Loading...
HomeMy WebLinkAboutNCG020918_NOI Application_20170406 • FOR AGENCY USE ONLY Date Received Division of Energy,Mineral and Land Resources/ Year Month Day Land Quality Section—Stormwater Permitting Program Certificate of Coverage NICIGI0120111Ig` National Pollutant Discharge Elimination System` Check# „off Perna Ass h ed to NCG020000 NOTICE OF INTENT— General Permit-Application National Pollutant Discharge Elimination S yst m application,for,cove_rage,undeAGeneral Permit NCG020000: STORMWATER AND/OR WASTEWATER DISC-IARGES associated with activities classified as: SIC3(Sfandardlindustrial=Classificatipn) C,ode,-14X9 Mineral Mining Industry(except as specified below) and like activities The following activities are included: • Active or inactive mining operations (including borrow pits-except for NCDOT bprrow pits)that discharge stormwater contaminated with or that has coflfine in contact-'with, any overburden, raw,rnateri0, intermediate products, finished products, byproducts or%/este products located on the site of such RE I�/E® • Stormwater from vehicle maintenance activities (VMA) at mining operations; C • Overflow from facilities that recycle process astewater; and/or APR 06 2017 • Mine dewatering (wastewater) The following activities are specifically exclu ed from coverage under this Gener -, h mi , §� i' wn QUALITY aPatilltiNG • Stormwater discharges associated with peat mining, coal mining, and metal mining; • Stormwater discharges from mining operations which are intermixed on site with stormwater from concrete operations; c3{ ,,of S • Stormwater discharges associated with oil and gas extraction operations; and 5 • Stormwater discharges associated with tourist gem mines S e 1C'c'1"4/1 • NCDOT borrow pits (covered under individual permit NCS000150) l The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000: Point source discharges of stormwater and wasteLater from in-stream sand mining operations (sand dredging or dipping operations) are covered instead by NPDES General Permit NCG520000,administered by-the Division of Water Resources NPDES Wastewater Permitting Program. Please contact DWR for more information: Please print or type all entries in this application form. 1) Mailing address of owner/operator(official address to which all.permit correspondence will be mailed): Legal Owner Name (Attach the most recent Annual Deport to the NC Secretary of State showing the current legal name of the corporation or entity. Alternatively this permit can be given to an individual or government authority. This name must be the same name as appears on the Division of Energy,Mineral,and Land Resources'Mining'Permit.) o Signee's Name(as signed for in question 41.,at end) Vit �iJf 1)12 0L= Sit-177 Street Address 572 y- SW JE y i '1 p City owl-FR/rt./ State fr t- ZIP Code &9 e [b Telephone No. c252--'4* 17411/?/ E-mail 2h QSell:7co efbiR codply ^'1 Alternate Contact Name* ttiggesTER R, WI-KE . E-mail (if different) Alternate Contact Telephone(if different) f 2T 3 ZZ -53 LI *Alternate contact should be affiliated with the Owner/Operator. Consultant information can be provided in question 5. Page 1 of 12 SWU-NCG02-NOI Last revised 9/10/2015 NCG020000 N.O.I. 2) Location of facility producing discharge: Facility Name SPL-9y /--#09 Ca/ (141-C (141i Facility Street Address ,6-7 S;pug/ IN-410(MIA Facility City - V State ZIP Code all'yb Facility County 000r'Ai Facility Contact --/✓MI►lictlJ OL 5EL By Telephone No. 25z. gd 5/—51/9( Fax: Ae5-7 `1 ' -4225 Contact'E=mail 'h e_Sefirr GD���riCD�N"1- .CD M 3) Physical Location Information: Please provide a narrative description of how to get to the facility(use street names, state road numbers, and distance and direction from a roadway intersection). sno-n} of ayosl o X13 lvf1t.K>iis ROAD ,/N 490-girfalArr Cda w -rF 4) Facility Location Coordinates: Latitude /Go -5Z� "9 N•Longitude 35°-110 "!Z 6 W (degrees/minutes/seconds or decimal degrees) 35-. Lig ao 5--° —16 . 7 gl a. 5) Consultant Information (if applicable): Consultant: Consulting Firm: (Optional) Mailing Address: Staple Business Card Here ' City: State: Zip Code: Phone. (_ ) Fax: ( E-mail: Permits: 6) This NPDES Permit Application applies to which of the following: ❑yew or Proposed Facility Date operation is to begin: Existing Date began mining: 7) Standard Industrial Classification: • Provide the 4 digit Standard Industrial Classification Code (SIC Code)that describes the primary industrial activity at this facility SIC Code: 8) Provide a description of the types of minerals mined at this facility: 5141\10 9) Is this a PROCESSING-ONLY facility forrmaterials mined elsewhere? El No ❑ Yes 10) Is this,an inactive mine site? - No ;� ;i Y . APO,❑ Yes If yes, have you certified to the Storrnwater Permitting Progra lthat all portions of the site where clearing, grading, and/or excavation activities have occurred have been stabilized'? ❑ No I] Yes (If yes, the site may be eligible for"Dormant Status" and reduced BMP inspections. See the General Permit.) Page 2 of 12 cWI Last revised 9/10/2015 NCG020000 N.O.I. 11) Does this facility already have a valid Miniig-Permit from DEMLR's Land Quality Section? ❑ No If no, please indicate the status of the Mining Permit application: Yes If yes, please provide the Mining Permit number: O 7-35 . Also provide a copy of the DEMLR Mining Permit with This NPDES application. IJ IL)FI— i iSa Fa P. 12) Does this facility have any other NPDES permits? 12r No, ❑ Yes If yes, list the permit numbers for all current NPDES permits,for this,facility: 13) Are you applying for a discharge permit in the same location as a previously permitted mine? ❑ No it Yes If yes, specify permit number and mine name if known. 47-35.- ,1 �Iy O /11rA1P 14) Does this facility have any Non-Discharge permits from DWR(e.g., recycle permits)? ' krNo ❑ Yes If yes, list the permit numbers for all current Non-Discharge permits for this facility: 15) Does total area of this,mine site include ready-mixed concrete plant and/or asphalt plant areas? RrNo ❑ Yes If yes, do they have separate NPDES stormwater permits? ❑ No 0 Yes (provide permit number(s) If not owned by the same compary, who is the owner? Development Activities and Buffers: 16) Will this mining operation precede develo ment activities at this site? ErNo ❑ Yes 17) Is this mine located within one of the 20 Coastal Counties, and will it add more than 10,000 ft2 ofd impervious surface? 'Yes (to both) ❑ No, this mine site IS in one of the 20 Coasijal Counties but will NOT add 10,000 ft2 of impervious surface. ❑ No, this mine site is NOT in any of the 20 Coastal Counties If this site is in one of the 20 Coastal Counties, you may be required to apply for an additional State Stormwater Permit. Check with your local Regional Office (see contact information and checklist below). 18) Is this mine located the Neuse,Tar-Pamlico, or Catawba River Basins, or the Randleman or Jordan Water supply Watersheds? ❑ No I Yes If yes, what size stream buffers are included on site? ft. You must show buffers on site plans. Also include information and plans showing diffuse flow through buffers as required.J, Page 3 of 12 SWU-NCG02-NOI Last revised 9/10/2015 _ V NCG020000 N.O.I. -Discharge Points, Receiving-Waters &Wetlands: 19) Receiving waters: Whatis'tlie name,of;the body-or, bodies of water(creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges will end up in? 3;i V s p-Or .5uJa"^ p - P\ rD To find the waterbody, please see the "MAPS"tab on http:/lportal.ncdenr.orq/web/wq for a map of NC Surface Waterbody Classifications. Receiving water classification(s)for the waters. If the site will discharge to a separate storm sewer system, name the operator of the separate storm sewer `system (e.g. City of�Raleigh.municipal storm sewer). Discharge of wastewater to receiving waters classified as WS-II through WS-V, or SA, must be approved by the Division of Water Resources (DWR) or Division of Marine Fisheries (DMF). DEMLR cannot grant coverage under NCG020000 without that approval. Also be advised that no new discharges of wastewater are permitted in receiving waters classified as WS-I or , freshwater ORW. Wastewater discharges to saltwater ORW will not be approved under General Permit NCGO2 but may be eligible for an individual permit. 20) Will this mine site discharge wastewater or stormwater to waters classified as High Quality Waters (HQW), Primary Nursery Areas (PNA),Trout(Tr)waters, or a class with a symbol like"+" or"@"that denotes a special management strategy is in place? N"No 0 Yes, HQW* 0 Yes, includes"+" or"@" ❑ Yes, PNA* ❑ Yes, Trout(Tr) 21) Will this mine site discharge wastewater or stormwater to waters classified as Shellfish (SA)waters? g' No O Yes, SA* *For questions 19-20, be advised that the NCGO2 General Permit limits the discharge volume of total combined wastewaters to 50 percent of the receiving water in-stream flow under 7Q10 conditions in HQW waters (PNA and SA waters are considered HQW by definition). You may be required to contact USGS to obtain a 7Q10 flow. 22) Will this mine site discharge wastewater or stormwater to impaired waters,or to waters with an approved "Total Maximum Daily Load" (TMDL)? To find impaired waters, please see the "Impaired Waters" map on the"MAPS"tab on http://portal.ncdenr.org/weblwo. To find approved TMDLs in North Carolina, please see DWR's Water Planning Section website: http://portal.ncden r.orq/web/wo/psimtu/tmd l/tmd ls. %No O Yes, these waters are impaired for(list pollutants): ❑ Yes, these waters have a TMDL for(list pollutants): Page 4 of 12 ,..., . ...,.. wr+ I act rAvicarl gilni7nis NCG020000 N.O.I. . - 23) List discharge points (outfalls)that convey discharge from the mine site(both on-site and off-site) and location coordinates. Attach additional sheets if necessary, or note that this information is specified on the site plan. Include proposed maximum daily flow rate for each wastewater outfall. . You must show all discharge points clearly on the submitted site plan. Be advised that NCDEQ may require you to apply for an individual permit, based on proposed discharge rates and receiving stre m conditions (low flows, impairments, etc.) Stormwater Stormwater Outfall No. .5. 10 .5 Latitude (degrees/minutes/seconds or decimal degrees): N Longitude (degrees/minutes/seconds or decimal degrees): W Stormwater Outfall No. Latitude (degrees/minutes/seconds or decimal degrees): N Longitude (degrees/minutes/seconds or decimal degrees): W Stormwater Outfall No. Latitude (degrees/minutes/seconds or decimal degrees): N Longitude (degrees/minutes/seconds or decimal degrees): W Stormwater Outfall No. Latitude(degrees/minutes/seconds or decimal degrees). N Longitude (degrees/minutes/seconds or decimal degrees): W Stormwater Outfall No. Latitude(degrees/minutes/seconds or decimal degrees): N Longitude (degrees/minutes/seconds or deci al degrees): W Stormwater Outfall No. Latitude(degrees/minutes/seconds or decim 1 degrees): N Longitude (degrees/minutes/seconds or decimal degrees): W Mi a Dewatering r ta' iq aCh-g-0 Mine Dewatering(Wastewater) Outfall No. 5��r6. PL'i 0eu!dyefi,-aer t/J-Tu-' �� ;,iA_,. Proposed maximum flow rate: I r Latitude (degrees/minutes/seconds or decim4 degrees): , N Longitude (degrees/minutes/seconds or decimal degrees): W Mine Dewatering(Wastewater) Outfall No. Proposed maximum flow rate: I ' Latitude (degrees/minutes/seconds or decimal degrees): N Longitude (degrees/minutes/seconds or decimal degrees): d W Process Wastewater Pr/ Process Wastewater Outfall No. _ Wastewater Description. Proposed maximum flow rate:, Latitude (degrees/minutes/seconds or decimal degrees): N Longitude (degrees/minutes/seconds or decimal degrees): W Process Wastewater Outfall No. Wastewater Description: Proposed maximum flow rate: Latitude (degrees/minutes/seconds or decimal degrees): N Longitude (degrees/minutes/seconds or decimal degrees): W Page 5 of 12 SWU-NCG02-NOI Last revised 9/10/2015 NCG020000 N.O.I. � t_ mato 5 i Gt"5--1) 24) Help us understand what will happen to the dewatering water at this mine site: ❑ N/A—this mine is not dewatering at all and will not dewater in the future. a) Will this mine be dewatering and discharging to waters of the state? (Answer only if dewatering) ❑ No El Yes If yes, where to? ❑ Surface Waters and/or Wetlands (on-site or off-site) ❑ Other(on-site or off-site) Describe b) Will this mine be dewatering but not discharging to waters of the state? (Answer only if dewatering) ❑ No El Yes If yes, explain how you are dewatering, and where that water will be directed. 25) Are there wetlands or surface waters within 400' of the mine pit perimeter? l$f No ❑ Yes If yes, what distance are they from the mine pit perimeter? feet. 26) Will mining operations require dewatering near wetlands or other waterbodies, and will dewatering potentially impact any wetlands or other waterbodies? NrNo, dewatenng will not occur near(within 400') of wetlands or other waterbodies (e.g., streams, lake, etc) ❑ Yes, dewatering will be near wetlands or other waterbodies Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement a Pumping Operation and Monitoring (POM) Plan that has been approved by the • Department. For sites that may drain wetlands—approval of a POM Plan may be required prior to coverage under this permit. The POM Plan should be submitted to the appropriate Regional Office and in all cases must be approved prior to operation. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at the end of the application Contact the Regional Office for questions specific to your mine 27) Have you been required to obtain 404/401 Certification permits? grNo El Yes If yes, please briefly describe below(include information such a required mitigation, BMPs, setbacks, and/or O&M plans for on or off-site wetlands or other pertinent information). Attach other sheets as necessary: Page 6 of 12 n1/1n I un,/,1 wine I nct rovicorl Q/1 n/9R1�i NCG020000 N.O.I. • 28) Have you been required to obtain a wetland delineation certified by the US Army Corps of.Engineers? W No ❑ Yes If yes, please attachi to application submission. Stormwater BMPs and Vehicle Maintenance: 29) Does this facility employ best managemer t practices for stormwater control? , O No 0 Yes If yes, please briefly describe: . n I 1 30) Does this facility have a Stormwater Pollution Prevention Plan? K No 0 Yes If yes, when was it implemented? 31) Are vehicle maintenance activities (VMA)occurring or planned at this mine site? iiiNo ❑Yes, If yes, will VMA area runoff discharge into the wastewatertreatment system(s)? O No,VMA runoff will discharge separately through a stormwater outfall O Yes,VMA runoff will drain back to the mine pit or other wastewater system Wastewater Treatment Facilities: 32) Will mine dewatering occur? (Yes,we are asking about dewatering again.) ❑ No R Yes If yes, will the mine discharge this water? / 3, g kiLS Ey/5771/6- Pd uDs 33) Will this facility wash mined materials? Rr No ❑ Yes If yes, will the mine discharge this water? 34) Will discharges of process wastewater treatment systems occur(including possible recycle system overflows)? o ❑ Yes If yes, describe what kind of systems: 35) Will this facility employ chemical additives to flocculate suspended solids? A No O Yes If yes, provide.the name, manufacturer, and the quantity of average daily usage of the chemical additive (if known). 1 Note: Please see our website for a list of evaluated polyacrylamide (PAMS) products for use in North Carolina: httpy//portal.ncdenr.orq/web/Ir/construction-stormwater 36) Will any of the wastewater treatment facilities at this mine overflow only during rainfall events that exceed the 10-yr,24-hr rainfall event? ❑ Yes If yes, which treatment systems are those? 1 ❑ No, all wastewater treatment facilities will ischarge more frequently (i.e , during smaller rain events) Page 7 of 12 SWU-NCG02-NOI Last revised 9/10/2015 NCG020000 N.®.I. 37) Are wastewater treatment facilities (including r ycle systems) planned in the 100-year flood plain? ❑ No ❑ Yes Wir 38) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2) for any new or.expanding water pollution control facility discharges in North Carolina. You may attach additional-sheets. List the types of wastewater this mine site will discharge: ❑ Mine Dewatering ❑ Process Wastewater(such as washing or recycle system overflows, other mining activity wastewater) a) What wastewaters were considered for this alternatives review? ❑ Dewatering ❑ Process WW b) Connection to a Municipal or Regional Sewer Collection System: i) Are there existing sewer lines within a one-mile radius'? .... ❑ Yes Cl' No (1) If Yes, will the wastewater treatment plant(WWTP) accept the wastewater? ... ❑ Yes ❑ No (a) If No, please attach a letter documenting that the WWTP will not accept the wastewater (b) If Yes, is it feasible to connect to the WWTP? Why or why not?* c) Closed-loop Recycle System (meets design requirements of 15A NCAC 2T .1000): i) Are you already proposing a closed-loop recycle system (CLRS)? ......... .. .. .. ❑ Yes ❑ No (1) -If Yes, for what type of wastewater at this mine site? ❑ Dewatering ❑ Process WW (2) If No, is this option technologically feasible (possible)? Why or why not?* (3) If No, is it otherwise feasible to build a CLRS at this site? Why or why nor?* (4) What is the feasibility of building a CLRS compared to direct surface water discharge?* d) Surface or Subsurface Disposal System (e.g., spray irrigation): i) Is a surface or subsurface disposal technologically feasible (possible)? . ..... .... ❑ Yes 0 No Why or Why nor?* ii) Is a surface or subsurface disposal system otherwise feasible to implement?* . .. ❑ Yes ❑ No Why or Why not?* Page 8 of 12 Cron I n,r'nno ntni I act revised g/10/2015 NCG020000 N.O.I. 14f . iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct discharge to surface waters?* e) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound alternative of all reasonably cost-effec ive options for the wastewaters being considered?* ❑ Yes ❑ No f) If this review included all wastewater ischarge types,would excluding some types (e.g. mine - dewatering) make any of the above non-discharge options feasible for some of the wastewaters? ❑ Yes ❑ No *Feasibility should take into,account init'aland recurring costs. You may be asked to provide further information to support your answers to these questions after the initial review. Other: 39) Hazardous Waste: - a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? )3(No ❑ Yes b) Is this facility a Small Quantity Generator,(less than 1000 kg. of hazardous waste generated per month) of hazardous waste? 'No 0-Yes c) Is this facility a Large Quantity Generator(1000 kg. or more of hazardous waste generated per month) of hazardous waste? No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored. - Where is material stored: How many disposal shipments per year Name of transport/disposal vendor - Vendor address: - 40) Is your facility providing appropriate secor1dary containment for bulk storage pf;liquid-materials? (See permit text for secondary containment require~'nents.) ❑ Yes 41) Does your site have an active landfill within the mining permit boundary? Nr-No ❑ Yes If yes, specify type: 0 LCID (Land Clearing and Inert Debris) 0 Other: Page 9 of 12 SWU-NCG02-NOI Last revised 9/10/2015 NCG020000 N.O.I. r°i Final Checklist: '—, This application will be returned as incomplete unless all of the following items have been included and initialed for. Please show that the following required information has been included by initialing in each space below. PO Fee of$100 made payable to NCDEQ. Completed application and all supporting documents. Copy of the valid approved mining permit(MP)for the facility or indication of MP application status. Ari. Copy of a county map or other general location map that shows the mining site and nearest major roads. /0Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc. t if 2 copies of large-scale (minimum 24" x 36") site plan with topographical lines with all outfalls, applicable buffers and wetlands clearly delineated, receiving waters, and 100-year flood plain line if applicable. , .7 A copy of your US Army Corps-approved wetland delineation if you marked "yes"to question 27 above. , 5 A line drawing of the water flow through the facility or block flow diagram. A pictorial description of the nature of any sources of water and any collection and treatment measures. If mine site is in one of the 20 Coastal Counties: • Applicant has checked with the appropriate regional office to verify the need for a Coastal State Stormwater permit. Indicate the Regional Office Contact: 1,0 @M-c‘WI It 4:7,-1 14 • Applicant has included a detailed list of impervious surface areas and percentages, sub-drainage areas, and total drainage area. If the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater, include the following and contact your local regional office about a Pumping Operation and Monitoring (POM) Plan. An approved POM plan may be required prior to NCGO2 issuance. 2 copies of detailed Full Size Plans (at least 24" x 36") delineating areas on the plans and listing acreage (including: wetlands, ditches, well-placements, pits, borrow areas, overburden storage, stormwater controls/BMPs, vehicle maintenance areas, settling basins, product process (such as screening, stockpiles, waste piles), total drainage area, impervious surface percentages (if state SW programs apply), applicable buffers, and access and/or haul roads). Pump dewatering size and information on its specifications. Well information (design, depths, maintenance). Physical monitoring for the wetlands areas. Settling pond sizing information, if applicable. Level spreader design, if applicable. Details about dewatering method. Cone of influence calculations. Description of measures to prevent erosion and flooding. ' Description and information about 401/404 permits that have been obtained. Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if applicable). have contacted my local regional office about a POM Plan. Regional Office Contact: Date contacted: -OR- will not impact any nearby wetlands,surface waters, or groundwaters by dewatering. ' Page 10of12 CInn I Airr_nn_nlni Last revised 9/10/2015 .3 '; NCG020000 N.O.I. Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement,repre entation,or certification in any application, record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or coitested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management]Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000) 41) Signatory Requirements (per 40CFR 122.22) All applications, reports,or information submitted to the Director shall be signed and certified. a All notices of intent to be covered under this General Permit shall be signed as follows (I)For a corporation. by a responsible corporate officer. For the purpose of this permit,a responsible corporate officer means:(a)a president, secretary,treasurer or vice president of the corporation in charge of a principal business function,or any other person who.performs similar policy or decision making functions for the corporation,or(b) he manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual salIs or expenditures exceeding 25 million(in second quarter 1980 dollars),if authority to sign documents has been assigned or delegated`.o the manager in accordance with corporate procedures. (2)For a partnership or sole proprietorship by a general partner or the proprietor, respectively,or (3)For a municipality,state,federal,or other public agency: i by either a principal executive officer or ranking elected official. I hereby request coverage under the referenced 9 eneral Permit. I understand that coverage under this permit will consfiitute_the permit requirements far the disctia ge(s) and is enforceable in the same manner as an individual permit. I agree to abide by the following as,a part of coverage under this General Permit: 1. I agree to-abide by the approved Mining P rmit for this mining activity. (A copy,of the valid mining permit must be attached to this request.) 2 I agree to not discharge any sanitary wastwater from this mining activity except under the provisions of another NPDES permit specifically issued therefore. 3. I agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. I agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing I solid waste disposal. 5. I agree that maintenance activities for vehcles and heavy equipment will be performed so as to not result in contamination of the surface or ground waters. I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as enforceable requirements of the General Permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Nt6P $ It—Vet) ' $TL'IR y 5 is Title. Pres ' e L5-.. 1-11/ 1-4-11/10 � L 74744-1.,-t- 1 -t/"6(.4 4./ . _ s-Ao - /7 (Signature ofAppl*nt) (Date Signed) Notice of Intent must be accompanied by a check or money order for$100.00 made payable to NCDEQ. Page 11 of 12 SWU-NCG02-NOI Last revised 9/10/2015 NCG020000 N.O.I. Mail the entire package to: Stormwatet Permitting Program Division of Energy,,Mineral and Land Resources 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Note The submission of this document does not guarantee coverage under the NPDES NCGO2 General Permit. Upon review of the submittal,,the Division may determine that coverage under an individual permit is more appropriate. Also be advised that renewed and continued coverage under NCGO2 may be dependent upon the permittee's compliance success and/or status of the receiving waters. For questions,please contact the DEMLR/Land Quality Section Regional Office for your area. DEMLR/Land Quality Section Regional Office Contact Information: -. r Asheville Office (828) 296-4500 LA7V� � i� 11:47:.* Fayetteville Office (910) 433-3300 �titi �.. Mooresville Office 704 663-1699 y . a 1v Raleigh Office (919) 791-4200 Y; w ,' � � - Washington Office ...(252) 946-6481 t�� , ..: � it 0.� Wilmington Office (910) 796-7215 ,v. Winston-Salem .... (336) 776-9800 Central Office (919) 707-9220 ,7, , Page 12 of 12 .1.+..,,.1 I act revised 9/10/2015 JEROL SELBY 66-258/531 NCDL2055689 3 3 5 3 101 SWEETWATER COVE PH.252-964-4621 BATH,NC 27808 3/20/.17`.7 /Q�/pp//'� �rr_ �V/ ▪ ) 1.10 1111.` V c h t' 0111)1.1101 • Dive I c1ja � � �)LLAIts 8 FEE., = ;'N� 0 ,*0 91 r PRIME CHECKING -' - Belhaven C vtlfi.AIKAII,� - a .thy " 'i ji SAND•ROCK•BULKHEAD STONE•EXCAVATING•SITE PREPARATION•DEMOLITION SELBY land concepts , IAi?' .,0 '-' 1 /fes► March 20, 2017 Stormwater Permitting Program LtPZ ✓1/ b r VO 1/0 Division of Energy, Mineral and Land Resources (,L� - 1612 Mail Service Center I 1 Raleigh, NC 27699-1612 a' .ss 1A- •! 7L V!d?}Pa 21C11-4--- Reference: ILrL I_Reference: NCG020000 pitiv-i.,{) vkb__ 0-2,/,-t 1 Walker Mine Permit#07-35 ta�'�-`p� 4 To Whom It May Concern: The above referenced permit renewal has been applied for. DENR-LAND STORMWATER QERMI ITYNG Thank you, (erol Selby 5724 Sidney Road•Belhaven,North Carolina 27810 PHONE 211=964-4171•FAX 9964 4686 251- 2s?_-41‘4-4o17.7.S Pit Dewatering Information • Make of Pump: Pungo low head,high volume PTO powered pump • Volume: 800 GPM average established by the RPM of power source • Gallons to dewater: Approximately 537,600 gallons are to be pumped twice yearly for a total of 1,075,200 gallons to be discharged. • Time required to dewater pit (1 time): 537,600 gallons 11.2 hrs. 48,000 gph • The only time that water is pumped out of an active pit is when mining of sand is taking place. The de-watering pump is located in the end of the active pit nearest a completed pit (pond). Water is discharged into the pond. If and when the volume being discharged is larger than the available free-board in the receiving pond, the additional water will flow by transfer pipe into another pond. If the available free-board in this pond is not sufficient to handle the water, then the excess water will sheet flow over a 30 ft. section of Pit No. 1 near the northeast corner. This clear water will flow through over 400 ft. of wooded area before it reaches Juniper Swamp. In all of the years the mine has been active, this has only happened twice.