HomeMy WebLinkAboutNC0078000_Compliance Evaluation Inspection_20170410 ROY COOPER
•t•
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Water Resources Director
ENVIRONMENTAL QUALITY
April 10, 2017
RECEWEDINCOMM
Mr. Jeff Matheney, SRQ Manager
Brenntag Southeast, Inc. p;p R 7 2017
2000 East Pettigrew Street waterQUat%t
Durham,NC 27703 PetmittingSection
SUBJECT: Compliance Evaluation Inspection
Brenntag Groundwater Remediation System—Greensboro,NC
NPDES Permit No.NC0078000
Guilford County
Dear Mr. Matheney:
On January 21, 2016, Min Xiao of this office met with Bill Mesar, Monroe Boykin, and Herman
Dixon,to perform a Compliance Evaluation Inspection on the groundwater remediation system at
the Greensboro facility. The inspection found the Brenntag treatment system to be compliant with
the NPDES permit. The inspection findings are detailed below and an inspection checklist is
attached.
I. Permit
The current permit became effective December 1, 2016, and will expire at midnight on May 31,
2021.No significant changes have been made to the processes since last renewal. Please keep the
most updated permit on-site.
•
II. Records/Reports
For this inspection,the DMRs were reviewed for the period January 2016 through December 2016.
The facility was found to be compliant with the effluent permit limits for the above period.
A comparison of October 2016 DMR with the field records and laboratory results revealed that
Flow, pH, Toluene, Benzene, Trans-1,2-Dischloroethene, Trichloroethene, and the result of
Chronic Toxicity had been correctly transcribed.Brenntag staff perform the on-site monitoring for
continuous flow and pH.ARCADIS collects the quarterly samples for the remainder of the effluent
parameters to TestAmerica laboratory and R&A laboratory(only for toxicity test).
Please note that the facility does not possess a field parameter certification currently,which
shall be obtained through Laboratory Certification Branch of NC DEQ.
III. Facility Site Review
The groundwater remediation system consists of the following: two extraction wells, a single
surge tank,two in-line strainers (bag filter#1 &bag filter#2), and an air stripping tower. Flow is
monitored using the mechanical totalizers on the influent lines from extraction wells EW-1 and
EW-2. The facility appeared to be competently operated and maintained.
State of North Carolina I Environmental Quality I Water Resources
450 West Hanes Mill Road,Suite 300,Winston-Salem,NC 27105
Phone:336-776-98001Interet:www.ncdenr.gov
IV. Flow Measurement
The permit requires continuous flow recording. Flow data reported on the DMR are obtained from
mechanical totalizers located on the influent lines of recovery extraction wells EW-1 & EW-2.
ARCADIS calibrates the totalizers periodically.An ultrasonic meter with parshall flume is located
outside the remediation building, and is used as a back-up meter for flow measurement.
VI. Effluent/Receiving Waters
The system discharges into an unnamed tributary of South Buffalo Creek, class "WS-V; NSW"
waters of the Cape Fear River Basin. The discharge was observed to be clear at the time of the
inspection.
Should you have any questions concerning this letter,please contact Min Xiao or me at(336)776-
9800.
Sincerely,
/Sherri V. Knight,PE
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources
cc: Monroe Boykin, Brenntag Mid-South, Inc. (mboykin@breentag.com)
Herman Dixon,Brenntag Mid-South, Inc. (hdixon@breentag.com)
Bill Mesar, Brenntag Mid-South, Inc. (bmesar@breentag.com)
Central Files
PDES-UniiD
WSRO
.j4
United States Environmental Protection Agency Form Approved.
EPA Washington.,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 Iti I 2 LI 3 I NC0078000 I 1 1 12 I 17/04/10 117 18[ J 19 Li I 201 I
211II111 IIIIIIIIIII III IIII I IIIIII IIIIILIIIII Ire
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved t
671 1 70 LJ I I 71 I Ji 72 I L�, I_I 731 1 174 75 80
Section B:FacilityData
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 09:10AM 17/04/10 16/12/01
Brenntag/Greensboro remediation
2 Segal Blvd Exit Time/Date Permit Expiration Date
Greensboro NC 27409 11:10AM 17/04/10 21/05/31
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data •
///
William M Mesar/ORC/336-851-6772/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Bruce Donald Bieh1,2000 E Petigrew St Durham NC
277034049/Director/919-281-2932/9195965441 No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
• Permit • Flow Measurement is Records/Reports •Self-Monitoring.Program
Facility Site Review • Effluent/Receiving Waters
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
•
•
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Min Xiao AA WSRO WQ1/336769800/ /to) 4o/ o,7
Signature f Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
,fes ✓' 2v�f() L-/////201/
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
NPDES yr/mo/day Inspection Type 1
3I NC0078000 I11 121 17/04/10 117 18 [ j
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
•
•
Page# 2
Permit: NC0078000 Owner-Facility: Brenntag/Greensboro remediation
Inspection Date: 04/10/2017 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 • 0
application?
Is the facility as described in the permit? • 0 0 0
#Are there any special conditions for the permit? 0 • 0 0
Is access to the plant site restricted to the general public? • 0 0 0
Is the inspector granted access to all areas for inspection? • 0 ❑ 0
Comment: The current permit became effective December 1, 2016, and will expire at midnight on May
31, 2021.
Record Keening Yes No NA NE
Are records kept and maintained as required by the permit? • 0 0 0
Is all required information readily available, complete and current? • 0 0 0
Are all records maintained for 3 years(lab. reg.required 5 years)? • 0 0 0
Are analytical results consistent with data reported on DMRs? • 0 0 0
• Is the chain-of-custody complete? _ • 0 0 0
Dates,times and location of sampling •
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis •
Name of person performing analyses •
Transported COCs U
Are DMRs complete:do they include all permit parameters? • 0 0 0
Has the facility submitted its annual compliance report to users and DWQ? 0 0 • 0
(If the facility is=or>5 MGD permitted flow)Do they operate 24/7 with a certified operator 0 0 • 0
on each shift?
Is the ORC visitation log available and current? • 0 0 0
Is the ORC certified at grade equal to or higher than the facility classification? U 0 0 0
Is the backup operator certified at one grade less or greater than the facility classification? • 0 0 0
Is a copy of the current NPDES permit available on site? 0 • 0 0
Facility has copy of previous year's Annual Report on file for review? ❑. 0 • 0
Comment: The renewed permit was mailed to the permittee in November 2016, but it was not on-site.
They've made a copy already.
Flow Measurement-Influent Yes No NA NE
#Is flow meter used for reporting? • 0 0 0
Page# 3
w
t
Permit: NC0078000 Owner-Facility: Brenntag/Greensboro remediation
Inspection Date: 04/10/2017 Inspection Type: Compliance Evaluation
Flow Measurement- Influent Yes No NA NE
Is flow meter calibrated annually? - • 0 0 0
Is the flow meter operational? • 0 0 0
(If units are separated)Does the chart recorder match the flow meter? 0 0 • 0
Comment: Flow data reported on the DRM are obtained from mechanical totalizers located on the
influent lines of recovery extraction wells EW-1 &EW-2.ARCADIS calibrates the totalizers
periodically.An ultrasonic meter with Darshall flume is located outside the remediation
building, and is used as a back-up meter for flow measurement.
Effluent Pine Yes No NA NE
Is right of way to the outfall properly maintained? _ U 0 0 0
Are the receiving water free of foam other than trace amounts and other debris? • 0 0 0
If effluent (diffuser pipes are required) are they operating properly? 0 0 • 0
Comment: The treated effluent is discharged into an unnamed tributary to South Buffalo Creek.The
effluent was observed to be clear during the inspection.
Page# 4