Loading...
HomeMy WebLinkAboutNC0024406_Installation of USGS gauge_20081023RE: Installation of USGS gauge Y� Subject: RE: Installation of USGS gauge From: "Lewis, Ron" <relewisl@duke-energy.com> Date: Thu, 23 Oct 2008 13:09:15 -0400 To: Jeanne C Robbins <jrobbins@usgs.gov> CC: Douglas A Walters <dwalters@usgs.gov>, James Mckay <James.McKay@ncmail.net> Jeanne, I spoke with Jim Mckay of the NCDENR Division of Water Quality today concerning the status of the USGS gage installation. Please include Jim on the correspondence that is noted below. Thanks, Ron Duke Energy Mail Code: EC13K 526 S. Church Street Charlotte, NC 28202 Office 980-373-5710 Mobile 704-607-8755 From: Jeanne C Robbins [mailto:jrobbins@usgs.gov] . Sent: Tuesday, October 21, 2008 10:11 AM To: Lewis, Ron Cc: Douglas A Walters; Jeanne C Robbins Subject: RE: Installation of USGS gauge Ron, As we discussed, I will send you a letter this week outlining the costs for installation and operation for the period beginning with the anticipated install date through the period June 30, 2009. This will coincide with the State's fiscal year, since billing will be made through the NC Division of Water Resources. The letter will ask that you respond to the Director of the NC Division of Water Resources, with a copy to our office, indicating that you will accept billing for this new gaging effort. We look forward to working with you on this important data collection effort. Jeanne C. Robbins, P.E. Surface -Water Specialist, Data Chief USGS -- Raleigh, NC (919) 571-4017 hftp://nc.water.usgs.gov/ "Lewis, Ron" <relewis1@duke-energy.com> To Jeanne C Robbins <jrobbins@usgs.gov> 10/20/2008 05:51 PM cc Douglas A Walters <dwalters@usgs.gov> Subject RE: Installation of USGS gauge 1 of 5 10/23/2008 1:06 PM RE: Installation of USGS gauge 'v Your cost for installation and annual operation of both gauges was approved. Do you need payment before getting landowner approval and starting installation or will the department bill Duke Energy separately for the capital and operating costs? For our accounting purposes, we probably would send separate checks for the capital cost of installation and for the annual operating cost. Thanks, Ron Duke Energy Mail Code: EC13K 526 S. Church Street Charlotte, NC 28202 Office 980-373-5710 Mobile 704-607-8755 From: Jeanne C Robbins [mailto:jrobbins@usgs.gov] Sent: Thursday, October 16, 2008 10:01 AM To: Lewis, Ron Cc: Jeanne C Robbins; Douglas A Walters Subject: RE: Installation of USGS gauge Ron, Attached is a proposal for a streamgage and raingage installation on the Dan River in the vicinity of the old USGS Pine Hall gage. I understand that the subject of adding a raingage came up during the site visit and I have outlined the streamgage and raingage items separately for both the one-time capital costs for installation as well as the annual operation and maintenance costs. If you have any questions about the attached proposal don't hesitate to call. We look forward to hearing from you regarding this potential installation. Jeanne C. Robbins, P.E. Surface -Water Specialist, Data Chief USGS -- Raleigh, NC (919) 571-4017 http://nc.water.usgs.gov/ "Lewis, Ron" <relewis1 @duke-energy.com> To Jeanne C Robbins <jrobbins@usgs.gov> 10/09/200812:24 PM cc "Covington, Edna X <ejcovington@duke-energy.com>, "Martin, Melonie Y" <mymartin@duke-energy.com>, "Price, R at Belews" <rwprice@duke-energy.com>, Douglas A Walters <dwalters@usgs.gov>, Geoffrey D Cartano <gcartano@usgs.gov> Subject RE: Installation of USGS gauge 2 of 5 10/23/2008 1:06 PM RE: Installation of USGS gauge 04 Jeanne, We look forward to receiving your proposal next week. Thanks for the update. Ron Duke Energy Mail Code: EC13K 526 S. Church Street Charlotte, NC 28202 Office 980-373-5710 Mobile 704-607-8755 From: Jeanne C Robbins [mailto:jrobbins@usgs.gov] Sent: Thursday, October 09, 2008 10:57 AM To: Lewis, Ron Cc: Covington, Edna J; Martin, Melonie Y; Price, R at Belews; Jeanne C Robbins; Douglas A Walters; Geoffrey D Cartano Subject: Re: Installation of USGS gauge Ron, I spoke with Doug Walters and Geoff Cartano who visited the site last week and they did indeed indicate that the old location at Pine Hall was still a suitable site for re -installation of a new streamgaging station on the Dan River. I will get a proposal out to you early next week outlining the costs and a proposed timeline for installation. And regarding the question about turning the gage off for some periods, we generally have annual funding agreements for operation and maintenance of our streamgages. Additionally, USGS gage instrumentation typically monitors river stage and we must visit the site over a range of river stages to measure discharge or streamflow and establish a rating or relation between river stage and streamflow. The rating, which relates river stage to streamflow, will be developed as soon as enough measurements can be obtained over the range of expected streamflow. So, if we turn the gage off for some time and did not visit it to verify the stage data collection was functioning properly or continue to measure streamflow under varying conditions particularly as large events may change the channel conditions at the site, we might need to start over on a rating making it difficult to report timely streamflow information. Feel free to email or call me at the number listed below if you have additional questions. We look forward to working with you on this streamgaging station installation. Jeanne C. Robbins, P.E. Surface -Water Specialist, Data Chief USGS -- Raleigh, NC 4 of 5 10/23/2008 1:06 PM RE: Installation of USGS gauge (919)571-4017 hftp://nc.water.usgs.gov/ "Lewis, Ron" <relewisl @duke-energy.com> 10/02/2008 02:15 PM To "Jeanne C Robbins" <jrobbins@usgs.gov> cc "Covington, Edna J" <ejcovington@duke-energy.com>, "Martin, Melonie Y" <mymartin@duke-energy.com>, 'Price, R at Belews" <rwprice@duke-energy.com> Subject Installation of USGS gauge Jeanne, According to the staff at Belews Creek Steam Station, the location of the old gauge and the building was located . during the site visit with Doug and Geoff today. Once you discuss the details of the condition of the site with them, please provide the next actions needed for installation and yearly maintenance costs, as well as additional costs for installation of a rain gauge at the same location. Thanks, Ron Duke Energy Mail Code: EC13K 526 S. Church Street Charlotte, NC 28202 Office 980-373-5710 Mobile 704-607-8755 5 of 5 10/23/2008 1:06 PM