Loading...
HomeMy WebLinkAboutNC0000396_1964 Basin Waste Boundary Minor Update April 2017_20170419DUKE ENERGY April 19, Zu17 North Carolina Departme,it of Eirviioiuiieiital Quality Division of Water Resources 1636 Mail Service Center Raleigh, NC 27699-163b RE: Asheville Steam Electric Plant 1964 Ash Basin Waste Boundary Buncombe county, Arden, Forth Carolina 213704 Dear Sir or Madam: 410 S. Wilmington Street. Rateigh, NO 27601 Mailing Address Mail Code NC 15 Raleigh, NC 27601 09-546-780 &19-545-63302 (/ax) DuRe Energy has Begun the process to prepare the 1964 ash basin for closure via excavation. 1 his process entails review of historical aerial photographs, 1964 ash basin drawings, site borings and discussions with present and prior employees. This has resulted in a slight iiioditicaticin ut the upstream waste Boundary from that first identified in Zulu when the Division required groundwater monitoring at the compliance boundary. This slight modification of the waste Boundary is shown in the two enclosed figures. The moditication of the waste Boundary required a slight change to the compliance Boundary and half mile radiaz) trUiii the compliancc boundary. The minor update to the halt mile radius resulted in one additional receptor identified (9 Plott Place)_ Records search reveals this location is supplied by municipal water. Future documents will show the enclosed updated waste, compliance and halt mile survey Buundai ieb. This intormation is also Being provided to the Asheville Regional Uffice. If you have any questions or need any claritit-ation regarding this submittal, tee[ tree to contact me at john.toepter@duke- enerKy.com or at 919-54b-78bI Respecttully suBmitted, Jo Toepter, E. Lead Engineer Duke Energy EHS CCP Waste & Ciroundwater Programs Enc: Figures 1 & Z, Syn I erra Corporation, April 5, ZUI/ cc/enc (via e-mail): Landon Davidson — NCDEQ Eric Smith - NCDEQ Mr. Ed Sullivan, Duke Energy Ivls. 1 eresa williams —Duke tnergy Mr. Mike Clough — Duke Energy Mi. Matt Hanchey — Duke Energy 'O . 1? `\-� � � > z +f .� . :,.t y 7 '• 4 c - .� :' i ff? i rJ r - - 1 •,,k:s i.v,+rw \SEE FIGURE 2 FOR MORE DETAIL IN THIS AREA DE ASHEVILLE PARCEL LINE REVISED HALF -MILE SURVEY BOUNDARY - / \ . PREVIOUS HALF -MILE SURVEY BOUNDARY LAKE JULIAN 11V: I� REVISED COMPLIANCE BOUNDARY _ PREVIOUS COMPLIANCE BOUNDARY 1 PREVIOUS WASTE BOUNDARY I `1 \ REVISED WASTE BOUNDARY \ 1964 ASH BASIN 1982 ASH BASIN ` 3 RAYS ` / \\ // tel. M ^� } A h ,�!•.�' �/�`•\ ��\\ y /?' .. �./ .Ir".` f{4 ani -. ` "'✓ Ae AERIAL PHOTOGRAPH OBTAINED FROM NC ONE MAP GEOSPATIAL PORTAL AT ema p.com/geoportal/catalog/ raster/download. page GRAPHIC SCALE 400 rr0 400 800 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www. synte rra co rp. co m Terra DRAWN BY JOHN CHASTAIN DATE 04/05/2017 Wn PROJECT MA1 (SITE T DE) PLATING LAYOUT: FIG 1 (SITE WIDE) 04/05/2017 4:28 PM P:\DUke Energy Progress. 1026\102. i FIGURE 1 REVISED WASTE, COMPLIANCE, AND 1/2 MILE WELL SURVEY BOUNDARIES ASHEVILLE STEAM ELECTRIC PLANT 200 CP & L DRIVE ARDEN, NORTH CAROLINA