HomeMy WebLinkAbout20170401 Ver 1_Meeting Note_20170410
Wanucha, Dave
From:Slaughter, Johnathan H
Sent:Monday, April 10, 2017 11:07 AM
To:Wanucha, Dave
Subject:RE: Caldwell Bridge #262 Application
Sounds good. Thanks.
-----Original Message-----
From: Wanucha, Dave
Sent: Monday, April 10, 2017 10:04 AM
To: Slaughter, Johnathan H <hslaughter@ncdot.gov>
Subject: RE: Caldwell Bridge #262 Application
I talked with Monte on Friday. We'll issue it in a couple days.
Dave W.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third
parties.
-----Original Message-----
From: Slaughter, Johnathan H
Sent: Monday, April 10, 2017 8:53 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: FW: Caldwell Bridge #262 Application
Dave,
Looks like Monte called this open water impacts so I am assuming that DWR mitigation is not required. Please see if you can
issue this permit this week. A lot of folks are upset about the bridge being closed and getting started will help the situation. A
lot of political interest in this one....... Thanks.
1
-----Original Message-----
From: Matthews, Monte K CIV USARMY CESAW (US) \[mailto:Monte.K.Matthews@usace.army.mil\]
Sent: Friday, April 07, 2017 2:01 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Slaughter, Johnathan H <hslaughter@ncdot.gov>
Subject: RE: Caldwell Bridge #262 Application
Heath, I'm just back in town today and saw your email. Attached is the permit for 0.77 acre of open water impact covered under
the minor deviation parameter (since it was endorsed by NCWRC) of NWP 3. No mitigation required.
I've also attached the newest version of NWP 3. No hardcopy will follow unless requested.
Monte
Monte Matthews
US Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
919-554-4884 x31
-----Original Message-----
From: Wanucha, Dave \[mailto:dave.wanucha@ncdenr.gov\]
Sent: Friday, April 07, 2017 10:50 AM
To: Slaughter, Johnathan H <hslaughter@ncdot.gov>
Cc: Matthews, Monte K CIV USARMY CESAW (US) <Monte.K.Matthews@usace.army.mil>
Subject: \[Non-DoD Source\] RE: Caldwell Bridge #262 Application
Monte,
Let me know if the Corps will classify as open water or bank stabilization. If the Corps permits as bank stabilization, DWR would
require mitigation because it is over 150'. Looks to me like open water impacts though (unless the dam is breached
permanently) and I doubt that will be happening anytime soon.
Heath,
Thanks for the detail in the SMP.
Dave W.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
2
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Slaughter, Johnathan H
Sent: Tuesday, April 04, 2017 1:49 PM
To: monte.matthews@usace.army.mil; Matthews, Monte K SAW <Monte.K.Matthews@usace.army.mil>; Wanucha, Dave
<dave.wanucha@ncdenr.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Chambers, Marla J
<marla.chambers@ncwildlife.org>; Marella Buncick (Marella_Buncick@fws.gov) <Marella_Buncick@fws.gov>
Cc: Guynn, Jami C <jcguynn@ncdot.gov>; Souther, Zachary S <zssouther@ncdot.gov>; Hiatt, Todd M <tmhiatt@ncdot.gov>;
Pettyjohn, Michael A <mpettyjohn@ncdot.gov>; Wayne, David A <dwayne@ncdot.gov>; Fuchs, Eileen A <eafuchs@ncdot.gov>;
David Petty (dpetty@tgsengineers.com) <dpetty@tgsengineers.com>; Kathleen Gray (KGRAY@TGSENGINEERS.COM)
<KGRAY@TGSENGINEERS.COM>; Johnson, Mark G <mgjohnson4@ncdot.gov>; Roger McGrady
<rdmcgrady@vaughnmelton.com>; Mellor, Colin <cmellor@ncdot.gov>
Subject: Caldwell Bridge #262 Application
Importance: High
Monte/Dave,
3
See attached permit application for the subject bridge. Please be advised that this is the number 1 priority for Division 11. If you
are working on other Division 11 Projects, we'd prefer to have this one first.
This project is a little different than most in that the bridge crosses a large pond with a stream running through it so I listed the
impacts under streams and open water in the PCN. I'm not sure which you preferred so I just covered both. Also, due to the
potential benefits of retaining the lower foot of the causeway, I did not request mitigation. If you just have to have it, let me
know and I will request it.
Additional emails will follow due to file size. Let me know if you have any questions or need additional information. Thanks.
________________________________