Loading...
HomeMy WebLinkAboutHF Lee Proposed Permanent Water Solution_20161123Permanent Water Supply Proposal to DEQ — HF Lee HF Lee Steam Station Wayne County 42 eligible households Duke Energy has evaluated the feasibility and costs of providing a permanent replacement water supply to eligible households, as required under G.S. 130A-309.21 1 (cl) of House Bill 630. Households were designated as "eligible" if any portion of a parcel of land crossed the mile compliance buffer described in HB630 and if the household currently utilized well water or bottled water (under Duke Energy's bottled water program) as the drinking water source. Undeveloped parcels were identified but were not considered "eligible" because groundwater wells are not currently utilized as a drinking source. Dewberry, a respected outside vendor, conducted the Potable Water Programmatic Evaluation (attached); the evaluation consisted of a survey of eligible households and a preliminary engineering evaluation, cost estimate and schedule. Dewberry's report, for the most part, assumes one metered connection per parcel; therefore, multiple homes may be serviced by one connection. The total count in this proposed plan includes all final connections. Based on the results of the Dewberry evaluation and the factors below, Duke Energy proposes that all 42 eligible households near HF Lee be offered the option of a connection to a public water supply or the installation of a water treatment system. The Fork Township Sanitary District already has a municipal line located along Old Smithfield Road, Pate Circle, Friendly Drive, Rosewood Road, and Ferry Bridge Road; therefore the majority of the households would require only service lines. A water line extension would be required along Rosewood Road (approximately 1800 feet). Estimates prepared by Dewberry, in conjunction with design information provided by the local water municipality, have revealed that at least 26 eligible households must accept connection to the public water supply for such connection to be cost-effective. Accordingly, Duke Energy proposes that if less than 26 households around the plant accept a connection to a public water supply, then all eligible households near the plant be offered installation and maintenance of a water treatment system to ensure a cost effective, long-term high quality water supply. From initial discussions with the Fork Township Sanitary District and evaluation of the system by Dewberry, the current system has adequate water capacity and the water quality could be maintained with the addition of the eligible households. The performance standard for the public water system is the Federal MCLs. The performance standard for the water treatment system is also the Federal MCLs except for those constituents identified in 2015 as having potential health concerns: arsenic, hexavalent chromium, cobalt, iron, lead, manganese, sulfate and vanadium. For these constituents, the performance standard will be either one-half of the MCL, or the appropriate state standard, whichever is more protective. DUKE �, ENERGY: Permanent Water Supply Proposal to DEQ — HF Lee Duke Energy is currently evaluating an ion filtration treatment system; this system has been successfully installed in other parts of the state, and initial results show it performs well in reducing vanadium and hexavalent chromium, among other constituents. The final water treatment system will be based upon the results of field studies. Duke Energy has made efforts to identify all eligible households, but it is anticipated that a nominal number of additional households will be identified during the initial outreach effort conducted upon approval of this plan by NCDEQ. If the final number of households, or the final number of households opting for public water supply, results in a conclusion different than those stated in this preliminary plan, Duke Energy will revise and submit the new plan to NCDEQ for evaluation and approval. Also, the estimate assumes one public water connection (i.e. meter box) per parcel; for parcels containing two households, the number of connections will be determined based upon negotiations between the well owner(s) and the municipality. Well owners will be responsible for making the decision for their parcels. Only households within the '/z mile boundary and served by well water at the time of the submittal of this plan will be eligible for a permanent water supply as part of HB630. The Dewberry evaluation includes a project schedule based on their past experience installing public water systems. The preliminary project schedule indicates that a permanent water supply will be available by February 2018. Upon submittal of this plan to NCDEQ, Duke Energy will begin negotiations with the local municipality and a more detailed schedule will be developed. If the municipality's schedule shows an implementation date extending beyond October 15, 2018, Duke Energy will request an extension and look at whether other contingency measures need to be implemented. Fork Township Sanitary District does have one water supply well located within the'/2 mile compliance buffer. Through discussions with Fork Township, the water from this supply well is combined with water supplied from other wells outside the'/2 mile compliance buffer and treated in their treatment plant before it is enters their distribution system. While the water from this supply well is already treated by a municipal water system, Duke Energy is recommending that the one water supply well located inside the'/2 mile compliance buffer be abandoned and a new well be installed at a location amenable to the Fort Township Sanitary District. A time frame will be developed with Fork Township and shared with DEQ once developed. ,& DUKE ENERGY: Permanent Water Supply Proposal to DEQ — HF Lee Dhli\AIf C-1- Connection Total Number Recommended 42 _ _ Water Quality Criteria Meets applicable water quality Yes standards (Federal MCLs) Completion Schedule Estimated completion date 02/2018 Request extension to 10/2019 Contingency factors and/or install water treatment system until line is complete Operational Considerations Required acceptance level to achieve consistent water quality and N/A supply Required acceptance level to achieve targeted cost per eligible 62% (26 households) household <$35k/household Location of households relative to 200 ft. — 1,800 ft. existing municipal water lines (0.04 miles — 0.34 miles) Other considerations Costs Total Installation Costs $920,000 Approximate cost per eligible $22,000 household Annual Maintenance Costs N/A Maintenance cost per household N/A annually Non -Duke Costs Total estimated water bills monthly $1,344 Estimated water bills monthly per $32 household Ongoing municipality costs for maintenance and flushing due to TBD low-flow/low-usage Total Costs (Duke and Non -Duke) Total estimated cost for all eligible $1,081,280 neighbors over 10 years Total estimated cost for each eligible $25,740 neighbors over 10 years (� DUKE ENERGY,. Dewberry H.F. Lee Station Phase II Potable Water Programmatic Evaluation Duke Energy November 23, 2016 SUBMITTED BY: Dewberry 2610 Wycliff Road Suite 410 Raleigh, NC 27607 SUBMITTED TO: Duke Energy Table of Contents ExecutiveSummary ...............................................................................................2 1. Introduction and Project Approach..............................................................4 2. Phase II Basis of Design................................................................................6 2.1 Potable Water Connection Mapping.............................................................. 6 2.2 Municipal Potable Water Connection Opinion of Probable Cost.................6 3. Site Analysis................................................................................................... 7 3.1 Station Mapping and Household Data.......................................................... 7 3.2 Field Observations.......................................................................................... 7 3.3 Other Considerations.....................................................................................8 4. Regulatory Permitting....................................................................................9 5. Schedule........................................................................................................10 6. Opinion of Probable Cost............................................................................11 Appendix A: H.F. Lee Station Phase II Mapping Appendix B: H.F. Lee Station Household Data Spreadsheet Appendix C: Schedule Appendix D: Opinion of Probable Cost 9 Dewberry Duke Energy 1 H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 11 Executive Summary This Phase II evaluation is structured to comply with the requirements of North Carolina House Bill 630: Section 13oA-309.211.(ci) of House Bill 63o requires provision of permanent water supply for each household that has a drinking water supply well located within a 1/2 mile radius from the established compliance boundary of a coal combustion residuals impoundment, and is not separated from the impoundment by the mainstem of a river, or other body of water that would prevent the migration of contaminants through groundwater from the impoundment to a well. To address the provisions of House Bill 63o, Dewberry performed this Phase II preliminary engineering evaluation to supply potable water to residents within a 1/2 mile of the compliance boundary. Preparation of this report is intended to comply with the House Bill 63o requirement to make a report submittal to the North Carolina Department of Environmental Quality (DEQ) by December 15, 2o16. On September 8, 2o16 a project review meeting was held at the Fork Township Sanitary District (FTSD) main office in Goldsboro, NC. Representatives from Duke Energy, Dewberry, and FTSD attended the meeting. FTSD sources water from 20 wells located throughout the area. These wells pump to a centralized water treatment plant. One of the 20 wells is located inside the compliance buffer (Appendix A: Sheet 3 — Parcel 9). Detailed Phase II mapping was developed using Wayne County property maps that show each household in the 1/2 mile compliance buffer. Dewberry visually observed the households shown on the Phase II mapping on September 8, 2o16. A household database was developed using Wayne County tax records tied to the GIS shape file which identifies the property owner and the address for each household within the 1/2 mile compliance buffer. Based on our site observations and the Phase II mapping, it appears to be technically feasible to install the potable water line in the public road right of way or along private roads using conventional construction methods. Easements appear to be required in four areas. A schedule was prepared in part to show milestone dates needed to comply with House Bill 630 which states the following: • Report submittal to the North Carolina DEQ no later than December 15, 2016. • DEQ renders a final decision to approve or disapprove the report no later than January 15, 2017. • Permanent replacement water supplies are provided no later than October 15, 2o18. If each of the milestone dates are met, the schedule indicates that project completion can occur in February of 2018 which meets the House Bill 630 schedule requirement for permanent replacement water supplies. TODewberry Duke Energy I H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 2 An opinion of probable cost was developed to provide potable water service to 42 households within the 1/2 mile compliance buffer. The 42 households are served from 35 water line connections as multiple parcels have more than one household per connection. The estimated costs are summarized below: Potable Water Service 1 42 households 1 $920,000 Potable Water Service per household 1 1 1 $22,000 The potable water connection cost estimate includes a 25% contingency which is deemed consistent with a project at the preliminary engineering level of detail. To be conservative the cost estimate assumes that all 42 households will receive potable water service. This report provides additional detail on the Project Approach, Basis of Design, and Site Analysis. H.F. Lee Steam Station mapping is provided in Appendix A. The household database is provided in Appendix B. The H.F. Lee Steam Station Potable Water Schedule is provided in Appendix C, and the Opinion of Probable Cost is provided in Appendix D. TODewberry Duke Energy I H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 3 1. Introduction and Project Approach PROJECT INTRODUCTION During the Phase I programmatic potable water evaluation desktop study, concept level mapping was developed showing the H.F. Lee Steam Station location, the potential potable water tie-in location, and potential pipe routing to residents within a 1/2 mile of the compliance boundary. We used the Phase I mapping to develop a concept level cost estimate with a 40% contingency. During this Phase II evaluation sufficient preliminary design work has been performed to prepare a cost estimate with a 25% contingency. This Phase II evaluation is structured to comply with the requirements of North Carolina House Bill 630: Section 13oA- 309.211. (CI), which requires provision of permanent water supply for each household that has a drinking water supply well located within a 1/2 mile radius from the established compliance boundary of a coal combustion residuals impoundment, and is not separated from the impoundment by the mainstem of a river, or other body of water that would prevent the migration of contaminants through groundwater from the impoundment to a well. To address the provisions of House Bill 63o referenced above Dewberry has performed a Phase I screening level evaluation and this Phase II preliminary engineering evaluation of the technical and economic feasibility to supply municipal potable water to residents within a 1/2 mile of the compliance boundary. The Phase II evaluation results will be used to prepare this report for submittal to the North Carolina Department of Environmental Quality (DEQ) by December 15, 2o16 as required by House Bill 630. Using publicly available information Dewberry evaluated the following criteria to perform the Phase II H.F. Lee Steam Station preliminary engineering study: • Identified public road right-of-way widths and ownership along the pipe route • Evaluated feasibility to install the proposed water line within the unpaved shoulder of an NC DOT roadway • Documented approximate location of U.S. waters, including possible wetlands shown in the U.S. Fish & Wildlife Service National Wetlands Inventory (as applicable) • Identified potential jurisdictional and permitting authorities to establish permitting needs • Estimated potential easement acquisition areas (estimated square footage and number of parcels affected) • Evaluated potential conflicts with known existing utilities • Estimated the pipeline length and pipe diameter(s) for the water line and the individual service lines • Evaluated the potential need for a water booster pump station or elevated tank to sustain adequate water pressure • Evaluated the water age and potential need for supplemental disinfection • Evaluated the potential need/requirement for fire hydrants and hydrant quantity • Evaluated potential construction methods and challenges • Evaluated potential municipal water system future improvements based on published Capital Improvement Plan (CIP) or published Master Plan TODewberry Duke Energy I H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 4 PROJECT APPROACH Dewberry contacted the Duke Energy Community Relations District Manager to discuss the information needed to execute the Phase II evaluations, and to arrange for a subsequent meeting with FTSD. On September 8, 2016 a project review meeting was held at the FTSD main office in Goldsboro, NC to discuss execution of this Phase II preliminary evaluation and subsequent project execution. Representatives from Duke Energy, Dewberry, and FTSD attended the meeting. The primary purpose of the meeting was to confirm the water distribution system tie-in location, system pressure, pipe size, and water quality at the tie -location, capacity limitations, and whether there are future planned water system projects that could impact the Phase II evaluation. Dewberry also inquired as to whether any households within a 1/2 mile of the compliance boundary were presently being served by municipal potable water. Following the meeting, Dewberry performed a drive -by observation of the potable water pipe route. During Phase I Dewberry obtained municipality mapping of the potable water distribution system and then developed draft maps showing the H.F. Lee Steam Station, the respective potable water distribution system tie-in location, and the water line pipe routing. We used the Duke Energy Drinking Water Receptor Surveys for Coal-fired Power Stations developed in 2014 to show compliance boundaries and the water supply wells within a 1/2 mile of the compliance boundary. The maps were prepared using GIS as the native software. During Phase II we developed more detailed mapping based on Wayne County property maps to identify property owners and household addresses within the 1/2 mile compliance buffer. For the Phase II analysis property parcels that were wholly or partly within the compliance buffer were included in the evaluation. Using the Phase II mapping a database of property owners and household locations was developed. Dewberry also contacted FTSD to confirm residents along the existing water lines within the compliance buffer who are currently connected to the system. This information allowed for identification of residents who were located along the existing water line but not connected to the water system. We also prepared a project schedule. Dewberry then developed an opinion of probable cost for the installation of piping infrastructure to the potable water tie-in location. We used vendor budgetary costs for the primary capital equipment and used cost factors to estimate the installation costs. We did not obtain contractor installation cost estimates for this evaluation. Dewberry reviewed the cost data with Duke Energy to obtain concurrence on the methodology and the allowances applied. TODewberry Duke Energy I H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 5 2. Phase II Basis of Design The purpose of this section is to document basis of design assumptions that were used to prepare the H.F. Lee Steam Station mapping, opinion of cost, and schedule. 2.1 POTABLE WATER CONNECTION MAPPING Key assumptions for the potable water connection mapping are as follows: Potable water piping is routed along state roads and will use municipality/county existing easements, where possible. Private easements will be required in four areas. Power transmission line easements will not be used for installation of the potable water piping. 2.2 MUNICIPAL POTABLE WATER CONNECTION OPINION OF PROBABLE COST Key assumptions for the potable water connection cost estimates are as follows: Item 1 on the cost estimate shows 6 inch C-goo PVC for the potable water line pipe. The 6 inch diameter is considered a conservative pipe size to meet the water demand of the households within the compliance buffer. The 6 inch water line pipes are not sized to meet fire flow as that is not required for potable service by FTSD. Items 1 through 8 on the cost estimate show material cost for the piping, valves, and associated fittings. The sum of Items 1 through 8 is shown as a separate line item. A 30% cost factor is then applied to the summed value to estimate the cost to install the pipe, valves, and fittings. The cost estimate quantities are based on the H.F. Lee Steam Station mapping and assumptions stated on the cost estimate. The unit costs are based upon vendor budgetary costs and cost data we have from recent similar projects. • The sum of quantities for items 21-22 on the cost estimate indicates there are 35 potable water line connections. The eight 2 inch service taps are for service connections exceeding 1,000 feet or parcels with multiple connections. The 27 - 3/4 inch service taps are for individual household connections close to the proposed main and meter box connection. • The number of connections shown in the cost estimate is based upon the Wayne County property maps and drive -by observations. Items g through 17 and items 21 through 25 are installed cost, so a 30% installation cost factor was not applied. Items 18 through 20 are material cost, so a 30% installation cost factor was applied. Items 1 through 25 are summed and shown as a SUBTOTAL. Cost factors are then applied to the SUBTOTAL to estimate the balance of the project costs. We have applied a 25% contingency which is deemed consistent with a preliminary engineering evaluation. Additional assumptions that Dewberry used to prepare the opinion of probable cost are provided as foot notes in Appendix D. Contractor General Conditions are included for the duration of on -site construction phase activities. Easement acquisition includes the cost to compensate land owners for water lines extended down private roads and/or across private property. TODewberry Duke Energy I H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 6 3. Site Analysis 3.1 STATION MAPPING AND HOUSEHOLD DATA The Phase II overall map in Appendix A shows the proposed tie-in location to the existing FTSD potable water supply system, indicating that just over a 1/4 mile (~1,800 LF) of new potable water piping is required to serve households within the 1/2 mile compliance buffer. FTSD has verbally agreed to own and operate the expanded potable water system. The Phase II Site map and sheets in Appendix A were prepared by overlaying Wayne County property maps onto the compliance boundaries detailed in the Duke Energy Drinking Water Receptor Surveys for Coal-fired Power Stations developed in 2014. The Appendix A Site map shows the 1/2 mile compliance buffer and ii rectangular property map sections. ii sheets were then prepared that show the water line route, individual households, and household service line connections within the 1/2 mile compliance buffer. During the September 8, 2o16 drive -by, Dewberry visually observed households shown in the Appendix A sheet mapping. The household database in Appendix B was created from the Wayne County tax records tied to the GIS shape file which identifies the property owner and the address for each household within the 1/2 mile compliance buffer, including parcels of land with no residents (empty lot). The parcel data listed on the spreadsheets also includes Parcel ID, Land Use, Easement Requirement, and anticipated Water Demand for each property. It should be noted that a number of parcels had more than one home located on the property; in this case one meter was assumed with length of service line assumed to extend to each home from a single meter. Engineering judgment was utilized in cases where homes were located out of sight from the road and multiple structures could be seen during an aerial review. Review of the mapping from Appendix A allowed for estimates of the required private easement areas around the Steam Station. The potable water line proposed to serve residents around the H.F. Lee Steam Station will require private easement acquisition in four areas. Typical municipal easement standards were followed. The easement area was calculated by multiplying the length of the water line on private property by 30 feet. The area was then multiplied by 50% of the average land value (per acre) as indicated by public tax assessment for properties around the H.F. Lee Steam Station, providing an estimate of the easement cost. Temporary easements were not included in the calculation. 3.2 FIELD OBSERVATIONS As shown in Appendix A, the water line piping will be installed along state roads, where possible. During the September 8, 2016 drive -by Dewberry did not observe rail road crossings or other above grade conflicting physical features that are anticipated to have a significant impact on the construction cost or schedule. Based on our observations and the Phase II mapping, it appears to be technically feasible to install the potable water line in the public road right of way or along the side of the private roads using conventional construction methods, such as an open trench with pipe bedding material. Approximately 16 service line road crossings will be required with no water line road crossings anticipated. Road crossings are planned to be subsurface boring to avoid open road cuts, and traffic impacts. It should be noted that the crossing count could be modified based upon final design and which side of the road the water line will be installed. Dewberry did not observe surface water or apparent wetland infrastructure conflicts. This is consistent with USGS mapping and the U.S. Fish & Wildlife Service National Wetlands Inventory. TODewberry Duke Energy I H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 7 During the drive -by Dewberry did not observe potential conflicts with known existing utilities. At present the 42 households within the 1/2 mile compliance buffer do not have public water or sewer. Natural gas main markers were not observed during the drive -by, but are typically located within the state road right of way and are smaller in diameter than water piping, therefore they would not cause a significant conflict. Fiber optic markers were also not observed during the drive -by. Aboveground electric was observed and therefore not considered an impediment to water line installation. Dewberry observed the public road right-of-way and private road widths and evaluated the feasibility to install the proposed water line within the unpaved shoulder of NC DOT roadway or within the private road shoulder. In areas that we could not determine right of way status (public or not) or areas where private property may have been constructed onto right of way, we either provided an allowance for water line easement, or the construction impact is accounted for in the cost estimate as a renovation allowance. 3.3 OTHER CONSIDERATIONS FTSD is a relatively small water system who owns the infrastructure, manages the water supply, and meters and bills for water use. FTSD sources water from 20 wells located throughout the area. These wells pump to a centralized water treatment plant. The water treatment plant treats approximately 0.5 MGD and distributes the water to the households in the FTSD system. One of the 20 wells is located inside the compliance buffer (Appendix A: Sheet 3 — Parcel g). The current system is not rated for fire protection. FTSD estimates the water pressure in the area to be approximately 50-6o psi, which is more than adequate for rural residential domestic service. FTSD has confirmed their capacity to serve the residents around H.F. Lee. Therefore based on this preliminary information, the flow capacity and pressure is deemed adequate to serve the 42 households in the 1/2 mile compliance buffer. Based on information from FTSD, the chlorine residual in the H.F. Lee area is approximately 1.5 mg/L with a water age of approximately 1 day. However, water system disinfection residual tends to breakdown as water age increases and this can be caused by lower rural residential demands and increased travel time. Two common ways to prevent loss of disinfection residual are 1.) disinfection boosting, and 2.) systematic flushing to maintain flow and minimize water age. The water system extension, as planned by Dewberry, utilizes the minimal diameter pipe for service and considers system flushing to be required in this area. The proposed water system extension for 42 households will marginally increase the water age. FTSD has considered the increase in water age and they think the water quality will be maintained. TODewberry- Duke Energy I H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 8 4. Regulatory Permitting The water line design will be required to adhere to requirements of the following agencies and permitting authorities. Each permit will require a separate set of documentation and will be submitted individually to the respective permitting agency. The timeline for submittal and approval is presented in the H.F. Lee Steam Station Potable Water Schedule detailed in Appendix C. • NCDOT Right-of-way Encroachment Agreement, Primary and Secondary Roads • NCDEQ, Division of Land Quality, Erosion and Sedimentation Control Permit • NCDEQ, Division of Water Resource, Public Water Supply Permit TODewberry Duke Energy I H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 9 5. Schedule The Phase II project schedule is provided in Appendix C. The schedule was prepared to illustrate milestone dates needed to comply with House Bill 630 which states the following: • "No later than December 15, 2016 an impoundment owner shall submit information on permanent replacement water supplies proposed to be provided to each household" • "The Department shall evaluate information submitted by the impoundment owner and render a final decision to approve or disapprove the plan, including written findings of fact no later than January 15, 2017" • "As soon as practical, but no later than October 15, 2018 the owner of a coal combustion residual surface impoundment shall establish permanent replacement water supplies" The schedule indicates DEQ report submittal on December 15, 2016 and DEQ approval by January 15, 2017. The schedule includes an initial go day negotiation period for development and execution of a Water Authority/Duke memorandum of understanding (MOU). The schedule is subject to change dependent upon the milestone dates for the MOU, the approval/comments from DEQ, and the resident input regarding permanent water supply choice. The balance of the schedule is deemed typical for a municipal design -bid -build water line improvement project and plans for all households to connect to public potable water. The schedule indicates an end date of February 2018 which meets the October 15, 2018 deadline. TODewberry Duke Energy H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 10 6. Opinion of Probable Cost The Phase II opinion of probable cost is provided in Appendix D. The opinion of probable cost was prepared in accordance with the basis of design criteria in Section 2.2 of this report. The opinion of probable cost indicates that the total estimated construction cost is approximately $920,000, which equates to approximately $22,000 per household. A 25% contingency is included. The Phase II opinion of probable cost includes individual allocations for the service connection lines and meters (items 18 through 25) that equates to approximately $11,500 per new connection. We arrived at that allocation as follows: For items 18 and i9 the service line lengths were measured for each household using the Phase II sheet mapping. Item 20 is for miscellaneous fittings associated with the service line connections. For items 21 and 22 the meter/meter box allowance was developed from vendor quotations and from recent bid tabs we have for similar projects. Item 23 is for road crossings where the connection to be served is on the opposite side of the road from the water line. Items 24 and 25 represent site costs associated with approximately 12,000 feet of new service line piping. TODewberry Duke Energy H.F. Lee Station Phase 11 Potable Water Programmatic Evaluation 11 Appendix A: H.F. Lee Station Phase II Mapping www.dewberry.com November 22, 2016 sups; Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Overall Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands Duke Energy Plant Railway Stream/Lake N 1 in = 1,600 feet 0 1,600 3,200 Feet November 22, 2016 IG, Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 1 Legend ----- County Boundary Proposed Potable Water Line (Duke) Proposed Service Line - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) ® Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 22, 2016 ,:I:, Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 2 Legend ----- County Boundary Proposed Potable Water Line (Duke) Proposed Service Line - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) ® Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 22, 2016 Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 3 Legend County Boundary Proposed Potable Water Line (Duke) Proposed Service Line Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant �e Railway Stream/Lake Existing Home (Constructed post Aerial) 0# Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 22, 2016 ,:I:, Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 4 Legend ----- County Boundary Proposed Potable Water Line (Duke) Proposed Service Line - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) U Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 22, 2016 , e), Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 5 Legend ----- County Boundary Proposed Potable Water Line (Duke) Proposed Service Line - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) ® Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 22, 2016 ,:I:, Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 6 Legend ----- County Boundary Proposed Potable Water Line (Duke) Proposed Service Line - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) ® Parcel Reference Number (Refer to spreadsheet for parcel details) N -it 1 in = 200 feet 0 200 400 Feet November 22, 2016 Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 7 Legend County Boundary Proposed Potable Water Line (Duke) Proposed Service Line Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant �e Railway Stream/Lake Existing Home (Constructed post Aerial) #J Parcel Reference Number (Refer to spreadsheet for parcel details) Al _7L 1 in = 200 feet 0 200 400 Feet November 22, 2016 Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 8 Legend County Boundary Proposed Potable Water Line (Duke) Proposed Service Line Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) #J Parcel Reference Number (Refer to spreadsheet for parcel details) `V 1 in = 200 feet 0 200 400 Feet November 22, 2016 ,:I:, Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 9 Legend ----- County Boundary Proposed Potable Water Line (Duke) Proposed Service Line - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) ® Parcel Reference Number (Refer to spreadsheet for parcel details) 1V 1 in = 200 feet 0 200 400 Feet �.�.V K� 141 147 142 160 � 175 174 f23; L _ l 149 z 145 143 170 47 _ 76' 155 156 144 172 �87' 167 O L r „ L w w v U 173 �� 152 = = 153 151 32 28 81i 8Z 111 80) 85 117 cn 9 W W 150 z z� J J� _ = Old Smithfield Rd Q-Q Q Q 74 112 �36,� 26 10i 4 r(27) 12 J 13 33� � • (38 C25j I 191 _ W Z 1 November 22, 2016 Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 10 Legend County Boundary Proposed Potable Water Line (Duke) Proposed Service Line Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) 0# Parcel Reference Number (Refer to spreadsheet for parcel details) `V 1 in = 200 feet 0 200 400 Feet November 22, 2016 ,:I:, Dewberry - Duke Energy Dewberry Proj. No. 50081779 Proposed Potable Water Site Preliminary Evaluation H.F. Lee Steam Station Sheet 11 Legend ----- County Boundary Proposed Potable Water Line (Duke) Proposed Service Line Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (Fork Township Sanitary District) Wetlands + Duke Energy Plant Railway Stream/Lake Existing Home (Constructed post Aerial) U Parcel Reference Number (Refer to spreadsheet for parcel details) 1V 1 in = 200 feet 0 200 400 Feet Appendix B: H.F. Lee Station Household Data Spreadsheet www.dewberry.com HE Lee Steam Station Parcel Spreadsheet Label Parcel ID Site Address Type of service Land Use Owner Name Tax Address Easement Req' Daily Flow Notes 1 2569696522 2002 ROSEWOOD RD Residential In Use COLLINS DAVID EARL 1968 ROSEWOOD RD 480 Gallons/cm-nectim, 2 2569696522B 2002 ROSEWOOD RD N/A Empty Lot COLLINS DEANA 2002 ROSEWOOD RD - - 3 2579275608 OLD SMITHFIELD RD N/A Empty Lot HINSON DON E & W FRANCES 162 MEMORY LANE - - 4 2579273486 118 MEMORY LN Residential In Use HINSON DON E & W FRANCES 162 MEMORY LANE - - 5 2579275440C 146 MEMORY LN Residential In Use HINSON DONNA 146 MEMORY LANE - - ■ 6 2579275-0 146 MEMORY LN N/A Empty Lot HINSON DON ENNIS 162 MEMORY LANE - - 7 2569671286 OLD SMITHFIELD RD N/A Empty Lot CAPPS EVA HEIRS 2216 ROSEWOOD RD - - ■ 8 2569662901 OLD SMITHFIELD RD N/A Empty Lot CAPPS LEAMON D & 2144 OLD SMITHFIELD RD - - 9 2569871458 ROSEWOOD RD N/A Empty Lot FORK TOWNSHIP SANITARY DISTRIC PO BOX 1515 - - FTSD Water Supply Well ■ 10 2579794916 1181 OLD SMITHFIELD RD Residential In Use TURNER JASONW 203 E ADAMS ST - - 11 2579794880 1163 OLD SMITHFIELD RD Residential In Use LANE JESSE LAMES II 107 KAYLA MARIE LANE - - 12 2579793865 1183 OLD SMITHFIELD RD Residential In Use CURTIS JOSEPH III & W ANGELA R 1183 OLD SMITHFIELD HWY - - 13 2579795857 1163 OLD SMITHFIELD RD N/A Empty Lot LANE JESSE J II 107 KAYLA MARIE LN - - 14 2579699587 1233 OLD SMITHFIELD RD Residential In Use ALLEN DAWN 1233 OLD SMITHFIELD RD - - 15 2579288350 1558 OLD SMITHFIELD RD Residential In Use JERNIGAN JOHNNIE AIR 1558 OLD SMITHFIELD RD - - 1fi 2579389795 1458 OLD SMITHFIELD RD N/A Empty Lot POWELL WILLIAM GLEN 1458 OLD SMITHFIELD RD - - 17 2579482842 1436 OLD SMITHFIELD RD Residential In Use RADFORD FRANCES S 1436 OLD SMITHFIELD RD - - F 18 2579489088 1385 OLD SMITHFIELD RD Residential In Use CROCKER ROBERTGREGG SR & W 1385 OLD SMITHFILD RD - - 19 2579396801 OLD SMITHFIELD RD N/A Empty Lot RADFORD FRANCES S 1436 OLD SMITHFIELD RD - - 20 2579165797 OLD SMITH FIELD RD N/A Empty Lot CAROLINA POWER &LIGHT PO BOX 14042 - - 21 2569977880E OLD SMITH FIELD RD Residential In Use RAINSTIM 1694 OLD SMITHFIELD RD - - 22 25fi9977880 OLD SMITHFIELD RD Residential Empty Lot DAVISHLLANN RAINS 1776 OLD SMITHFIELD RD - - 23 2670606392 106 PATE CIR Residential In Use ALSTERBERG AMBER LYNN 106 PATE CIR - - 24 26707-091 1165 OLD SMITHFIELD RD Residential In Use RAC T&R LLC 1174 OLD SMITHFIELD RD - - 25 2610706091 1153 OLD SMITHFIELD RD Residential In Use LANE ALICED 1149 OLD SMITHFIELD RD - - 26 2579790708 1217 OLD SMITHFIELD RD Residential In Use JOHNSON OLIVER CJR & W UNA 405 ASH ST - - 27 2579792873 1193 OLD SMITHFIELD RD Residential In Use BLALOCK CHARLES A&SANDRA HAL 103 MERL CIRCLE - - 28 2579696838 101 PATE CIR Residential In Use REAJOSHUA LEIGH 101 PATE OR - - 29 2569768864 2261 ROSEWOOD RD Residential In Use BRIDGERS MICHAEL DALE 2261 ROSEWOOD RD - - wr 30 2569869220 1898 OLD SMITHFIELD RD Residential In Use RAINSJENETTE5 1898 OLD SMITHFIELD RD 480 Gallons/connection 31 2579791881 1199 OLD SMITHFIELD RD Residential In Use FAIL DENNISE 1199 OLD SMITHFIELD RD 480 Gallons/connection 32 2579692731 150 PATE CIR Residential In Use TEMPLE REBECCA 150 PATE CIR - - 33 2579690141 1279 OLD SMITHFIELD RD Residential In Use PITTMAN WILLARD THOMAS 1279 B SMITHFIELD RD - - 34 2569472691 119 NEUSE ISLAND LN Residential In Use PIPKIN REX C& WIFE 2271 OLD SMITHFIELD RD 480 Gallons/connection 35 2579699425 OLD SMITHFIELD RD Residential Empty Lot GIPSON BRENDA DARLENE EVANS 1241 OLD SMITHFIELD RD - - 36 2579698751 1223 OLD SMITHFIELD RD Residential In Use KORNEGAY THOMAS L II 3137 NC HIGHWAY 111 N - - 37 2579497022 1390 OLD SMITHFIELD RD Residential In Use OVERBEE DENNIS JAMES 7351 BROGDEN RD 480 Gallons/connection E 38 2579697176 123-221 Quaker Mobile Home Parks In Use B AND D MANAGEMENT INC PO BOX 477 - - 39 2179411921 1396 OLD SMITHFIELD RD Residential In Use COOKE DONNIE M 1396 OLD SMITHFIELD RD 480 Gallons/connection 40 2579690343 OLD SMITHFIELD RD N/A Empty Lot PITTMAN WILLARD THOMAS 1279 B SMITHFIELD RD - - 41 2579690343 OLD SMITHFIELD RD N/A Empty Lot PITTMAN WILLARD THOMAS 1279 B SMITHFIELD RD - - 42 2579075009 OLD SMITHFIELD RD N/A Empty Lot HILL BURNICEN 1750 OLD SMITHFIELD ROAD - - 43 2579593352 101 JJ LN Residential In Use GARNER WESLEY A JR&W ADRIENN 101JJLANE - - 44 2579485427 OLD SMITHFIELD RD N/A Empty Lot RADFORD BLANCHE 1349 OLD SMITHFIELD RD - - 45 2579791707 1205 OLD SMITHFIELD RD Residential In Use BOBBY DENNING PROPERTIES LLC 1126 N BREAZEALE AVE - - 46 2569677921 2194 ROSEWOOD RD N/A Empty Lot CAPPS EVA HEIRS 2216 ROSEWOOD RD - - 47 2670607231 104 PATE CIR Residential In Use BREEDLOVE JOHN L& W MOLLY 104 PATE CR - - 48 2579171670 920 FRIENDLY DR Residential In Use MOORE DONALD J 916 FRIENDLY DR 480 Gallons/connection 49 2579279681 OLD SMITHFIELD RD N/A Empty Lot PRICE D MCKINLEY 203 TRAMWAY PL - - 50 2569786376 2123 ROSEWOOD RD N/A Empty Lot HARTLEY MYRTLE 2119 ROSEWOOD RD - - 51 2579273711 1595 OLD SMITHFIELD RD Residential In Use UZZELL MALCOLM&WIFE 1595 OLD SMITHFIELD RD - - i 52 2569777080 2245 ROSEWOOD RD Residential In Use MILLER NEAL SCOTT 2245 ROSEWOOD RD - - 53 2579172580 1676 OLD SMITHFIELD RD Residential In Use MELVIN SYLVIAC 1676 OLD SMITHFIELD RD - - 54 2579376972 OLD SMITHFIELD RD N/A Empty Lot VINSON JAMES ALLEN ETALS 809 PARK AVE - - 55 2569969886 1776 OLD SMITHFIELD RD Residential In Use NEAL DONALD CJR 386 PERKINS MILL RD - - ■ 56 2579062132 1775C OLD SMITHFIELD RD Residential In Use WILLIAMSON RAYMOND SHERRILL 1775C OLD SMITHFIELD RD 480 Gallons/connection lmeter, 5 homes 57 2579073080 1750 OLD SMITHFIELD RD Residential In Use HILL BURNICE NOVELL& W SHIRLE 1750 OLD SMITHFIELD RD - - ■ 58 2579063444 1775 OLD SMITHFIELD RD Residential In Use LANE CRISTAL DOAN 828 GARNER RD - - 59 2569472118 OLD SMITHFIELD RD Residential In Use KORNEGAY CECIL&WIFE 197 NEUSE ISLANDS LN 480 Gallons/connection 60 2579166267 OLD SMITHFIELD RD N/A Empty Lot CAROLINA POWER & LIGHT PO BOX 14042 - 61 2569967090 OLD SMITHFIELD RD N/A Empty Lot CAROLINA POWER &LIGHT PO BOX 14042 - - 62 2569779099 ROSEWOOD RD N/A Empty Lot MILLER NEALSCOTT 2245 ROSEWOOD RD - - 63 2569578194 OLD SMITHFIELD RD N/A Empty Lot CAPPS WALTER STEPHEN&WIFE 2150 OLD SMITHFIELD RD - - F 64 2569377160 197 NEUSE ISLAND LN Residential In Use KORNEGAY CECIL& WIFE 197 NEUSE ISLANDS LN 480 Gallons/connection 65 2579079048 1709 OLD SMITHFIELD RD Residential In Use LEATHERS MARTHA H 1709 OLD SMITHFIELD RD - - 66 2579174516 1672 OLD SMITHFIELD RD Residential In Use PEEDIN GWENDOLYN H 1672 OLD SMITHFIELD RD - - 67 2569776538 2195 ROSEWOOD RD Residential In Use MITCHELL R DARRYL & W ASHLEY 2195 ROSEWOOD RD - - fib 2569775024 2234 ROSEWOOD RD Residential In Use CAPPS RACHEL P 2216 ROSEWOOD RD - - 69 2579054828 2775C OLD SMITHFIELD RD N/A Empty Lot WILLIAMSON RAYMOND SHERRILL 1775C OLD SMITHFIELD RD - - 70 2569958642 OLD SMITHFIELD RD N/A Empty Lot CAROLINA POWER&LIGHT PO BOX 14042 - - 71 2569857970 1907 OLD SMITHFIELD RD Residential In Use PEARCE LARRY WARD 1907 OLD SMITHFIELD RD - - 72 2569952453 OLD SMITHFIELD RD N/A Empty Lot CAROLINA POWER & LIGHT PO BOX 14042 - - 73 2579696594 1247 OLD SMITHFIELD RD Residential In Use GIPSON BRENDA DARLENE EVANS ETAL 1247 OLD SMITHFIELD RD - - 74 2579696644 1241 OLD SMITHFIELD RD Residential In Use GIPSON BRENDA DARLENE 1241 OLD SMITHFIELD RD - - 75 2579595339 100 11 LN Residential In Use WALLACE ADELE C 100A LANE - - ` 76. 2579079491 1694 OLD SMITHFIELD RD Residential In Use DAVISJILL ANN RAINS 17760LD SMITHFIELD RD - - 77 2569379352 197 NEUSE ISLAND LN N/A Empty Lot KORNEGAY CECIL&WIFE 197 NEUSE ISLANDS LIN - - 78 2579692147 1279 OLD SMITHFIELD RD Residential In Use PITTMAN WILLARD THOMAS&W ELA 1279 B OLD SMITHFIELD RD - - 79 2579171486 1682 OLD SMITHFIELD RD Residential In Use EDWARDS CORAH 16820LD SMITHFIELD RD - - 80 2670700190 1196 OLD SMITHFIELD RD Residential In Use NPROJECTS U-C 386 PERKINS MILL RD - - 81 2579697988 100 PATE CIR Residential In Use SMITH KENNETH E 100 PATE CIR - - 82 2670608091 1210 OLD SMITHFIELD RD Residential In Use JOHNSON BARBARA KAY& 12100LD SMITHFIELD RD - - 83 2579488381 1391 OLD SMITHFIELD RD Residential In Use CROCKER ROBERT GREGG SIR &W 13850LD SMITHFILD RD - - 84 2670701184 1186 OLD SMITHFIELD RD Residential In Use ENGLAND JEFFREY CHARLES&WTI 11860LD SMITHFIELD RD 85 2670702188 1180 OLD SMITHFIELD RD Residential In Use KEPPLER WILLIAM FRANKLIN & W D 11800LD SMITHFIELD RD - - 86 2670609247 OLD SMITHFIELD RD N/A Empty Lot BROGDEN DAVID STEPHEN 12020LD SMITHFIELD RD - - 87 2670607172 102 PATE CIR N/A Empty Lot JOHNSON BARBARA KAY& 12100LD SMITHFIELD RD - - 88 2579580972 1371 OLD SMITHFIELD RD Residential In Use ACKISS JEAN F 13710LD SMITHFIELD RD - 89 2579489867 1377 OLD SMITHFIELD RD Residential In Use CROCKER ROBERT G SR 13850LD SMITHFIELD RD - - 90 2579056344 OLD SMITHFIELD RD N/A Empty Lot CAROLINA POWER & LIGHT PO BOX 14042 - - 91 2579064292 1763 OLD SMITHFIELD RD Residential In Use WILLIAM50N RAYMOND SHRILL 1775C OLD SMITHFIELD HY - - 92 2579163248 OLD SMITHFIELD RD N/A Empty Lot CAROLINA POWER &LIGHT PO BOX 14042 - - 93 2579058844 OLD SMITHFIELD RD N/A Empty Lot WILLIAMSON RAYMOND S 1775C OLD SMITHFIELD RD - - E 94 2579067780 1725,1775C OLD SMITHFIELD RD Residential Empty Lot WILLIAMSON RAYMOND S 1775C OLD SMITHFIELD RD 95 2579591535 105 11 LN Residential In Use GRICE KENNETH WAYNE & W JANET 105 J J LANE - - 96 2579592414 1D3 11 LN Residential In Use GARNER WESLEY ARLISS JR&W 101JJLANE - - 97 2579498265 1374 OLD SMITHFIELD RD Residential In Use MERRITT ALTON RAY 13740LD SMITHFIELD RD 480 Gallons/connection i 98 2579499364 1364 OLD SMITHFIELD RD N/A Empty Lot BARNES ROXANN PASSERRELLO 141 HILLSIDE ST -- - 99 2579498037 1382 OLD SMITHFIELD RD Residential In Use MARTIN KRISTEN 13820LD SMITHFIELD RD - - 100 2579592215 1350 OLD SMITHFIELD RD Residential In Use GURLEY JOHNNIE PO BOX 1551 480 Gallons/connection 101 2579590137 1368 OLD SMITHFIELD RD Residential In Use KELLY DAVID GARRISON & W WENDY 13600LD SMITHFIELD RD - - 102 2579176494 1653 OLD SMITHFIELD RD Residential In Use WALKER BILLY R&WJUDYA 16530LD SMITHFIELD RD - - 103 2579274016 162 MEMORY LN Residential In Use HINSON DON ENNIS & WIFE 162 MEMORY LANE - - 104 2579270349 1635 OLD SMITHFIELD RD Residential In Use WIGGINS RUSSELL LEE JR 16350LD SMITHFIELD RD - - 105 2579178326 1645 OLD SMITHFIELD RD Residential In Use WIGGINS RUSSELL LEE SR&WIFE 1645 OLD SMITHFIELD RD - - 106 25791783268 1645 OLD SMITHFIELD RD N/A Empty Lot WIGGINS RUSSELL & ELIZABETH 1645 OLD SMITHFIELD RD - - 107 2579175316 1663 OLD SMITHFIELD RD Residential In Use EPPS MICHAEL 1663 OLD SMITHFIELD RD - - 108 2579271474 118 MEMORY LN N/A Empty Lot HINSON DON ENNIS & WIFE 162 MEMORY LANE - - 109 2579168896 1663 OLD SMITHFIELD RD N/A Empty Lot EPPS MICHAEL 1663 OLD SMITHFIELD RD - - E 110 2569871529 2237 ROSEWOOD RD Residential In Use SASSERGRAHAM &WIFE 1614USHIGHWAY70W 111 2670609096 1202 OLD SMITHFIELD RD Residential In Use BROGDEN DAVID STEPHEN 12020LD SMITHFIELD RD - - 112 2579585660 1349 OLD SMITHFIELD RD Residential In Use RADFORD BLANCHE 13490LD SMITHFIELD RD - - 113 2579482842 1436 OLD SMITHFIELD RD N/A Empty Lot RADFORD FRANCES S 14360LD SMITHFIELD RD - - r 114 2579481807B 101 BLESSED LN Residential In Use PAUGH JACOB 1304 E MULBERRY ST - - 115 2579481807 101 BLESSED LN N/A Empty Lot RADFORD NELSON W & W SHEILA D 306 BRASWELL RD - - 116 2569890169 ROSEWOOD RD N/A Empty Lot MITCHELL JOE THOMAS 24230LD SMITHFIELD RD - - 117 2670703282 1174 OLD SMITHFIELD RD Residential In Use CARTAGENAJUAN RAMON & W ROSAL 11740LD SMITHFIELD RD - - 118 2579388628 OLD SMITHFIELD RD N/A Empty Lot POWELL WILLIAM GLENN 1458 OLD SMITHFIELD RD - - 119 2579389903 OLD SMITHFIELD RD N/A Empty Lot POWELL WILLIAM GLEN 1458 OLD SMITHFIELD RD - - 120 2579389669 1444 OLD SMITHFIELD RD N/A Empty Lot POWELL WILLIAM GLEN 1458 OLD SMITHFIELD RD - - 121 2579385750 1476 OLD SMITHFIELD RD Residential In Use POWELL WILLIAM GLEN 1458 OLD SMITHFIELD RD - - 122 2579388661 1458 OLD SMITHFIELD RD Residential In Use POWELL WILLIAM GLEN 1458 OLD SMITHFIELD RD 480 Gallons/connection 123 2579394142 OLD SMITHFIELD RD N/A Empty Lot POWELL WILLIAM GLEN 1458 OLD SMITHFIELD RD - - 124 2579397282 1446 OLD SMITHFIELD RD Residential In Use POWELLJEFFREYG 14460LD SMITHFIELD RD - - 125 2579498626 1358 OLD SMITHFIELD RD Residential In Use BARNES RODNEY DEAN ETAL 13580LD SMITHFIELD RD - - 126 2579490241 103 BLESSED LN N/A Empty Lot RADFORD BERNICE MARK 120 ALBERT DR - - 127 2579396801 OLD SMITHFIELD RD N/A Empty Lot RADFORD FRANCES S 14360LD SMITHFIELD RD - - i 128 2579482106 1459 OLD SMITHFIELD RD Residential In Use ALBRITTON TIMOTHY BRIAN 1459 OLD SMITHFIELD RD - - 129 2579389167 1463 OLD SMITHFIELD RD Residential In Use BOND JEREMY B & W SANDRA 1463 OLD SMITHFIELD RD - - i 130 2579376972 OLD SMITHFIELD RD N/A Empty Lot VINSON LAMES ALLEN ETALS 809 PARK AVE - - 131 2569751075 OLD SMITHFIELD RD N/A Empty Lot CAROLINA POWER &LIGHT PO BOX 14042 - - E 132 2569771794 ROSEWOOD RD N/A Empty Lot CHURCH UNKNOWN - - 133 2569774370 2216 ROSEWOOD RD Residential In Use CAPPS RACHELP 2216 ROSEWOOD RD - - 134 2569951735 1891 OLD SMITHFIELD RD Residential In Use PEARCE JOYCE D 18910LD SMITHFIELD RD - - 135 2579590823 109 JJ LN Residential In Use PULLEY CHARLES K&WIFE 1091J LANE - - 136 2579590697 107 1 J LN Residential In Use LYNCH LARRY E 107 A LANE - - 137 2579594730 102 J J LN Residential In Use JOYNER BETTY B 107 LOU DR - - E 138 2670502086 112 J J LN Residential In Use HALESJEFFREY H & W CARLA 1121J LN - - 139 2579593932 110 1 J LN Residential In Use EDWARDS RACHEL C 1101J LANE - - ■ 140 2670507196 110 NEAL DR Residential In Use BULLARD WILLIAM RAY 1156 WHITE OAK RD - - 141 2670508028 108 NEAL DR Residential In Use JOHNSON CHERYL PO BOX 10611 - - 142 2579598958 106 NEAL DR Residential In Use ROBERTS BILLIE R & VIVIAN A RO 174 PINE TREE IN - - 143 2579690995 146 PATE CIR Residential In Use PITTMAN GREGORY A & W JANETE 146 PATE CIR - - 144 2579691825 148 PATE CIR Residential In Use BURNETTE STEPHEN W & W ANDREA 148 PATE OR - - 145 2579599806 104 NEAL DR Residential In Use BOYETTE ROBERT STEVE&WIFE 104 NEAL DR - - ` 146 2670505072 109,111 NEALDR Residential In Use STANLEY TREMONTEO RAY SR 1660 LANCASTER RD - - 147 2579596827 107 NEAL DR Residential In Use THORNTON NEWLAND E&WIFE 107 NEAL DR - - ■ 148 2579597429 101 NEAL DR N/A Empty Lot HARDEE W A & RENEE JORDAN 101 NEAL DR - - 149 2579596764 IDS NEAL DR Residential In Use STANLEY TREMONTEO RAY SR 1660 LANCASTER RD - - 150 2579599549 100 NEAL DR Residential In Use RADFORD TAMMYL 100 NEAL DR 480 Gallons/connection 151 2579691637 1270 OLD SMITHFIELD RD Residential In Use LASSITER SUSANH 12700LD SMITHFIELD HWY - - 152 2579598502 101 NEAL DR Residential In Use HARDEE W A & RENEE JORDAN 101 NEAL DR - - 153 2579690632 1280 OLD SMITHFIELD RD Residential In Use TAYLOR CHRISTOPHER LEWIS 12800LD SMITHFIELD RD - - It 154 2579596423 1318,1316 OLD SMITHFIELD RD Residential In Use JOYNER BETTY 107 LOU DR - - 155 2579596696 103 NEAL DR Residential In Use BOYD KENNETH L 1423 PEACHTREE ST - - 156 2579599736 102 NEAL DR Residential In Use BUNN PAMELA W 1107 GURLEY DAIRY RD - - 157 2569860541 2287 ROSEWOOD RD Residential In Use BRIDGERS TONY RAY 2287 ROSEWOOD RD 480 Gallons/connection 158 2569874014 2109 ROSEWOOD RD Residential In Use BRIDGERS WILLIARD RAY &W PEGG 2108 ROSEWOOD RD 480 Gallons/connection 159 2569769404 2287 ROSEWOOD RD Residential In Use BRIDGERS TONY RAY 2287 ROSEWOOD RD Y 480 Gallons/connection 160 2670600035 144 PATE CIR Residential In Use LEWIS BILLY RAY & W PATRICIA 144 PATE CIRCLE - - 161 2670509291 142 PATE CIR Residential In Use MUNTZ MARK 142 PATE CIRCLE - - 162 2569765559 2282 ROSEWOOD RD Residential In Use BRIDGERS WILLIARD RAY & W PEGG 2108 R05EWOOD RD 480 Gallons/connection 163 2579175770 932 FRIENDLY DR Residential In Use FIELDS KENNETH R & W SANDI 1591 KINGS DAIRY RD - - 164 2579171909 896 FRIENDLY DR Residential In Use JERNIGAN RANSOM KIRBY 896 FRIENDLY DR - - 165 2579184080 OLD SMITHFIELD RD N/A Empty Lot BELSOUTH TELECOMMUNICATIONS IN 1155 PEACHTREE ST - - 166 2579173715 916 FRIENDLY DR Residential In Use MOORE GARY 916 FRIENDLY RD - - 167 2670605030 103 PATE CIR Residential In Use FEDERAL NATIONAL MORTGAGE ASSOCIATION 3476 STATEVIEW BLVD - - 168 2670604099 105 PATE CIR Residential In Use HAM DILLARD & WIFE 105 PATE CIRCLE - - 169 2579695813 1240 OLD SMITHFIELD RD Residential In Use COOK DEE DEE H 12400LD SMITHFIELD RD - - 170 2670603023 137 PATE CIR Residential In Use BAKER MITCHEL HICKS 2822 CASHWELL DRIVE#107 - - 171 2670602342 133 PATE CIR Residential In Use BOWEN GLENDA BRYAN 133 PATE CIR - - 172 2579693962 139 PATE CIR Residential In Use COOKE ESTHER MENDOZA 139 PATE OR 480 Gallons/connection 173 2579694708 141 PATE CIR Residential In Use GRUBBS MARSHALLJ II & W CHRIS 141 PATE CIR - - 174 2670604252 107 PATE CIR Residential In Use LOFTON EMORY & W ROBBIN 107 PATE CIRCLE - - 175 2670602174 135 PATE CIR Residential In Use FAIL JENNAC 135 PATE CIR - - 176 2579179983 927 FRIENDLY DR N/A Empty Lot PEARCE ETHAN 19070LD SMITHFIELD RD - - 177 2579187255 895 FRIENDLY DR Residential In Use HOOKS LISAE 895 FRIENDLY DR - - 178 2579187680 875 FRIENDLY DR N/A Empty Lot PRICE D MCKINLEY 203 TRAMWAY PL - - 179 2569676038 OLD SMITHFIELD RD N/A Empty Lot FAIL RH&WIFE 20760LD SMITHFIELD RD - - 180 2569677921 2194 ROSEWOOD RD Residential In Use CAPPS EVA HEIRS 2216 ROSEWOOD RD - - 181 2569773663 ROSEWOOD RD N/A Empty Lot CAPPS EVA HEIRS 2216 ROSEWOOD RD - - 182 2569761927 2066 OLD SMITHFIELD RD Residential In Use MULLENS JAMESA 20660LD SMITHFIELD RD 480 Gallons/connection 183 2569665604 2082A OLD SMITHFIELD RD Residential In Use JERNIGAN LINDA FAIL 2082A OLD SMITHFIELD RD - - 184 2569484092 2277 OLD SMITHFIELD RD Residential In Use COOR KENNETH K 1R & WIFE 2504 BRADFORD PLACE - 185 2569770037 2080 OLD SMITHFIELD RD Residential In Use WOLSKE HOPE M 2080 OLD SMITHFIELD RD 480 Gallons/connection 186 2569668758 2080 OLD SMITHFIELD REAR RD N/A Empty Lot WOLSKE HOPE M 2080 OLD SMITHFIELD RD Y - -. 187 2569371544C 2303,2293,2283 OLD SMITHFIELD RD Residential In Use KEPPLER WILLIAM 22930LD SMITHFIELD RD Y - - 188 2569371544 OLD SMITHFIELD RD Residential Empty Lot COOR KENNETH KJR&WIFE 2504 BRADFORD PLACE Y - - 189 2579777828 OLD SMITHFIELD RD N/A Empty Lot MILLS RALPH A&WIFE 276 MILLS ROAD - - 190 2579985611 1059 OLD SMITHFIELD RD Residential In Use MCCLENNY WILLIAM A 4700 GLENN FOREST DR 490 Gallons/connection 191 2670708003 1149 OLD SMITHFIELD RD Residential In Use LANE ALICED 11490LD SMITHFIELD RD - - 192 2569453392 292 FERRY BRIDGE RD Residential In Use HILL BILLY KEITH 555 BRASWELL RD 480 Gallons/connection 193 2569668769 2076 OLD SMITHFIELD RD Residential In Use FAIL EDITH PATTERSON 20760LD SMITHFIELD RD Y 480 Gallons/connection One meter, 3 homes 194 2569867554 1898 OLD SMITHFIELD RD Residential In Use RAINS JENETTES 18980LD SMITHFIELD RD 480 Gallons/connectIt, 195 2569854714 1933 OLD SMITHFIELD RD Residential In Use SCOTT JACKIE&WIFE 760 WOODALL DAIRY RD 480 Gallons/connection One meter, 2 homes 196 2569763152 2008 OLD SMITHFIELD RD Residential In Use MCLAMB TERRY LYNN&WIFE 20080LD SMITHFIELD RD - - 197 2569752825 OLD SMITHFIELD RD N/A Empty Lot MARTIN THELMA RAINS 760 WOODALL DAIRY RD - - 198 2569669023 2039 OLD SMITHFIELD RD Residential In Use PERSON WILLIE RAY 427 BIG DADDYS RD - - 199 2569759678 1971 OLD SMITHFIELD RD Residential In Use RAINS JENETTIE5 18980LD SMITHFIELD RD 480 Gallons/connection 200 2569765212 2020/2306 OLD SMITHFIELD RD/ROSEWOOD RD Residential In Use PEARCE ROBERT GLENN & W PATSY 2306 ROSEWOOD ROAD - - 201 2569760254 2032 OLD SMITHFIELD RD Residential In Use SCRUFARI ANTHONY PETER 20320LD SMITHFIELD RD - - 202 2569765058 1990 OLD SMITHFIELD RD Residential In Use PEARCE HAZEL M 1990 OLD SMITHFIELD RD - -. 203 2569476924 2271 OLD SMITHFIELD RD Residential In Use PIPKIN REX CARTER & WIFE 22710LD SMITHFIELD RD Y 480 Gallons/connection 204 2569478649 2251 OLD SMITHFIELD RD Residential In Use WALTERS ANDREW E & WIFE 22510LD SMITHFIELD RD Y - - 205 2569572330 2199 OLD SMITHFIELD RD Residential In Use KORNEGAY THOMAS L 2199 OLD SMITHFIELD RD 480 Gallons/connection 206 2569477841 2259 OLD SMITHFIELD RD Residential In Use HESTER BRIAN LEE 2259 OLD SMITHFIELD RD - - 207 2569573186 2185 OLD SMITHFIELD RD Residential In Use HARTLEY HERBERT W 304 CONNIE CIR - - 208 2569662731 2012 OLD SMITHFIELD RD Residential In Use CAPPS RACHELP 2216 ROSEWOOD RD 480 Gallons/connection 209 2569475140 2229 OLD SMITHFIELD RD Residential In Use MARTIN LEON HAROLD & WIFE 1090 WORLEY RD. Y - - 210 2569575353 2182 OLD SMITHFIELD RD Residential In Use HARTLEY RANDY W & W BEVERLY 2182 OLD SMITHFIELD RD - - 211 2569569963 2144 OLD SMITHFIELD RD Residential In Use CAPPS LEAMON DWIGHT&WIFE 2144 OLD SMITHFIELD RD - - 212 2569663634 2100 OLD SMITHFIELD RD N/A Empty Lot COUNTY OF WAYNE PO BOX 227 - - 213 2569578534 2176A,2176B OLD SMITHFIELD RD Residential In Use HARTLEY HERBERT W & WIFE 304 CONNIE CIRCLE - - 214 2569574435 2196 OLD SMITHFIELD RD Residential In Use THOMPSON CLARENCE DAVID 479 PRINCETON RD - - 215 2569570378 2217 OLD SMITHFIELD RD Residential In Use MARTIN LEON HAROLD & WIFE 1090 WORLEY RD. - - 216 2569660850 2124 OLD SMITHFIELD RD Residential In Use CAPPS LEAMON D & 2144 OLD SMITHFIELD RD - - 217 2569578003 2150 OLD SMITHFIELD RD Residential In Use CAPPS WALTER STEPHEN & WIFE 21500LD SMITHFIELD RD - - 218 2569583603 2240 OLD SMITHFIELD RD Residential In Use HARDEE BILLY 11620LD SMITHFIELD RD 480 Gallons/connection 219 2569760475 OLD SMITHFIELD RD N/A Empty Lot WATERS RONALD E & W PAULA 165 PERKINS MILL RD - - 220 2569650637 FERRY BRIDGE RD N/A Empty Lot FAIL CLYDE JEROME 1510 CROW'S FOOT RD - - 221 2569663060 FERRY BRIDGE RD N/A Empty Lot FAIL CLYDE JEROME 1510 CROWS FOOT RD - - 222 2569454048 187-775 FERRY BRIDGE RD N/A Empty Lot COUNTY OF WAYNE PO BOX 227 - - 223 2569458590 268 FERRY BRIDGE RD N/A Empty Lot COUNTY OF WAYNE PO BOX 227 - - 224 2569039036 FERRY BRIDGE RD N/A Empty Lot LANE FARMS INC PO BOX 1179 Y - - 225 2569550526 232 FERRY BRIDGE RD Residential In Use BRAGG AARON 232 FERRY BRIDGE RD - - 226 2569553162 FERRY BRIDGE RD N/A Empty Lot CAROLINA POWER & LIGHT PO BOX 14042 - - 227 2569456490 268 FERRY BRIDGE RD N/A Empty Lot COUNTY OF WAYNE PO BOX 227 - - 228 2569656829 OLD SMITHFIELD RD N/A Empty Lot RAINS GEORGE RAY &JENNIFER 18980LD SMITHFIELD RD - - 229 2569663497 2084 OLD SMITHFIELD RD Residential In Use FAIL BEATRICER 20840LD SMITHFIELD RD 480 Gallons/connection 230 2569469594 2175 OLD SMITHFIELD RD N/A Empty Lot HOWELL DANNY & W PEGGY 313 LASSITER RD -. - 231 2569661710 OLD SMITHFIELD RD Residential In Use CAPPS LEAMON D& 2144 OLD SMITHFIELD RD 480 Gallons/connection 232 2569660392 2105 OLD SMITHFIELD RD N/A Empty Lot COUNTY OF WAYNE PO BOX 227 - - 233 2569568576 2127 OLD SMITHFIELD RD Residential In Use RICE CLAYTONC 2127 OLD SMITHFIELD RD 480 Gallons/connection ` 234 2569756782 OLD SMITHFIELD RD Residential In Use RAINS GEORGE RAY &JENNIFER 1898 OLD SMITHFIELD RD 480 Gallons/connection 135 1111111111 112 FERRY BRIDGE RD N/A Empty Lot COUNTY OF WAYNE PO BOX 227 - - 236 2569567182 FERRY BRIDGE RD N/A Empty Lot KORNEGAY DICKIE G 403 NEUSE ISLANDS UN - - 237 2569568475 OLD SMITHFIELD RD N/A Empty Lot KORNEGAY DICKIE G 403 NEUSE ISLANDS LN - - 238 2670407229 OLD SMITHFIELD RD N/A Empty Lot MUSGRAVE ZEBULON B 1241 SAULSTON RD - - 239 2670504164 113 NEAL DR Residential In Use JONES MIRRANDA A STANLEY 313 RED MOUNTAIN UN - - i 240 2670504164 103 RODNEY CT Residential In Use JONES MIRRANDAA STANLEY 313 RED MOUNTAIN UN - - 241 2579492620 OLD SMITHFIELD RD N/A Empty Lot HAYWOOD LYNDA R 1331 OLD SMITHFIELD RD - - Appendix C: Schedule www.dewberry.com Task Name HF Lee DEQ Report Submittal & Approval Municipality/County Negotiation & Agreement Municipality/County Design Agreement Period Municipality/County System Design (assuming NTP within 30 days of agreement) Field Work/Survey 30% Design Development Development of 30% Construction Documents Review of 30% Design 30% Design Review Meeting 60% Design Development Development of 60% Construction Documents Review of 60% Design 60% Design Review Meeting Final Design Development Development of 100% Construction Documents Review of 100% Design 100% Design Review Meeting Easement Development Deed Research Develop Plats Easement Acquisition Permitting NCDEQ Erosion and Sedimentation Control Permit NCDOT Right -of -Way Encroachment Permit (State and District) NCDEQ Water Supply Permit Advertise, Bidding & Contracting NTP Construction of Water Main & Services Substantial Completion, System Testing, & Certification project Completion Start Thu 12/15/16 Mon 11/14/16 Mon 11/14/16 Mon 2/20/17 Mon 2/20/17 Mon 3/13/17 Mon 3/13/17 Fri 4/7/17 Tue 4/11/17 Wed 4/12/17 Wed 4/12/17 Mon 5/8/17 Fri 5/12/17 Mon 5/15/17 Mon 5/15/17 Fri 6/9/17 Tue 6/13/17 Wed 4/12/17 Wed 4/12/17 Mon 4/24/17 Tue 5/9/17 Wed 6/14/17 Wed 6/14/17 Wed 6/14/17 Wed 6/14/17 Tue 9/26/17 Fri 11/24/17 Mon 11/27/17 Fri 1/26/18 Fri 2/23/18 Finish Sun 1/15/17 Mon 2/13/17 Mon 2/13/17 Tue 6/13/17 Fri 3/10/17 Tue 4/11/17 Thu 4/6/17 Tue 4/11/17 Tue 4/11/17 Fri 5/12/17 Fri 5/5/17 Fri 5/12/17 Fri 5/12/17 Tue 6/13/17 Thu 6/8/17 Tue 6/13/17 Tue 6/13/17 Tue 5/23/17 Fri 4/21/17 Mon 5/8/17 Tue 5/23/17 Mon 9/25/17 Mon 8/14/17 Mon 9/4/17 Mon 9/25/17 Fri 11/24/17 Fri 11/24/17 Thu 1/25/18 Fri 2/23/18 Fri 2/23/18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Project: HF Lee Steam Station Manual Summary Rollup Proposed Schedule 3rd Quarter 1st Quarter 3rd Quarter 1st Quarter 11/24 I u ♦� 2/23 Page 1 Appendix D: Opinion of Probable Cost www.dewberry.com Opinion of Probable Cost HF Lee Steam Station Potable Water Connection Item I Material Unit QQt y Unit Cost Extended Cost Main 1 6-inch C-900 PVC Pipe LF 1,800 $ 7.00 $ 12,600 2 6-inch Tee EA 1 $ 850 $ 850 3 6-inch Gate Valve w/Box (assume three at every tee and one per 5,000 LF) EA 10 $ 750 $ 7,500 4 6-inch Misc Fittings (Assume 2 fittings per appurtenance plus 1 fitting per 1000 LF pipe times 80# per fitting) LB 1,800 $ 4.00 $ 7,200 5 Automatic Flushing Devices EA 1 $ 8,000 $ 8,000 6 2-inch Blow -off Assembly EA 0 $ 850 $ - 7 Fire Hydrant EA 0 $ 6,000 $ 8 1-inch Air Release Valve and Manhole (at highpoints in main) EA 0 $ 2,200 $ - Subtotal Materials/Equipment: $ 36,200 Installation (% of Material/Equipment): 30% $ 10,900 9 Clearing & Grubbing LF 1,800 $ 3.50 $ 6,300 10 Excavation and Backfilling for Trench LF 1,800 $ 18.00 $ 32,400 11 Pipe Bedding Material (#67 Stone - assumed for 25% of pipe) CY 100 $ 35.00 $ 3,500 12 Railroad Crossing (Casing, Piping, Spiders and Installation) EA 0 $ 50,000 $ - 13 Rural Road Crossing for Main (Casing, Piping, Spiders and Installation) EA 0 $ 20,000 $ - 14 Erosion Control Measures (Silt Fence/Check Dams based on feet of pipe) LF 1,800 $ 4.50 $ 8,100 15 Testing, Disinfection, Clean Up, Seed and Mulch (Assume: 25-ft impacted area) LF 1,800 $ 8.50 $ 15,300 16 Connection to Existing Waterline EA 1 $ 5,000 $ 5,000 17 Traffic Control LS 1 $ 5,000 $ 5,000 Services Connections/Lines 18 2-inch PVC Pipe LF 7,220 $ 4.75 $ 34,300 19 3/4-inch PVC Pipe LF 4,630 $ 3.00 $ 13,900 20 Misc Fittings for Service Connections (valves, fittings, etc.) EA 35 $ 150 $ 5,300 Subtotal Materials/Equipment: $ 53,500 Installation (% of Material/Equipment): 30% $ 16,100 21 2-inch Services Taps, Meters, Meter Boxes and Misc. Connections to Main Line EA 8 $ 6,120 $ 49,000 22 3/4-inch Services Taps, Meters, Meter Boxes and Misc. Connections to Main Line EA 27 $ 3,000 $ 81,000 23 Road Crossing for Services - (Jetting/bore, Casing, and Installation) EA 16 $ 1,500 $ 24,000 24 Excavation and Backfilling for Service Trench LF 11,900 $ 10.00 $ 119,000 25 Flush, Clean Up, Seed and Mulch (Assume: 5-ft impacted area) LF 11,900 $ 4.00 $ 47,600 SUBTOTAL $ 513,000 Sub -Total FOB Allowance (% of Material/Equipment): 2% $ 2,000 Renovation Allowance (% of Material/Equipment): 5% $ 5,000 Sub -Total $ 520,000 Contractor Overhead and Profit: 15% $ 78,000 Contractor General Conditions: MONTH 3 $ 20,000 $ 60,000 Sub -Total: $ 658,000 Contingency: 25% $ 165,000 Sub -Total: $ 823,000 Design, Bid Phase, and Construction Phase Engineering Services 10% $ 83,000 Easements Acquistion (Permanent) $ 15,000 TOTAL ESTIMATED CAPITAL COST: $ 920,000 Notes: 1.) Fire Hydrants were not included as fire flow is not needed for potable water service. 2.) Renovation Allowance to account for private property refurbishment (signs, fences, etc.) 3.) Number of Service Taps taken from field evaluation and property records. 4.) Permanent Easement Acquisition based on 50% of average area property tax value. 5.) Temporary easements are not included in this estimate. 6.) No significant rock excavation, water crossings, wetlands, or other abnormal working environment included. 7.) Opinion of Probable Cost dated November 2016; cost may vary depending upon escalation at time of construction. 8.) Piping footage may change with final design. 11/23/2016 FINAL Dewberry