Loading...
HomeMy WebLinkAbout20170404 Ver 1_CAMA Application_20170405r ROY COOPER Governor MICHAEL S. REGAN Secretary N_rit, y 0. BRAXTON DAVIS Coastal Management Director ENVIRONMENTAL QUALITY March 29, 2017 TO: Karen Higgins 2 0 1 T 401 & Buffer Permitting Unit Q Q DWR/Water Quality Permitting FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather.coat ov Fax: 395-3964 (Courier 04-16-33) 17: 4 V SUBJECT: CAMA Application Review b ql APR U 5 2017 Applicant: Glenn & Carol Meyer v _u,,,..__ Project Location: 6224 Quail Run Rd., adjacent to Cedar Is. Basin/canal Masonboro Sound, in New Hanover County Proposed Project: to replace an existing private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by April 21, 2017. If you have any questions regarding the proposed project, contact Courtney Spears at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Glenn and Carol Meyer 2. LOCATION OF PROJECT SITE: 6442 Quail Run Road, off Greenville Loop Rd., adjacent to Cedar Island Basin/canal, in Masonboro Sound, New Hanover Co. Photo Index - 2006: 22-7422, M, 14 Latitude: 34°11'19.78"N Longitude: 77050'04.57"W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 7/8/16 and 3/9/17 Was Applicant Present — Yes (agent) 5. PROCESSING PROCEDURE: Application Received — 03/23/2017 (completed) Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - New Hanover Co./Wilmington Land Classification From LUP - Conservation (B) AEC(s) Involved: EW, PT, CW, ES (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - Municipal Sewer Planned - None (F) Type of Structures: Existing — timber bulkhead, stepdown water accesses (2), private pier & floating dock Planned — New access pier, gazebo, boathouse, boatlift2 (2) and fixed platforms (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] nRFnr.Fn FII I Fn OTHER (A) Vegetated Wetlands - Shaded 60 sq. ft. (B) Non -Vegetated Wetlands — Open Water 4500 sq. ft. 1033 sq. ft. (C) Other - Highground 240 sq. ft. (D) Total Area Disturbed: 5,833 sq. ft. (0.13 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA Open: No 8. PROJECT SUMMARY: The applicant proposes to replace an existing private docking facility within the Cedar Island Basin. Glenn and Carol Meyer Page Two 9. PROJECT DESCRIPTION The project site is located at 6442 Quail Run Road, off Greenville Loop Rd., adjacent to the Cedar Island Basin, in Masonboro Sound, in New Hanover County. To locate the property from Oleander Drive (NC Highway17), turn onto Greenville Loop Road and travel west approximately 1.5 miles just before Bradley Creek Elementary School. Turn left onto Old Military Road and travel east approximately 0.5 miles until you reach Quail Run Road. Turn right onto Quail Run Road and the property of interest will be located on the left. The property consists of approximately 6.53 acres and the average elevation ranges from approximately 3.5 to 27.5 feet above normal high water (NHW). Upland vegetation consists primarily of hardwood species such as Live Oaks and other woody species such as Pine trees. The property borders Cedar Island Basin/canal, which is also shared by the adjacent riparian property owners and the residents of Cedar Island directly across the basin to the east from the property of interest. The property has approximately 250 linear feet of shoreline which is stabilized by an existing timber bulkhead. Waterward of the bulkhead is a swath of coastal wetlands varying in width from approximately 3 to 15' consisting primarily of Spartina alterniflora. The applicant maintains an existing private docking facility into the Cedar Island Basin/canal. The existing pier is approximately 20 feet in length by 6 feet in width. An access ramp then leads onto an existing floating dock, measuring approximately 30 feet in length by 8 feet width, which runs perpendicularto the shoreline and channel. There is a section of floating dock measuring approximately 10' in width and approximately 22' in length at the end of the perpendicular portion of the floating pier running parallel to the shoreline. There are two floating finger piers, one extending from the northern side of the main portion of the floating dock measuring approximately 16' in length by 5' in width and running parallel to the shore and a second extending southward and measuring approximately 25' in length and 5' in width. The application states that existing docking facility accommodates up to five (5) vessels in water depths ranging from -1' to -4' at NLW (See sheet 1 of MP - 4). The New Hanover County/City of Wilmington Land Use Plan 2006 Update classifies the adjacent waters as Conservation, and the adjacent high ground portion of the project area as Resource Protection. In the project area, the waters of Cedar Creek are classified as SA, by the NC Division of Water Resources, and they are CLOSED to the harvest of shellfish. These waters are designated as Primary Nursery Area (PNA), by the NC Division of Marine Fisheries. PROPOSED PROJECT: The applicant proposes to replace an existing private docking facility within the Cedar Island Basin. Once the existing docking facility is removed, a new raised walkway measuring approximately 6' wide by 25' long running perpendicular to the shore will lead to another portion of raised walkway measuring approximately 6' wide by 15' long running parallel to the shore. From the raised walkway a fixed pier measuring approximately 6' in width by 19' in length will run in an easterly direction into the basin. From the southern edge of the end of the fixed pier will be a gazebo measuring approximately 20' by 20'. From the end of the fixed pier a ramp will lead to a floating section of pier running perpendicular to the shore and measuring approximately 6' in width by 16' in length. At the terminus of this section of floating dock Glenn and Carol Meyer Page Three will be a larger floating dock running parallel to the channel and measuring approximately 100' in length by 10' in width. From the western edge of the southern portion of the floating dock there will be a boathouse measuring approximately 14' by 28' with a 14' by 14' boatlift inside. There will be another 14' by 14' boatlift on the western edge of the northern portion of the floating dock. The application also states that the new facility would accommodate up to six (6) vessels in water depths of approximately -1 feet at NLW to -4 feet at NLW (See Page 3 of 4). The Cedar Island boat basin was originally permitted and dredged in 1969 under Federal permit # 26-69 and State Permit #184. Maintenance dredging was performed in 1977 and 1989 through State permit #208-89. Most recently CAMA Major permit #9-03 was issued for maintenance excavation on 1/14/03 and it expired at the end of 2006. The applicant proposes to conduct maintenance dredging in the footprint of the docking facility in an area of approximately 30' in width by 150' in length to a final depth of -4' at NLW, removing approximately 400 cubic yards of material by bucket to barge excavation (See Page 3 and 4 of 4). The depth of -4' at NLW will connect to current water depths of -4 at NLW at the edge of the dredge footprint. The dredge spoils will be taken approximately 0.5 miles to Shore Acres Co. property behind US Army Corps property (AIWW DA_0248). Permission to dispose of materials on Shore Acres Co. property was obtained by Maritech via email on 3/20/17. 10. ANTICIPATED IMPACTS The construction of the new docking facility would incorporate approximately 1,333 additional square feet of Estuarine Waters and Public Trust Area, within an area essentially usurped by the existing docking facility. The proposed facility would extend approximately 41.5 feet into the waterbody, which measures approximately 177 feet across, thus conforming to the'/ width rule. The proposed walkway, measuring approximately 25 feet in length by 6 feet in width and 15 feet in length and 6 feet in width would be located within the 30 -foot buffer and would impact approximately 240 sq. ft. of high ground. The proposed structures would be located within the applicant's riparian access area and would not encroach into the adjacent 15' riparian corridor setback requirements. The proposed 30' wide by 150' long by -4' at NLW deep excavation will disturb approximately 4500 square feet of shallow bottom habitat and remove approximately 400 cubic yards of muddy sand material. Once excavated the dredge spoils will be placed on a nearby dredge spoil island. Minor increases in turbidity should be expected during excavation and construction. Submitted by: Courtney Spears Date: 3/28/2017 Office: Wilmington Overbeck Marine Construction, Inc 3506 Tall Pine Ct. Wilmington, NC 28409 Daniel@overbeckmarine.com 910-386-8883 Debbie Wilson January 13, 2016 Division of Coastal Management (DCM) 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Application for Major Permit 6422 Quail Run, Wilmington, NC 28409 (Glenn Meyer) To whom it may concern, On behalf of Mr. Glenn Meyer, we are applying for a CAMA Major Permit to construct a new dock facility at this location. Currently there is a dilapidated facility that consists of 5 slips which will be removed entirely prior to the start of this project. Mr. Glenn Meyer would like to accommodate 4 vessels (2 large vessels and 2 runabouts). We are proposing to install a 6'x19' fixed pier, 20'x20' gazebo, 4 - piling boat lift, boat house with integrated boat lift, 8'x100' floating dock, and dredging around floating dock structures to a depth of -4' below NLW (please see attached drawings). Mr. Meyer purchased this 6.4 acre property with 250' of water front because of the location in Cedar Creek Basin, a deep water basin that is well protected and suitable for dockage of larger vessels and has a history of dredging. The basin was originally authorized in 1969 under state permit #184 and federal permit 26-69. Since then the basin has been maintained regularly, and most recently has dredging under state permit 9-03 that expired at the end of 2006. After speaking with Mr. Meyer and understanding his vision for the dock facility, we designed the facility to accommodate two larger vessels (45-65') and two runabouts (16'-35'). We are proposing a large floating dock (100' length) to accommodate the 2 larger vessels (45'-65'); we have classified this as (4) 25' slips to stay consistent with local regulations but are intending this to be used as dockage for 2 vessels. Robb Mairs has met with us on several occasions for site visits and has helped us in positioning and design of the facility in order to comply with local DCM regulations. RECEIVED DCM WILMINGTON, NC Please let us know if you need any further information or clarification for the proposed project. Thank you for your assistance in review of this application. Sincerely, Daniel Shirley, agent Overbeck Marine Construction, Inc 910-386-8883 Daniel@overbeckmarine.com RECEIVED DCM WILMINGTON, NC Ben INF4 APPLICATION for Major Development Permit (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name OVERBECK MARINE CONSTRUCTION Agent/ Contractor 1: First Name DANIEL Business Name Project Name (if applicable) Agent/ Contractor 2: First Name Applicant 1: First Name MI Last Name PO Box GLENN tate MEYER Applicant 2: First Name MI Last Name Contractor # CAROL City MEYER ZIP If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 6117 CLAIRIDGE ROAD WILMINGTON NO ZIP Country Phone No. FAX No. 28404 USA 71Street 910 - 616 - 3451 ext. Address (if different from above) City State ZIP 6442 QUAIL RUN ROAD WILMINGTON NO - 28409 Email g.meyer6ll7@gmail.com 2. Agent/Contractor Information Business Name OVERBECK MARINE CONSTRUCTION Agent/ Contractor 1: First Name DANIEL MI Last Name SHIRLEY Agent/ Contractor 2: First Name MI Last Name Mailing Address 3506 TALL PINE COURT PO Box CityTNC WILMINGTON tate ZIP 28409 Phone No. 1 910 -386 -8883 ext. Phone No. 2 ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> RECEIVED DOM WILMINGTON, NO Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # NEW HANOVER 6442 QUAIL RUN ROAD 284,447 Subdivision Name City State Zip 6.53 ACRES , I WILMINGTON NC - 28409 Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project CAPE FEAR CEDAR CREEK/BASIN c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown ICWW e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. 6452 QUAIL RUN ROAD: R-20 RESIDENTIAL, DOCK NEW HANOVER 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 250 284,447 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 6.53 ACRES , I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 3.5'- 27.5' ®NHW or ❑NWL e. Vegetation on tract PINE AND HARDWOOD TREES, WETLANDS, MISC. BRUSH, ORNAMENTAL LANDSCAPING f. Man-made features and uses now on tract 3 BDR, 2 BTH SINGLE FAMILY RESIDENCE SHED, DIRT ROAD, DOCK g. Identify and describe the existing land uses adjacent to the proposed project site. 6436 QUAIL RUN ROAD: SINGLE FAMILY RESIDENCE, DOCK 6452 QUAIL RUN ROAD: R-20 RESIDENTIAL, DOCK h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R-20 RESIDENTIAL (Attach zoning compliance certificate, if applicable) ®Yes ❑No DNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes (jJNo k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. [--]Yes WNo DNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes [)allo DNA National Register listed or eligible property? <Form continues on next page> RECEIVED DCM WILMINGTON, NC Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? IXYes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. SEPTIC o. Describe existing drinking water supply source. ON SITE WELL p. Describe existing storm water management or treatment systems. CFPUA 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment PRIVATE ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. PROPERTY IS TO BE USED FOR RECREATIONAL BOATING, PRIVATE DOCK FACILITY c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. CONSTRUCTION OF A PIER, DOCKS, GAZEBO'S, BOATHOUSE AND BOAT LIFT DOCK FACILITY SMALL PILE SETTING BARGE MOORED INSIDE d. List all development activities you propose. REMOVAL OF EXISTING DOCK. NEW CONSTRUCTION OF PIER, GAZEBOS, BOATHOUSE, BOAT LIFT, FLOATING DOCKS AND WATER ACCESS STAIRS. e. Are the proposed activities maintenance of an existing project, new work, or both? NEW CONSTRUCTION AFTER REMOVAL OF EXISTING PIER AND DOCK f. What is the approximate total disturbed land area resulting from the proposed project? 1,640 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. NONE i. Will wastewater or stormwater be discharged into a wetland? ❑Yes [�No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes [-]No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED DCM WILMINGTON, NC Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name SHELBY CORBETT EAKINS Phone No. Address 6436 QUAIL RUN ROAD, WILMINGTON, NC 28409 Name BRUCE B. CAMERON, IV Phone No. Address 5723 WRIGHTSVILLE AVE., WILMINGTON, NC 28403 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 9/13/2016 Print Name Daniel Shirley Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information RECEIVED CCM WILMINGTON, NC Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation andlor fill activities. All values should be given in feet. 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. mud, sand Approx. 400 cu yds below NLW c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: To create suitable depth for dockage of vessels at all tides d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Spoil disposal island on the AIWW approx. 0.5 -mile from Area within Shore Acres Co. parcel R06300-002-003-000 site. Shores Acres Co. property (R06300-002-003-000) of approx. 0.3 -acres. behind Corps' AIWW DA_0248 c. (i) Do you claim title to disposal area? ❑Yes ®No [INA (ii) If no, attach a letter granting permission from the owner d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA (ii) If yes, where? Use of the Shore Acres Co. disposal area may be requested for future maintenance dredging. Otherwise, disposal for future maintenance dredging will be specified by the dredging contractor. e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? RECEIVED (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No [INA DCM WILMINGTON, NC or other wetlands (WL)? If any boxes are checked, provide the Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length 150 Width 30 Avg. Existing -1' to 4 NA NA Depth Final Project 4 NA NA Depth 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. mud, sand Approx. 400 cu yds below NLW c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: To create suitable depth for dockage of vessels at all tides d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Spoil disposal island on the AIWW approx. 0.5 -mile from Area within Shore Acres Co. parcel R06300-002-003-000 site. Shores Acres Co. property (R06300-002-003-000) of approx. 0.3 -acres. behind Corps' AIWW DA_0248 c. (i) Do you claim title to disposal area? ❑Yes ®No [INA (ii) If no, attach a letter granting permission from the owner d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA (ii) If yes, where? Use of the Shore Acres Co. disposal area may be requested for future maintenance dredging. Otherwise, disposal for future maintenance dredging will be specified by the dredging contractor. e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? RECEIVED (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No [INA DCM WILMINGTON, NC or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No [INA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) i. (i) Will fill material be brought to the site? ❑Yes ❑No [INA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill P, GENERAL a. J How will excavated or fill material be kept on site and erosion controlled? c. (i) Will navigational aids be required as a result of the project? ❑Yes MNo [INA (ii) If yes, explain what type and how they will be implemented. submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Bucket to barge d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No [INA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. RECEIVED BeM ,NC 01-Pyl P,3 Date January 13, 2017 Project Name §W Quail Run 'Appli nt Name Glen RECEIVED CCM WILMINGTON, NC Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑ This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government ®Private/Community ❑Yes ®No / c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? []Yes ®No (ii) Number If yes: (iii) Length 20' 100' (ii) Number (iv) Width 6'. 8' (iii) Length (v) Floating ®Yes ❑No (iv) Width (v) Floating ❑Yes ❑No e. (i) Are Platforms included? ®Yes []No f. (i) Are Boatlifts included? ®Yes ❑No If yes: If yes: (ii) Number 2 (ii) Number 2 (iii) Length 19'. 20 (iii) Length 13'. 13 (iv) Width 6', 20' (iv) Width 13' 13' (v) Floating []Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 6 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies 5 ® Dockage ("wet slips") only, number of slips: 6 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ®Open water; dredging for basin and/or channel []Open water; no dredging required []Other; please describe: k. Typical boat length: 16'- 65' m. (i) Will the facility have tie pilings? []Yes ®No (ii) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Mixed Types I. (i) Will the facility be open to the general public? []Yes ®No RECEIVED DCM WILMING70N NC Z DOCKING FACILITYAWARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: 0 Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats, be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? R VED AGM WILMINGTON, Nj m. Is the marina/docking facility proposed within rima or secondary nursery area? Pes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes -kNo o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW []SAV ❑SB ❑WL None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes �No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ❑This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ®Private/Community (ii) Number 1 (iii) Length 28' (iv) Width 14' Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 16. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED 0CM WILMINGTON, NO Z GENERAL a. Proximity of structure(s) to adjacent riparian property lines South End of Floating Dock >15' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 177' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 110' d. Water depth at waterward end of structure at NLW or NWL 4'-6" 8. OTHER ❑This section not applicable a. Give complete description: We will be completely removing the existing facility (fixed pier and all floating docks). All new work will fall within the 15' setbacks and will include: 6'x 19' fixed pier with 4'x 16' aluminum ramp (access to floaters), 6'x 20' floating dock with 10,000 Ib. boat lift; 8'x 1 00'floating dock to accomodate 4 slips, 14' x 28' boathouse with 16,000 Ib. boat lift; and 20'x 20' gazebo (roofline). Typical vessel size: 16'- 65'. 9/14/2016 Date 6442 QUAIL RUN Project Name GLENN MEYER Applicant Name Applicant Signature RECEIVED GCM WILMINGTON, NO No. Description Date 3506 TALL PINE CT Mrd.+ & Mrs. Glenn Meyer PAGE 1 OF 4 (Existing Structures) WILMINGTON, NC 28409 442 Quail Run Rd. Project Name QUAIL RUN 6 N OVERBECK 910-386-8883 Date 6 MARCH, 2017 PAGE -0 M.,..., Wilmington, NC 28409 Drawn by GGPS Ir Checked by DJS Scale t" = 50' < 253'-3" (L27) C' Bruce B. 6452 Quail' q . Wilmington: '+ 97'� VVATERVVAY-________,.,, �15' /7 COASTAL WETLAND , 253'-3" (L27) C' Bruce B. 6452 Quail' q . Wilmington: '+ 97'� VVATERVVAY-________,.,, �15' /7 COASTAL WETLAND Shelby Corbett Eakins 6436 Quail Run Wilmington, NC 28409 0 / BEACH/WATER ACCE: (EXISTING, 2 PLCS.) 253'-3 2" L27 # RAISED WALKWAY 6'x 19' PIER �, I 20'x 20' GAZEBO -25 0 25 50 Bruce B. Cameron IV 6452 Quail Run Wilmington, NC 28409 97' QjA WATERWAY-_ 0 off, 177' DISTANCE ' ACROSS WATERBODY f - 30'x 150', Approx. 400 cu/ydk. 10,000 LB. BOAT LIFT (5) • (4) 25' LG. (3) 25' LG. 14'x28' BOATHOUSE (2)\25' LG. WITH BOAT LIFT 8'x 100' FLOATING DOCK (1) 25' LG. CF1'BAR (::•RF_4=K. SASIN COASTAL WETLANDS (#) SLIPS DREDGE AREA (4' THROUGHOUT) i x 20' GAZEBO PI BOATHOUSE EXTERIOR BOAT LIFT 40"0 PILE TYP. 12'- 14' INBED 4' TING DOCK v z 00 w8 >z U2 LU >J U is INo. Description Date 3506 TALL PINE CT Mr. & Mrs. Glenn Meyer PAGE 4 OF 4 WILMINGTON, NC 28409 6442 Quail Run Rd. Project Name QuailRun N OVERBECK 910-386-8883 Dale 7 MARCH, 2017 PAGE -04 = Wilmington, NC 28409 i Drawn by GGPS v Checked by DJS Scale 1"= 10' i