HomeMy WebLinkAbout20170438 Ver 1_Bridge 580126 McDowell Permit Application_20170413 (2)Corps Submittal Cover Sheet
Please provide the following info:
1. Project Name:_Bridge 580126, SR 1560 Old Linville Road
2. Name of Property Owner/Applicant: NC DOT _
3. Name of Consultant/Agent:
*Agent autliorization needs to be attached.
4. Related/Previous Action ID number(s):
5. Site Address:
6. Subdivision Name:
7. City: Ashford
8. County: McDowell
9. Lat: 35.87929 Long: -81.93660 (Decimal Degrees Please )
10. Quadrangle Name: _Linville Falls
11. Waterway: Pond Branch
12. Watershed: Catawba River
13. Requested Action:
X Nationwide Permit # 14
General Permit #
Jurisdictional Determination Request
Pre-Application Request
The following information will be completed by Corps office:
AID:
Prepare File Folder Assign number in ORM Begin Date
Authorization: Section 10 Section �404
Project Description/ Nature of ActiviYy/ Project Purpose:
Site/Waters Name:
Keywords:
`��STATEq .
�.0 � No
Ps5
�t 21
'� e.
��':
rj.--_�-�:
�W Cf
`':y� di
.'�;.�,
STATE OP NORTH CAROLINA
DEPART'MENT OF "1'RANSPORTATION
ROY COOPER
GOVtRNOR
April 13, 2017
Ms. Lori Beckwith
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
Subject: NationwidePermit#14
Bridge 580126, SR 1560 Old Linville Road
State Project No. 17BP.13.R.1 l
McDowell County, NC
Dear Ms. Beckwith:
JAMr;s H. TaoG�oN, III
SECRH'fARV
I have enclosed a set of plans, a PCN application for NWP #14, and a vicinity map relative to the
proposed bridge replacement project on SR 1560 Old Linville Road, McDowell County, NC.
We propose to replace the existing 18'6" timber bridge with an aluminum box cufvert (23'4"x
7'8") with ]ow flow channeL Stream slope at the culvett site is 2.9%. Culvert installatio�� will
result in pennanent impacts to 38 linear feet of Pond Branch with an additional 51 linear feet of
floodplain bench/stabilization. Tempora�y impacu to 95 linear feet of the stream are necessary
for dewatering/diversion during construction. The stream is approximately 7 feet wide with
predominately cobble and boulder substrate. Pond Branch is classified as Class C, Trout.
Existing channel morphology will be maintained upstream and downstream of the culveit.
Riparian vegetation will be reestablished along disturbed areas associated with the project.
Stonnwater will be diverted through grass-lined ditclies or vegetated buffers prior to entering
streams.
Tliis project may impact potentiaily suitable northern long-eared bat (Myotis se�tentrionalis)
(NLEB) summer roosting habiYat via tree clearing. Followivg the SLOPES from NWP Regional
Condition 3.13, the project is located inside a red HUC and a survey found no evidence of bat
presence/usage at the site. A total of 8 trees will be cleared for the project. No effect on the
remaining McDowell County IisY of federally protected species (threatened or endangered) or
designated critical habitat will occw�.
Mniling Address:
NC DEPAR'fMENT OP TRANSPORTATION
DIVISION THIRTEEN
POST OFFICE BOX 3279
ASHCVILLH,NC 28802-3279
Telephone:(828)251-6171
Fox:(828)251fi394
Cus/mrter Servfre: 1-877368-0968
Website: www.ncdo�.gov
Localior[
55 ORANGE SI�REF'I'
ASHHVILLE,NC 28801-2340
Lori Beckwith
Page —2 Bridge 580126, McDowell County
April 13, 2017
As a part of the 401 Certification process, the project was processed through the DOT
Programmatic Agreemeut for Minor Project as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121-12(a). No Historic Resources will be adversely
affectcd. A rock fapade will be constructed that is similar to the adjacent church to comply with
the No Adverse Effect. These forms are attached for the Corps file.
By copy of this letter, we request Marla Chambers, North Carolina Wildlife Resources
Commission Western Region Coordinator, to comment directly to the Corps concerning the
permit request.
By copy of this letter, we are asking the Area Roadside Pield Operations Engineer, to comment
on the above project. Pond Branch is classified as Class C, Trout. The project will not require a
trout buffer variance.
By copy of this letter, 1 am forwarding one electronic copy of the application package to Kristi
Lynn Carpenter, NC Division of WaYer Resources, Transpartation Permitting Unit with cc to
Kevin Barnett, NC DWR Asheville Regional Office for review and comment. Please charge the
application fee of $240.00 to WBS element # 17BP.13.R.11. Please fo�ward comments directly
to the Corps with copy to Division 13 Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-617 ].
Sincerely,
�� r� P,��-
Roger D. Bryan
Division 13 Eirvironmental Officer
�nclosures
cc: J.J. Swain, Jr., P.E.
Chris Medlin, P.E.
Reid Whitehead, P.E., CPESC
Kevin Barnett
Marla Chambers
Kristi Lynn Carpenter
O�O� WATF9�G
y
> g
o �
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
7. Processing
1a. Type(s) of approval sought from the X Section 404 Permit ❑ Section 10 Permit
Corps:
1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? X Yes ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes X No ❑ Yes X No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation X Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h ❑ Yes X No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No
2. Project Informatlon
2a. Name of project: Bridge 580126, SR 1580
2b. County: McDowell
2c. Nearest municipality / town: Ashford
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state 17BP.13.R.11
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if N/A
applicable):
3d. Streetaddress: N/A
3e. City, state, zip: N/A
3f. Telephone no.: N/A
3g. Fax no.: N/A
3h. Email address: N/A
Page 1 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: North Carolina Department of Transportation
4b. Name: J.J. Swain, Jr., P.E., Division Engineer
4c. Business name N.C. Department of Transportation
(if applicable):
4d. Street address: 55 Orange Street, P.O. Box 3279
4e. City, state, zip: Asheville, NC 28802
4f. Telephone no.: 828-251-6171
4g. Fax no.: 828-251-6394
4h. Email address: rdbrvanCaDncdot.aov
5. AgenUConsultant Information (if applicable)
5a. Name: N/A
5b. Business name N/A
(if applicable):
5c. Streetaddress: N/A
Sd. City, state, zip: N/A
5e. Telephone no.: N/A
5f. Fax no.: N/A
5g. Email address: N/A
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): N/A
1b. Site coordinates (in decimal degrees): Latitude: 35.87929° N Longitude: - 81.93660° W
1c. Propertysize: 0.1 acres
2. Surtace Waters
2a. Name of nearest body of water (stream, river, etc.) to pond Branch
proposed project:
2b. Water Quality Classification of nearest receiving water: C, Trout
2c. River basin: Catawba
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing bridge on SR 1560 surrounded by low density residential area and forest.
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
100
3d. Explain the purpose of the proposed project:
Replace the existing 18'6" timber bridge with an aluminum box culvert (23'4" x 7'8" x 38') with 7' wide low flow channel.
The channel configuration is shown in the plans.
3e. Describe the overall project in detail, including the type of equipment to be used:
A permanent impact to 38 linear feet of Pond Branch will be necessary for culvert installation with an additional 51
linear feet of impact for floodplain bench/stabilization activities. In addition, a temporary impact to 95 linear feet will
be necessary for an impervious dike/diversion to dewater the work area during construction. Equipment used will
include excavator, crane, and trucks.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / X Yes ❑ No ❑ Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type � preliminary ❑ Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NC DOT
Name (if known): Roger Bryan Other: N/A
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
PJD completed by NC DOT on April 13, 2017 and submitted with this permit application.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes X No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes X No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands X Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem orar T
W1 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W2 � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P 0 T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ❑ P X T Impervious pond Branch X PER X Corps � 95
Dike/Dewatering ❑ INT ❑ DWQ
Floodplain Bench/ X PER X Corps
S1 X P❑ T Stabilization Pond Branch � INT ❑ DWQ � 51
S1 X P❑ T Aluminum Box pond Branch X PER X Corps � 38
Culvert ❑ INT ❑ DWQ
S2 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S3 � P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 95
3i. Comments: 38 feet of permanent culvert impact, 51 feet of permanent floodplain bench, and 95 feet of temporary impacts
for dewatering. The total project footprint is 95 linear feet.
Page 4 of 10
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora T
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P�T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. Sc. 5d. Se.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
Sg. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surtace area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number— Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigalion (square feet) (square feet)
Tem orar T im act re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Minimized length of culvert and has low flow channel within the structure to maintain natural stream bottom. Floodplain
bench will be constructed to maintain stream channel stability.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
N/A
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for X Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ X Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this X Payment to in-lieu fee program
project?
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. X Yes
4b. Stream mitigation requested: 38 linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool X cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes X No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: ❑ Yes ❑ No
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project7 N/A
2b. Does this project require a Stormwater Management Plan? X Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No.
000250 Post Construction Stormwater Program
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project? N/A
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
❑ USMP
apply (check all that apply): ❑ Water Supply Watershed
X Other: N/A
3c. Has the approved Stormwater Management Plan with proof of approval been N/A
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply): ❑ Session Law 2006-246
X Other: N/A
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A
5b. Have all of the 401 Unit submittal requirements been met? N/A
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) Iand7
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes � No
habitat?
Sb. Have you checked with the USFWS concerning Endangered Species Act � Yes � No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Field survey of the project area and evaluation of current distribution data. With regards to Northern long-eared bats, the
project is located inside a red HUC and the bridge was surveyed and no evidence of bat presence/usage were noted. A
total of 8 trees will be removed during construction.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? � Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Current Maps/Database
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Current Maps/Database
8. Flood 2one Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: Project will not impact water passage or flood zone beyond existing
conditions
8c. What source(s) did you use to make the floodplain determination? Current FEMA Maps
Roger D. Bryan 4/13/2017
ApplicanUAgenYs Printed Name Applicant/Ag Ps Signature Date
(Agenfs signaWre is valid only if an authorization letter from the applicant
is rovided.
Page 10 of 10
������u�
Figure 1. Bridge 580126, Pond Branch above and below the bridge, McDowell County, NC.
�3:�
` .... �' _ _. "
i Y r�� ��,• ��.
� �..
�' �T
� : �
��
::.v.a�`. �
sa�` ,
�
�.v �A
Envrronmenta!
Qua(!ty
ROYCOOPER
co����o�
Mr. Roger Bryan
NCDOT Division 13 Environmental Supervisor
North Carolina Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Dear Mr. 6ryan:
March 28, 2017
Subjec[: Mitigation Acceptance Letter.
Division 13 Project, Replace Bridge Number 580126 over Pond 6ranch on SR 1560 (Old Linville
Road), McDowell County; WBS Element 776P13.R.11
The purpose of this letter is to notify you that the Nor[h Carolina Deparhnen[ of Environmen[al Quality -
Division oF Mitigation Services (NCDEQ-DMS] will provide tlie compensatory stream mitigadon for the subject
project. Based on the information received from you on March 27, 2017, the impacts are ]ocated in CU 030501D1 of
the Catawba River basin in the Northern Mountains (NM) Eco-Region, and are as follows:
Catawba Stream Wetlands Bufler(Sq.Ft.)
03050101 Nom Coastal
NM Cold Cool Warm Riparian Ri arian Marsh Zone 7 Zone 2
Impacts 38.0 0 0 0 0 0 0 0
feet acres
This impac[ and associated mitigation need were under projected by the NCDOT in the 2017 impact data.
NCDEQ-DMS will commit fo implement sufficient compensatory stream mitigation credits to offset the impacts
associated with this projec[ as determined by the regulatory agencies using the delivery tlmeline listed in Section
F.3.c.iii of the In-Lieu Fee Inslrument dated �uly 28, 2010. IFthe above referenced impact amounts are mvised, [hen
this mitigatlon acceptance letter will no longer be valid 2nd a new mitigatlon acceptance letterwill be required from
NCUEQ-DMS.
Ifyou have any questions or need additional information, please contact Ms. Beth Harmon at 919-707-8420.
Sincerely, �c'��
Jame . S[anfill
Credit Management Supervisor
cc: Ms. Lori Beckwith, USACE - Asheville Regula[my rield Office
Mr. Chris[opher D. Medlin, P.E., Division 13 Bridge Maintenance Manager
Ms. Linda Fitzpatrick, NCDOT - PDEA
File: SR 1560 - Bridge 580126 - Division 13