Loading...
HomeMy WebLinkAbout20170436 Ver 1_B-4637 Nationwide Sampson April 12, 2017_20170412STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR April 12, 2017 US Army Corps of Engineers Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 Attention: Brad Shaver NCDOT Coordinator JAMES H. TROGDON, III SECRETARY Subject: Application for Section 404 Nationwide 23 Section and 401 Water Quality Certification far the replacement of Bridge No. 325 over Little Coharie Creek Overflow and Bridge Nos. 326 and 327 over Little Coharie Creek on SR 1409 (Old Salemburg Road) in Sampson County. TIP No. B-4637. Debit $240 from WBS 33808.1.2. Dear Sir: The North Carolina Department of Transportation (NCDOT) proposes to replace Sampson County Bridge Nos. 325, 326 and 327 on SR 1409 (Old Salemburg Road) over Little Coharie Creek and its overflow. The purpose of this letter is to request approval for a Section 404 Nationwide Permit No. 23 and Section 401 Water Quality Certiiication. In addition to this cover letter, this application package includes the following for B-4637: stormwater management plan, permit drawings, roadway plans, and DMS acceptance letter. This project calls for a letting date of January 16, 2018 and a review date of November 28, 2017, but this schedule will likely be advanced. Impacts to Jurisdictional Resources The project will have permanent surface water impacts of 0.01 acre and 0.02 acre of temporary surface water impacts, located at Site 2 in the permit drawings. Wetland impacts occur at two mapped sites, Site 1 east of the main stem of Little Coharie Creek and Bridge No. 327, and Site 3 east of the creek and Bridge No. 327. A total of 0.23 acre of permanent impacts in wetlands. Section 404: Application is hereby made for a USACE Nationwide 23 Permit as required for the above-described activities. MadlingAddress: Telephone.• (919) 707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (919) 212-5785 1020 BIRCH RIDGE DRIVE NATURAL ENVIRONMENT SECTION Custamer Service.• 1-877-368-4968 RALEIGH, NC 27699 1598 MAIL SERVICE CENTER RALEIGH, NC 27699-1598 Website: www.ncdot.gov Section 401: We are requesting a Section 401 Water Quality General Certification 4093 from NCDWR. We are providing this application to NCDWR for their approval. Authorization to debit the $240 Pernut Application Fee from WBS Element 46041.1.1 is hereby given. A copy of this permit application will be posted on the NCDOT Website at https://connect.ncdot.�ov/resources/Environmental/Pa�es/default.aspx under Quick Links > Permit Applications. A Programmatic Categorical Exclusion (PCE) was completed for this project in July 2016. A copy of the PCE is also available at the above website address under Quick Links > Environmental Documents. Thank you for your assistance with this project. If you have any questions or need additional information, please contact Gordon Cashin at or (919) 707-6107. Sincerely, � �o� Philip S. Harris III, P.E., CPM, Manager Natural Environment Section cc: NCDOT Permit Application Standard Distribution List ���� w A 7,�,��� � r � � } � � � � � ' � T Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 23 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Replacement of Bridge Nos. 325, 326 & 327 SR 1409. 2b. County: Sampson 2c. Nearest municipality / town: Roseboro 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state g�637 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if not applicable applicable): 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 707-6107 3g. Fax no.: (919) 212-5785 3h. Email address: gcashin@ncdot.gov 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): not applicable 1 b. Site coordinates (in decimal degrees): Latitude: 34.992706 Longitude: -78.521824 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 12.2 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Little Coharie Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C; SW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The study area includes the existing roadway and bridge. Land use is forestland, with some farmland. 3b. List the total estimated acreage of all existing wetlands on the property: 6.5 acres N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 209 feet 3d. Explain the purpose of the proposed project: To replace three deteriorated bridges. 3e. Describe the overall project in detail, including the type of equipment to be used: Three bridges of lengths 35'6", 35'8", 85'10" and widths 23'10", 23'10", 23'11" will be replaced with bridges having lengths 60', 60', 115' and widths 30' each. Standard road building equipment will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained fo�r this property / � Yes ❑ No ❑ Unknown project (including all prior phases) in the past. Comments: JD requested on 3/26/2012 4b. If the Corps made the jurisdictional determination, what type � preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Michael Baker Engineering Name (if known): Richard Darling Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 4/11/12 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for yaur project (check all that apply): � Wetlands � Streams - tributaries ❑ Buffers � Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact number — Type of Type of wetland Forest Type of jurisdiction Area of impact Permanent (P) or impact (if known) ed (acres) Tem ora T Fill, � excavation, Site 1� P❑ T rip rap swamp Yes � Corps 0.18 mech. � � �WQ clearing No � ❑ Corps Site 2❑ P❑ T � � pWQ No Fill, � excavation, Site 3� P❑ T riprap, swamp Yes � Corps 0.05 mech. � � �WQ clearing No ❑ Site 4❑ P❑ T Yes ❑ Corps ❑ ❑ DWQ No 2g. Total wetland impacts 0.23 2h. Comments: There are 0.3 acres of temporary impacts due to hand clearing. There will be <0.01 acre of temporary fill in the hand clearing areas for erosion control measures. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of Stream name Perennial Type of Average Impact number - impact (PER) or jurisdiction stream length Permanent (P) or intermittent (Corps - width (linear feet) Temporary (T) (INT)? 404, 10 (feet) DWQ — non-404, other) Site 2� P❑ T Bridge/Road Little Coharie Creek � PER � Corps 35 28 way fill ❑ INT ❑ DWQ Site 2❑ P� T Bridge/Road Little Coharie Creek � PER � Corps 35 80 way fill ❑ INT ❑ DWQ Site 3❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 28 Perm. 80 temp. 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number — waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Tem ora T 01 � P❑ T Little Coharie gridge/roadway fill, bridge pier stream 0.02 perm. Creek 01 ❑P❑T 4f. Total open water impacts 0.02 perm. 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surFace area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Tem ora T re uired? B1 ❑P❑T ❑Yes ❑ No B2 ❑P❑T ❑Yes ❑ No B3 ❑P❑T ❑Yes ❑ No B4 ❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. This structure has been designed to have as little environmental and surface water impacts as possible. To avoid direct discharge of bridge stormwater into the receiving water, deck drains are not required for the proposed bridge. Storm water impacts to the creek have been minimized by utilizing grated inlets and pipes to collect bridge stormwater which will be outlet on Class II rip-rap before entering the stream. The project also utilizes an offsite detour. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction impacts will be minimized through the use of Best Management Practices for Construction and Maintenance Activities. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑ No impacts to Waters of the U.S. or Waters of the State? If no, ex lain: 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ � Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? � Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes � No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If not, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governmenYs jurisdiction is this project? not applicable ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No N/A 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State � Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) � Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes additional development, which could impact nearby downstream water quality? � No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes � No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No impacts? � Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website, field surveys. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Maps Digitally signed by Colin Mellor C o I i n M e I I o r DN: cn=Colin Mellor, o=NCDOT, ou=NES, Plllll S. Harris III, P.E., C.P.M. email=cmellorC�ncdot.gov,c=Us 04-12-2017 � Date: 2017.04.12 12:5038 -04'00' ��"� ApplicanUAgent's Printed Name Date Applicant/Agent's Signature (AgenYs signature is valid only if an authorization letter from the applicant is provided.) 11 Enviranmental Quality ROY COOPER C,ov�rnor Mr. Philip S. Harris, III, P.E., CPM Project Development and Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: Apri15, 2017 Subject: Mitigation Acceptance Letter: B-4637, Replace Bridges 326 and 327 over Little Cohaire Creek on SR 1409, Sampson County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the compensatory riparian wetland mitigation for the subject project. Based on the information supplied by you on Apri13, 2017, the impacts are located in CU 03030006 of the Cape Fear River basin in the Southern Inner Coastal Plain {SICP) Eco-Region, and are as follows: Cape Fear Stream Wetlands Buffer (Sq. Ft.) 03030006 Non- Coastal SICP Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2 Impacts (feet/acres) 0 0 0 0.23 0 0 0 0 ��u�� �� �.�.G ����a��, a„W�, wcuanu ��npdc�s may oe proposea �o ne mingatea at a 1:1 mlhgat�on ratio. See permit application for details. The impacts and associated mitigation needs were under projected by the NCDOT in the 2017 unpact data. DMS will commit to implemznt sufficient compensatory riparian wetland mitigation credits to offset the impacts associated with thic rrn�Prt ae (�PYP��14Pl� I� �I th� ,r�r�u]atC� j 3b.�. .G:BS L:3:l;s t�Ie C�iCif vCi y' t12T'iciu'1E iiStcu iii Sci;iiuii i'.�.l;.11l Ul iRC lII-'Llell t'ee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420. Sincerely, Jame . Stanfill Credit anageuient Supervisor cc: Mr. Brad Shaver, USACE Wilmington Regulatory Field Office Ms. Amy Chapman, NCDWR File: B-4637 !'�"`Nothing Compares�� 5tate of North Carolina Cnvironmentaf Quality "217 West Jones Street I 160i Mail Service C�nter I Raleigh, North Carrolina 27699-f601 919 707 860Q High��va� , North Carolina Department of Transportation �� Stonilwdter Highway Stormwater Program �� STORMWATER MANAGEMENT PLAN (Version 2.05; Released April 2016) FOR NCDOT PROJECTS WBS Element: 33808.1.2 TIP No.: B-4637 County(ies): Sampson Page 1 of 1 General Project Information WBS Element: 33808.1.2 TIP Number: B-4637 Project Type: Bridge Replacement Date: 2/22/2017 NCDOT Contact: Craig Freeman, PE Contractor I Designer: Kimley-Horn & Associates Address: NCDOT Hydraulics Unit Address: 421 Fayetteville Street 1020 Birch Ridge Drive Suite 600 Raleigh, NC 27610 Raleigh, NC 27601 Phone: 919-707-6721 Phone: 919-653-6623 Email: cafreeman2@ncdot.gov Email: vance.blanton@kimley-horn.com CitylTown: Roseboro County(ies): Sampson River Basin(s): Cape Fear CAMA County? No Wetlands within Project Limits? Yes Project Description Project Len th lin. miles or feet): 0.21 Surroundin Land Use: Rural Proposed Project Existing Site Project Built-Upon Area (ac.) 0.7 ac. 0.5 ac. Typical Cross Section Description: 2@ 10' wide lanes with 0' to 3'11" paved shoulders and 3' to 6' grass shoulders and 3:1 2@ 10' wide lanes with grass shoulders side slopes Annual Avg Daily Traffic (vehlhr/day): Design/Future: 935 Year: 2037 Existin : 490 Year: 2017 General Project Narrative: Replacement of Bridges No. 810325, 810326, and 810327 on SR 1409 (Old Salemburg Road) in Sampson County. The existing bridges, overall length (OAL) = 35'6"; 35'8"; (Description of Minimization of Water 85'10" (respectively) and widths = 23'10"; 23'10" 23'11" (respectively), will be replaced with bridges having OAL = 60'; 60` 115' (respectively) and widths of 30' each. The new Quality Impacts) bridges are wider than the existing bridges to provide the required shoulders necessary for roadway and drainage. The roadway is being widened to provide the minimum lanes for safe travel. An offiset detour will be utilized for maintenance of traffic. No new roadside ditches are introduced as part of this project. Rip rap is placed on each of the bridges' sloping abutments to act as slope stabilization and prevent erosion. The bridges were designed to not require deck drains. Runoff from the bridges is captured on the low side of the bridges in shoulder berm gutter and traffic bearing 2G1's on either side of the road in the roadway sags, with the exception of two locations where the 10-year runoff at the sag location is less that 0.1 cfs. The systems are designed to outfall outside of proposed fill slopes in the area of an existing wetland that will be minimally disturbed by the outfall. All other roadside stormwater sheets across the roadway and down the roadway fill slope similiar to existing conditions. Waterbody Information Surface Water Body (1): Little Coharie Creek NCDWR Stream Index No.: 18-68-1-17 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) See Sheet 7A For Index of Sheets See Sheet 1B For Conventional Symbols � � .� � V � � 0 V ����� �� ����� �������� JL/J� �Y �� IIL�� �� �1J�1���1J�1 �"Y d� �l � SAMI'S 01� CO U1�1 T�' LOCATION: REPLACE BRIDGE 325 OVER LITTLE COHARIE CREEK OVERFLOW AND BRIDGES 326 AND 327 OVER LITTLE COHARIE CREEK ON SR 1409 (OLD SALEMBURG RD) TYPE OF WORK GRADING, PAVING, DRAIIVAGE, AND STRUCTURES WETLAND AND SURFACE WATER IMPACTS PERMIT liqi i i F;ii i i��ii �� � , E� � oP ,� ����N �E � � w r nno o-� rvoaruiN; rwz2 . i� F ne �vein<E �� tioan� .i. .i �u �� , ci,i.u�.. � _� — � �a � i J � ��,� �e0 � SITE 1 �� �� . ` , •BRtD E d2B BRI GF 326 �,�,� �; � • � « • : . • • -c�i . � ` � �f i � • � . + ` k � ' � ,'� • „ I : • , , . • �,,,,,,,y,,.yvs���� . '.-. .,. . . ., . . .. : �.. . .� � .: t �..+ �.. .,,,,f < liIDGE•3 u �� � .. � ., i� . .., y � ... r. - : . �� " `v"„ .�- �, �. . , I . � . .,, .� . ...t , .+r, . . "_ y • - y �- - . ,1u_ __ a e _ r Z " ' . __M __ .y_�'• • — TO�R 10�2 ' .��� I `.. � SR 1409 Ola SALEM D * ...� ,. - � _ ...- L i i � � � . . .. rl 9 � i E �3�)�__ . _ 4 _ �� _ '�. ._— _� L J ,�4�—..-.�—r.""�'e". -*.;��c+ . ,_t x " ` . _..-. �E.,,�"— �' ... — ,'�`_!^,.`�T�� ,.� .,P } � -.. ,,,.-a. . iw�,..x�. F,_,r._m.�F`=,�'�.�-F. � .+ �� � .. Et5D�821DF,E •�^ t t � � ' y +c •BEGIN.BftIDGE, e„t ��y � ° N`4+t0RiD6 e�+ '� � t . � -Le$fAa13a�1300 �- ., F, a .._iRk �...i,..F, . • _ . _ . .-�:SfMtt..zs.QQ+1- '�`• � .. . .. . . . -�`gTa.�s<-yS.W-�-� , • , • , �, � �o-"`�« �e�,.F���• .. . . . ± tt � 't it � V 1 � .�EMD'BRtbGE+ � t V -L- S7A 20+06.00+/- BEGIN BRIDGE � _�_ srA ,8,.gboo.� j�;�� ° '`�r�F�SITE 3 SITE 2 �, � � ° `,1 `' � ,� �� � L\ ��� ,��1 L� ? '� ' -t- STK)15��20.00+/- W�� � � � CLEARING ON THIS PROJECT SHOULD BE PREFORMED TO THE LIMITS ESTABLISHED BY METHOD III PERMIT DRAWING SHEET 7 OF 9 IN�O�IIPLE7l'E PLr�N9 m0 NOT USE FOR A/W ACQUISITION GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PreFared in tl�e Office of: N�'DRAULICS ENGINEER ADT 2017 = 590 DIVISION OF HIGHWAYS 50 25 � 50 1�0 1000 Birch Ridge Dr., Ra[eigh NC, 21610 ���P ADT 2037 = 935 �, �� b e K= �� o�o LENGTH ROADWAY TIP PROJECT B-4637 =.154 MI zo�z sr�xnARD srecrF�c,arroxs ,�a� ��� PLANS � �$ D= 55 % LENGTH STRUCTURE TIP PROJECT 8-4637 =.054 MI srcN.�rua�: N� � �. 50 25 0 50 100 T— 5 0�0 * RIGHT aF WAY DATE: GARY R. LOVERING, PE � V= bo MPH TOTAL LENGTH OF TIP PROJECT B-4637 =.208 MI NOVEMBER t8, 20�6 PR°,E`T F"G'"EER ROADWAY DESIGN ��, ,� PROFILE (HORIZONTAL) * (TTST 1%+DUALS 4%) F.NGINEER '��„�� ��,�� l0 5 0 70 2p FUNC CLASS=RURAL LOCAL LETTING DATE: SUSAN C. LANCASTER, PE �� g`����� SUBREGIONAL TIER NOVEMBER 21, 2017 rRo�Ecroesrc.,� cNcrxErrs PROFILE (VERTICAL) s�cN.arune: r� Z 0 N K �� � DENOTES FILL IN WETLAND �L11�LLlJ DENOTES E%CAVATION IN WETLAND � DENOTES MECHANIZED CtEARING � LEGEND � DENOTES FiAND CLEARING �DENOTE$ TEMPORARY IMPACTS IN SURFACE WATER �DENOTES IMPAC75 IN SURFACE WATER BEGIN TIP PROJECT B-4637 -L- STA. 10 + 50.00 � 50 25 0 50 100 PLANS / /��J �n Q'� 1 � �_,. �� � \ �S� �i 1 ,� y/ �u � / �_/ s� � BRIDGE 325 BRIDGE 326 \- "Tr�a r , qE ���E�r ,F � '� ,F �. ..1...:... �...+C,..""""'ym" x""""".p."'c...... µa...a...... d...:...... ..-...... � . � � � � � �. ... . ... . . . � � � � � �.. � �... � �... . � .�...�... .�....... .� .. .�. �... �.. � .�. �..Y.� . � � � � � � � � � � � � � � Na�os� ,�('1� /�/� � � � � � � � � � � � � � � ' � � � � � � � � � � �; � � �� � � � �� � � � � J �/��'1� � � �� � � � �� � � � �v�oo�s � � �� � � � �� � � � �� � � � �� :� � � � � � � ,��. li: � � � � � � �� � Noo�s � . � � � � � � � � � � � � � � � � � � � � � � � � � �_ � .. � � .� � � � � � � � � � �� � � �. . .� . .. � � . .. � _. . �. .� _ . .. �. � � � .. �. .. � . � .. _. ! _� � �l 2 _ � � � —'� � * � '� � ,� —� — — - `� � , J- _ —•e —a� — � — —e�M— —'"— 1-� xis�NCA W�e`— — F y` � � � _ � — -� —eiM ExisriNc ai� 5 _ — —'� — .e _ _ _ " _ _ — �jJ�. i]ii � ` — — _ — — — — — i1] ] _ _ — _ — — _ — _ — — _ — � _ — . �� .u.J � i _r — — iJ �R -- — _ _—r -----_ —_-- o � • , DG. °32 ', , °' —Ti/ �,4'%3' F9 F' F I - �I i _ i i i . -i i B G PROIECT REFERENCE NO. SHEET NO. B-4637 4 2W SHEEi NO. ROAOWAY OESiGN HVORAULICS ENGINEER ENGINEER IN�MPILE lE PL.�N9 DO NmT USE FOR ! W ACQUISI'4'[ON �REL�I1�fI�NA� f8� g� PIL.�NO DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAW�NG SHEET 2 OF 9 N END TIP PROJECT B-4637 -L- STA. 21 + 50.00 BRIDGE 327 .....�...�..'�.....'.�� ,F ' � ,�. � ,� � � � � � � � � � � �� � � � � � � � � � � � � � � ,� � 'N�oos ,� � � .� � � .� '� � � � . � � � � � � � � � .� . � � . � � � � � � . � � � � � � � E � J=. � � � ..� � ,� � � —�e� � — _ — _ x _ — — — -1�.'h�e�— — _ _ _"_ �— _ —._ _ — _ � _ � SR 1409 QLO SALE 6URG RO IT BST — _ _ _ � T CONC I . " _. . i' — — _ _ _ _ _ _ _ i f1YGi - " �_: - S >> J � " �� '— . _ .. .. — ..— . . _ — _ . ' _ � ._.. � ' _ _,� _ — _ — — — _ � .� � � � . � � � � � . � � � � � R � —� � � ��. � � � � � � � � � — ' ,� � � — — —a'p — _ '�9 q ,._ s,.,,. .� '� � � � � � � � • � � V�0�15 � 1� ,� � . � � T - —' �v� ` � � � � � � � � � � � � y' ,� � ,� -� • -� yc 1� ; �l � ,� � ,� 1` � � ,� `� � � : V�ODS z ,� '� � � � � � �l � � � � � �: � � � � ,� � � � ,� � 000s� � � � � � � � � � „� �k � � � p oao�s� � � � � � � � � � � � � � � � .� � � � � � � � � . � � � � � � � � � � � � � � � � � � . � � m , � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �' . '� .� '� �F � . �l � �F � 1 � `� � '� � ,� '� � ,�- y` � �F � � • � :� � `� y_ =pm yc � � � � ,� � �l � ,� � `� � J ,� � � � �F � � 1'- ` � � � �C- � ,� �F � � • � F � • � �l � � � �F .v_ �i .. .K � „ �l .r `F .. / �l 'w., V�- � � � i� � � � ,. � � � .e � .K � � � �. � ,. � � � .. � „ � .v � � .e � .. � �K � .K .. Y � � �l . ,. � � •. Jc '� � � � ............................ ...... !.... ............................................................................................................� ...... ...... . � ........... SITE 2 � S- SITE 3 � �. �s� � L , s� . � `� � � \ � s l SEE DETAILED ENLARGEMENTS ON NEXT SHEET N Z � N i � F F DENOTES FILL IN WETLAND ��1!/�1�LJ DENOTES EXCAVATION IN WETLAND * * * � DENOTES MECHANIZED � '� � CLEARING � � � � LEGEND ����� • • � � �DENOTES TEMPORARY IMPACTS IN SURFACE WAT �1'/�1///I DENOTES IMPACTS IN SURFACE WATER 25 12.5 0 25 50 PLANS �`� �PO � PROJECT REFERENCE NO. SHEET NO. B-4637 4 RNJ SHEET NO- ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IN��hIPLE E F'LA�V9 DO NOT USE FOR /� W AC�UISITION PItELIMIN RY PL�N�9 OO NOT USE FO CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL S16NATURES COMPLETED PERMIT DRAWING SHEET 3 OF 9 ............... ..............- ••-•---•••-•.. ..................... F ,� � � ,� ,� '� W 0�0 D S� � � � � � � .� 1� � ,� � � ,� � � ,� 1� � ,� '� � .� '� � � : � � � � � 1� 1� 1L '� � : .� � '� � ,� � � � � ,� � � � � � � ,� � � ,� '� � � .� '� W 0 0 [�S 1� � � � � � � � � � � � ,� � : : � � ,� � B�IDGE'�32� � ,� '� � � � � ,� ��RIDG� 32�6 ,� '� � � y< � 1� � � � 1� � � : \ 1� „ � �, . .��;,�Is—� ; , r—, . .v � ,� '� - � � r,.. . � .�,� ./ '�'C \ � �,. ��� , , .I—� �—, : �, . , ; �— . �r ., � � ,� y` � � r� . �':i,_ s � ■r-- .,��_ �� �111 � �j� ��II�JL��'� Z I�i�.-� I���N �in�-;.�—� — ���.� �'�� -----���� 1�_- � � � � �� � � woc�s '� � y� � y� : � � � � � � � � � � � � � � � � � � � � ,� � .� � � 1� '� .v_ '� , ' � �„ � 1 � � � � � � �� is�iNe—Ry�W�a�— - �— — — — — — — — , ► � � � � � � � � — �% —�=— — � �_ _ —y _ � —e�M ExisTiNc Ri�N � 7!`�`-7F��F 'iE � ')E '�F' ':F 'if � � 7t � � � � � � � � R .� � � � � � � �,� � � � � � '� � � � ,� '� � � ,� � � '� � � �4V 0 D � � � ,� � '� � � � ,� `� � � � ,� '� � � � � � ' � � � � � � � � � � � � � � � � � � � � � �: � � � � � � � � � � � � � � � ,� � y� � y� '� .� '� � � � � � '� ' v .� ,. � „ � ,. � .� '� .v '� „ �U Z O z � � _ i � ro m m �� � DENOTES FILL IN WETLAND �L11�LLlJ DENOTES E%CAVATION IN WETLAND � DENOTES MECHANIZED CtEARING LEGEND � DENOTES FiAND CLEARING �DENOTE$ TEMPORARY IMPACTS IN SURFACE WATER �DENOTES IMPAC75 IN SURFACE WATER 50 25 0 50 100 PLANS / /��J �n Q'� 1 � O � \ ��� 1 4 ____ _ JS� � , � � g�,-�� ��_-� ;', , -,�--;�_; _ , �� � < _, o �9_ � -,�� _ � s , ,�� , � ,, � , , � 1 �- - � �' � �-" '�,�EGIP!! ��TIP �Pi��JECT B-4637 � ��y j �� '. '� ���' �--� =�, StA..]Q+50,.00 ��_ � __- ��s = � ��� '96-i _ _ _ �,n.f� gA_ _�... c} � __, �, i% 9�_� --9� i� ��'1 _`� � � i ��� ` _ " ,' I �� . i � 1 / � — . 'l � �, ,' i _� � � �_�� BRIDGE 325 BRIDGE 326 ' ���s,�,' _- � � �� � � - -95 � - � � '� �' �EO�.g � � � � � .�. ....��...�.:.�.-}.. �._..__..,r....��g5.�.�...�. .o......�...r....:. . ��...�. ..,�...�,.......... .,� ...95: ��� � � �'-----_���'. � � � . s i . � ^ .c � � ... . � . - - � � . �� , .�...:� - . . __ _, .�� � '� ,� � '� � � '� .� �� � � '��Na ¢� \`� c'T� �� /'��.� ///����//�� ,� � � � 56=� � i � � .�. � � � 9� gK..� .�� .� � � � � � � f� .� ---�,, ~�,. _, .� '� � � -�_ � _� -�� � � � y6 � -� � ��.� � V 1iT�� � � i � � � � � � � � '� � � � � � � �i��' � � � .�,`�� � � � _ � - ;K ; � � 7� / - � ,�, � ,� � Vwo�s_ � ,� '� ,� 9 , � �: oo�s � � _, ,� � � ,� � ,� � � ,� � � %6 - � �K �� ,� � '� � '� � '� ' �- _ �9 '� ,� � �` .� � '� 6-i � � .� �,� � - � „ K � _'� ,� � '� ,� � _ ,� ,� � � ,e� 95 -�a � '� .�- �- � � � �95 -� - � _ � 5- �'�-- - �' - �_ -�- = - � - � � _�- � _ � . � � �`� " � - ----- --- � ' , .. -- . _ .. _ _ . � - � �y - - . -. - - .. . � � ,��, - � � � .� � -'� 96 � � � � � , � * � � '� � � ,� � '� � � � � � ,� � �94,_� � _ '�$ _ � I, � -- �-&, _ � z �� �- g,� � � -- - - "�am�`a�� �- _ � _ - -� � -a'�6�wca s��- � _ ._ .r � - - rt'[� --- - ur- __ ___ - - '�'ib - _- 00/ . __ ' - -- - _ ___ -_ __ _ _ _ -_ -- - .. ' � -- __- - --- - - ' - - 00/ - - - - : - - _ �. � = 00/ - � � � �_ � .'�� 'x' � � 00/ - - - - ,- - - 001 ��['ie- _ � .. � _ _ _ , _ 00/ � _ � - X)01 _ I. - _ _ _ r - - - ,�_.tiql� _ _ _ _ _-�- ----- — ._ _ _ _� _ ----_-------.--- - _ _ � •32 -- _ _ ' $ ' T�� � �B Gl', 2 . i i . _ _ r_' ___ _ _ _�� ' OLOSALE.1/B!/R R4_II'Bi7__ ________--`-101--- i . --�-- -.. -- _��-- _ i � - -__ ___o-____ -__�_ " �I- � /' 0 ' � � - _ /OQ _ -_ - ag �IO� � _ _ _ c C � �� _ . . - - _ _ _ _ __ _ - _ _ _ __ - _ 9__ --_ /� _ _-- -- -- -= � - - - - -- - - - -_- -_ --- � -- - - '< � _ `�m` - -- -- - - � -,r , � � yl�--� --- ' --- d�, � � � ,� - �-�- � ,� � �� _ - � .� � �.� � - ,� � ,� � `� � ,� � `�e � � ' � � � � ,� �� ,� � .� � �4aao5 � � '� � � ,� 95 � R *. � \� .. � � y` � �� 1�� � �- � � 1� � �r .,� '� ,� \ � � ' V7�30D5 ^ .9 PROIECT REFERENCE NO. SHEET NO. B-4637 4 2W SHEEi NO. ROAOWAY OESiGN HVORAULICS ENGINEER ENGINEER IN�MPILE lE PL.�N9 DO NmT USE FOR ! W ACQUISI'4'[ON �REL�I1�fI�NA� f8� g� PIL.�NO DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAW�NG SHEET 4 OF 9 �{�D T1P PROJECT B-4637 -, —L— STA. 21 + 50.00 ,� �g6 , � �RIDGE 327 � � V - - � � � ..,..�..��••----�--��� �9s ' � ; ,� � � � e -- � � __ � , � ,� 'S6 _ � � ,� � � � 1`� _ � , - 96__-� � � � � � � � � � � � e � � � '; 'N�oos ,� , � '� �. , -� --, ' � � � � � .� � .� . '� � � -�5 =� '--,� � � 'e` �,, � - - - � 1 � .. ._ . _ � • � ,� � �, Q E � '� � � /� -''�� �.� . _,� _ '� - - '� � � , � ���� _§�-=�a-�� 5��49 s =- -= ��� z6--�E` -- _` °�_ _a' _�� __ __' ___ - - — - ______/0/` __ ,--- _— -- - _ _ ---Z01 -- _---- SR 1409 QLO' SAIE 6URG RO IT BST __ - r_ - - - - - - T - . 5 � -- - � � - l00 - - /0/ - - _ ' --9�°y �-_=s - -'rlBO-' _�9 � - -- g - �l i .� '� � �.� , � � _ � i � • � -� � � ' � '� � � �'�--�'�_- ,� ��• .� � � � ., �� '� �= '� � ,� � � ,� � J,� .�,- t � • �-- `� _ � � oao�� '� � '� � � � ,_� ,� _�'� � . � � ,� � ,� `� : � � � - — � r �y000s�� � � � � � � � � •� , � "� � � � �' / � � � � _� � � "� � � � i � � � � � � � � � � � '� � � � � � '� � � � � � ���s� ; � ��v � _ � �• • � � �- � �� � � ,� � � � � � �'. _ � � i � � �� i � �'-� � � � � \ � � � I � � � � � � / � ��- � s „� � � � � � . � � � � � �� � � � � ,� �` � ,� _ '� � � �'� � ,� ,� �� ,�. _� � ,� � � � � �r- � ,� '� ,� � � �/ � '� ,� �'l '� � � ,� • � �, � .� '� � � � � -�m�� ,,� � ✓ ,� �l � �y�6 � ,� •� '� ,� •� ._ s „ � i .r � � ,. ' � -�. � �. � \ � � .. .e � - _ � �\ � � � � . � � . � s '� „ �y „ � � � '�„ ��...` � � ., � � Y � • � � � �� � - 7_�� . � .. � ( 1 .. ��d� �� � ' � , _ 6 '� / , '� r. � '� . � .. .� , , •.......\G. ..%......1....: ...."' "" ' ................. . �-�.........�..-..rL.�O.... .....� ................ .. . ....... .... .... ... ...... s � .. ` i .. � " .. . . ... . \ � � 6� � _ ,- \�. /. j. �` ,.� -1d \ __ i ___, �___ �a�i � - i g5 �`O �� � � � � �96-� ���� � ����V�� 5 �� i � ���� --,�---- � 95 - � - 9�'� . y � `s' " �' 1 I / � � � _ \ � / " \ i 1 � � \ �� �00 �' i95- � �� � o� � , 96 � ,' � � � � ---- -. .��Sr _- - � � � �y,� �. g� � g6 � 1O _ , / � � 1 i' � l � � �1 � � � 9S� _ -� \ \ \ � \� - - �� � — �- ,n - �(� �� � _;9��, _:99,, ��16 SEE DETAILED ENLARGEMENTS ON NEXT SHEET 0 � �� F F DENOTES FILL IN WETLAND �L1�J DENOTES EXCAVATION IN WETLAND * * * * DENOTES MECHANIZED � � � CLEARING � � � � LEGEND I%/�///�� • � ' / �DENOTES TEMPORARY IMPACTS IN SURFACE WATER �1�!1%!11�1J DENOTES IMPACTS IN SURFACE WATER 25 12.5 0 25 50 / PLANS �q�`� ��Q � .� .,� � . `T �Ns � 4 ��w � � "'�t • � � ' � � '� �� � �� I� - _ .-w� . _ ...� E � �- P, �y "���',+���II.._'� ���.���'�� ���� �,�, . �� - - • ��;; ��' - � ♦ � '���� ������ �� ..A��..— '; r waw��s'i7� .. '� Pa�, 1 11 ► ��'�� � �I� I � s�pg��;a=a�a--��—�—�=:W'����ii� � I��1��� ''' ��1�1�1 -- ��Ira���"►��1�a1.�1'�� � '(, �t'��" ' ' " "� � �'"w� < � ���� � �� �� � c�- ����. ,.�'��� ��°1� .���! �`.�: �•�"��� .,� �s� �� ����� ° �; '� � .� � :< cv • � �p PROIECT REFERENCE NO. SHEET NO. B-4637 4 2W SHEEi NO. ROAOWAY OESiGN HVORAULICS ENGINEER ENGINEER IN�MPILE lE PL.�N9 DO NmT USE FOR ! W ACQUISI'4'[ON �REL� 1�f I�N� f8� g� P]L.�NO DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 5 OF 9 _ ` ................................ ......... n�V(\a���.........�..........1.. ... � . y........... � . . . . . .. ............• "-------------- ................. .. -.J F '� � � '�' � W 0 OD s � �� . �1� � ' � � ,� '� .� '� — ' � � � � \ g . ,� ' � ,� � � � i � � � '� --—' � � y� � � 1G '� ,� ��`�56---— � � 14 1� 1� : � � ,� � — '�` � � � � � ,� � '� c � � �� � � � � � � '� � � , ' .� '� � '� � '� W a[�S � '� ,� � '� � � � ,� � ,� � � ,� � '� — ' � — �� � � 1G ,� � B '� '�323 , � , � — '�� � � 1� � ,� �RIDG� � 326 ,� � �S� � � � � � `9S � ' '� : � � '� —�C�-—-� ——� � '— —�� � ,� � � ,�' �_�. � _ , � � �- - =�- - -_ ,' - - =�5 - - - - - � _ _ ---- --� �-�- ; �� - �-�5_-_-,� - - - _ - - - - - --------- -- -, - - �' � - - = � — — — _ , ,; t,� — � � - — � � � � � ---- � � — ��-�-_ -- - - —�94 -� �� : `� ` � ��__ '� dE � � � � — —a�� ` „- _1� _ _ � - — �— — — � -� , —— — -- - - � � �_ — �� �r �� ���_ =� -_— - — — — — — — ,_ ����-��� -_ --- - __ -_ _ — ' — �- - — -- � ��--� __ ��� �� - - - ` 1� • -- -- -� +_r�iJa= - -- - —� _-_ --- __ - -- -- - __ -_ -- — - • --__ ' r��i�� - __ _ = Fitt+t` � � �' -- — ��_ _ - -- -- --- �- — — — _t��i i, i��- � �- � ` � — - - - — — — — — — — — — ———— ——— , -��i+ii =� — --- -———- —— —— �i � � . —�� — � _ ---� . __— — �� ,-��t� �------ �� — — ————� �l- - �� ,—— _———— _—— 00/ — x � �+ � ___—— — --—————— — '-00/ ———— � :�_ '' a —— � — -- �——— • ��� -- � _ � --- — -., ————— — �——— - �i --- 101 ---�__ a < � — — — —' — — — — _ _ _ _ _ �rrr t-, : � _ � � _ - _ _ �i i +-i,i ; � , - - _-_ _ �� _ � �� � � � W��iS � � � �---, � � �� s ,� � .� � , � ` � � � �' � ` � � _ � � � � � ,� ,� , m u I . . , . , , s . .......... � /....c . : .. ................. 6.:_......... � aC� C — - - o - - r .r��° f_�' .�l?4�" -F - f " ---- — o----- - -- - cTi — --- --- I I �-' ���ia �..�, - - - —._����.-�a��, .�:�'�..�,.;��us.�:..� �� ��l:'iAii�ri'i —,.���wii� r��i i`�w��_''w��_-_—���i.'�J.����.�'��.".4� �;''s�'�:�T�ii�L��%`���?s_ _ � � � � �, � � � � 95 � � � � �, � R � � � �� '� � `� � � � � � . � � _� ' ` ,� '� � � � � � � � �� � � � �� � � ,�1'� �� �`� �� � '� '� � --�"�� ,� � � � �` � `� � `�` � � � � �-- .� � , � � ___�,� � � � � � ,� � � ,� � � � � `�� ,� � � ,� � � , � � ,,� - , �: �� � �, � � ,� � _ �_ , � � � � � � � � ,� � , ,� � , � : .� � � , ,� � ,� � , � � � � � .� � � , � � , ; � .___- �,, � � „ � , ,, � � � .� , -� - - _ , � � � v � .v � � .� � ' „ �� ��,,, . �, , '�---' � � , � �� , i , i , : • .:. ...............�------..... ...............................................................�.!................ :.�.�._...—. :�-------- �-----..........i.................................................................�.............i..............�?� / � ::9i9B:E�?::EBeB9�B�eBeEe:::EEeB9�@999efi�:::99eB99�i99:E��:eeBeEe:::EEeE���999:fi���i99eE�?��EBeE����eBeEe:::EEeE��@999:fi�::: :fi���i9BeE�?:�EBeE����eBeEe:::EEeE�:�999:fi�:::99eE� . '• C ::::::::::::::::::�:::::::::�::::::::::C:::::::::C::::::::::::::::::�C::::::::�C:::::::::C::::::::�:::::::::�C:::::::::C::: :�C::::::::::::::::::�:::::::::�C:::::::::C:::::::: wt�eeeeaeme�eaaem�s�:eeeme::eaem�ee:eaemee:eaem�eeeaaems�:eeeme::eaee�eeeeaemee:eaem�eeeaaemse:eeeme::eaem�eeeeaem �Eaemeg:Eaemege�aemsgeEeeme::E�eg�egeEaemege�a , _ ,, BEGiN GRADE '� i -L- STA. 10 + 50.00 ' _ _ ELEV. 101.33' 'I - , . _ � � i � PI = 18+10.00 PI = 11+00.00 PI = 14+50.00 II PI = 2U+80.00 EL - 102.84' EL = 101.94, PI = 16+70.00 EL = 102.32' PI = 19+40.00 EL = 101.84' I- EL - 101.48' , PI = 12+70.00 VC = 130, I'� EL = 102.82' VC - 100' EL = 102.71' � VC = 140' �' F VC - 100' VC = 200 K- 144 � VC = 120' K= 152 VC = 140' K= 152 K= 200 � K= 154 } I K= 158 K= 152 V= 60 MPH �! y= 60 MPH V= 60 MPH __ __. V= 60 MPH V= 60 MPH V= 60 MPH V= 60 MPH i -'� �� � '-' ' ' - - - ' '- � CL 57A 12+68.00 -L- i - '-' � - -' ���- '- CL STA 15+56.00 -L- i '- '-- - ' �' '- CL STA 19+45.50 -L- {{{��,��, ��I��, ��I �_ � lm6D'.24' COREO SLAB i . 1960' - 24" CORED SLAB .. 1Ca35' - 2P COREO SLA6, ��-�m � � W/ 4'END BENr CAPS AND � � p// 4'END BENT CAPS AND �� � �� ��� 1e70'- 24'COREO SLAB �' � 11 O .. .. .. F_ . '. . . .. . .. . ., .. .. . -i_ �. �PIELEV ROU025ABUTh1ENTS i .... ., . ... .. . C�IELEV ROUO2.36BUTlvIENTS .. .. . �. ,-- � SPILL THROUGHTABU�MENT� . -� . . . . . . . . . . . . . . . . . . . SKEW = 90' . . . . . . . SKEW = 90' . . . . . . . . CC ELEV = 102.54' � Q � � � SICEW = 90' 3 (+)0.8000% (-�0.5000% (+J0.4000% (-0.3571°h (+)0.3000% (-�0.6214% � ��� — — — — — — — — — — — — — — —� — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- ------ o� Q _ _ _-- _ _ _ _ (+)0.3000% — END BRIDGE END BR�DGE —r (+)0.3000/ � -L- STA. 12+98.00 +/- I J -L- STA. 15+86.00 +/- l I I I I J END BRIDGE i�-.�-i - i_� � I I I I I -L- STA. 19+98.00 +/- L BEG�N BR�DGE � c�_ m 90 -�- s-rA.,2-ss.00 �, � � ' � , l , ,� � ��r BEGIN BRIDGE � i� � � �� -L- STA. 18 + 93.00 -/- APP�rox.ExCaVaTro � BEGIN BRIDGE E�=952'rrrPi N � i -L- STA. 15+26.00 -/- APPROX.IyORuAL �'SEL.= 94 _ � 80 APPROX.NORMAL Vi'SEL.= 945' APPROX.NORAIAC {y5£L.= 445' � � aaa�rox.excaV�roN {� APaaox.ExcaVarap � -_. _ - _ ' � EL=95b'triP) - � it EL=955'fTl'Po '� _ . . m' �: i� ............ ... .. ........... � 7 Q �. � . . . . . . . o. .,� � ��_ _ .. � ... .,i._..�..,,........,..... �, ...', ... . . .. . . .. � _ _ m E �ii � j PROJER REFERENCE NO. SHEET NO. B-4637 5 ROADWAV DESIGN HYDRAWCS ENGMEER FNGINFFR INC�MFQ,E lE 1PLFAN9 DO NmT USE FOR l W ACQUISITION . ..... . ..... . ..... . ....... .. . . ..... . . „ . . . ., . , , ., . . :C�CC�CC:C�Q7�CT.C�CC::T.C:CC�C::C�CC�CCCC�CC�CC:C� :�.C:::::::::C::::::::�:::::::::�C::::::::�.C::::::::: �G9CI�mCCCCC»CCCCCCC�ZCCCCCC�C::C�CI�CCCGlCC�CCCCCCi�CCCCCCC�s»CCCC�C::CCCI�CCCGlCI ;��@@�@a;E�g��E9;E�e9;;9;E;;9�e;;E�eB�69e��@@�@a;@�;��@@@��@@ ,�;E;;9�E;;E�EB�E9;��E9 :::::::::::::::::::::::::::::::::::::C:::::::::::::::::::::::::::::::::::::::C:::::::: I ...................................................................................................................... I ::::::::::::::::::::::::::::::::::T.::::::::::::::::::::::::::::::::::::::�:::::::::::::::::::::::::::::::::::::::T.:: � ...................................................................................................................... I:e:e9Eee:eEeee� :e:eeeee�::eeBee:e9:eee�:e:e9eee:eEeee� :e:eeeee�::ee3:e:e9eeee�:e:e9Eee:eEeee� :e:eeeee�::eeBee:e9:ee 10 11 12 13 14 15 16 17 18 BRIDGE HYDRAULIC DATA BR/DGE 327 DESIGN O/SCHARGE = 2900 G DESIGN FREOUENCY = 25 YR OES/GN /�4i' ELEVAT/ON = IOOJFT BASE D/SCHARGE = 4300 G BASE FREOUENCY = l00 YR BASE H4% ELEVATION = l0/A9 F OVERTOPPdyG DISCHARGE = 5/00 Cf OVERTOPPING FREOUENCY = 100+ YF OVERTOPPING ELEVATION = l0/✓ DATE OF SURVEY = 0//l4/2 WS. ELEVAT /ON 19 20 21 END GRADE -L- STA. 21 + 50.00 ELEV. 102.05' FOR -L- AIIGNMENT, SEE SHEET 4 22 ��0 /05 I00 95 Il0 /05 I00 95 - � � � Q � //0 E � � /05 � � � � � " I00 � � � � � � �, 95 � � � � 90 � t � 0 w 85 � � � � w v l05 � a _ � /00 �� � 7 m � � 95 � � �� �o �,� �� ;,� 90 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 O 2.5 5 PROJ.REFERENCE NO. $HEET NO. �TTI B-4637 X-3 5 70 15 20 25 30 35 40 45 50 55 60 65 70 75 DCOAAIT fIDA\A/IAIf� / � � ,.,, .,.. � \��\ ��O /05 /00 95 Il0 /05 /00 95 I/0 /05 /00 95 90 85 /05 /00 95 90 ���I '- I 75 70 65 60 55 50 A5 40 35 30 25 20 15 70 5 0 5 10 15 20 25 30 35 AO A5 50 55 60 65 70 75 O 2.5 5 PROJ.REFERENCE NO. $HEET NO. �TTI B-4637 X-5 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 70 15 20 25 30 35 40 45 50 55 6a 65 70 75 PERMIT DRAWING SHEET 8 OF 9 - - - - - - - - - - - - -- - - - - - - - - --- - -- - - - - - - - - - - i -- -- - - -- - - - - - - -- -- ----- - ----- -- - - - - -- -- -- -- - - -- -- - -- - -- -- -- - - --- - - - - - -- -- -- - - ---- - --- - - -- -- -- - - -- - ---- - ----- -- -- - - - - -- - -- - - - - _ -' - - - - - - - - - - - - - - - - - - - - - - - - - - - i - i - - - - - - - - - - - - ---- - - - - - - - - - - - - - - - - - - -- - - - -- - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - -- - - - - - - - - - - - - i _i - - . - /05 /05 I00 - - l00 �II - -- -- -- - - -- -- ----- - ---- - - - - -- -- --- -- - -- --- - -- - -- -- ----- - -- -- - - - -- -- -- - ---- - --- - - -- -- -- - - - ---- - ----- -- -- - - - -- - -- - - - -- -- -- - i ` 95 'I- -- - - -- -- - - - -- - - -- -- - - - -- - - --- - -- - - - - - -- - - - - -- 95 I i � �� --- - ---- - - - - - - -- -- ----- - ---- - --- - --- - -- -- -- -- ---- --- - -- - -- -- ------ - --- - - - - - - -- -- ------ - ---- ----- - --- - -- -- ---- - -- - ---- - ----- -- -- - - - - - -- - -- - ---- -- -- - --- - -- - - f �- - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - '- - --- - - --- - - - - - - - - - - - - - - - - - - -- - - ---- - - -- - - - - - - -- - - ---- - - -- - - - - - //0 ' � ll0 /05 ;I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - /05 �I- - - - .- I00 /00 ��� `-�_ 95 ` _ 95 � -- -. - - --- -- - --T -- - -- -, - - -,-- -- - -. - '- � '�--- - --- -- -- - - - -- -- ------ - ------ -- - - - - -- -- --- -- ---- - - -- - ---- - ----- -- -- - - - - -- - -- - ---- -- -- - --- - -- - - � I� �� „� END BRIDGE —L— STA. 20 + 06.00 +/— , -___ - __ --� '��� „o Q � _ _ _____ ___, � � : ---- -- -- --- - -- -- ----- - ----- - --- - --- -- - - -- -- - --- - -- - ---- ---- -- -- --- - - - E -- -- --- - - - - - - - -- --- - -- - � , � ; - � s /05 � o o I' /05 � - - - - - - Q r- Ifi�� 0.020 0.020 �� -- Q r- 1 - - - - - - � m �f . —� � •1 —� � . �I .. � II� F-- 3' --------- 3�� �- ' � IOO � ' � J / _ _ _ _ _ _ _ _ _ - - - — - - - - - - - - - - - - - - - � J _------- ---- ----- - ---- --- ------- lOO � � s -- ----- ----------- :---- --- -- ------ ----- : , � � , - - '� 101.48 \'� � , � �, � 95 ----------------------------� SITE 3 �� �------------------------------ 95 ��- - - - zo+oo.00 �, �-- � � �� � , 3 , � ' ----- ----- --- - -- ----- - i- -- --- -- - i � _i- _, o . .- —,---.---�J----� � ---J_�_� _— _� _.—..--J-- ----�--L--� ---. �-�- , . . . . � .____ — _�__�-_.�--- _- - �--. -_,. _;-_ � --. — _� __ . _ . � . _ _- _ - -. -_,-. _,-. - ,-. . � , — . ,-_ . � //0 -' I _; __ _ _ _._ __ i I��_ I/0 �'- - -� � t , - _, - - , , - -- --- ---, _ � ' - - - - - - - - - - - - - -- - - - - - - -- - - - - - - - - - - - - - - - - - - - - --- - - - -- -- - - -- - - - -- - - - -- - - - - -- -- , ' o _ Iw /05 - l05 � OA20 0.020 , �. � I � � - - - w — _-- — � -- , � �� 0 0 0 0 0 0 0 0 0 0 l00 /00 � a -- - -- - - _ _ - - � 95 � � � � �� � � ��� � , � 95 � - - - - - --- -- - - - ----- --- -- - -- - - - - -- -- - -- - - -- SITE 2 -- --- - - - - - -'� � '�� � _ ,� � 90 88.42 �-� . 90 � _ - _ � _ - - - - - - - �� - - - - - - - - - - - - - - - - - - - - ,�o ———————————————————————————————————————-- —T�-+56.00 —————--— . � _ T� — — — � ;� 85 �� ---------------- 85 �� �� o� �, o oJ� — — �.. ��°; 75 70 65 60 55 50 45 40 35 30 25 20 15 70 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 ��� WETLAND PERMIT IMPACT SUMMARY Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 11+26 - 12+09 (RT) Roadway Fill < 0.01 < 0.01 1 -L- 12+09 - 12+26 LT/RT Class B Rip Rap < 0.01 < 0.01 1 -L- 12+26 - 13+10 (LT/RT) Bridge/Roadway Fill 0.01 0.09 1 -L- 13+10 - 14+98 LT/RT Roadway Fill 0.04 0.03 1 -L- 14+98 - 15+14 (LT/RT) Class B Rip Rap < 0.01 < 0.01 1 -L- 15+14 - 15+98 LT/RT Brid e/Roadway Fill < 0.01 < 0.01 0.12 1 -L- 15+98 -18+37 (LT/RT) Roadway Fill 0.05 0.04 1 -L- 18+81 -19+42 LT/RT Brid e/Roadway Fill < 0.01 0.07 2 -L- 19+12 -19+81 LT/RT Brid e/Roadwa Fill 0.02 28 80 3 -L- 19+72 - 20+10 (LT/RT) Bridge/Roadway Fill < 0.01 0.02 0.02 3 -L- 20+10 - 20+27 (LT/RT) Class B Rip Rap < 0.01 0.01 TOTALS*: 0.10 0.04 0.09 0.30 0.02 28 80 *Rounded totals are sum of actual impacts NOTES: Less than 0.01 acres of the permanent surface water impacts are due to the proposed bridge pier. <0.01 acre of Temporary Fill in Wetlands in the Hand Clearing areas for erosion control measures. • � See Sheet lA For Index of Sheets See Sheet 1 B For Conventional Symbols I I ITY P _ _ OFF SITE DETOUR �� �� � � ��� � � ��� �� ��� � � ���� �� LOCA TI01�1: BRIDGES 32� A1�D 326 O T�ER LITTLE COHARIE CREEK OVERFLOW A1�D BRIDGE 327 OVER LITTLE COHARIE CREEI� 01� SR 1409 (OLD SALEMB URG RD) TYPE OF WORI�: GRADI1�lG, PA VI1�lG, DRAI1�lAGE, A1�D STR UCTURES TO SR 1002 F (DUNN RD) BEGIN TIP PROJECT B-4637 —L— STA. 10 + 50.00 BEGIN BRIDGE -L- STA. 12 + 36.88 BRIDGE 325 BRIDGE 326 SR 1409 (OLD SALEMBURG ROAD) END BRIDGE l-�7'T[E COH�RiE -L- STA. 12 + 99.13 CREEK OVERFLOW BEGIN BRIDGE -L- STA. 15 + 24.88 THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHOULD BE PREFORMED TO THE LIMITS ESTABLISHED BY MODIFIED METHOD III. —L— ILITTLE COHAR/E CREEK OVERFLOW END BRIDGE -L- STA. 15 + 87.13 ., END TIP PROJECT B-4637 —L— STA. 21 + 50.00 / cnT4. �y���s�. ��sc�E,r \ s BRIDGE 327 \ � 1 BEGIN BRIDGE -L- STA. 18 + 91.81 END BRIDGE -L- STA. 19 + 99.19 � SALEMBURG � DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared In tl� Offlce of: HYDRAULICS E1VGIIVEER GRAPHIC SCALES DESIG11t DATA PROJECT LEI�GTH ADT 2 Ol 7= 590 DI VISI01� OF HIGHWA YS 50 25 � 50 ��� ADT 2037 = 935 1000 Birch Ridge Dr., Raleigh NC, 27610 �� �� �Oa�G� �q K= 11 % LENGTH ROADWAY TIP PROJECT B-4637 = 0.164 MI 2012 STANDARD SPECIFICATIONS �Q �oQ PLANS � � D= 55 % LENGTH STRUCTURE TIP PROJECT B-4637 = 0.044 MI SIGNATURE: P.E. � a 50 25 0 50 l00 T— 5 ��o * RIGHT OF WAY DATE: GARY R. LOVERING, PE a � V= 60 MPH TOTAL LENGTH OF TIP PROJECT 6-4637 = 0.208 MI PROJECT ENGINEER ROADWAY DESIG11t � � * 0 0 NOVEMBER 18, 2016 E11tGI11tEER � � a 0 PROFILE HORIZONTAL � � ) (TTST 1 /o + D UALS 4 /o) � �' o� D e �Q° � �> l0 5 0 l0 2p FUNC CLASS=RURAL LOCAL LETTI11lG DATE: SAM ST.CLAIR ��p� S U B RE G I O NAL T I E R JAN UARY 16 , 2 O� H I'ROJECT DESIGN ENGINEER PROFILE (VERTICAL) PE SIGNATURE: BOUNDARIES AND PROPERTY.• State Line ----- ----- County Line --- ---- Township Line -- -- City Line - - Reservation Line - - Property Line Existi ng I ron Pi n � Property Corner � Property Monument � Parcel/Sequence Number �23 Existing Fence Line -X X X- Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - -W�B— — — — Proposed Wetland Boundary W�B Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB Existing Historic Property Boundary HPB Known Contamination Area: Soil - �' �' Potential Contamination Area: Soil - � � Known Contamination Area: Water '� '� Potential Contamination Area: Water � � Contaminated Site: Known or Potential '�' � BUILDINGS AND OTHER CULTURE.• Gas Pump Vent or U/G Tank Cap O Sign � Well ° Small Mine �' Foundation 0 Area Outline Cemetery t Building School � Church � Dam HYDROLOGY.• Stream or Body of Water --- --- Hydro, Pool or Reservoir �____� Jurisdictional Stream �S — Buffer Zone 1 Bz � Buffer Zone 2 Bz 2 F I ow Arrow �--- --- Disappearing Stream �--- --- Spring c�'�����-��� Wetland � Proposed Lateral, Tail, Head Ditch � FLOW False Sump � �"I'.,���" 'I�:'. (�>I��' � �)I"'I I I � `'.,�� I'�(�) .,I \'.��, I�I �'I:; I(�)�' (�)I��' I I I � i�I I ``'.,�� �':�� � � ' � ' : � � � � � � , , , , . „ . RAILROADS.• Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled RIGHT OF WAY.• Baseline Control Point Existing Right of Way Marker Existing Right of Way Line Proposed Right of Way Line Proposed Right of Way Line with Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite R�W Marker Proposed Control of Access Line with Concrete C�A Marker Existing Control of Access Proposed Control of Access Existing Easement Line Proposed Temporary Construction Easement - Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Drainage / Utility Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Aerial Utility Easement �� CSX TRANSPORTATION O MILEPOST 35 0 SWITCH � � � T Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES.• Existing Edge of Pavement — Existing Curb — � � . W . W . �� � W in� 0 ._ _. �:� �c� �A� E E TDE PDE DUE PUE TUE AUE 0 Orchard Vi neya rd EXISTING STRUCTURES: MAJ O R: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole U/G Power Line LOS B(S.U.E.*) U/G Power Line LOS C(S.U.E.*) U/G Power Line LOS D(S.U.E.*) — TELEPHONE: Proposed Slope Stakes Cut --- �--- Proposed Slope Stakes Fill --- F--- Proposed Curb Ramp cR Existing Metal Guardrail — Proposed Guardrail = Existing Cable Guiderail — Proposed Cable Guiderail — Equality Symbol Pavement Removal I�EGETATION.• Single Tree Single Shrub ti ��������i�i � � Hedge Woods Line � � � � Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal Telephone Cell Tower U/G Telephone Cable Hand Hole U/G Telephone Cable LOS B(S.U.E.*) - U/G Telephone Cable LOS C(S.U.E.*) - U/G Telephone Cable LOS D(S.U.E.*) - U/G Telephone Conduit LOS B(S.U.E.*) U/G Telephone Conduit LOS C(S.U.E.*) U/G Telephone Conduit LOS D(S.U.E.*) U/G Fiber Optics Cable LOS 6(S.U.E.*) U/G Fiber Optics Cable LOS C(S.U.E.*) U/G Fiber Optics Cable LOS D(S.U.E.*) � � � � Vineyard CONC J ��N� WW � � WATE R: Water Manhole Water Meter Water Valve Water Hyd ra nt U/G Water Line LOS B(S.U.E*) U/G Water Line LOS C(S.U.E*) U/G Water Line LOS D(S.U.E*) Above Ground Water Line TV: �oN� Hw TV Pedestal TV Towe r �--------� U/G TV Cable Hand Hole ��B U/G TV Cable LOS 6(S.U.E.*) U/G TV Cable LOS C(S.U.E.*) � U/G TV Cable LOS D(S.U.E.*) U/G Fiber Optic Cable LOS B(S.U.E.*) s U/G Fiber Optic Cable LOS C(S.U.E.*) U/G Fiber Optic Cable LOS D(S.U.E.*) � � O a � HH GAS : Gas Valve Gas Meter U/G Gas Line LOS B(S.U.E.*) U/G Gas Line LOS C(S.U.E.*) U/G Gas Line LOS D(S.U.E.*) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer SS Forced Main Line LOS B(S.U.E.*) SS Forced Main Line LOS C(S.U.E.*) SS Forced Main Line LOS D(S.U.E.*) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line LOS B(S.U.E.*) U/G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. - A�G Tank; Water, Gas, Oil Geoenvironmental Boring U/G Test Hole LOS A(S.U.E.*) Abandoned According to Utility Records - End of Information W A/G Water - - - -T�- - - - - -T�- - TV - - - -TV FO- - - - -TV FO- TV FO � � — — — —G— — — - — —G— — —c— aic cas � O 55 A/G Sanitary Sewer — — — —FSS— — — - — — F55 — — F55 • � 0 a - 7UTL - 0 UST 0 � m AATU R E.O.I. N Z O > W � RELATIONSHIP OF BRIDGE #325 TO PROPOSED PAVEMENT BEGIN APPROACH SLAB END BRIDGE -L- STA. 12 + 26.00 -L- STA. 12 + 99.13 GRAU 350 TYPE III i TYPE III 0 0 GRAU 350 TYPE III �i TYPE III 8:1 P.5 TAPER M LT. & RT. END APPROACH SLA -L- STA. 13 + 10.00 BEGIN BRIDGE -L- STA. 12 + 36.88 NOT TO SCALE O � O 0 O � O � O � BEGIN TIP PROJECT B-4637 -L- STA. 10 + 50.00 REMOVE EXIST BRIDGE - BRIDGE 325 CLASS 'B' RIP RAP EST ITONS EST 5 SY GFD SHOULDER BERM GUTTER STA.12+16 TO STA.12+26 (LT AND RT) ,� � y� � � � . � � � � � � � � � � � � � � � � � � � � .� � � �2 ,� �+oo.o�i -�- ,� � ,� ,� � '� � .� �0.00' LT � '� � � � ,� � � ,� � � ,� 55.0�J' LT � � � +� � � � � � ,� � 411 ;�—`�� `.�-`� �'— � ��—�—� � .� � � ,� aoi � � � � � � � � _ _ — " —�_ —9�M — � — � � — � — —H�M— —`L— -�— — — .0 27'INC. _-��---� _ _ fE---7�i_ — � SR 1409 OLD SALEMBURG RD l7' BST x `' + `` T B 2 G I F - � � � � 15' - — — — — , � � �.. � 50' �PER � � �� F � �� � � � � � � � T. AND �T. � ,� � 03 ,� � � � � � � � � � � � � � � ,� � � ,� � + 00. 0 -L� '� � � ,� '� .� '� � � '� � � � 30.00' RT � � � � � ,� '� v � � .� '� � � � � � 5 .�O�RT� � 0 0 D � � ,� I .v_ d � CLASS 'B' RIP RAP EST ITONS EST 5 SY GFD RELATIONSHIP OF BRIDGE #326 TO PROPOSED PAVEMENT BEGIN APPROACH SLAB END APPROACH SLAB -L- STA. 15 + 14.00 -L- STA. 15 + 98.00 TYPE III � TYPE III 0 0 TYPE III �i TYPE III M BEGIN BRIDGE END BRIDGE -L- STA. 15 + 24.88 -L- STA. 15 + 87.13 NOT TO SCALE � 1 LINA WALTON HOWARD DB 1052 PG 967 CLASS 'B' RIP RAP EST ITONS EST 5 SY GFD 15" — SHOULDER BERM GUTTER I STA.15+04 TO STA.15+14 (LT AND RT) WO�DS � � � ,� � � � � ,� '� � � � � � � � � � � � � � �+10 � ,� � � � � � � �� CLA�S�,JI RIP.�RAP'�TO S�iO LDE� � � (S�RU.CiURES.. Y. I�E � ) .� '� ,� F .� � � � � � � � � � � — �����xi�N�-Rr�w�at- —'� —� - / � F I _. � ii �---------- � LE K G � � REMOVE EXIST TIMBER VERTICAL ABUTMENTS DOWN TO ELEVATION 95.2 (I' ABOVE NORMAL WATER SURFACE ELEVATION). APPROXIMATE EXCAVATION EL=95.2' (TYP FOR BRIDGE 327) BRIDGE 326 REMOVE EXIST BRIDGE CLASS II RIP RAP TO SHOULDER (STRUCTURES PAY ITEM, TYP) � � W 0 0 D,� '� � ,� � � �` ,� � � � � " � `�'�� ,� � � .� � � '� C� A SS I I�I P R�P T 0 S,�10 U L�@ E R ,� � - g� - 3� � � � �(STRUCTURE�- PAI� ITEM, TYP) y� '� + � � � � � � � � � � � +81 � � � +98 � '� � '� ,� � .� � � � � R � � � � � � � � � � 404 � .� —'� � -�� \ � � � � — � — � —e�M— — —,,— —� — —F— .� —� — — o � 0 \\�--,i� --------- � ` `� � TB2G1 I' ' `� ` � I ' � I i � + $ i � ,� \ � �� ^ M _ _ —Bl.M— — — ��J — � — r– — M — — — � � � �\ w i a ��� �--� � y��- R -'--------� -. - � - - --- � — � � F � � � F ,� LlT7"�EE OHARIE F� � � � � —�- � � � -� � ���� � � � � � � � � �5 C�EK OV FLOW '� '7� � � � � � � � .� '� � � � '� � 4�6 ,� + 14� � ,� .� � ,� � W ,� � � ,� � � ,� '� � .� '� + 10 � '� � � '� � � '� ,� � '� ,� � ,� � '� ,� � � ,� � � � � � � � � � � � � ,� � � ,� � � ,� � � � � � � + � � �� ,� '� v � .� '� � � � � � ,� � �OO�S '� v � � � � .w � � � � .w � � � „ � � � � � � � � � WOO�S CLASS 'B' RIP RAP EST ITONS EST 5 SY GFD REMOVE EXIST TIMBER VERTICAL ABUTMENTS DOWN TO ELEVATION 95.5 (I' ABOVE NORMAL WATER SURFACE ELEVATION). 3 RALPH L. LEONARD. JR. AND WIFE. PATRICIA H. LEONARD DB 1748 PG 97 REMOVE EXIST TIMBER VERTICAL ABUTMENTS DOWN TO ELEVATION 95.5 (I' ABOVE NORMAL WATER SURFACE ELEVATION). � PATRICK DUDLEY NEAL AND WIFE. DIANE G. NEAL OB �780 PG 62 BRIDGE 327 - REMOVE EXIST BRIDGE AND TIMBER VERTICAL ABUTMENTS CLASS 'B' RIP RAP EST ITONS EST 5 SY GFD � 15" � � � „-B��4 � / PROJECT REFERENCE NO. B-4637 R�W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 4 HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N O � N N O � O � i SHOULDER BERM GUTTER STA.20+10 TO STA.20+20 (LT AND RT) � ,� � .� � .� � . WOODS � � ,� � � ,� � .� '� � � � ,� '�+ 00.�0 -L- .� '� � � '� � � � � � 0.00' LT,� � � ,� � ,� '� � 55.00' LT � � � ,� � � � s � � �. w_� ��" � � � /�2 � � �� � — � � — � � — � Y�LB— � — — — �- — �WLB �— — —��— -� — — – �% — � � �B2G1 � - f B2G1 0 `V - - - - � i F 15" 1 � 4 —1 — � — — , �09 �/�K \ _v_ , SR 1409 OLD SALEMBURG RD l7' BST �� ��-�'����— 9�M ��� "��� — — — — � ��=,���' LT. A�I D R . ,� � � ,� � � .� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � ,+10� � � � �+00:�00 -L- � � � .� '� � � ,� '� � ,� \. �9.00' T � .� � � � � � „ � � � � � 55.OQ' RT � .0 '� � „ � ■