �. ��_- IJ!^, t° Zi #4 3'-11 " 6 16 6 18CC m a * m Z3 2'-7" V4 Z2 #4 3'-6" 4 9 4 9 0 H2d 2'-11" k 6" HK. H1 Z3 #4 3' 1" 4 8 4 8 'FH" BARS "N" BARS "Z" BARS N NT4 Z" HEET 2 OF 2 REINF. STEEL LBS. 525 #7W SHEET 2 OF 2 838.22 "H", "N", & "Z" BAR DIMENSIONS ARE OT TO OUT, WING ELEVATION CON./C.S. CU. YDS 7.3 9.4 838.22 Z 0 0 H r I, - IF -1= CD . LL -J Z O O m = Z Iw-cQi�oCD UjF- C/3FF--IyOJ Cr O d= CL'-' Q O O X LL 0 .. C7 00 J Ow 0 z H INSCL O 0 J t0 = Z Z O z--31.4 F- o C/3 - _CC LU = N CU 0 3 OF i .31 ww (n �Z2 W LIQ w UQU oLu UdZ m DIMENSIONS AND QUANTITIES FOR CONCRETE JUNCTION BOXES Ljj z %' U O LIJ 'w' aXW>-z V) �0 zC4 Ov C7 W �¢ IoW=Za��� 0wLOL WLy0a� !rte^ DIMENSIONS OF BOX AND PIPE PIPE SPAN WIDTH HEIGHT REINFORCEMENT BARS "A" TOP SLAB DIMENSIONS ��-•1 Gza CUBIC YARDS IN Box TOTAL QUANTITIES BOX AND SLABS DEDUCTIONS FOR ONE PIPE CU.YDS. 0 A 8 H N0. LENGTH E F TOP SLAB BOTTOM SLAB WALL/ FT. OF NT. Les. CU. YDS. REINF MIN. H" C. S. R. C. 12" 2'-0" 2'-0" 2'-3" 12 2'-9" 3'-0" 3'-0" 0.167 0.167 0.185 22 0.750 0.015 0.024 15" 2'-3" 2'-3" 2'-6r' 12 3'-0" 3'-3" 3'-3" 0.196 0.196 0.204 24 0.902 0.023 0.036 16" 2'-6" 2'-8" 2'-9" 14 3`-3" 3'-6" 3'-8" 0.227 0.227 0.222 30 1.065 0.033 0.049 24" 3'-0" 3'-0" 3'-3" 16 3'-9" 4'-0" 4'-0" 0.296 0.296 0.259 40 1.434 0.059 0.085 30" 3'-6" 3'-6" 3'-8" 1s 4'-3" 4'-8" 4'-6" 0.375 0.375 0.286 51 1.660 0.082 0.127 36" 4'-0" 4'-0" 4'-3" 20 4'-9" 5'-O" 5'-0" 0.463 0.463 0.333 64 2.341 0.132 0.176 42" 4'-6" 4'-8" 4'-8" 22 5'-3" 5'-8" 5'-8" 0.580 0.560 0.370 77 2.878 0.180 0.243 48" 5'-4" 5'-4" 5'-3" 26 W-3" 6'-4" 6'-4" 0.743 0.743 0.407 111 3.623 1 0.235 0.317 54" 5'-10" 5'-10" 5'-9" 28 6'-7" W-10" B'-10" 0.865 0.885 0.444 128 4.283 0.297 0-401 80" 6'-6" 6'-6" 6'-3" 30 7'-3" 7'-8" 7'-6" 1.042 1.042 0.481 145 5.090 0.367 0.495 66" 7'-1" 7'-1" 6'-9" 32 7'.10" 8%1" 8'-9" 1.210 1.210 0.516 188 5.917 0.444 0.589 z O(n F- Q Qa He U 00 c5 = Z Uj cc Z LL QU=®1.04 H COF= W -OJ oo(Hna Z ,>� ~ H CL Q O O LL W O J FZ4Zw ~ a. H �CLm ®�Q QC0 G O z W co W Z:N (na�- H J 0 W � HEET 1 OF 1 840.14 IO T1 TWO PIPES 8,_1,1 v I T2 OR T3 TOP & BOTTOM 2-"G' 10' Z 1M "O THREE PIPES 11'-1,"I O i T5 @ 6" TOP & BOTTOM t" f F- ,y. �-� ,'-10x6" 2"�-yr 2„�t- �'a ZE i 11x'- I 1 6 SPA. @ 9" II II -2r, FILL FACE 2 z F- _ rH Cl) "Z" BARS IN - FILL FACE I,,,1 w C7 U 1m4 z -I = D _ I TOP OF FOOTING - EE ' „N„ 6 9., „V,r@ 1 r _6„ O O d = z O O Cl) o '° I Z1 DETAIL @ IN 'WALL W= Z LL - = m I ro PIPE NOT "H" U O = Z H'OD d Z2 Y1 @ 1._4„ 8" -6' SHOWN N Z' T4 _ Z O O H .9 @ WING WALL _ .L '� N LL J C1= ]0 Z 1 3, _ 1 „ TWO 12" O O C0 D D D� I PIPES �5" i'-6" 1 T4 N Z H DC 1 7:8" 'Q a I,�7'-8" THREE_ Z3 6 T" ' ' 'I I ~ r O z I ( PIPES T4 T5 @ 6" T 8 4-- 1 0 614"� - 5 SPA. @ 9" 2-N2, 3,_0„ i 12,- , 2-N3, 2-N4 " e" FF2F'--4ill" PLAN SECTION - BB SECTION - AA 3"0" SEE STD. # 838.45 FOR GENERAL NOTES. O BILL OF MATERIAL FOR ENDWALL W �g 16'-2" TWO PIPES REINF. STEEL 2 PIPES 3 PIPES Y M _ 23'-10" THREE PIPES 4„ BAR SIZE LENGTH N0. IFIF NO. ESR J CO C 2-V1 @ 1'-4" iV 2-02 OR G3 �` B1 #4 5'-6" a 29 12 44 0 CO Z Z STR. FAC 2-N1 @ 8" FILL FACE I 82 #4 4'-8" 4 12 4 12 =O 3' 0) r o w B 2-01 a N B3 #4 6'-0" 4 16 8 32 II- Z M H I 1-V1 STR. FACE + '�' w PIPE NOT 61 #7 8'-2" - - �. W ' Q0 Cl) `n SHOWN G2 #7 15'-10" 2 86 Z W -1 ITi iv IO. ( i� 10. �` 2 -BZ 9 1It: I a G3 #7 23'-6" - 2 96 W IL v Cn _ V_ J ti _ I SLOPE Hi #4 5'-6" 10 37 10 37 Q I- d. 1"A A 01 r a i s IA bW' 1 °i r 3" B DRAINS H2 #4 3' 6" 4 9 4 9 C W_ -H m 6 ABOVE r Z m N N v I I 7 FLOW LLINE cc M 0 0 L N1 #4 7'-1111 8 42 12 63 O t� L() 01 033 6" - ' 6" - N3 #4 5'-8" 4 75 4 15 0 W -++ I TAPER DETAIL z 0 io CONST. JT. I 2.83 2 -Bt N4 #4 4'-9" 4 13 4 13 ,Q CL t -q Ti #4 11'-10" H M B 4. JN, @ 8" FILL FACE 5 SPA. @9" FILL T2 #4 19'-6" 6 78 - - W F�- ((i 2 SPA. @ 1'-9" STR. FACE 2-N1, 2-N3, 2-N4 T3 #4 27% 2' - - 6 108 = 4 R1 CZ ELEVATION FACE 2 -Hl, 1-H2 T4 #4 5'-3" 8 21 6 21 H a ' Z H2 T5 #4 2'-8" 64 107 96 180 J 0 W 3 SPA. @ 1'-2" FILL (0 p z z z z FACE 3 -Ht, 1-H2 VZ 2 SPA. @ 1'•8" V1 #4 5'-9" 4 15 6 23 Z Z m 0 = 21 3'-6" N2 FILL FACE V2 #4 4'-10" 2 6 2 6 W Z O 31*z �- 14 I I 1-Y2, 1-V3, 1-V4 V3 #4 3'-11" 2 5 2 5 W 0 O 11- c_ e _ Z2 3'-0" I N4 V4 #4 3'-1" 2 4 2 4 �. ��_- IJ!^, t° Zi #4 3'-11 " 6 16 6 18CC m a * m Z3 2'-7" V4 Z2 #4 3'-6" 4 9 4 9 0 H2d 2'-11" k 6" HK. H1 Z3 #4 3' 1" 4 8 4 8 'FH" BARS "N" BARS "Z" BARS N NT4 Z" HEET 2 OF 2 REINF. STEEL LBS. 525 #7W SHEET 2 OF 2 838.22 "H", "N", & "Z" BAR DIMENSIONS ARE OT TO OUT, WING ELEVATION CON./C.S. CU. YDS 7.3 9.4 838.22 Z 0 0 H r I, - IF -1= CD . LL -J Z O O m = Z Iw-cQi�oCD UjF- C/3FF--IyOJ Cr O d= CL'-' Q O O X LL 0 .. C7 00 J Ow 0 z H INSCL O 0 J t0 = Z Z O z--31.4 F- o C/3 - _CC LU = N CU 0 3 OF i .31 U ww (n �Z2 W LIQ w UQU oLu UdZ m ^-" U 5z Ljj z %' U O LIJ 'w' aXW>-z V) �0 zC4 Ov C7 W �¢ IoW=Za��� 0wLOL WLy0a� !rte^ r[ rTti W �Zyi Q a �UiF-< ZUOmza -0030 UpU)=zUFUi?="KI- ��-•1 Gza 5 1C>3 - tY a x(DOQ Z W aCOZz�oa��w� NZUzz=Og�aew u�u A ^ �D�wgr�mz00 W W x W W Z Q Q Z W d- W AU Z W r W < JAMW U U U% Z o Q o Q M U w � w D- U Of WC; D• U 0 2E C; LL o a o Qr co 0 U � 0 F- rn a M 0 0 Cl � 00 M ? N C W ON J - GD C'M N y M�Z cN} Q1 o n -0 LLI d i 0 0) E �2-� In N N S` 0) � '� U w U a .- : Lo = > J C) y� W O Uj ry Z LL tY O w Z Q Z O ry a- 11 r (0 LO U ww (n �Z2 W LIQ w UQU oLu UdZ m ^-" U 5z Ljj z %' U O LIJ 'w' aXW>-z V) �0 zC4 Ov C7 W �¢ IoW=Za��� 0wLOL WLy0a� !rte^ r[ rTti W �Zyi Q a �UiF-< ZUOmza -0030 UpU)=zUFUi?="KI- ��-•1 Gza Z 0aY 1--X D LL 9 (Z'3au�o <aZ tY a x(DOQ Z W aCOZz�oa��w� NZUzz=Og�aew u�u A ^ �D�wgr�mz00 U V J w F- V � !rte^ V J U Z tY U Z Q WLU X u�u A ^ W U W W x W W Z Q Q Z W d- W AU Z W r W < JAMW r O U U U% Z o Q o Q M U T � w D- U Of WC; D• U 0 2E C; LL o Fri V J V � !rte^ V J Z � U Z LU X u�u A ^ W U ® 10--01 N x W V J Z W d- W AU Z � T V JAMW = W Z M U n Z W co 0 U � Z F- rn a M 00 LL Cl � 00 M ? N C W ON - GD C'M N y M�Z cN} Q1 o n -0 d i 0 0) E �2-� In N N S` 0) � '� U U a .- : Lo = > Fri V J !rte^ V J Z Z 0 O u�u A ^ W U ® 10--01 Z Q V V J �--( W d- W AU Z Z C0fwl�!ten V PROJECT NO. 14-0243 DRAWING NAME: SHEET NO. D-2 SUPPORT ROPE TO WIRF TO PR PLAN VIEW SUPPORT POST 24" INTRO BOTTOM STAKE TO COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE CROSS SECTION FENCE AND FABRIC APPLICATION NOTES: 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND BURIED IN TRENCH STEEL POST SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY, Q�� PROVIDE SUFFICIENT SPACE TO ALLOW WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. A BROAD. FLAT AREA FOR SEDIMENT 0 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN SILT FENCE \d I LENGTH). PROVIDE 5 BAFFLES FOR DRAINAGE AREAS 6"X6" TRENCH, iGREATER 2' THAN 10 ACRES. BACKFILLED AND I 4. BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET. COMPACTED ! + 5. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE SECTION VIEW AT OPENING TOP OF THE BERMS 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER SILT FENCE - J -HOOK EACH RAINFALL ccn Q SKIMMER BASIN FLOAT WATER ENTRY UNIT WITH TRASH SCREEN ORIFICE OPENING INSIDE THE HORIZONTAL TUBE WITH A CONSTANT HYDRAULIC HEAD E 40 PVC PIPE )R ARM) FLEXIBLE HOSE INFLOW STRUCTURE 18" MIN TOP OF DAM 16" MAX FLOW w TARP PROTECTION DEPTH g I DITCH AND BURY TARP z �W,101 MIN-.{ EDGE (MIN. 12") gLENGTH w SECTION THRU WEIR SKIMMER DEWATERING DEVICE BAFFLES PLAN VIEW INFLOW STRUCTURE TERING INLET SHALL BE PROTECTED (AS NEEDED) FROM EROSION WITH RIPRAP, TARP, MATTING OR EQUIVALENT. EMERGENCY SPILLWAY 1' MIN FREEBOARD BAFFLES (STD) SKIMMER CMP OUTLET PIPE ('ROSS SECTION TOP OF DAM EMERGENCY SPILLWAY ELEVATION DISSIPATER PAD /RIP RAP 0 0 0 p 0 0 NOTES: 1. BASIN SHOULD BE CLEANED OUT WHEN CAPACITY REACHES AN ELEVATION REPRESENTING THAT THE BASIN IS HALF -FU LL. 2. THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO AVAILABLE SUPPLY. IF MULTIPLE TARPS ARE TO BE USED, THEN TARPS SHALL BE OVERLAPPED AT LEAST 12". THE UPSTREAM 12" TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP SHALL BE 50 MIL. HEAVY DUTY SILVER TARPAULINS OR EQUIVALENT FOR U.V. RESISTANCE. 3. PROVIDE A MINIMUM OF THREE POROUS BAFFLES TO EVENLY DISTRIBUTE FLOW ACROSS THE BASIN, REDUCING TURBULENCE. 4. BAFFLE MATERIAL MUST BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR A SILT FENCE. 5. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST BAY, SO THIS SHOULD BE READILY AVAILABLE FOR MAINTENANCE. 6. DURING THE CONSTRUCTION PHASE OF THE PROJECT, PERMANENT STORMWATER RISER SHALL ONLY DEWATER FROM THE TOP OF PIPE. 7. POND SHALL NOT BE CONVERTED FOR STORMWATER USE UNTIL APPROVED BY ENVIRONMENTAL ENGINEER. END VIEW VENT PIPE -R FNTRY UNIT GENERAL NOTES: 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. TOP VIEW 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. ODIFICATIONS MAY BE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE. POTENTIAL FOR PIPING CAN OCCUR. PROPER DESIGN TO MINIMIZE DISCHARGE AROUND PIPE MUST OCCUR. M 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION INSTALLED. 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. / EARTHEN EMBANKMENT / EMERGENCY SPILLWAY PVC VENT PIPE SCHEDULE 40 PVC PIPE (BARREL OR ARM) FLOAT FLEXIBLE HOSE \ - L = 1.4 x DEPTH TO THE OVERFLOW MINIMUM LENGTH APPLIES DISCHARGE PIPE MAINTAIN DEPRESSION TO SCHEDULE 40 SIDE VIEW MINIMIZE CHANCE OF SKIMMER (NO SCALE) BECOMING STUCK FAIRCLOTH SKIMMER ° DISCHARGE SYSTEM WITH EMBANKMENT NOTES: APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED, FREQUENT CHECKS NOTES: SOP OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED. WASHED STONE PAD TO BE 50'L X 25'W X 6"TH MINIMUM. IF THE ADJOINING ROADWAY IS WIDER THAN 25', THEN THE O�O\�/ WASHED STONE SHALL BE AS WIDE AS THE ADJOINING P ROADWAY. S� TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS IS TO BE PROVIDED. ENTRANCE(S) SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. o MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. Z� PERIODIC TOP DRESSING WITH STONE (2" THICK) WILL BE 6" MIN NECESSARY; KEEP SOME HANDY. 2-3" ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD COARSE AGGREGATE MUST BE CLEANED UP IMMEDIATELY. FILTER FABRIC UNDER STONE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT TOE OF SLOPE ANGLE AND LENGTH OF "J -HOOK" WILL VARY t7 gm H � H' Z =cn00 F_ 11 0 "Z-1=> 0O�Dnm _ m z x Z H p 0 0 H oD�> l V5' TOE OF SLOPE 20" WATTLE USED TO RELEASE WATER IF NECESSARY EVATION AT THE BOTTOM OF THE TANT END OF THE "J -HOOK" ®SHOULD BE THE SAME AS THE LOWEST POINT 1. EL. ®= EL. ® TO MAXIMIZE STORAGE ALONG THE TOP OF SILT FENCE Q "J -HOOK" SILT FENCE "SMILE -CONFIGURATION" SILT FENCE e0 �O l APPLICATION APPLICATION o M v SILT FENCE SHOULD BE LOCATED AWAY EMBANKMENT FROM THE TOE OF THE SLOPE TO Q�� PROVIDE SUFFICIENT SPACE TO ALLOW F A BROAD. FLAT AREA FOR SEDIMENT 0 ACCUMULATION AND MAINTENANCE SILT FENCE ACTIVITIES. THE ENDS OF THE SILT `az7�0 -I C) C) LU QZ LL= HCDa00 FENCE SHOULD BE TURNED UP - Z=O 1....=I'-ZLLU 04WW OW 0 EL GRADIENT TO MAXIMIZE STORAGE. C/) 1-- 0J O to FLOW O cn H z ' > II U SILT FENCE SECTION AT TOE OF FILL SILT FENCE - J -HOOK INSTALLATION A EARTH BERM DITCH BLOCK FUTURE E.O.P. -�' - SUMP LOCATION A - FUTURE. E.O. P. SEDIMENT CONTROL STONE - CLASS B STONE G TEMP. SLOPE DRAIN TEMP. SLOPE DRAIN In Z TEMP. EARTH SHOULDER BERM TEMP. EARTH SHOULDER BERM CLASS "B' STONE FOR INLET PROTECTION CLASS "B" STONE FOR INLET PROTECTION EROSION CONTROL OPTION #2 EROSION CONTROL OPTION #1AM-4. L, A SKIMMER (SIZE VAR.) STEEL POSTS (QUANTITY VAR.) PLASTIC SLOPE DRAIN PIPE (PRACTICE STANDARD 6.32) OR GEOTEXTILE LINING, TEMPORARY OR PERMANENT DITCH COIR FIBER BAFFLES - (PRACTICE STANDARD 6.65) z / STONE PAD below VIEW Rtlelrnusklrnmer) RISER STRUCTURE EMBANKMENT r __STONE ENERGY jCDISSIPATOR A- ERGENCY SPILLWAY WOOD STAKE OR METAL POST TOP OF EMBANKMENT RISER STRUCTURE I' MIN *-EMERGENCY SPILLWAY TRASH RACK EREESOARD- It rgh%giftl I'MIN. r=iq l l ?,S 1W I SKIMMER �Y 1y ( I., MINIMUM- 14 uukal+Rif uWHIR�llli uu lug BARREL PIPE 1 i CLASS B STONE PAD CUT OFF ANTI -SEEP (4'X4' X I' MIN.) ANTIFLOTATION BLOCK SECTIIONAL MEIN TRENCH COLLAR STABILIZER -- OUTLET 2` DEEP L1 NOTES 1, SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. a 3. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO EMBANKMENT I FT FROM BOTTOM OF BASIN, NOT TO SCALE 4, THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. Figulre 6.151 d Sediment Basin (with Riser Barrel Pipe) z 0 SECTION A -A o M v H r ozU NOTES Q�� O <!K 0t Z< F- u"Ua� a <1 �ccn O O >r0pm�O rZi=C30 E c'n �/ W 00�=Z INLET TREATMENT FOR STAGED CONSTRUCTION WHEN NOT LEFT IN PLACE FOR MORE THAN 30 DAYS. `az7�0 -I C) C) LU QZ LL= HCDa00 _ - Z=O 1....=I'-ZLLU 04WW OW 0 EL ZH-o�m C/) 1-- 0J O to 0OH O cn H z ' > 3. EXTEND SLOPE DRAINS TO BOTTOM OF SLOPE, SEDIMENT BASINS AND EROSION CONTROL MEASURES. OPTION #1 D > > --H CL ccn Q Lu 1 OF 1 z 4. USE CLASS B EROSION CONTROL DEVICES MAY ALSO BE UTILIZED TO PREVENT SCOUR AT OUTLET LOCATIONS. SHEET 1 633. ®� w w iHEET 1 OF t 5. USE MAXIMUM SLOPE DRAIN SPACING OF 200 FT MEASURED ALONG TOP OF SLOPE. _ M 1622.01 ac Q CA O EARTH BERM rE' Z (� DITCH BLOCK FUTURE PAVEMENT 0 �, 17 N Z ANCHOR STAKES V- W r ® 'O TEMP. EARTH SHOULDER BERM ca �` ii TTI H TEMP. SHOULDER ANCHOR STAKE BERM DITCH 12" EXTEND DRAIN AS REQUIRED TO EARTH BERM DITCH BLOCK y�UlpF9 FZ-r �, _ Z•� _ -----� _ _ _ _ -1 N' 1 COINCIDE WITH HEIGHT OF FUTURE E.O.P v ® ~'�"� _ - _,_ FINISHED EMBANKMENT Q 4 �' p N <4 - 121, TEF+-- 10 RMAXSHOULDER BERM �"'� Q O d z _ _ _ _ _ MIN. \ II ELBOW d W 0) > O M 0 NATURAL GROUND LINE - - - - SUMP LOCATION 3 > EARTH BERM DITCH BLOCK y FILL Q � O. ~ 0 ` TEMPORARY SLOPE DRAIN MATERIAL Z 1W- O Iii 19 O TEMP. SHOULDER BERM DITCH ---J I SHOULDER .- 5' MIN. ANCHOR STAKE TEMP Q ELBOW PITCH u% aD STAGE BUILDUP OF FILL I '� �I � D / H Z NOTE: TOE OF FILL-� `TOES Ca17 )� Z M z ANCHOR STAKES 30" LONG OF\\ J W Q >7 Z W O AND SET MINIMUM 12" DEEP. CLASS "B" STONE OR SILT SHOULDER � � BASIN TYPE B. SEE NOTES. POINT LU o TEMPORARY SLOPE DRAIN\� = TEMP. EARTH SHOULDER BERM �\ N SECTION A -A V] M ozU NOTES 0- a O <!K 0t Z< F- u"Ua� a <1 Oz W C) VT 1. OPEN END PIPE WITH SUMP AND MINIMUM SETBACK AND PROPER COMPACTION IS AN ACCEPTABLE E c'n �/ W �xr�Q � V OR INLET TREATMENT FOR STAGED CONSTRUCTION WHEN NOT LEFT IN PLACE FOR MORE THAN 30 DAYS. I- (� ;J -I W . m _ 2. AT INLETS A STANDARD T -SECTION MAY BE INSTALLED FOR MULTI -DIRECTION FLOW AND ELBOWS O Z 04WW OW 0 EL W FOR SINGLE -DIRECTION FLOW AS DIRECTED. ISOMETRIC VIEW to i z,,zzT>=>0C(W :D _i W JF-> [DZOO Q 3. EXTEND SLOPE DRAINS TO BOTTOM OF SLOPE, SEDIMENT BASINS AND EROSION CONTROL MEASURES. OPTION #1 STONE FOR EROSION CONTROL AT OUTLET LOCATIONS. SILT BASINS AND OTHER SHEET 1 OF 1 1 OF 1 1z 4. USE CLASS B EROSION CONTROL DEVICES MAY ALSO BE UTILIZED TO PREVENT SCOUR AT OUTLET LOCATIONS. SHEET 1 633. ®� w w iHEET 1 OF t 5. USE MAXIMUM SLOPE DRAIN SPACING OF 200 FT MEASURED ALONG TOP OF SLOPE. _ 1622.01 1622.01 STANDARD METAL POSTS 2'-0" IN GROUND GALVANIZED HARDWARE WIRE EXTENDS TO TOP OF BOX ca>� cam° - - t°°� • 41 o 9% O a °o O --� b° 060 r'On O - �� ---- U #57 WASHED STONE PLACED TO A HEIGHT OF 12"-18" MIN. ABOVE TOP OF BOX STANDARD CATCH BASIN/YARD INLET PROTECTION EDGE OF PAVEMENT NOTES USE CLASS B EROSION CONTROL STONE FOR N11 K1411WIM o'cv" STRUCTURAL STONE. STRUCTURAL STONE BACK THE ENGINEER MAY DIRECT THE OPTION OF SLOPE CLASS A STONE FOR SITES HAVING LESS THAN ONE (1) ACRE DRAINAGE AREA AND A DITCH GRADE LESS THAN 3%. ISOMETRIC VIEW fl' MIN. NATURAL GROUND I CROSS SECTION VEE DITCH BASE OF DITCH NATURAL GROUND 12" 12" MIN. 1' MIN. SEDIMENT TRAP ....... FLOW OPTIONAL TYPE SILT BASIN ' CROSS SECTION TRAPEZOIDAL DITCH ELEVATION VIEW z ON IH- Q Q H°Cc=av LLJ0HZ 0 0 ' _ Z Lu cc Q Q _ QUfr 0 I- CI F- O J Z0U)Ir Q_ H LLI m W CL cc I.- 0 0 lL he z W c ❑ H J D N Z cn O = = U) H J � W O Ii W 11-- 1633.0 1633.0 U 0o z 0ir-,,x V] wZ0 OO��Zm ozU o 0 0- a O <!K 0t Z< F- u"Ua� a <1 Oz W C) VT O0 W u, x O M O' O I 0 ') W �v�> E c'n �/ < 0-, za ¢ a °oW �xr�Q � V OR WoOQ0ao z of `n Z x-La2 I- (� ;J -I W . m _ F.2Oa,Q} co .<zz o 00 O Z 04WW OW 0 EL W U to i z,,zzT>=>0C(W :D _i W JF-> [DZOO Q 1z ' Z W w w = LU .,rl F••� z ¢ z Q W MSI � W r- 00 O F- M } r U r � Q CD �+�Iii w Q U -1Q LU rn � � �S LO � a- 0 LU a- 0 W o o CD Q a 0M C �I-�w ❑ N M 'Z6 J �Uc� L h _ co Z co N o @ r- W > �8)cDE _ W �R'Omj N N .,t -T U U JQ=> Z z 0 W o ® 0Y w U CD Z LL rY 0 W Z Q S F- W W I1 IZ ti (0 L0 d M N U 0o z 0ir-,,x V] wZ0 OO��Zm ozU z z060P>_ Cj) ,¢W9z ui Lu OU� fVQ✓� O <!K 0t Z< F- u"Ua� a <1 Oz W C) VT O0 W u, x O M O' O I 0 ') W �v�> E c'n �/ < 0-, za ¢ a °oW �xr�Q � V OR WoOQ0ao z of `n Z x-La2 I- (� ;J -I W § z o0�ZozF-EP- o W _ F.2Oa,Q} co .<zz o 00 O Z 04WW OW 0 EL W awZ�o�O¢�=ai to i z,,zzT>=>0C(W :D _i W JF-> [DZOO U FSI a w LU V U W U _ o to X LU Q 1z ' Z W w w = LU .,rl F••� z ¢ z Q 0 MSI � W r- 0 � Lu z O M } r U _i 0]U7 CD �+�Iii w Q U -1Q LU rn � � �S LO � a- 0 LU a- 0 W o o 75. ESS S 036242 o o Ic ////�1011111111�� PROJECT NO. 14-0243 DRAWING NAME: 14-0243_D SHEET NO. D-6 FSI a w V W U _ o to X LU 1z ' Z W W = .,rl F••� Z ®I Z 0 MSI � co 0 � zN W z O M 0 V 0 Q U _i z rn �+�Iii Q O U)Z rn V J Z 0 ^ W l.J.- 00 LL W O a 0M C �I-�w ❑ N M 'Z6 �Uc� L h _ co Z co N o @ r- > �8)cDE _ �R'Omj N N .,t -T U U JQ=> PROJECT NO. 14-0243 DRAWING NAME: 14-0243_D SHEET NO. D-6 FSI w U) Z W Ir - .,rl F••� Z ®I 0 0 MSI W 0 � U z O 0 V 0 Q _i z �+�Iii O U)Z V J Z 0 ^ W l.J.- VWN4=cD W PROJECT NO. 14-0243 DRAWING NAME: 14-0243_D SHEET NO. D-6 12" (30 cm) NORTH � A GREIEN N 15csm) (5G" O (15 m) e rl ) - 4° (10 cm) 1 (D2"-5" * m 12 5c Sc ) - m ~h hh 1h \ h h \ 5„ \ (10cm-15cm) 15 cm ( ) .. ... .._ 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL -O -SEED DO NOT SEED PREPARED AREA. CELL -O -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE, ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART INA 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm) (DEPENDING ON BLANKET TYPE) AND STAPLED. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH 013iHE BLANKET BEING OVERLAPPED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m -12m) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A6" (15cm) DEEP X6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: B C CRITICAL POINTS *HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE A. OVERLAPS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE. B. PROJECTED WATER LINE C. CHANNEL BOTTOM/SIDE ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE A SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY B BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. C 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 USA 1-800-772-2040 CANADA 1-800-448-2040 www.nagreen.com TYPICAL CHANNEL LINER INSTALLATION 8' OC MAX '1 NOTES: 1) TOTAL DRAINAGE AREA FLOWING TO THE FENCE MAY NOT EXCEED 1 ACRE. 2) SILT FENCES SHOULD NOT BE USED AT PIPE OUTLETS OR IN AREAS OF CONCENTRATED FLOW (CREEKS, DITCHLINES, SWALES ETC.) TO INCREASE STORAGE CAPACITY AND PROLONG THE LIFE OF THE SILT FENCE, IT IS GENERALLY ADVISABLE TO DIG A SEDIMENT PIT IN FRONT OF YOUR SILT FENCE WHENEVER POSSIBLE. GAUGE 4"X4" OR 2"X4" WELDED WIRE HOOKED ONTO PERFORMED CHANNELS ON STEEL POSTS. (NO WOOD POSTS) ULLTRAVtOLET RESISTANT (BLACK) MIRIFI FABRIC OR EQUIVALENT SECURED TO WIRE W/ METAL CLIPS OR WIRE AT 8" OFF ° CENTER. ° M DIMENT STORAGE LEVEL. REMOVE °SEDIMENT WHEN THIS LEVEL IS REACHED OR ° r8" - - - AS DIRECTED BY CONSERVATION INSPECTOR. ° _ - _ - _ - _ - - - TRENCH, COVER W/ SOIL & TAMP BACKFILL. SHEET DRAINAGE (ONLY) _-_-_ - - - - ---NAT41RALGRADE GUARRY APPROX.12" OF FABRIC INTO TRENCH z `v - - ARRY 6" OF WIRE INTO TRENCH. T STEEL POSTS @ 8' O.C. MAX.. (NO WOOD POSTS) MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPLY. REPLACE BURLAP EVERY 60 DAYS. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE.TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALSAND UNSTABLE SEDIMENT DEPOSITS AND BRING THE ARE TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TEMPORARY SILT FENCE now what's below. 0111 before you dig. h NORTH AMERICAN GREEN 12" (30 cm) 2"-5" (5cm-12.5cm) 6" (15 cm) L (15 cm) W W W * y W * V• W v W W W N y W W W W W* ." 3 3A - (7.5cm \ \ O 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL -O -SEED DO NOT SEED PREPARED AREA. CELL -O -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM, STAPLES/STIAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THrr PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 USA 1-800-772-2040 CANADA 1-800-448-2040 www.nagreen.com TYPICAL SLOPE BLANKET INSTALLATION CLASS 1 RIP RAP(SEE SECTION THRU BASIN BELOW) �- CLASS 1 RIP RAP \ INVERT \ \ ow PIPE HEADWALL / I #5 WASHED STONE. STOR qGE AREA '�� V THICK X 3' HIGH MIN. PERSPECTIVE VIEW I I \ \ \ \\ PIPE INVERT RIP RAP HEADWALL FLOOD STORAGE ZONE / - _NATURAL AREAS TO BE SEDIMENT 3, _�-_GROUND , FIL DISTURBED (CUTL• STORAGE .5' FLOW ETC.) F�0 1.5' ------- FILTER FABRIC CLASS 1 RIP -RAP MAX. SEDIMENT DEPTH(CLEAN OUT POINT) #57 WASHED STONE SECTION THRU BASIN, FILTER AND CULVERT PIPE MAINTENANCE: INSPECT, CLEAN AND PROPERLY MAINTAIN THE INLET PROTECTION AFTER EVERY STORM UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABILIZED. TO PROVIDE SATISFACTORY BASIN EFFICIENCY, REMOVE SEDIMENT WHEN THE SEDIMENT STORAGE AREA IS HALF FULL. SPREAD ALL EXCAVATED MATERIAL EVENLY OVER THE SURROUNDING LAND AREA OR STOCKPILE AND STABILIZE IT APPROPRIATELY. TEMPORARY HORSESHOE INLET PROTECTION (ARC FILTER) FILTER OF 1" DIA. #57 WASHED STONE NOTE: SILT FENCE FABRIC TO OVERLAP j HARDWARE CLOTH BY 12" STEEL FENCE POST WIRE FENCE ILT NCE FABRIC ON S FE HARDWARE CLOTH WIRE FRAME FILTER OF 1" DIA. #57 T WASHED STONE T FLOW DIRECTION GRADE SIDE VIEW u i SILT FENCE FABRI EXCAVATED WIDTH WIRE SCREEN SEE PLANS FOR VALUE OF W DEWATERING _ -TEMPORARY - 2 I SEDIMENT POOL I ° V MIN•I ``No ° -- 16" 2' MAX. SEDIMENT I o�°° ° ■. ■ 0 O- -I i I -III -III -I 1 1- i 1=1=1III =1 I �I 11=1 I I -III -I 11=1 I f 1 �1 � 1111=III=1 -� I I-1 I ITI 11=1 I I-1 I f CONCRETE BLOCK -� ,- DEWATERING •-`'��}' IFMRI O B ��R W-011 r.'m ? 1 o p ° 00 60 ��® 00000 p o 03ODQ�� @p,09C4J - 2:1 SLOPE, GRAVEL FILTER CONSTRUCTION SPECIFICATIONS 1.) LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS, IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2 X 4 WOOD STUDS THROUGH BLOCK OPENINGS. 2.) CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 -INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. 3.) USE CLEAN GRAVEL, 3/4- TO 1/2 -INCH IN DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED. BLOCK AND GRAVEL DROP INLET PROTECTION NOTE: ALL PARTIALLY COMPLETED STORM DRAINS SHALL BE PROTECTED AT THE END OF EACH DAY IN ACCORDANCE WITH THESE DETAILS. UPSTREAM END OF STORM DRAIN OVERFLOW 1/3 PIPE D p 4 DIAMETER D o c DA D BURY BOTTOM OF PLYWOOD � 18" MIN. 3/4" EXTERIOR H �N > PLYWOOD PLYWOOD INLET PROTECTION SI PC WASHED S FILTER ACF PIPE INLET TREAM END OF OVERFLOW RM DRAIN 0 1/3 PIPE p - D DIAMETER C D.. CA ZDWARE CLOTH J III u Li u u STONE FILTER INLET PROTECTION TEMPORARY IN TRENCH PIPE PROTECTION TO BE USED IN TRENCHES WHEN PIPE INSTALLATION IS INTERRUPTED BY RAINFALL SUFFICIENT TO DIRECT ALL SEDIMENT -LADEN STORMWATER INTO A SEDIMENT CONTROL DEVICE. MUST BE INSTALLED PRIOR TO CLEARING AND GRUBBING OF THE AREA (OR IN CONJUNCTION WITH THIS OPERATION IF SEDIMENT CONTROLS AND DIVERSIONS ARE INSTALLED AS EACH CRITICAL POINT IS REACHED). A- DIVERSIONS SHOULD BE LOCATED TO MINIMIZE DAMAGES BY CONSTRUCTION OPERATIONS. B- DIVERSIONS SHOULD BE SEEDED & MULCHED IF THEY ARE TO REMAIN IN PLACE OVER 30 DAYS. C- CHECK DEVICE AFTER EACH RAIN, BUT ONCE A WEEK REGARDLESS REPAIR AS NECESSARY. 12" MIN Imo- , SLOPE 2:1 FSO MAX g NATURAL GROUND OR COMPACTED FILL FILL / CUT SLOPES - m r- NATURAL GROUND OR O`N FILL CUT SLOPES II--I� lil it III - 18" MIN DEPTH m IiI i�llil Ilill�l Ill - j Illlilllllilllllilllllillil111111=1� 11111- HARDWARE CLOTH STEEL FENCE ON WIRE FENCE POST PLAN VIEW STEEL FENCE POST bUKT VVIKt rtINUt: r1AMUMAKt IGLU I r1, FRONT VIEW AND SILT FENCE FABRIC 6" INTO THE TRENCH STANDARD SILT FENCE OUTLET NTS �. 112" MIN 18" MIN DEPTH NATURAL GROUND OR FILL / CUT SLOPES FLOW BERM DITCH BERM/DITCH NOTES: POSITIVE GRADE MUST BE PROVIDED TO ASSURE DRAINAGE IF SLOPE EXCEEDS 2%, SEED AND MULCH DIVERSION. TRY NOT TO EXCEED 5% (HIGH VELOCITIES RESULT). MAXIMUM D. A. = 5 ACRES WITHOUT SUPPORTING CALCS. DIVERSIONS AT THE TOP OF SLOPES MUST EMPTY INTO AN APPROVED SLOPE DRAIN. BERM/DITCH IS MOST COMMONLY USED MAINTENANCE: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND AREA WITH NATURAL GROUND LEVEL AND STABILIZE APPROPRIATELY. TEMPORARY DIVERSION BERM / DITCH 5' POSTS NOTES: 1. TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT. Z 2. SIGNS IN BOTH ENGLISH AND SPANISH SHALL BE M PLACED IN TREE PROTECTION AREAS. THE SIGNS SHOULD READ, "TREE PROTECTION AREA/NO TRESPASSING" AND "ZONA PROTECTORA PARA LOS ARBOLES/ PROHIBIDO ENTRA". 12' MAX TREE PROTECTION FENCE NTS INSTALL ROCK OUTLET AT LOW POINTS ALONG SILT FENCE, AND IN LOCATIONS SHOWN ON THE PLAN. 0 0 IL CL SEDIMENTCONTROL STONE EXCAVATE SMALL PIT IN FRONT OF ROCK OUTLET. -7 I --a 12"± SILT SILT FENCE Shoulders, Side Ditches, Slopes (Max 3:1) 18" MIN. 0 STRUCTURAL STONE SHALL BE (CLASS "B") STONE FOR H �N > EROSION CONTROL PURPOSES. TYPE PLANTING RATE • SEDIMENT CONTROL STONE SHALL BE NO.5 OR NO.57 NCDOT `. 3' MAX. WASHED STONE. 7 18" MIN. 0 SILT FENCE WITHOUT ROCK OUTLETS HAS A CAPACITY OF 1/4 300 lbs/acre UW` DRAINAGE ACRE PER 10OLF FENCE. and Abruzzi Rye • SILT FENCE WITH ROCK OUTLETS AT 100' SPACING HAS A - CAPACITY OF 1/2 DRAINAGE ACRE PER 100LF FENCE. STRUCTURALSTONE 300 lbs/acre TEMPORARY SILT FENCE OUTLET NTS MIF1FrWYi F SW I C,R An i2" DEEP (ALTER STRIP POOL "^`` FILTER FJ4SRAC T6 FULLY ENCOMPAM O T11 OF RIR 98E PUMA OW DETAILS FOR QM1. i2' � HKYC RAP AND 6 E TiEta fi h LEliftlTH AND VR6TH RIP RAP ivlVRm or- i2` oN ALL 91C m SIZE 6 DEPiH ON PLAt,15 r ■ r a ► r ► � , e r� Consult Conservation Engineer or Soil Conservation Service for additional information concerning other alternatives for vegetation of denuded areas. The above vegetation rates are those which do well under local conditions; other seeding rate combinations are possible. ***Temporary - Reseed according to optimum season for desired permanent vegetation. Do not allow temporary cover to grow over 12" in height before mowing, otherwise fescue may be shaded out. SEEDING SCHEDULE 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3.) REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.) APPLY AGRICULTURAL LIME, FERTILIZER, AND UNIFORMLY MIX WITH SOIL (SEE BELOW*). 5.) CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 6.) SEED ON A FRESHLY PREPARED SEEDBED AND SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK 7. AFTER AND MULCH IMMEDIATELY E S 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY RESEEDINGS WITHIN THE PLANTING SEASON IF POSSIBLE. STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9.) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE AND FERTILIZATION AFTER PERMANENT COVER IS * APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (3 TONS/ ACRE IN CLAY SOILS) FERTILIZER - 1,000 Ibs. /ACRE -10-10-10 SUPERPHOSPHATE- 500 Ibs> / ACRE -20% ANALYSIS MLCH -2 TONS / ACRE (5000 LBS/AC FOR STEEP SLOPES) - SMALL GRAIN STRAW ANOTHER - ASPHALT EMULSION @ 300 GALS./ ACRE SEEDBED PREPARATION MAINTENANCE: NEW SEEDLINGS SHOULD BE INSPECTED FREQUENTLY AND MAINTENANCE PERFORMED AS NEEDED. IF RILLS ANG GULLIES DEVELOP, THEY MUST BE FILLED, RE -SEEDED, AND MULCHED AS SOON AS POSSIBLE. DIVERSIONS MAY BE NEEDED UNTIL NEW PLANTS TAKE HOLD. DAMAGE TO VEGETATION FROM DISEASE, INSECTS, TRAFFIC, ETC., CAN OCCUR AT ANY TIME. HERBICIDES AND REGULAR MOWING MAY BE NEEDED TO CONTROL WEEDS, DUST AND SPRAYS MAY BE NEEDED TO CONTROL INSECTS. WEEK OR DAMAGED SPOTS MUST BE RELIMED, FERTILIZED, MULCHED, AND RESEEDED AS PROMPTLY AS POSSIBLE. Shoulders, Side Ditches, Slopes (Max 3:1) LOD W woQOOWgzm g- a H �N > DATE TYPE PLANTING RATE Aug 15 - Nov 01 Tall Fescue 300 lbs/acre Nov 01 - Mar 01 Tall Fescue 300 lbs/acre UW` WU>- 5;0zj F -F -00a ¢� and Abruzzi Rye 25 lbs/acre Mar 01 - Apr 15 Tall Fescue 300 lbs/acre Apr 15 - Jun 30 Hulled Common Bermudagrass 25 lbs/acre Jul 01 Aug 15 Tall Fescue 120 lbs/acre W Lu 0 and ***Browntop Millet 35 lbs/acre Z r" or ***Sorghum -Sudan Hybrids 30 lbs/acre Wm Z Slopes (3:1 to 2:1) co Mar 01 - Jun 01 Sericea Lespedeza (scarified) 50 lbs/acre W < AND: N (Mar 01 - Apr 15) Add Tall Fescue 120 lbs/acre (Mar 01 - Jun 30) or Add Weeping Lovegrass 10 lbs/acre (Mar 01 - Jun 30) or Add Hulled Common Bermudagrass 25 lbs/acre Jun 01 - Sep 01 ***Tall Fescue 120 lbs/acre and ***Browntop Millet 35 lbs/acre O or ***Sorghum -Sudan Hybrids 30 lbs/acre Sep 01 - Mar 01 Sericea Lespedeza 70 lbs/acre (unhulled-unscarified) N M N M'DUrI C; and Tall Fescue 120 lbs/acre (Nov 01 - Mar 01) Add Abruzzi Rye 25 lbs/acre Consult Conservation Engineer or Soil Conservation Service for additional information concerning other alternatives for vegetation of denuded areas. The above vegetation rates are those which do well under local conditions; other seeding rate combinations are possible. ***Temporary - Reseed according to optimum season for desired permanent vegetation. Do not allow temporary cover to grow over 12" in height before mowing, otherwise fescue may be shaded out. SEEDING SCHEDULE 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3.) REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.) APPLY AGRICULTURAL LIME, FERTILIZER, AND UNIFORMLY MIX WITH SOIL (SEE BELOW*). 5.) CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 6.) SEED ON A FRESHLY PREPARED SEEDBED AND SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK 7. AFTER AND MULCH IMMEDIATELY E S 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY RESEEDINGS WITHIN THE PLANTING SEASON IF POSSIBLE. STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9.) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE AND FERTILIZATION AFTER PERMANENT COVER IS * APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (3 TONS/ ACRE IN CLAY SOILS) FERTILIZER - 1,000 Ibs. /ACRE -10-10-10 SUPERPHOSPHATE- 500 Ibs> / ACRE -20% ANALYSIS MLCH -2 TONS / ACRE (5000 LBS/AC FOR STEEP SLOPES) - SMALL GRAIN STRAW ANOTHER - ASPHALT EMULSION @ 300 GALS./ ACRE SEEDBED PREPARATION MAINTENANCE: NEW SEEDLINGS SHOULD BE INSPECTED FREQUENTLY AND MAINTENANCE PERFORMED AS NEEDED. IF RILLS ANG GULLIES DEVELOP, THEY MUST BE FILLED, RE -SEEDED, AND MULCHED AS SOON AS POSSIBLE. DIVERSIONS MAY BE NEEDED UNTIL NEW PLANTS TAKE HOLD. DAMAGE TO VEGETATION FROM DISEASE, INSECTS, TRAFFIC, ETC., CAN OCCUR AT ANY TIME. HERBICIDES AND REGULAR MOWING MAY BE NEEDED TO CONTROL WEEDS, DUST AND SPRAYS MAY BE NEEDED TO CONTROL INSECTS. WEEK OR DAMAGED SPOTS MUST BE RELIMED, FERTILIZED, MULCHED, AND RESEEDED AS PROMPTLY AS POSSIBLE. F- U W DO ffzz�2PT LOD W woQOOWgzm g- a H �N > 0 CL W =�a F-o_1UF OW U -U jZCYJ W k 0WCaww0aw E"rnC7 3�aW~�8za �¢z �QR� z_ oawt)O<co 0W0Ws Z i 3: o m UW` WU>- 5;0zj F -F -00a ¢� �ogo a? 625 620 615 610 0+00 SECTION A -A HORIZ. V= 40' VERT. V= 4' 625 620 615 610 0+75 620 615 610 Culvert Sizing Analysi • —� a., a'�! - B « a 110. % of Da Total DA: 3,572,643 SF C�-Jy iri W Roadway 2105 LF Fuff Width, Ak LF Half Width, (27"wide road) Roadway 2175 LF FLif Width, 760 LF Half Width, (27 " wide road) 68,085 SF 0.961 A H Z^ - PRE -DEVELOPMENT ACTIVITIES. PUMP(s) SHALL SF OM 14% Bedfofdi Hds Subdnnslon 2,045,469 SF BE LOCATED IN A SAND BOX MEETING MINIMUM Cther(Stng1eFaff*Residence)11 ,.' ., mmmi SF GRAPHIC SCALE 11% DIAMETER FOR FUEL SPILL REQUIREMENTS. 567,594 5F e 0 5 10 20 40 Combined C Vatue 0.43 CONTRACTOR SHALL INSTALL 54" PIPES UNDER Peals How 25 year storm (7.67 inc =' CFS w 0O W DRY CONDITIONS AND VERIFY THAT PUMP (IN FEET)j a �%\► iinch 2-547pipes a 1 W LL AROUND IS IN WORKING ORDER PRIOR TO J =tib IMPACTS TO UNNAMED TRIBUTARY TO OTTER CREEK PRE -DEVELOPMENT STREAM LENGTH IMPACTED BY CULVERT: 66 LF TEMPORARY CHECK DAM (RIP RAP): 27 LF DEWATERING FOOTPRINT: 94 LF 0+00 SECTION B -B HORIZ. 1" = 40' VERT. 1" = 4' 620 615 610 0+75 GRAPHIC SCALE 10 0 5 10 20 40 ( IN FEET) I inch= 20 ft. TEMPORARY SANDBAGS TOP OF BANK PUMP(s) OF ADEQUATE CAPACITY TO I IP ss --ss BREAKLINE OF UNAMED TRIBUTARY TO OTTER CREEK CHANNEL BREAKLINE OF CHANNEL FOR THE UNNAMED TRIBUTARY TO OTTER CREEK RIPARIAN BUFFER � � w ys'o� ate► � � F N ff y� 2:1 SLOPES TO BE MATTED F� CCMMMM/h/1111 f-UCM AC fl1�C!` Ell • IFA0 INE �? • � W a., a'�! PUMP(s) OF ADEQUATE CAPACITY TO MAINTAIN --=-- --__ % of Da Total DA: 3,572,643 SF C�-Jy iri W DOWNSTREAM FLOWS CONSISTENT WITH I Roadway 2175 LF FLif Width, 760 LF Half Width, (27 " wide road) 68,085 SF 0.961 A H Z^ - PRE -DEVELOPMENT ACTIVITIES. PUMP(s) SHALL SF OM 14% Bedfofdi Hds Subdnnslon 2,045,469 SF BE LOCATED IN A SAND BOX MEETING MINIMUM 57° ,.' ., 379,726 SF GRAPHIC SCALE 11% DIAMETER FOR FUEL SPILL REQUIREMENTS. 567,594 5F e 0 5 10 20 40 Combined C Vatue 0.43 CONTRACTOR SHALL INSTALL 54" PIPES UNDER Peals How 25 year storm (7.67 inc =' CFS w 0O W DRY CONDITIONS AND VERIFY THAT PUMP (IN FEET)j a �%\► iinch 2-547pipes a 1 W LL AROUND IS IN WORKING ORDER PRIOR TO J =tib _ BEGINNING PLACEMENT OF PIPES. w w ro c 112 N U 0 0 o�Z V CL E O r QQ U U d d 1 a as o V t v l C) U n r .' 0. . . s8 J 4 c j W I �? W w so xz2T'l � W wOi0pUpim �-F4zt-=�.�w�o ~UOUcnlU—�O r % of Da Total DA: 3,572,643 SF C�-Jy iri W Z DULL' Wulx 3 OOSZ�ZxXw�p Roadway 2175 LF FLif Width, 760 LF Half Width, (27 " wide road) 68,085 SF 0.961 A H Z^ P 510,879 SF OM 14% Bedfofdi Hds Subdnnslon 2,045,469 SF 0.50 57° Other Sire Farr 4 Residence 379,726 SF GRAPHIC SCALE 11% Wooded 567,594 5F e 0 5 10 20 40 Combined C Vatue 0.43 Peals How 25 year storm (7.67 inc 272.34 CFS w 0O W w (IN FEET)j a �%\► iinch 2-547pipes a 1 W LL W =tib C w w ro c 112 N U 0 0 o�Z V CL E O r QQ U U d d 1 a as o South Culvert 'zing na sis W w so xz2T'l � W wOi0pUpim �-F4zt-=�.�w�o ~UOUcnlU—�O C-Vak % of Da Total DA: 3,572,643 SF C�-Jy iri W Z DULL' Wulx 3 OOSZ�ZxXw�p Roadway 2175 LF FLif Width, 760 LF Half Width, (27 " wide road) 68,085 SF 0.961 A H Z^ Mobile Hors Park 510,879 SF OM 14% Bedfofdi Hds Subdnnslon 2,045,469 SF 0.50 57° Other Sire Farr 4 Residence 379,726 SF 0.40 11% Wooded 567,594 5F 0.20 16% Combined C Vatue 0.43 Peals How 25 year storm (7.67 inc 272.34 CFS w 0O W w Z a Options 2-547pipes a Q W LL IMPACTS TO UNNAMED TRIBUTARY TO OTTER CREEK PRE -DEVELOPMENT STREAM LENGTH IMPACTED BY CULVERT: 74 LF RIPRAP (KEYED INTO STREAM BED): 20 LF DEWATERING FOOTPRINT: 110 LF PRECAST CONCRETE NCDOT STD. HEADWALL (TYP.) NORTHERN CREEK CROSSING DETAIL 1"=20' TOP OF BANK TEMPORARY SANDBAGS TO DAM THE CREEK DURING CROSS PIPE SOUTHERN CREEK CROSSING DETAIL 1"=20' 1 1AAI-rC nC MIC N 10DAAI(`C y NOTE:STORM PIPE (INCLUDING CULVERT AND HEADWALL) SHOWN SURVEYED BY SUMMIT DESIGN AND ENGINEERING SERVICES 12/01/2016. PROPOSED GRADING IS PER THE ORIGINAL DESIGN AND HAS NOT BEEN FIELD SURVEYED. 1 � —/ REINFORCED CONCRETE ENDWALL IS SIMILAR TO NCDOT STD DRAWING 838.22 WITH HEIGHT ADJUSTMENTS PROVIDED AS NECESSARY. H W w so xz2T'l � W wOi0pUpim �-F4zt-=�.�w�o ~UOUcnlU—�O vi Z w— w @Q_7 ria — to 1= LLo=oza¢wwOa 1 �+v3� T W A w Fd'Qw3g=I1.U111 J 3mawr-ypxs_oJ a gw1=a'¢Z 00 0.'m' C�-Jy iri W Z DULL' Wulx 3 OOSZ�ZxXw�p r^ S 3 m A H Z^ aaizz0a3�W. ocxn0ga=� C7_jWF�m ZOo Z U 02 Wca J W U Z U h 11-1- z m WL U M � T_ V ~ � w 0O W w Z a 00 a Q W LL W =tib C w w ro c 112 N U 0 0 o�Z V CL E O r QQ U U d d 1 a as o M 0 C) U JLOZ> J W W J C'1 w o W LU > 0 W U Lu Z LL _ w� Z Q Z) O W W a. a I` c0 U d M N H W w so xz2T'l � W wOi0pUpim �-F4zt-=�.�w�o ~UOUcnlU—�O vi Z w— w @Q_7 ria — to 1= LLo=oza¢wwOa 1 �+v3� T W A w Fd'Qw3g=I1.U111 J 3mawr-ypxs_oJ a gw1=a'¢Z 00 0.'m' C�-Jy iri W Z DULL' Wulx 3 OOSZ�ZxXw�p r^ Z U O �"' L 1.' Q 4 ~45- 55 LK4�<z0 O C7 USW 3aod��JW LU oo12 A H Z^ aaizz0a3�W. ocxn0ga=� C7_jWF�m ZOo H ro w U U W w r^ Z N x w A H Z^ w U Z U Wca J W U Z U h =(5 z m WL U M � ~ � w w w Z a a N W LL W =tib C w w ro c 112 N U 0 U m o�Z V CL E O r QQ U U U 1 a as o M 0 Iuu !4 ro w U w r^ Z N x w A H Z^ w U Z U Wca J W U Z U h =(5 z m WL U M � ~ � aLO1 N W LL W =tib C (5 N M y ro c 112 CD o�Z V CL E >°5 cm- a co 2 M . y U JLOZ> Iuu !4 r^ Z Z z O A H Z^ w U Z U O J W U �IT1zW w UU =(5 PROJECT NO. 14-0243 DRAWING NAME: 14-0243D SHEET NO. D-8 J I- W 0 0 z U) U) 0 U Z> �W/ W