HomeMy WebLinkAbout20170424 Ver 1_B-5236 Nationwide CAMA New Hanover April 7 2017_20170407STATE OF NORTH CAROLINA
DEPAR'TMENT OF TRANSPORTATION
ROY COOPER
GOVERNOR
Apri17, 2017
Wilmington Regulatory Field Office
US Army Corps of Engineers
69 Darlington Avenue
Wilmington, North Carolina 28403
ATTN: Mr. Brad Shaver
NCDOT Coordinator
JAMES H. TROGDON, III
SECRETARY
N.C. Dept. of Environmental Quality
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
ATTN: Mr. Stephen Lane
NCDOT Coordinator
Subject: Application for Section 10 Permit, Nationwide Permit 23, Section 401 Water Quality
Certification and CAMA Major Development Permit for the Proposed Replacement
of Bridge No. 19 over Lords Creek on SR 1100 (River Road) in New Hanover County,
North Carolina; TIP No. B-5236; Federal Aid Project No. BRZ-1100(29); Debit $475
from WBS No. 42840.1.1
Dear Sirs,
The North Carolina Department of Transportation (NCDOT) proposes to replace the existing 91-foot,
three-span bridge No. 19 with a 120-foot, two-span bridge on existing alignment. Traffic will be
maintained using an off-site detour. Permanent impacts to coastal wetlands total 0.18 acre. An additional
421inear feet of permanent stream impact will occur to Lords Creek due to bank stabilization. All
utilities will be relocated with no impacts to jurisdictional streams or wetlands.
Please see enclosed copies of the Pre-Construction Notification (PCN), Division of Coastal Management
Major Permit Forms 1, 2 and 5, Division of Mitigation Services Acceptance Letter, pernut drawings,
stormwater management plan, utility drawings, and roadway plans for the above referenced project. A
Programmatic Categorical Exclusion (PCE) was completed in January 2015, and distributed shortly after.
Additional copies are available at the NCDOT website: http://207.4.62.65/PDEA/EnvironmentalDocs/
This project calls for a letting date of September 19, 2017 and a review date of August 1, 2017. The
project schedule may be advanced if funding becomes available.
Regulatory Approvals
Section 10 Permit: Application is hereby made for a Section 10 Permit as required for the above-
described activities in accordance with Section 10 of the Rivers and Harbors Act of March 3, 1899 (33
U.S.C. 403)
MailingAddress: Telephone: (919) 707-6000 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 212-5785 I O2O BIRCH RIDGE DRIVE
NATURAL ENVIRONMENT SECTION CuStOrit¢Y SErviC¢: 1-H%%-36H-496H RALEIGH NC Z.%61O
IS9g MAIL SERVICE CENTER Website.• www.ncdot.gov
RALEIGH NC 2%699-1S9g
Section 404 Permit: We anticipate that the bridge replacement, including all approach work will be
authorized under Section 404 Nationwide Permit 23 in accordance with Section 404 of the Clean Water
Act (33 U.S.C. 1344).
Section 401 Permit: We anticipate 401 General Certification number 4093 will apply to this project.
NCDOT is requesting written concurrence from the North Carolina Department of Environmental
Quality, Division of Water Resources.
CAMA Major Development Pernut: NCDOT requests that the proposed work be authorized under a
Coastal Area Management Act Major Pernut. Adjacent riparian landowner certified mail return receipts
will be provided once they are received. Authorization to debit the $475 Permit Application Fee from
WBS Element 42840.1.1 is hereby given.
A copy of this permit application will be posted on the NCDOT Website at
htt�s://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under Quick Links > Permit
Applications. Should you have any questions regarding this information, please contact Jason Dilday at
(919) 707-6111 or jldilday@ncdot.gov.
Sincerely,
o,� Philip S. Harris III, P.E., C.P.M., Manager
� Natural Environment Section
cc: NCDOT Permit Application Standard Distribution List
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit � Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 23 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h � Yes ❑ No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? � Yes ❑ No
2. Project Information
2a. Name of project: 8-5236 - PROPOSED REPLACMENT OF BRIDGE NO. 19 ON SR 1100 (RIVER
ROAD) OVER LORDS CREEK
2b. County: New Hanover
2c. Nearest municipality / town: Wilmington
2d. Subdivision name: n/a
2e. NCDOT only, T.I.P. or state g_5236
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: 919-707-6111
3g. Fax no.: 919-212-5785
3h. Email address: jldilday@ncdot.gov
Page 1 of 10
4. Applicant Information (if difFerent from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1 b. Site coordinates (in decimal degrees): Latitude: 34.0864 Longitude: - 77.9212
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: Approximately 8.5 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Lords Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C; Sw
2c. River basin: Cape Fear
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Land use is primarily forested and residential development.
3b. List the total estimated acreage of all existing wetlands on the property:
Approximately 4 acre
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
250'
3d. Explain the purpose of the proposed project:
Replace a structurally deficient bridge and functionally obsolete bridge. Replacement of the bridge will result in safer
traffic operations.
3e. Describe the overall project in detail, including the type of equipment to be used:
The proposed replacement of Bridge No. 19 over Lords Creek in New Hanover County involves replacement of the
existing 91-foot, three-span bridge with a 120-foot, two-span bridge on existing alignment. Traffic will be maintained on an
off-site detour during construction. Standard road and bridge building equipment, such as trucks, dozers, and cranes will
be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / � Yes ❑ No ❑ Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? � Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): NCDOT Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
September 19, 2011, Action ID 2011 26
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
Please see attached cover letter.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
Page 3 of 10
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
� Wetlands � Streams - tributaries ❑ Buffers
� Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
roadway,bridge,
W2 � P❑ T bridge coastal marsh � Yes � Corps 0.18
approaches � No ❑ DWQ
W2 � P❑ T excavation coastal marsh � Yes � Corps <0.01
� No ❑ DWQ
W2 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P 0 T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W7 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts 0.18 permanent
2h. Comments: See attached Permit Drawings and Wetland Permit Impact Summary for additional detail. There will be 0.21
ac. of hand clearing. Temporary fill in wetlands in hand clearing areas for erosion control measures =0.04 ac.
Page 4 of 10
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 � P❑ T bank stabilization Lords Creek � PER � Corps 30 42
❑ INT � DWQ
S2 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S3 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S4 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S5 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S6 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 42
3i. Comments: Permanent stream impact due to interior bent = 25 sq ft. Temporary stream impact due to work coffer dams
=1056 sq ft.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem orar T
01 � P❑ T Fill Ditches 0.03
02 ❑P�T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
Page 5 of 10
5i. Expected pond surface area (acres):
5. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora T im act re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
63 ❑POT ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed bridge is longer that the existing bridge. The replacement bridge is two spans as opposed to the old three span
bridge, meaning less bents in the water. The proposed bridge will be on the existing alignment. Slopes were armored with
riprap to achieve 1.5:1 slopes, where practicable, within the project limits to reduce coastal marsh impacts. The new bridge
will have no deck drains or direct discharge into Lords Creek. An off-site detour will be used during construction. See
Stormwater Management Plan for more measures.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
NCDOT Design Standards in Sensitive Waters will be employed. NCDOT will implement "Guidelines for Avoiding Impacts to
the West Indian Manatee, Precautionary Measures for Construction Activities in North Carolina Water," during work on this
project.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ � Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? � Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
Page 6 of 10
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. � Yes
4b. Stream mitigation requested: 0 linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): 0 square feet
4e. Riparian wetland mitigation requested: 0 acres
4f. Non-riparian wetland mitigation requested: 0 acres
4g. Coastal (tidal) wetland mitigation requested: 0.18 acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page7of10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings and stormwater management plan.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project? N/A
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
� Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply): ❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A
Page 8 of 10
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State � Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) � Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.l
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Not applicable.
Page 9 of 10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No
impacts?
� Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
USFWS & NOAA Fisheries websites and agency consultations
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS county index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes ❑ No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA documentation; EA/FONSI
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? approved NEPA documents
Digitally signed by Colin Mellor
C o I i n M e I I o r DN: cn=Colin Mellor, o=NCDOT, ou=NES,
email=cmellor@ncdot.gov, c=US
�o� Philip S. Harris III, P.E., C.P.M. Date:2017.04.0712:43:42-04�00� 04-07-2017
Applicant/AgenYs Printed Name Applicant/Agent's Signature Date
(AgenYs signature is valid only if an authorization letter from the applicant
is provided.)
Page 10 of 10
DCM MP-1
APPLICATION for
Ma�or Deuelopment Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable) New Hanover Bridge 19 (B-5236)
NC Department Of Transportation
Applicant 1: First Name MI Last Name
Philip S Harris
Applicant 2: First Name MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address PO Box City State
Natural Environment Section 1593 Mail Service Center Raleigh NC
ZIP Country Phone No. FAX No.
27610 USA 919 - 707 - 6111 ext. 919 - 212 - 5785
Street Address (if different from above) City State ZIP
PDEA - Century Center B, 1020 Birch Ridge Drive Raleigh NC 27610-
Email
jldilday@ncdot,gov
2. Agent/Contractor Information
Business Name
NA
AgenU Contractor 1: First Name MI Last Name
Agent/ Contractor 2: First Name MI Last Name
Mailing Address PO Box City State
ZIP Phone No. 1 Phone No. 2
- - ext. - - ext.
FAX No. Contractor #
Street Address (if differenf from above) City State ZIP
Email
<Form continues on back>
252-808-2808 . 1-888-4RCOAST .. www.nccoastalmanagement.net�
Form DCM MP-1 (Page 2 of 4) APPLICATION for
Major Development Permil❑
3. Project Location
County (can be multiple) Street Address State Rd. #
New Hanover River Road 0.4 miles north of SR2343 (Royal Fern Rd) SR 1100
Subdivision Name City State Zip
NA Wilmington NC 28412-
Phone No. Lot No.(s) (if many, attach additional page with list)
NA - - ext. NA , , , �
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
Cape Fear Lords Creek
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
�Natural ❑Manmade ❑Unknown Cape Fear River
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
❑Yes �No work falls within.
n/a
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
225.0 19141
c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or
n/a, NWL (normal waterlevel)
(If many lot sizes, p/ease attach additional page with a list) 1.48' �NHW or ❑NWL
e. Vegetation on tract
,low growing grasses : bahiagrass, fescue, elover, blackberry and pennywort
fringe evergreen forest: loblolly pine with understory of wax myrtle, redbay. yaupon, eastern red cedar and dwarf palmetto
salt marsh: black needelrush, smooth cordgrass, bulrush and sawgrass.
f. Man-made features and uses now on tract
Existing1 @30'8' ; 1@30'1 "; 1@30'8" bridge and roadway approaches. Aerial sanitary and water lines
g. Identify and describe the existing land uses adiacent to the proposed project site.
Wooded swamp
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
publiC use (Attach zoning compliance certificate, if applicable)
�Yes ❑No ❑NA
j. Is the proposed activity part of an urban waterFront redevelopment proposal? ❑Yes �No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. � Yes ❑ No ❑ NA
If yes, by whom? NCDOT
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes �No ❑NA
National Register listed or eligible property?
<Form continues on next page>
252-808-2808 . 1-888-4RCOAST .. www.nccoastalmanagement.net❑
Form DCM MP-1 (Page 3 of 4) APPLICATION for
Major Development Permil❑
m. (i) Are there wetlands on the site? �Yes ❑No
(ii) Are there coastal wetlands on the site? �Yes ❑No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? �Yes ❑No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
None from site
o. Describe existing drinking water supply source.
None on site
p. Describe existing storm water management or treatment systems.
Non-concentrated sheet flow to wetlands. Concentrated flow from bridge to be outletted on to rip rap pads to dissipate
flow before entering wetlands.
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial �Public/Government
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The project will replace an existing insufficient bridge for the safety of the travelling public.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Removal of existing bridge; top down bridge construction; roadbed compaction and paving. Using Excavator, backhoe, forklift, lattice crane, grader, dump trucks
and paving machine. Equipment to be stored on site. Fill slopes were steepened to 1.5:1 to lessen impacts to coastal marshes using riprap to armor banks
within the footprint of the project, reducing wetland impacts by an additional 0.05 ac.. Slopes reverted to 3:1 once the extent of guardrail had been reached.
Guardrail lengths were determined by the extents of the project and conflicts with existing driveways.
d. List all development activities you propose.
Relocate utilities; remove existing bridge; construct proposed bridge and modify roadway bed.
e. Are the proposed activities maintenance of an existing project, new work, or both? both
f. What is the approximate total disturbed land area resulting from the proposed project? 1.3 ❑Sq.Ft or �Acres
g. Will the proposed project encroach on any public easement, public accessway or other area �Yes ❑No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
For the small concentrated area for the bridge the flow will be dissipated through a rip rap pad into the wetlands. All other
discharge will sheet flow into adjacent wetlands.
i. Will wastewater or stormwater be discharged into a wetland? �Yes ❑No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes �No ❑NA
j. Is there any mitigation proposed? �Yes ❑No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
252-808-2808 . 1-888-4RCOAST .. www.nccoastalmanagement.net�
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional information
!n addifion to this compl2ted application form, (MP-1) the folloNing ifems belo�n; if applicable, must be submitted in order for the application
package fo be compleie. Ifems (a) –(� are always applicable to any major development application. Please consult the applicafion
instrucfion booklet on how to properly prepare the required ifems below:
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed. .
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name See attachments
Address
Name
Address
Name
Address
Phone No.
Phone No.
Phone No.
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. _-
7. Certification and Permission to Enter on Land .
I understand that any permit issued in response to th'is application will allow only the development described in the application.
The project wi!! be s�.ibject to the c�nditions and restrictions contained in the permit. ,. -�
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date 03 -- 3 �—' Z-D �% Print Name 1 N1l.�P �• tt/�'Q��S � l��
,�'c
Signature _
Please indicate application attachments pertaining to your proposed project.
�DCM MP-2 Excavation and Fill Information �DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
❑DCM MP-4 Structures Information
.... .. .... .. . . .. <. .. ., ,., . . . .. .. . .. .� . �. . .. .. < . . . . . .. >. , .. .. . c. . . .. . . . . .. ... .... , Y. . ... ...
Form DCM MP-2
EX CAVAT I O N a n d F I L L
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access Other
Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding
(NLW or Breakwater shoreline
NWL stabilization
Length
Width
Avg. Existing NA NA
Depth
Final Project NA NA
Depth
1. EXCAVATION �This section not applicab/e
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of the excavation in these areas:
d. High-ground excavation in cubic yards.
2. DISPOSAL OF EXCAVATED MATERIAL �This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
c. (i) Do you claim title to disposal area?
❑Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner
(i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of disposal in these areas:
d. (i) Will a disposal area be available for future maintenance?
❑Yes ❑No ❑NA
(ii) If yes, where?
f. (i) Does the disposal include any area in the water?
❑Yes ❑No ❑NA
(ii) If yes, how much water area is affected?
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaaement.net revised: 12/26/06
� :,� � �� r. � s� �_'� � �r
«
�,`��� ��� s��x� ��� ��:����sr,��'��a: "�i��:a x g�xs� �`-�x��w�.. '��, �z
3. SHORELINE STABILIZATION
(If developmenf is a wood groin, use MP-4 — Structures)
a. Type of shoreline stabilization:
❑Bulkhead �Riprap ❑Breakwater/Siii ❑Other: _
c. Average distance waterward of NHW or NWL: 7.5
e. Type of stabilization material:
Class II Rip Rap
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap 225
Breakwater/Sill Other
i. Source of fill material.
Local Quarry
4. OTHER FILL ACTIV/TIES
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes [
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
❑This section nof applicable
b. Length: 480
Width: 20
d. Maximum distance waterward of NHW or NWL: 10
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No �NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
Class II Rip Rap
�This section not applicable
No ❑NA b. (i) Will fi�l material be placed in coastal wetlands/marsh (CV1n,
submerged aquatic vegetation (SA�, shell bottom (SB), or
� other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion
controlled?
NCDOT Design Standards in Sensitive Watersheds
will be implemented during project construction
c. (i) Will navigational aids be required as a result of the project?
❑Yes �No ❑NA
(ii) If yes, explain what type and how they will be implemented.
b. What type of construction equipment will be used (e.g., dragline,
backhoe, or hydraulic dredge)?
Excavator, backhoe, lattice crane, forklift, dump trucks paving
machines, bull dozer, grader
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes �No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
Applicant Name
Date D�, 3 r —�D l� �` ��i/�^IP J. �%�IQ�IS I��
Applicant Signature
4
Project Name
� >.;, � ,, ..... ,... .._
<$. . . . �.� ` ,� . .� .. Z, fi,. � ..:... � -..R . ...>. -� .3 ' � ` -' . ....... .... .. ......... . .. . ...
..,�. r-' F - �-.�. '.i� - . ; q:�:
Form DCM MP-5
BRIDGES and CULVERTS
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. BRIDGES ❑This section not applicab/e
a. Is the proposed bridge: b. Water body to be crossed by bridge:
❑Commercial �Public/Government ❑Private/Community Lords Creek
c. Type of bridge (construction material):
1@55 ; 1@65' 45" Prestressed Concrete Girder
e. (i) Will proposed bridge replace an existing bridge? �Yes ❑No
If yes,
(ii) Length of existing bridge: 91'
(iii) Width of existing bridge: 31"
(iv) Navigation clearance underneath existing bridge: 3_0'
(v) Will all, or a part of, the existing bridge be removed?
(Explain) All
g• Length of proposed bridge: 120'
d. Water depth at the proposed crossing at NLW or NWL:
7.0'
f. (i) Will proposed bridge replace an existing culvert? ❑Yes �No
If yes,
(ii) Length of existing culvert:
(iii) Width of existing culvert:
(iv) Height of the top of the existing culvert above the NHW or
NWL:
(v) Will all, or a part of, the existing culvert be removed?
(Explain)
h• Width of proposed bridge: 36'7"
i. Will the proposed bridge affect existing water flow? �Yes ❑No j. Will the proposed bridge affect navigation by reducing or
If yes, explain: Bent in main Channel increasing the existing navigable opening? ❑Yes �No
If yes, explain:
k• Navigation clearance underneath proposed bridge: 3_0'
I. Have you contacted the U.S. Coast Guard concerning their
approval? �Yes ❑No
If yes, eXpia�n: Advanced approval received dated
October 22, 2013
m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: 3_0'
waters? ❑Yes �No
If yes, explain:
2. CULVERTS �This section not applicab/e
a• Number of culverts proposed:
b. Water body in which the culvert is to be placed:
< Form continues on back>
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaaement.net revised: 10/26/06
Form DCM MP-5 (Bridges and Culverts, Page 2 of 4)
c. Type of culvert (construction material):
d. (i) Will proposed culvert replace an existing bridge?
❑Yes ❑No
If yes,
(ii) Length of existing bridge:
(iii) Width of existing bridge:
(iv) Navigation clearance underneath existing bridge:
(v) Will all, or a part of, the existing bridge be removed?
(Explain)
f• Length of proposed culvert:
e. (i) Will proposed culvert replace an existing culvert?
❑Yes ❑No
If yes,
(ii) Length of existing culvert(s):
(iii) Width of existing culvert(s):
(iv) Height of the top of the existing culvert above the NHW or
NWL:
(v) Will all, or a part of, the existing culvert be removed?
(Explain)
g• Width of proposed culvert:
h. Height of the top of the proposed culvert above the NHW or NWL. i. Depth of culvert to be buried below existing bottom contour.
j. Will the proposed culvert affect navigation by reducing or k. Will the proposed culvert affect existing water flow?
increasing the existing navigable opening? ❑Yes ❑No ❑Yes ❑No
If yes, explain: If yes, explain:
3. EXCAVATION and FILL ❑This section not applicab/e
a
c.
(i) Will the placement of the proposed bridge or culvert require any
excavation below the NHW or NWL? ❑Yes �No
If yes,
(ii) Avg. length of area to be excavated:
(iii) Avg. width of area to be excavated:
(iv) Avg. depth of area to be excavated:
(v) Amount of material to be excavated in cubic yards:
(i) Will the placement of the proposed bridge or culvert require any
high-ground excavation? �Yes ❑No
If yes,
(ii) Avg. length of area to be excavated: 45'
(iii) Avg. width of area to be excavated: 30'
(iv) Avg. depth of area to be excavated: 1'
(v) Amount of material to be excavated in cubic yards: 50
b. (i) Will the placement of the proposed bridge or culvert require any
excavation within coastal wetlands/marsh (CW), submerged
aquatic vegetation (SAV), shell bottom (SB), or other wetlands
(WL)? If any boxes are checked, provide the number of square
feet affected.
�CW 235 ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of the excavation in these areas:
114 sq. ft. - removal of existing bridge; 121 sq. ft.
roadway ditch
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaaement.net revised: 10/26/06
Form DCM MP-5 (Bridges and Culverts, Page 3 of 4)
d
e
9
If the placement of the bridge or culvert involves any excavation, please complete the following:
(i) Location of the spoil disposal area: Proposed roadway bed; material to be compacted for use as roadway fill and embankment
(ii) Dimensions of the spoil disposal area: 60' x 800'
(iii) Do you claim title to the disposal area? �Yes ❑No (If no, attach a letter granting permission from the owner.)
(iv) Will the disposal area be available for future maintenance? ❑Yes �No
(v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell
bottom (SB)?
❑CW ❑SAV ❑WL ❑SB �None
If any boxes are checked, give dimensions if different from (ii) above.
(vi) Does the disposal area include any area below the NHW or NWL? ?❑Yes �No
If yes, give dimensions if different from (ii) above.
(i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed below NHW or NWL? �Yes ❑No
If yes,
(ii) Avg. length of area to be filled: 380'
(iii) Avg. width of area to be filled: 13'
(iv) Purpose of fill: Roadway embankment
(i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed on high-ground? ❑Yes �No
If yes,
(ii) Avg. length of area to be filled: 380'
(iii) Avg. width of area to be filled: 13'
(iv) Purpose of fill: Roadway and shoulder bed
4. GENERAL
a
Will the proposed project require the relocation of any existing
utility lines? �Yes ❑No
If yes, explain: See attached utility narrative and drawings.
If this portion of the proposed project has already received
approval from local authorities, please attach a copy of the
approval or certification.
f. (i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed within coastal wetlands/marsh (CW), submerged
aquatic vegetation (SAV), shell bottom (SB), or other wetlands
(WL)? If any boxes are checked, provide the number of square
feet affected.
�CW 7390 sa ft ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of the excavation in these areas:
roadway embankment
b. Will the proposed project require the construction of any temporary
detourstructures? ❑Yes �No
If yes, explain:
< Form continues on back>
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaaement.net revised: 10/26/06
����� ���� ��� ������� � ��� ��.�������£ ����� � �� ��
c. Will the proposed project require any work channels?
❑Yes �No
If yes, complete Form DCM-MP-2.
e. What type of construction equipment will be used (for example,
dragline, backhoe, or hydraulic dredge)?
excavator, backhoe, forklift, latttice crane, dump trucks
paving machines, bull dozer, grader
g. Will the placement of the proposed bridge or culvert require any
shoreline stabilization? �Yes ❑No
If yes, complete form MP-2, Section 3 for Shoreline
Stabilization only.
Date
� 3�- 3 �-- 2�O ��
Project Name
�t� � L ! %� S �,A IQ12 %..S / /,�-
� Applicant Name
..�i' %��_
Applicant Signature
d. How will excavated or fill material be kept on site and erosion
controlled?
NCDOT Design Standards in Sensitive Watersheds
, .- ��. -��-� -. . �. . . - .� .�
f. Will wetlands be crossed in transporting equipment to project site?
❑Yes �No
If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
- � .�. � 3��. <x � zK �s�� �.�'� �j o: ".��� � �. .... ..-� � ak�"� ?as� �a.� ���#�g:?�i.�i'�a:�'s: �..�,��i'��a'r��`�t '� �;�� i � �s�
a �..: :�.^�<�a13..:?z<Q$.��� �. F...s��k'��a A1-:c�,.?�. � .
Prc�cer Troc�i�re� ,�4b, f�'rrfa^rrn�! L+a�z��
� 1-��i-�}���
P�U �R�H�S"�"��IC �� HIST+CII�I� Pl��}PEl�'I'�ES
�i���I�NTI��`FEC'T�I]� F+Q1�M
P��3J�CT Il�o1�11�IA,TI�IY
Pra�j�ct r"Vn: i�-52.36 �'c�trrr�v.• 1�ew Han�nvet�
��35 Nr�_' 4284i}, I,1 I�ac�rrie���c: l�C�, ar �C�
F..�. ,Vu; F��tL-11 �Of�{2�) T�u�cCir:�: ❑ Stat� � Federai
�'ec��r�rf ��,T,SAC_�FJ l'c'�',�pii ,Re�r}zrl�•c��ct?' ��'�s ❑ I�!o P�rrrrr� 7y,�a.� �.Jn�s�i+au+n at tl�is trme
Prc��c�t ��serr�r��a�r; �4e�luc��mei�1 uf 13r�c}�;�^ Na_ 19 nr� �S.�R11 ii(1(Ria�e�' 1Rr��r�1J n�� l.�ra�c�Is �Crc•ek �,�2 ,'Ve�w
ff�r�vve�r �our�ty, Nc�Y�'h C°cr�r�iinca. �'Vc��rn��c�' alterra€rtiv�.s nr jt���£a�setf c��fr��ri{ rc��ries ���c�r�.} c��fned at th�
li��e �f urch�t��rltr�ic�u� s�irrvev. r�s such. the arcflaeoln�,*tcr�f .�iPF, erac�r»apassc�s � ruther �cu�cr�r'aus urecr
r� ��-��r !� r,�c�ea�rmcatictt� rrr�r�ar ali�nrtaer�t .��i,�ts aaad t��r���r�rtrry r�n�cdfe c��tr�u�' e�p�rr,���s. Th� .�l �E
n��C�s'�r�`�S 2(?UO,fT. i� �e�rgf�a a�rd ��0�. i�� �tF�c�Ph. If �xte��c��i cr�j��^p,.kfrx�u�t�'1}� �0�(�,f't. fr€�m �'�re brrcf�e c�rrter�
pUirrt f� l�ae tlra�lhern pr�jeel f�rni#s arrri ��if�. f! �rfJl77 t�J'� �1i`1d���' �4'�iP�l' �lU�T#�! IiJ f�7�' S'CI�iPIT�i'TT �l7"[JfE��
Iirr�ifs.• arrd �r�,tr��ries 1�Oft. fc�r�er�ralfv.fronr �'ire .�RI I�fl ce1���r�lix�e_
�U1Vf1�i�A�tl' i�F FII�]7�1NGS
T}rs �Vr�a�1i1 �'crrol rn� I�ejxr�r°tn��nt of Ti ct�sporlulrr�n �4�C�DC�� Y�l'i2�f�,eci #he sub, js�et �ra�i�ct arad c�etet�rrrirt�ci':
Histaric �rchitecturelTy�nds�apc:s
� '['here �re nc� I�Iati�nal Etegist�e�-listed or �tud�r [.��tcd prope�t��� v�+ithin the pro�ect's area of pot�ntial
efFects.
�[] Ti�cre arc n� pr�perkies �e�� ti�aR� Fit�y yc%a�s �f+d tiwhich �re c�nsidefed tc� meet Crit�ria Ca�siderati�n �C;
within ti�e proj�ct}s �r�a c��putential efl'�cts.
�] Ther� �re ttr� grt�perties vvithin t�te project's area af poten#i�l �eff'�c�s.
[] '[`h�re ase prvperkie� ove� tif�y years c�ld with�z� the �te2� c�f �ter�tial eff`�c#s, bu� they do not rrie�t the
�riteria for li�tir�� nn tl�e Natit�nal R�;�;i�t.��'.
❑ t11� }�ropertics �`e�tc�r t�an S� y�ears of age ]c�cated i�z �he APF have �ee�t c�n�#dcrccf aatc� ail ��mpl��nce
i�r historic arc�tite��ure with Sectic�n 1D6 v#`th� i�l�tior�al Fli:�toric Pre���vat��m Act and �� I�l-i �(a) hds
b�ert eorrr�is�t�:d for k�is prcrj�+et.
� 'f here �re na histnei� pro�erties �rr�settt t�r aff�eted hy th�s project. ��itdcach cm�+ r��nte,s rxr ��vc�lme���.s �r,�
l?G'E(�Et�
e�ti'C�13�D�CS�I
� T�ere arc n� �+1ati�an�l Rs�gist�r-l�sx�d ar Stud� i.,ist�ed pr��serkies wit��n tl�� �r�aj�ct'� �re� c�f put�;�iial
e��'eet�,
❑ I�Iu subsurface archaeal,�gicai �nv�stig�tioYts are �eqtdre�l for this �rc�je�i.
0 Subsurfaee irtvestigatios�a �lid t��! reveal th� prteesen�e af any arc��e4�a�icat re�caure+�s.
� Subsurf��� in�r�tigaii�r�s di�f nat re�+eal the pre .er�c� of arxy �rch�e�lo�tc�� resources c�nsidered eligible
Fc�r th�e I�Ia�fonal Register.
.�r� rf�.5�.�4 i'ru�srl+v.r �'rrsemr" fnrm ,f+ir,4f�nnr7`rarspemaJ�ar F'rayrers a.s �i+xtJ��d �n �ha ZfJi�7 Prn�uramenr .�grrrmu:r.
h`C'fXJTArt�huea'u;qy � He.ranric.{rrlifrcerutr. Ci�w�.r
� �hU i€i�r�tifi�d Arc?�a�la�ical �it�� 1c��tttc{ witl�in th,� AI�E have becn cc�r�sidcr�� anci �9l c�rympii�nce fvr
acch�tec�ln�ic�1 re�nurces �vith Se�tion I{}�5 ok'the Natian�l Eiistczri� Prescrvaiinn 11ct �ncl GS �21-t2�aj
h�s bee� �ntnpleted For thi;� pmjecc.
� 'i'hcne �.r� na h�stor�c pru�pe�-t��s prc:sent ur �ffcc:ted by tl�i� prc��e�c� (�firrclt er�y nofe.s r►r cicacirm�rits crs
���erctrc�j
SUMMARY OF Ci1Lii1R,�►L l+�!iUURC[?S �FV1EW
�3r,rrjcl�.�r•cr^�p�ron ojrrview c��i��1�i�es, r'esrr�;s af x��i��+�. unrl rnrac�e�si�ur�s:
A s+te f�le search an�d map nevie+w was comfucted at the t}ffice vf Sta#� Ar�haealogy {�j �rn fiAareh 8, �O�i 1. Thts work d�scicrsed
the Iatatlon oF s�ev�ral previo+.esly retotded arthaeo�oglcat sites �3 YNH33, �ENH 135, 3�N�+5�]9' •� situdted wlthin or abutcang the
praject APE, jn �ddttiar�, numerous c�the� archaeal�gic�l sites have been reeor+�ed nearby to the n�arth a�d sauth a9ar�g SR11ip0
In slmllar to�rpgraphlc, Re���logical, ancE hydrolagacal envlrcnmanta� cante�Rs. �k cultwr�l res�unces suruey cf tha proJect study
area was thereF�re r�camm�nded_
buring the slt� vis4t an O�rtarc� �i: ��3T f a transect w�s �s�tabllshed� on each sld� of SEt1k04 approxirn�trly 75Ft. frvm kha road
ccnt�r•Ilna. Tc�nsect �i subsumerJ the �astem pt�rtlnn cf thr pra� ec# Af�E wh�t� transect �2 �ntarnpas3ed the wcstern area.
5i��vel �est plts {s;p} w�re �xravate�d a� 5L►fF, ankervals ��ong ther�a transects end nurn6efed se�uerR[tally scuth ta nar[h wkth the
project �rea {s�e attached stp mapj. Shavek [esr�ng vras canducted in areai rro� obseFvec� tn be saturanrd ar inundated and
arsas r�at radically disturbed hy erosi�n or pas;/vn-gctn; humaa earth-movirtg activioes. Ess+entialiy, all areas character��ed by
well drained so�is and sl►ght ele+rat�en xas+�s were su6j�ected tQ subwrlace ingwiry_ Rad�al stps �re exc�+ated at S�Dft. �nterva�s
pe►pmndrtutar t4 lt�e trans�eti m order to establistt the site's boun�sry as n re4�tes to the praject AP�. i� tQwl, S� shovel fest
pMt# w�r; tx�BvaxRFd alDng trar►se�ct fll �2 po3itive + 2 fbdiils� iild 3Q Sh�ovp! fest pits a�artg transeCC �2 �3 p4sitw@ *� rad�slsl.
Qne new 3rthieo*lo�[al site ('�iMH807� vras r�[prd¢d near ehE s�uthern prnject 6rnits and a previt�usly kn�wn �E+ypurte
�3tNN509�• `� setwaGet! irnmediat+2ly saut� of Br�dge No. 19 wes reu�si�cctid and delineated in respect ta the projert ccx+struction
foatprl�t. Both +�f ih� resou€ces cn��itut+e su�face�subsu�Face artifsct scattets that hawe been trun�taate�d by the SR1100 �d
tnnstntttlan, es vre11 �s have suifere� other imparis �ncludJ�tg erosaon, gredls�g, ar�d develapr�n#, White the�e sites rrW� lend
somt wtry $aneral pers�ectl+re csn the set[lem�nt pattams, I�r�df��m/env�ronrnenfat �references, and �r�ehi�torit terimit serl�+s
d�str+butions af tha local W�odl�r►d peria�d Inhabttanis, they a,ick attrlbut.�s essentl�l ftar estshlisF�ing inte�r�ty, .pres�rvatlon,
unit�u�ness, and rel�var��e and are there#ore recamrner+ded N4T EUGI�I..E fQr flstir�g on the �+ak�csnal f#eglst�r af HI�#orlc �Eaees
(NRHPj, In additlan� slte 311VH33 could ncat �e relocated withln the narthwest�rn A�PE q�adrant. 1'he ��te Is Ilkely sltuated
furth�r to the north}narthwest 4eyanct tF�e pr�aject flmlts and wlll not kre affec[ed by the prc,�ect �s prapased, Also, thls suruey
deierrntned that 3�NH7,3� h.ad been rnispfatted qn �hB �CBrqltna Bkd[h t�apa m�R �+air�tai�ed at the €�SA �n� IS not I�cat�d
within the proj+ect lt�E_ Ir�stead, thls �ur+�y Fnund kh�t 3'1NN509" extorsds w�steriy atra�s SRli.t� anc4 irtt� the area preu�Qusty
mislabeled is NFli�S.
3Yt�t1509"- is a surta[ef stibsurfa��. PreF�Fstaric/hfstork a�ti(ac[ s[atker �aca�e�d an a ra�sed dun�e-dike +�plartd feat�ke
immcdtateFy s�uth cf the Bnak� t,6o_ i9 structure_ A tRtal of th�r�ecn shavrl te�st pits wer�e excavated abqn� �he tw4 iransc�cts
and inti�ud� ridials upon thts landf�rsr�typ� leaturr. Thr�e 4f ttiest reCurtro�d antifaets of prehi5#p+tiC 8ffi113tlon. Tiny resid�l
cefamic sherdtes$ wese reccsverecl From tt�e upper 2Qcm�s of the tw�a posit�e tesk pst lacae�ns an transert � 1 and ane sand-
[�err,,�er�d punctaerd body sherd with m#�riw incising was }ound at 60cmbs-�Ocmbs at T=2 5TP=B. Eras�pon, grad�ng, ��d ather
he3vy eartK•moving maci�inery utt�izatian i�as sev�2rtly dkstur6�d [he ea#t�rn suria�ce �nd subsurE�� pareloni fli 3iN1i509' •,
Ilrt�f�tts col kct�d frorn x.h�e surface asi the �astem pq�rtitsn pf the slike In[lude multiple escamples of an �ariy VYnpola�d i�nt sa�nd
4�ratipered punctatrd ware, pr�sumahdy irarri a si�gf� vessel cr "pot bus�"'. Middle Woodiar,d s�nd aad cnarse sand #emperetl
cer�mlc iragment sperf�ne�rs {particularly alnr�g the nurCheastern sJte per�phery}, end twa hi�toric c�eramic exam�tt�es that fikeFy
datA t0 tfie mi�d�nln�teenth century. In addition, hrlck fragm��tc wer� nnEed on tt�e surface In the nnrtheastern core s�tB area.
The oNgln�l slte fvrrrs repartP� a colpnia4 f4und�ation Yn thls �rea oF the si�e, and fhe �rick fragments may cons#Itute the rernalns
n# thls foundatlan faUo-wing the grading ar�d pseuda-d�welopme�rr# of thls area Fon c�sme .sise c+�r�skrucNa», Desplte thc number
nf a�tlf�cts coifected fre�m tlist�,rksed su�face csan��xts, 31�IHSQ9'• E� unlikely to c+o�rt�in slgniflcan�,lntect subsurface cultural
F�atur�s t�r m�aningful artiFaet concentrat�on� eapahle of addr8s9ing, �mp�rtant eegianal research a�endas. Yhe site i�
recommen�ded nat �llglble fvr lis�ting on the NRHi' and rto furthar arork ls advacated_ A�ddi#�flat Infprmatlorr can be atteln�d
lrvm tt►e AkC Ar�hatalsxg�cal �ike r-orm.
3�NH$p7• fs a subs�crface prefeisWr6c-ceiamk arRifact sulter sltunted at the saajthem project IYrrE�[s an both ea3ktrn and
wcstrra sldes oi 5Ri100_ A wtal af nine sAr�v�e1 test pits �nciu�r� radtals w�re �eeavated to rbeNr►pate the bour►dar�es of the site
as it relates t� the praJ�eci APE. Four �f thes�e test pits rrturned premarf►y Middle WcFedlan� periad reramic vessal Fragments
snd a sin��e quat�tiite flal�e. The c�nstn,cticx� and nuintenance o1 SR�300 and i�s associat�ed righc�f•way, horna dev+�aprnemt
in the eaS#Mn sit� ar�a, eao�ins�, a�d perched water t�W@3jsf'i 1@+�NI riS@ are all fac�ar� �nntn-huting t4 �fie 5n!'s past and On-
�nodn6 disturbBnCe, Que ta krur ar�la�# densities and mufiR�p�fe d�siu�b�nees che srte is recammend�d n�p4 eli��bk ipr listi� on [he
NRHp tinder criterian �_ Fks i��ttrer work is recvmmended Addit�anal infcrrnnat�or+ �t tt�e �esource caa br atta�ned �iram th�
Nnrih Carolina ,4rchaevlogical Sate Fctrn.
A�in�ding af "no h�srorK properties af#ected" is can sldered apprc�p�9ate for the �r�jec# as proposed.
�NO N1Tfl4Y[ FFtD�itNilCi I�YGtedti ���I7tiM�ru Alrnur 1'ir+ar�,s+t��r��.w f'w; w.rs us fJv..�rfet�cl m rhe ?rll?F Y+rrart,Rmanrarc �rr�-mr+n.
,ti'{'i1(17'�1xcAdwluRy 41ff.rrnrtt .�lnl+urrr,r;rc CsFe�s
�UAF'+G1�t'�' �[)C'�.J11�E�"�`�IT��N
:5c,c �sta�ched: i�a,�(s�, �'are�+in� �urv+�y �.nF�s� 1"�►a�lus, Cc�rt�p�n�ie�n�e� ���p� c�f no�s !'rv�n �urv�y.
Si�n�:
��lt�ir�l F��sourc�:� 5��al��t, T���T
"Nr+ h+drrorrc Ymy�rar,rr Pr�r ",{or�►I�++'t }'mor !'+rrtra.t,Dwrr�rNr,�n l'%�rE•ts mr �i��cdt�aer� �n th� ?r1i7r Prra�tr�,r�nrn� ,II�{�rnarm
�4'�.'�!l']"1'A�t�u�ra��P s� N�rltarh r�nhurtc�r��trr�ar
En vironmental
Quality
ROY COOPER
� �o.�ernor
March 28, 2017
Mr. Philip S. Harris, III, P.E., CPM
Project Development and �nvironmental Analysis Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Dear Mr. Hams:
Subject: Mitigation Acceptance Letter:
B-5236, Replace Bridge 19 on SR 1100 over Lords Creek, New Hanaver County
The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the
compensatory coastal marsh mitigation for the subject project. Based on the information supplied by you on March 28,
2017, the impacts are located in CU 03030005 of the Cape Fear River basin in the Southem Outer Coastal Plain (SOCP)
Eco-Region, and are as follows:
Cape Fear
03030005
SOCP
Impacts (feedacres)
S tream
Cold Cool Warm
0 0 0
W etlands
Riparian Non- Coastal
Riparian Marsh
0 0 0.18
Buffer (Sq. Ft.)
Zone 1 � Zone 2
*Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See pernut
application for details.
Tliis mitigation acceptance letter replaces the mitigation acceptance letter issued on Uctober 20, 2016. The
impacts and associated mitigation needs were under projected by the NCDOT in the 2016 impact data. DMS will commit
to implement sufficient compensatory coastal marsh mitigation credits to offset the impacts associated with this project as
determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iu of the In-Lieu Fee Instrument
dated July 28, 2010, If the above referenced impact amounts are revised, then this mitigation acceptance Ietter will no
longer be valid and a new mitigation acceptance letter will be required from DMS.
If you have any questions or need additional information, please contact Beth Harmon at 919-707-$420.
Sincerely,
Ja e . Stanfill
Credit Management Supervisor
cc: Mr. Brad Shaver, USACE — Wilmington Regulatory Field Office
Ms. Amy Chapman, NCDWR
File: B-5236 Revised
-^�°Nothing Compares�v.
State of North Carolina Environmental Quality
"L17 VVest Jones Street I 1601 Mail Service Center I Raleigh. North Carolina 27649-1601
919 707 8600
(Version 2.02; Released April 2015)
WBS Element: 42840.1
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
County(ies): New Hanover
General Project Information
WBS Element: 42840.1.1 TIP Number: B-5236
NCDOTContact: Jonathan Moore, PE Contractor/ Desian
Address: Hydraulics Unit
1020 Birch Ridge Road
Raleigh. NC 27610
Phone:(919)707-6734
Email: 'Imoore@ncdot.gov
vn: Wilmington
asin(s): Cape Fear
is within Project Limits? Yes
Length (lin. miles or feet): 0.18 Su
Propi
Built-Upon Area (ac.) 0.8
Cross Section Description: 2@ 12' lanes with 5' paved shoulder
ProjectType: BridgeReplacement Date: 12/28/2015
Wetherill Engineering/Anne Gamber
Address: 1223 Jones Franklin Road
Raleigh, NC 27506
Phone:(919)851-8077
Email: gamber@wetherilleng.com
New Hanover
CAMACounty? Yes
Project Description
Land Use: Forest / Some Residential
�t Existing Site
ac. 0.6 ac.
2@ 11' travel lane with 4' paved shoulder and 2' grassed shoulder.
nual Avg DailyTraffic (veh/hr/day): Design/Future: 8885 Year: 2036 Existing: 5220 Year: 2016
neral Project Narrative: REPLACE BRIDGE NO. 19 OVER LORDS CREEK ON SR 1100 (RIVER ROAD) WITH A 1@55'; 1@65' 45" PRESTRESSED CONCRETE GIRDER BRIDGE. NO DIRE�
�scription of Minimization of Water DISCHARGE WILL BE ALLOWED INTO THE SURFACE WATERS. THE RUNOFF FROM THE BRIDGE WILL BE DISCHARGED ON TO A RIP RAP PAD TO DIFFUSE
alitylmpacts) FLOW WITHIN THE WETLAND BOUNDARY. FILL SLOPES ALONG THE NORTHERN ROADWAY APPROACH WILL BE STEEPENED AND REINFORCED WITH RIP
RAP TO MINIMIZE IMPACTS IN WETLANDS.
rface Water Body (1): �
DWR Surface Water Classification for Water Body
ier Stream Classification:
�airments: mE
uatic T&E Species?
TR Stream ID:
�ject Includes Bridge Spanning Water Body?
ck Drains Discharge Over Water Body?
(If ves. provide iustification in the General Proiec
LORDS CREEK NCDWR Stream Index No.:
PrimaryClassification: Class C
Supplemental Classification: Swamp Waters (Sw)
18-84
Comments:
Buffer Rules in Effect: N/A
Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
�tivel General Project Narrative)
�
�
See Sheet fA For Index of Sheets
See Sheet 18 Fo� Conventionol Symbols
�/ �� „ � �
Sanders.l�d. i�' Q oc �
*� � 4 V �
421 i
.�_.�-���� p '
,
Pilots Ridge Airport
�O �
t7c
�
�� �.�
�
" 421 �
� m
317 125I
PROJECT '
LOCATION
U S Coast Guartl is2g
O ^/
, ^ 421
VICIIVITY MAP
(NOT TO SCALE)
OFF—SITE DETOUR
������ �� ����� ��������
�������� �� ���������
1�EW HA1�O T�ER CO U1�TY
LOCATION: REPLACE BRIDGE 1110.19 .OVER LORDS CREEK
01V SR 1100.
TYPE OF WORK GRADING, PAVING, DRAINAGE � STRUCTURE
PERMIT DRAWING
SHEET 1 OF 10
WETLAND AND SURFACE WATER IMPACTS PERMIT
A O�A AC.
SITE 1
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERPORMED TO THE LIMITS ESTABLISHED BY METHOD III.
GRAAHIC SCALES DESIGN DATA
50 25 0 50 l00 ADT 2016 = 5220
ADT 2036 = 8885
PLANS K = 11 %
D = 80 %
50 25 0 50 100 T= 3 %*
V = 60 MPH
PROFILE (HORIZONTAL) * (�ST =1% + DUALS 2°/
t0 5 0 l0 20 FUNC CLASS =MINOR
ARTERIAL
PRc�FILE IVERTICALI SUB—REGIONAL TIER
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT B-5236
�o �
BE IN BRID E \os�
-L- STA.15+04.40+/- ,�+�F
� F,',
SITE 2
-L- ST . l i
Prepo�ed !n the Off/ce of:
DIVIS7011ldgOF RHIGHWAYS
= 0.163 MI 2072 STANDARD SP6CIFICATIONS
+/-
+
'ATB dl'A'IS PItOIECT qEP8q8NC8 NO.
.�� B-5236
BTATB MOl.N6 Y.A.PROI.NQ
42840.1.1 BRZ-1100(29
�
DGBCRIIIYON
P.E.
iy����i;���L��I �#��'�,:
���►�l���Rr����#,��
�:r���''�..,�.����.►�„��.��;�r�
�r��: �#���
��
HYDRAULICS ENGINEER
LENGTH STRUCTURE TIP PROJECT B-5236 = 0.021 MI RLGHT OF WAY DATE: GARY LOVERING, PE ,ROADWAY DESIGN ENGINEER
SEPTEMBER 16, 2016 PROJECT ENGINEER
TOTAL LENGTH TIP PROJECT B-5236 = 0.184 MI
LETTING DATE: SUSAN C. LANCASTER, PE
SEPTEMBER 19. 2017 PROJECT DESlGN ENG/NEER
P.E.
INCOMPLETE PLANS
DO NOT USE FOR R/P' ACQI;ISITION
PRELIMINARY PLANS
DO NOT USF, FOR CONSTRUCTiOr
z
0
>
�
Z
n
�
wz
� � Sta. = 11 +00 —L— LT
� � -- DA= �0.�75Fac
BEGIN TIP PROJECT B-5236
-L- STA. 10 + 75.00
....... vv . ��VT �.L JRIIVV7
� DENOTES EXCAVATION
IN WETLAND
� DENOTES FILL IN
WETLAND
� DENOTES HAND
CLEARING
� DENOTES IMPAGTS IN
{(� SURFACE WATER
O
BURNETi ENTERPRISES.INCORPORATED
f1R1 �nnn or nee
PERMIT DRAWING
SHEET 2 OF 10
PROJECT REFERENCE NO. SHEET NO.
B-5236
WW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
O
RUTH B, PHILLIPS REVOCABLE TRUST `
FIRST TRACT
(ROW 30' FR�OM C L SRI100)
\
END TIP PROJECT B-52:
-L- STA. 20 + 50.00
80' 0' 80'
GRAPHIC SCALE
Z
0
>
�
Z
� d � � \ �
� � l � �� \ v �,�
� wz
�
� Z�� \ / ta.= 1�+00 -L- LT
�� �n h �� � D - 0.17�ac � \
�;� n � n �� _.
BEGIN TIP PROJECT B-5236
-L- STA. 10 + 75.00
....... vv . ��VT �.L JRIIVV7
� DENOTES EXCAVATION
IN WETLAND
� DENOTES FILL IN
WETLAND
� DENOTES HAND
CLEARING
� DENOTES IMPAGTS IN
{(� SURFACE WATER
O
BURNETi ENTERPRISES.INCORPO�2QTED
.. f1R1 �nnn or nee
PERMIT DRAWING
SHEET 3 OF 10
PROJECT REFERENCE NO. SHEET NO.
B-5236
WW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
O \
RUTH B, PHILLIPS REVOCABLE TRUST
FIRST jTRACT � � " \�� j
i� DB 39fi PG 389 � � �
(ROW 3�' FROM CL ��I100) / � � ��
� �_� '' � � � �
��
�� �\�� '� � � v \\
� V� � � A��
� � � V � �� _ �. A:
� �A�\� ���
—�.� �� �� V��\V���\\�,a�
—,
\ � \ \°�S \ � � :_��
n\ ' �� �� � � \ � - �
END TIP PROJECT B-52;
-L- STA. 20 + 50.00
80' 0' 80'
GRAPHIC SCALE
Z
0
>
a
�
_
�
�
N
�,
m
�
w
�
�
a
0
0
¢
u
i
w�
� ,�c
a,-
40
30
20
10
0
� Y � PROIECT REFERENCE NO. SHEET NO.
PERMIT DRAWING 8-5236 s
ROADWAY DESIGN HYDRAULICS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C L! C CT A rl C � A � G���_���FFo ctir.itiFca
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
40
30
20
10
0
�F 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
io--- _ _ -.
— _ � �' i � -
— _ � '� : �J+'r:
. . �. . . . . . �' � .. '� �.�2�
5
�
��
5
0
!o
5
0
O 2.S S PROJ.REFERENCE NO. $HEET NC
� B-5�j6 x-�
0 5 10 15 20 25 30 35 40 45 50 55 _ 60 65 70 75 ��
PERMIT DRAWING
� , SHEET 5 OF 10 io
' _ -_
_ __� ---- ------ _ _
. . . . . . . . . . . . . � . ,.. I I I I I.I. I J I I I L1_I_ll LIJ_LLLLLLIJ. -. �. .
�.Q2� . ... . . . .
`J
�
ia
' 3��� __.- ---�—�--__ — _--_ 4:1 � __ ___ ___ _ ____, ___ ___ ____
� — — — —��•-- =
_. —
� — _ — — —
3.82 -----------
1��_ o
I �
J
�
U.ULV V.VLV I
— 3: I
3'� -- -------- -
-- _- ------- I __ — _ __
------- — ��n --�----
io ,` , : . ,� : , ,,��, I
�
�
_ __- -_ — _ 'r 0.015 0.021 I
___ _ ' I
� = _= v = 3:
5 _ 3�. . -- — — _= -- — I
� —� �
� �_
_ ----�I' �
— -------------- 5.51 --- J
0
�o
5
io
5
0
io
5
0
�o
. . . ... . . . ..... ... . ... . I / � . . . . ..... . J
/ \ \ I
— — — — — — — — — — — — —
--L-' 5.44 �� _ I _
— —
� ', � 10 + 50.00 ��� _— o
-L-
75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
_- - _- - - - _-_- - = - - -_- _- - - - _ ._ _ _ _-_ - - _�.:.__ - _�_--_ _- _ --_-
0 2.5 5 PROJ.REFERENCE NO. SHEET NO
� � B-523b X-3
75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
PERMIT DRAWING
CLJCCT L /'1C l/1
/_5 _ _ -
� � I ii �i �i li ii i i ii I
- - i * -:-
� : �-
� i i � �
._
,.. ,.
- ,�I � I 0.020 0.020 � I� �I _kl_.::: _ �
-- -- -- I _
IO _ _ . . _ .. . ... . J J . I I . I .I J i i I . i i � _ '�. J ' I I ' I ' _ I _ ' �L.J
_ . .I. __ . . .�. .. _. .. . _ '_ _ _-I � � . � .I � _ . IT . .- . . - . _ . _ . . - . - _ _ . _ ' �TI '1 7 "
i I I �I �� r . . ..:.. :{
�. I I I I I I '.I I .il - �- . � - '.. �... ...... .�... .. .. � �. I I ��I .i. I I 'I� +
1 I I i _ �
I I I I I I I
I I I I I . ... ... - T- .
I I
\ ' �\ I
J � � � : � � � � . R�: -�- � ��
� � � , - , - ; i . _ _
' �'' � ' ; ��1�1f- , I , ,_�� �� ��r� ���� � '�
_
� �
� � '� � '�
_— �� � ������ � J-
� � � � � � � �, �� � � ��� � � ��� � � �_ �-- ,,��_ 'li. I �
' ' �� ,
� � � � �
� � � ; ; � ; , I, _ - -
0 � � � � � � � � � � � � � � �_ _- � - - - �—
� � � � �
_ _ � — �
-5 ----- ----
--
---- -------- --- — -3.45
----------- 15+50.00 : -�_..
� �������,���������������„������„����������
J-� 6.82 ��. �
/ ��
� -_
�5 ._III .�' .I ........ .......I. .�............ ....�..I � � ' II.. II, . ' . �J
�, , , . . . . . . . . . I . I - . : . . . . : .
... . . - . - - - -.- I I I . .. . �__� I
� I I I I . . . . . - � - . �. _., . . I i i I. ___ . _ . . .
. . ... .... . _ . . ... .. ... . ... . -... ... .
. .... . . . . _ . . . . . . . . . .. . . . . . . . . . .. . . . � � . � � _ . . . " � . . - . .
� I_.
. . . _ . - I t - -.- .-J_.-...-_' � I I. �
�V I � � � .. .. _ �� __ I__.-___ _� ........ O.O/.O O.OLO .... II . -_ � ... . /O
I
' : , -- 3.I _ ___ __ _ _
; ; ' � i, i —__ -----_ ----�
` � �. 3�' �,I,_ __ ,_ ------
� � � . �, ------ -- ------------
_ _ _ . _ _ ._ _ _. _ _ , . .-. _. .� _._�_ � 5
_ ____ _ _ ____ �— ��� 6.88 �
�
_—=�" --
— _��, _ �� � � u � � �� � I- ������ ������� ������� ���������������� ��---����������� �,����� � ����� � ����� �� �
o — _. _ — � � � � � _ �-�I k� � 14 -F� 50.00 �++I+�+ I� �I+U+I� �U� k�-r---_- – - � – � ' ' �- __ +� �� o
-L-
75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
_- - _- - - - _-_- - = - - -_- _- - - - _ ._ _ _ _-_ - - _�.:.__ - _�_--_ _- _ --_-
0 2.5 5 PROJ.REFERENCE NO. SHEET NO
� �� � � � B-5236 X-4
75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
PERMIT DRAWING
�,� SHEET 7 OF 10
_ _. , _ .
_
. _
i� ' _ _ _ _ _ � _ ._, : . ,, ,-. . . , -_�
- _ - -__ _ _
-- � �_ - is
, _ ;_ ;
I
'.
-._._ -- - - , _ ' : ;
- - - - - � ; �.
, ,
� ; ; �� ;.
, , ' � � ; � , ; _.. ; �o
/0 � - - _ � �w� � ' 0.020 0.020 � �� I � ��_. � ���.: �W/ � ;
m =-=_ =- —
_� �- — — _ _ � -- - _ -_ �--- -- i i� i
�
�� �� � � � �
� _ i�i � � �.� , , — -- — — — 's�� - � � I 1 i
� � � - _--- —, _ I . F1 _
1 �
-. li� 5.46 ��� y -
i �
_ �
— — — — — — — � � — — — — — — — — — -
0 ---------- ---- _ �\ �------ �
,
, I� � � �
I �
: � 17+00.00 , �— _
_ _____ '
, �, �, __ __ _
, � � -,, , ,-
�
���� � � ��� , , ,����� _ _ _ �
� � � , -- � � � � � � � -- - -- - ---- - — --- --- --- -
� ,
;
� � � � � � �� � �
� � �� � �� � �
� � � � � ,,, , , ,
��� � ���� �:���� � � � � , ,
_
��� ��� � � � � � ����� � �� ��
� � � � � � � � -
_ ,:,'�� ,, ,�'���,��� ,�'��,, ,��',,� ,�� :,�� � ,
� � � ���� � �� �� � �� � �� ��
��� ��� �� ��� � � ��������� ��� �� ���� ���
�
� ,
� � � � � ��� � � � ��� � � � � � � � �� � ��� � � �-- � , , �� ��� � l5
�r � �� �� � �
� �;�� � �;�,I � �� ��� � ��� �� � � � � � � � � � � �
,
------
- --� � --�. �f
r-- �--� -- ; �-�--� -�- � _ , , . �, - - i i � i i - - -
_ r- ____ �___r__
� � �
� ����� ����� _ _ _ �
_ _ _ � �� ��
� � � � ���� � ���
��� ��� � �� ��� � � _ _
� � � � ' �-- �- - , � � 1
— 0.020 0.020 � � , io
,_R -- - I
/0 iii li i i i i i i ili,i i i� i i i i ili I �-
iii
-- - -�_ -_ `-_ -
,,, , W, J- - - R
_ _ __.
� � � '� � ��� � � � � � m -� � ���
� � � , � _ ,
� �
� ' ��� ' I - ;
J ' ' ' � .� _ — _ _ _ _ — --- —.. � I � ' � w r
— - � � � � � � � � � � � � •S. _ � ' '_ 5
_ , — ,. _
: � � � � , �' � � � 5.94 \ I _- ,. : '�
,, , ,
1- � �
� � � '� � � �� �� �_
_ _ � / , _ _ _ - \ � � ��
, \ _ _. _ -
--- -------------���/ , ' � �_ �-; i � _/ \\ - ' 0
� - - \ � i i
\ - -
i r Ti i- _ i i _ i_i �\ i �
- - T_ __ � -- _ -
, ,
`
---- --- -- _ _- _ _-- -
, - -
--- _
-5 � � ' � � �.��� � � ��� ������ � ������ � ������ � � �� ' � � � ��� -5
��� ��� :��� �� �
�
,' , � _ \
—_ _--- - - , �- — — —
� � � ;;, ,;,, :� ,;, � ;,�� � ' 16+50.00 � �
._ ��� ��� �,
_ ,:,I'��� , ��' ���'� , ��� ��� , ��� , � , � � � � -,, __ ____ -_
, , ; ,
, , _
_ ___ ___---- -____
�. � _ L II I III III III IIII I IIIIII' Illlllil IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII �'���
I I - . --_ _ _ _ _ _ _ _ _ _ ___ _____ _ _
�I � � � �i � .. I i I
�5 �. I I I I . .. li . _ _ . ._ ._. _,. . . . _.._ . . ._ . _ _ . . . I . _ _ __ _ i i i i .. /5
. ��i I I�.... I'..'.I II'.I I ... I..'.II li........ il .
. ,i ,i ,. I I ,. ,. I . I I. I.., . . . . I� I��I . '
� �I I� � � � _ _
� � '�:� � I� I�,�C � ��������������
io � � I ''����� � O.o2o 0.020 �' I ,� � ,� ���-,�-� �o
�-R� I � _ _ _ _ _ _ _ —� - j - -
� � ro� �� _ I I -- ,� �R�`
�Wj � � � �� � � �� ���— �
- -I -�- � I � I � I � \W/
5 _ _ � �
� '� f i �
�� �� � � I � , � �
..... ....... ...... ........ ........... .... ..._. ..._. .......... I �',...�� ... . .... .. __.. _ ..� . ....
� . _- . . . . � � . . . . . _ _
� II�---- -- --- ;
i �\�
— — — - — — — � � , __._. �,
a __._ 0
� � �� 2.29 ���\ __ --- _
� � ���� �� __—
� � � � �� � � _
--- ��i,���������� ������ ��� 7�� ��� ��� ��� ��T�� — � �� � �
, - I' _ — —
-5 w++I�H�� �- _ _ ' - . t��N� I�-'�I+U+I�=1 ' � �
�,_---- -�
16 + �0.00
75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
�
�
�
�
N
C1
B
r
�
N
E
Q
O
S
�C
C�
N
�
m
U
X
O
O
Q
/
�
@
Z
_
,
�
�
N
��
�m�
�
z�N
�m,
WNr
�/N
� ..�
��
_- - _- - _ _ - - - - _—_- - = - - -_- _- - - - _ ._ _ _ _-_ - - _�.:.__ - _�_--_ _- _ --_-
0 2.5 5 PROJ.REFERENCE NO. SHEET NO.
� � B-523b X-5
75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
PERMIT DRAWING
SHEET 8 OF 10
�:,_ ; _ , ,
_ _ _ ..- - - � �
_ _ , . ����� .
� - . .�
_
� �, _ . . �. �. . . . -, 1 .
, _ _ . ._ . ._ . L '�... . . .. . . .. �, . . .
_,._ : .. . '. _ : . i_ . ... _ .. . . . . i '. '. . . �'. '. . '. . . �'. '. . . i �. �, . . . . �'. '. . . '.� . . '. '. . . .. .. . i
i� . . ... _ . . . ... _ , ; . . . . ; . . . .. � � �. �. �. . _ . . . . . . . . -. �., ...t...
_ _ _ _ i -
��
. _,_ , ,-` . ._. . . . . . ...
. . . . — — .. . . _ ._._..—.. . '� .. . � . . I i , , . i � �.
.. . . . ..._:. � , �.�2� — �.�2�
-_ i i
..... . . I .. �I".. .. �
_ _ _ _
_ . ' j � _� .�! . � . . .
.. . � �� � . . . . :- I
� 3.� " II Cc- �--------------_ - I � f111 �
__ I
, ,, _ ... _ ,. . _ . _.. � _ _.. . .,_ _
.
_ \ ` \ I 3. �
, �—
----�I� 5.26 �� '�
— — — — — — — — — — — — — — -=" — _ _ _ =___, — — — — - — — —
° , 19 + 00.00 � °
,
.------------_ ____ ---- ___----- -----------__
__ _ _ ___
. , ,
� � � �� �� , _ ._ . _ --
,,'�� ,� ,��,�,���,�,�� ,, ,��',,� ,�� ,�� - � �,-
� � � � � ;� ,� ;� � � - - - - - ----- - -
�
� � � � :� � � � � � � � �
� ����
__
� � �� � �� �
��� � ���� � ���� � � � �� , ��
� � � � � �
,, � � , � ��� �, ��� �, ��� ,, �, ��� ,,�� ,-- ---- ,,- - ; � � � � �� �
__ , � , �
, , � �� � � � � � - _ � _ ;
/0 i i i i i�i ` i�i i i ii ii i �i ii i i 'i 'i ' —_ i i i /�
� � � � � � -. - � ��' I
. . . �` . . . .. . . n nnn �. �. � n nnn . . . . . . . .
5
_ . --- --- — —.
o _
_ � � � � � I �
_ � ; '� � � '� � � ' '�
i �
— — � -�'
/5 � � � � �'� ���� ���� ��� '� � � � �� ��� '� � �'�� '�'�'� ���
� � � � � � � �
���� �� ,,� ��� �� ��� ��
;'� � '� '� � � � �
�'��
/0 �� �� �� � ,
..
-}'--_
� � � � � � � � � �:'� ��� �.� ��� � ��
� � '� � � '� '� '�
I
� � � � � -'� '
� �� ��
5 � � - '-'--- � � __ � : -- '
I
0
�J
�V
�
0
� . �. �. �. �. � - �.
`_ ,. . _ . , �',. , .-_'_.i �. �. �. .
- �. i i ii i ii i :i. ii
- .. _- ii i ....
I 3:I ' ! � "�� , �� 5
� �
- , , , �_
,.\ ,,
-- — � -- � _
�
�
—____ __— -- --- — J
� � �
_
�� � ; � �� � /5
II � � _ _ _ -------__ •J.� _ , _
� —� �
��� � , ., � \ _
.................................................................................... � . i /
I / �
Y
— — — — — —
---- — ----==---� N�-I���
75 70 65 60 55 50 45 40 35 30 25 20 15 10
5
�` `_ . .................................... I ....................... ...._........... .......
�
5.25 �
i�U�l$kl�U�l� , � __ — — —
--- _------------- o
11 +�0.�� �—
5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5
_
��� ��� � �� ��� � � ��
� � � � � �
/0 �i iii i:iii i i ii i�iii i�ii�i i�ii i�ii��
--- -________ ________ ______----___ I I_ _____ I
_ _ _�:__ " _�_�_ __ _,� �__.
0 2.5 5 PROJ.REFERENCE NO. SHEET NO
� B-5236 X-6
10 15 20 25 30 35 40 45 50 55 60 65 70 75
PERMIT DRAWING
I I I I� I� I�I I-I 1-1 I� I I I I I�I I I I� U 11 I I I I I 1=11� SHEET 9 OF 10
,I
%0
� � � ' � � , ���
— — — _ � 0.009 0.023 _ _ , �'----- -- _ ���
— — 3�• ,
F — — - _ �- -- — — _ 3: j ' '��' r 5
�_ . . _ -- — — — — - - --
' _--__ ---- -____ _ 5 J0 — �
--- - -_ ___ - �
-- _ _ , , _J� �� . _,- � :
; _�J .,, , -- --
- _ _— -- —
. . . 20+50.00 ' �
� � � � � ,
� � II lii i � ��� � � �� o
o � � � ��� ���� �� �� � � �������� ��� �� �
� � � � � � � � � � � --
��'�� �� ,,'� ��� �� ��� �� ��� ,, _ ---__ ____ _
, ,
, ; _ _ _ T - -- __
;_
��� ��� � , � � � � �
�'�� ����' '��� ���
� � �� �� �� � � � � � '
� �, �, � � �
� � � � � � � � � � � , :
- ��'�� �� �'���',�������� ���'��� ��� :��� , --
� � � � � � ,, , , _
� � � � � � ;� -. _ , ,
�'�� � � �� � �, �, � �� � � �� � � � �
io �� � � � � � '� ' ' � � : � '� � � � � �� �� � �' � � '�� � �� � � � � � � � � ��� , , ���� , �� �� �� ; ���,_��� � � �+� � � �; � � � � �� �� io
_ _ �
;;, _ ; ,
, , , , , � , � � ,
� � � � � � � ,
�� - . i � �
, � 0.019 0.020
5 -__ � 3;1 �— _ -T— — L 5
-- — _ —_.---:—
--
_ .... � - - __- _ - _.- -.- . . . .= _,---._- ' i i - i i i i i i - . ' i i i i i i i ; i i�.
� �, � i
- _ .- -- _ , - ` I i I I �', �,. :
- - - _ � � - �.� � ... ... .. ... _... �� ..._ -._.
-----�� 5.56 ��`I _ i : :_
�
�_
0
�o
�
I � / �
..... I � �. . .
— — — — — — — - � i�-kl�=U�l�=l
o----- ---
75 70 65 60 55 50 45 40 35 30 25 20 15 10
5
... ..... � � �/ � .....
5.35 �_ I\
i�-U�I�=k��-U�I�' � _ __ _ _ — —
---- ----
19+50.00 --- °
-L-
5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 10+75 to 11+90 LT Roadway Embankment < 0.01
10+75 to 11+20 RT Roadway Embankment < 0.01
2 14+20 to 15+20 LT 1@55'; 1@65' 45" PSC Bridge 0.01 < 0.01 0.02
14+75 to 15+20 RT 1@55'; 1@65' 45" PSC Bridge < 0.01 < 0.01 < 0.01
16+10 to 20+00 LT 1@55'; 1@65' 45" PSC Bridge 0.09 0.09 0.01 12
16+10 to 20+50 RT 1@55'; 1@65' 45" PSC Bridge 0.07 0.09 0.02 30
TOTALS*: 0.18 < 0.01 0.21 0.03 42 0 0
*Rounded totals are sum of actual impacts
NOTES:
Permanent Stream Impacts: due to interior bents = 25 sq. ft.
Temporary Stream Impacts: due to work coffer dams = 1056 sq. ft.
Temporary Fill in Wetlands in the Hand Clearing areas for erosion control measures = 0.04 acres
Revised 2013 10 24
B-5236 NEU NARRATIVE
Existing Utilities
There are existing fiber optic phone lines that run along the west side of River Rd.
for the project length. The lines are in conflict with our proposed bridge
construction. These are owned by AT&T. The contact for the phone facility is
Lance Laliberte, Telics P.O. Box 2398, Greenville, N.C. 27836, Phone Number
252-227-4596 Mobile 910-620-3901.
There is one existing 8" ductile iron force main sewer running along the east side
of River Rd. for the project length. It is in conflict with our proposed bridge
construction. It is owned by AquaAmerica the contact is Michael Poulios, phone
number 919-653-6965, email MDPoulios(a�aquaamerica.com.
There is one existing 10" water main that runs on the east side of River Rd. and
runs the project length. It is in conflict with our proposed bridge construction. It is
owned by Aqua America and the contact is already shown.
Proposed Utilities
Proposed telephone fiber optic cables will be installed by open cut from
approximately L-Sta. 13+18 where it connects to the existing fiber optic telephone
cables. These run to a proposed hand hole at L-Sta. 13+89 where the proposed
directional bore begins. From there it runs close to the proposed Right of Way line
and runs parallel to River Rd.. From there, it runs to L-Sta. 18+18 where it turns
back toward the roadway area. where a proposed hand hole will be installed at L-
Sta. 19+17 and the directional bore stops. It then is installed by open cut and
connects to the existing phone cables at L-Sta. 19+50. No environmental impacts
or buffer impacts are resulting from the proposed phone line installation on B-
5236.
One proposed 8" force main sewer will be installed by open cut on the east side of
River Rd. from L-Sta. 12+24 to L-Sta. 12+43 where a proposed directional bore
starts. From this point, the proposed bore runs parallel along River Rd. off of the
B-5236 area to where it ends. An open cut is used to install the sewer at a 45
degree bend and it connects to the existing force main sewer running near River
Rd. . No environmental or buffer impacts will be caused by this sewer
installation.
One proposed 10" water main is going to be installed from the existing water line
at L-Sta. 12+16 by open cut as it runs at a 45 degree angle from the existing water
main to L-Sta. 12+39. A directional bore is used to install the proposed water main
from L-Sta. 12+39 in a path parallel with the proposed Right of Way. It runs off of
the B-5236 area to a station approximately 893 feet from the bore start. It then is
open cut in a 45 degree path to tie to the existing 10" water main. There are no
environmental impacts that are caused from the installation of the proposed water
main. The stations referred to in this report are approximate and measured along
the L-line.
• �
�
�
�
��
�
>
�
1�6
o° ��
w�/ � H
• Elemer
Sanders
1276
�IIamY �. �- � O �� \
School L � �
/ � {� i
Zd. , �, � .
i
��� O i
O ,
� � ♦
� ,
i
421 -~ '
� �
J � .
� '
_ 1 '
, ,
.
,_ �'��„�,-� � :
, .
� �
.
Q �� �
���, � .
.
.
��Y 0 "
/ O '
� Gj ;
1524 '� •
.
Pilots Ridge Airport � �` �� ,;�
525
.
��_ � -
�1701 —__J O ;•
-- �-----�� •C �
2317
0
0
� 234
� ,
L� f — —� V � i
(� � , �Q' � �
i�i �
� �
Hanes Freeman �— J Q- O �
Cemete Q � �
Chapel ry ,
,� �r � '
� � ���- ,�p� ; .
.
� �� _ � "
421 � � �o :
.
m � .
.
.
1257
� �
.
.
.
.
.
:�
.
:
(6 �
:
� �
._ .
.
. PR� ECT � - nlet
J � a�}� r
LOCATl01� v aro��na Be ,
;
Mt. Pilgrim
Church .
U.S. Coast Guard
�
�� �
�� �' �
�
G ,
, �
1527 �
;�
,�
,,
„
, ,
, �
� �
i
Q � i
� ,
� '
� ,
� ,
�S '
� �.
'S � Sea Breeze
� ,.
,,
„
„
„
421 �-----�,�:
� �� ,
„
, , �,.
�
� ' �'
� /� �
T�ICII�ITY MAP
(11tOT TO SCALE)
OFF-SITE DETD UR
GRAPHIC SCALES
50 25 0
PLANS
50
100
SHEET 1110.:
UE-1
UE-2
UE-3 THR U
I1�DEX 4F SHEETS
UE-S
DESCRIPTI0111:
TO
CAROLINA BEACH
TITLE SHEET
1�EU PERMIT PLA1� SHEET
1�E U PERMIT PR OFILE SHEETS
•
•
.
• � )
BEGI1�
_r— .c7
TIP PR OJECT 8—�236
. IO + 75. 00
BEGI1� BRIDGE
—L— STA. l5 + 04.40
e�
WA TER A1�D SEWER
OWI�ERS 01�1 PR� ECT
(A) AQUA I1�C. WATER
(B) AQUA I11tC. FORCE SAI�ITARY
(C) A T�T TELEPH�I�E
SEWER
E1�D BRIDGE
—L— STA.16 + 24.40
E11 tD TIP PR OJECT 8-5236
—L— STA. 20 + 50.00
�
�o�o�o ��o
B- 2
5
����� ���
U E-1
TO I
WILMINGTON
Bo Hemphill P.E.
Kelvin Martin
Amy Dupree
Dayton Martin
���������� �����
�� ��� �7�� ��� � % � ����7�������
����������� �����
�� ��� ��� ��� ������������
DI VISI011 t OF HIGHWA YS
UTILITIES U11tIT
ISSS MAIL SERVICES CE11lTER
RALEIGH 11tC 27699-ISSS
PH0111E (919) 707-6690
FAX (919) 250-4151
UTILITIES REGI0I�AL E1�GI11tEER
UTILITIES E1�1GI11lEER
UTILITIES AREA COORDI11lATOR
UTILITIES COORDI11lATOR
C)1
�
�
�
N
Q
H
�
�
H
0
�
�
T
�
w
_
�
�� r H
, 4,
-� �
ore
AMA
T A
W L
�
lt A Y
+ ��
__ � �
. �
, � _ .. �- �
��1����� I���I � .
_�_
,
��
�u��-�in.
;1 � ��� C� �� e
�
� .
✓on ult
�� n
e cut
� �� OSe
�r�� �r��ov�
� c� �1 � ��, �--� � �
TELEPHONE LINE PROFILE
A �
I
��+��
, +��
�� � �
`„jr�
��� ' ��
PROJECT REFERENCE N0.
B-5236
�� 1 �v�
� �
� �
T '
�
_ a��bpeA
°Pg�`tr'�a
Yyup��
BpyMQ� 4'p@
&0�4�0�%/
bq��MweN
by$� ��ws
4�A'QMWu.
_-_ _ I
-
�� �--_--.
�
� -- --_ � _ ----- -- �
� rr
+ +
4"T P H �
� N N U
��' I��1���� C����� F��-k-���
���,� H I � I �
; T �
L I� �
' A Y
� U
��r
4� �� ���
� �
�-���
�� _
+ + 4+ 4+ �
� ��
�
�
. .�— ����� �r�� �
����
X1S��,�� ��
T hr
e e o
on ult
���
���
� U t, t C� X C� �
p
�nd c���� t.�
+
�.� � � ��
e v�
SHEET N0.
UE-5
•�
�
• �
O
0)
See Sheet 9 A For Index of Sheets
See Sheet �B For Conventlonal Symbols
,��,� �� �amY 1� � ,�� 1
E�ementa S hoo� �� � ^
Sanders �d� ���' Q � %
O '
_'-/ � � '
.
421 �' - �` •
�� •
� � �
� •
. - �-'6� � _ J- ,
6 �
.
.
_ � �� .
.
�Z�s ' � " •
��, p o .
.
1524 ^� � :
Pilots Ridge Airport � �` �.` �'
.
� —� �,o, _' o :
ol0
--- � .c •
� � r—� v (� �
C� Q" � ♦
,�; /. ♦
Hanes
Freeman � — � Q O �
Chapel Cemetery Q 0 ,
-i-� �" � .
� �� �� � %
421 @ g � � •
� � :
t� '
.
O � .
.
.
.
� ,
�
1257 '
.
Ca •
� ;
� .
O �
PROJECT � �-��n�et
LOCATI011t v rolina Bea; �
M[ Pilgri
U.S. Coast Guard
0 ^
�,
�
Ga , �
1527 ,: �
. �
� �
m �I � '�"
� � , �
�• �
��5�8 �6 r Z•
Sea ee, , e V
� �� � �
„
� –�' �r
� 421 ��
,
���� � /
VICII�ITY MAP
(11tOT TO SCALE)
OFF—SITE DETO UR
,- r T . \ r T . � ��i
� 1 .,.• � �.�
� ���,�� � �����
l�)1 �� 1� 1��)' �� ��� 1���'' 1 1 1 �, I« 1 1",'� �� �.���
I ,
LOCA TI01�: REPLA CE BRIDGE 1�0.19 .O T�ER LORDS CREEI�
01� SR 1100
TYl'E OF WORI�: GRADII�G, PA T�I1�G, DRAII�A GE � STR UCT URE
BEGI11t TIP PROJECT B-5236
—L— STA.10 + 7 .00
-L- STA. l5 + 04.40
TO
__ CAROLINA BEACH
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III.
N
-L- STA.16 + 24.40
�
� ...�,5\
,r\ o�,
OJ,
'S ��'F` \
\ �� N
1
E11tD TIP PROIECT B-5236
—L— STA. 20 + 50.00
SR 1100 RIVER ROAD
TO
WILMINGTON
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES DESIGI� DATA PROJECT LE11tGTH
Prepored In the Offlce of: HYDRAULICS E1VGI11lEER
ADT 2 017 = 5400 DI VISI01� OF HIGHWA YS
50 25 0 50 10� 1000 Birch Ridge Dr. Ralei h NC 27610 0� �OQ�/�y
ADT 2037 = 9075 ' g ' � �
K= 11 % LENGTH ROADWAY TIP PROJECT 6-5236 = 0.162 MI 2012 STANDARD SPECIFICATIONS �@� `��°'oQ
PLANS
D = HO % P.E. � �
50 25 0 50 l00 T= 3 0�0 * LENGTH STRUCTURE TIP PROJECT B-5236 = 0.023 MI RIGHT OF WAY DATE: GARY LOVERING PE SIGNATURE: q �
. ROADWAY DESIG11l E111GI11tEER � o
V = 6O MPH J U LY 2 0 2 O16 PROJECT ENGIII�EER
* _ o o TOTAL LENGTH TIP PROJECT 6-5236 = 0.185 MI ' ��� Q�Q
PROFILE (HORIZONTAL) (�ST —1 /o + DUALS 2 /o) � o
l0 5 0 l0 20 FUNC CLASS =MINOR LETTIIIIG DATE: VACANT �� p�p���
ARTERIAL SEPTEMBER 19, 2017 PROJECT DESIGN ENGINEER
PROFILE (VERTICAL) SUB—REGIONAL TIER P.E.
SIGNAT URE:
J
BO U11lDARIES AND PROPERTY.•
State Line ----- -----
County Line ---
Township Line --�
City Line -�
Reservation Line -
Property Line
:��I�.,� �I� �,� ���I.,.� ��c��1�;'1�I 1 e . ,��,1�;c��1.,1 � .��. Ir�1 ��1�1c�� c��,l��� 11� ��1 1 �`�.a �-�
� � ' � � : �
� - � � � - , � � . „ .
-
RAILROADS:
Standard Gauge
_ CSX TRANSPORTATION
RR Signal Milepost MILEPOOST 35
Switch 0
SWITCH
RRAb d d +�-++
Existing Iron Pin �
Property Corner �
Property Monument �
Parcel/Sequence Number �23
Existing Fence Line -x x x-
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence '�
Existing Wetland Boundary - - - -W�B- - - -
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
Existing Historic Property Boundary
Known Contamination Area: Soil - �'
Potential Contamination Area: Soil �
Known Contamination Area: Water '�
Potential Contamination Area: Water �
Contaminated Site: Known or Potential
BUILDINGS AND OTHER CULTURE.•
Gas Pump Vent or U/G Tank Cap
Sign
Well
Small Mine
Foundation
Area Outline
Cemetery
Building
$CilOOI
Church
Dam
HYDROLOGY.•
Stream or Body of Water ---
WLB
EAB
EPB
HPB
0
0
s
0
�
�
I
�
�
Hydro, Pool or Reservoir �_ _ _ _ �
Jurisdictional Stream �S -
Buffer Zone 1 Bz �
Buffer Zone 2 Bz 2
Flow Arrow �--- ---
Disappearing Stream �--- ---
Spring �-��.�_ -,�
Wetland �
Proposed Lateral, Tail, Head Ditch
� FLOW
False Sump �
an one
RR Dismantled -
RIGHT OF WAY.•
Baseline Control Point
Existing Right of Way Marker
Existing Right of Way Line —
�
�
Proposed Right of Way Line R
Proposed Right of Way Line with R
Iron Pin and Cap Marker
Proposed Right of Way Line with R
Concrete or Granite R�W Marker
Proposed Control of Access Line with c
Concrete C�A Marker �
Existing Control of Access
Proposed Control of Access
Existing Easement Line
Proposed Temporary Construction Easement -
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Drainage / Utility Easement
Proposed Permanent Utility Easement
Proposed Temporary Utility Easement
Proposed Aerial Utility Easement
Proposed Permanent Easement with
Iron Pin and Cap Marker
ROADS AND RELATED FEATURES:
Existing Edge of Pavement -
Existing Curb -
iC�
�A,
E
E
TDE
PDE
DUE
PUE
TUE
AUE
�
Proposed Slope Stakes Cut --- �---
Proposed Slope Stakes Fill --- F---
Proposed Curb Ramp cR
Existing Metal Guardrail -
Proposed Guardrail =
Existing Cable Guiderail -
Proposed Cable Guiderail -
Equality Symbol
Pavement Removal
I�EGETATION.•
ti
����������:
Single Tree �
Single Shrub �
Hedge
Woods Li ne � � � � � � �
Orchard
Vi neya rd
EXISTING STRUCTURES.•
MAJ O R:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall -
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
Storm Sewer
UTILITIES:
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
U/G Power Cable Hand Hole
H-Frame Pole
U/G Power Line LOS 6(S.U.E.*)
U/G Power Line LOS C(S.U.E.*)
U/G Power Line LOS D(S.U.E.*)
TELEPHONE:
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
Telephone Cell Tower
U/G Telephone Cable Hand Hole
U/G Telephone Cable LOS B(S.U.E.*) -
U/G Telephone Cable LOS C(S.U.E.*) -
U/G Telephone Cable LOS D(S.U.E.*) -
U/G Telephone Conduit LOS B(S.U.E.*)
U/G Telephone Conduit LOS C(S.U.E.*)
U/G Telephone Conduit LOS D(S.U.E.*)
U/G Fiber Optics Cable LOS 6(S.U.E.*)
U/G Fiber Optics Cable LOS C(S.U.E.*)
U/G Fiber Optics Cable LOS D(S.U.E.*)
� � � �
Vineyord
CONC
J �ON� WW �
�
CONC HW
�--------�
� CB
O
-s
�•
��
�
�
O
❑T
�
HH
- T -
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
U/G Water Line LOS B(S.U.E*)
U/G Water Line LOS C(S.U.E*)
U/G Water Line LOS D(S.U.E*)
Above Ground Water Line
TV:
TV Pedestal
TV Towe r
U/G TV Cable Hand Hole
U/G TV Cable LOS B(S.U.E.*)
U/G TV Cable LOS C(S.U.E.*)
U/G TV Cable LOS D(S.U.E.*)
U/G Fiber Optic Cable LOS B(S.U.E.*)
U/G Fiber Optic Cable LOS C(S.U.E.*)
U/G Fiber Optic Cable LOS D(S.U.E.*)
GAS :
Gas Valve
Gas Meter
U/G Gas Line LOS B(S.U.E.*)
U/G Gas Line LOS C(S.U.E.*)
U/G Gas Line LOS D(S.U.E.*)
Above Ground Gas Line
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Above Ground Sanitary Sewer
SS Forced Main Line LOS 6(S.U.E.*)
SS Forced Main Line LOS C(S.U.E.*)
SS Forced Main Line LOS D(S.U.E.*)
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
Utility Unknown U/G Line LOS B(S.U.E.*)
U/G Tank; Water, Gas, Oil
Underground Storage Tank, Approx. Loc. -
A�G Tank; Water, Gas, Oil
Geoenvironmental Boring
U/G Test Hole LOS A(S.U.E.*)
Abandoned According to Utility Records -
End of Information
W
A/G Woter
- - - -TV FO- - -
- -TV FO-
TV FO
�
�
----c----
- —c—
—c—
A/G Gas
0
O
ss
A/G Sonitary Sewer
— — — —F55— — — -
— — FSS — —
F55
0
�
4
AATU R
E.O.I.
�
0
N
�
��
�
��
N
z
0
N
i
w
�
s
U
H
U
a
o.
.�
�
�
�
�
a�
N
.�
.�
.�
O
�
�
E
�
�
a
a
�
V
0
�
�
�
�
�
�
X
w
Z
O
N
�
W
�
�
N
W
0
�
0
�
�
0
O
BEGIN TIP PROJECT B-5236
-L- STA. 10 + 75.00
T
� � �
�
— _ � L� _ _ — � I " _ _ �L� �L�=
— — — — — �Tr�'0— — — — — — -� 1
— m —
0
= m
__�__=�=---Fs --
� � - `l
r ��-���,�-, -��.,1,
I � /� �
� /�
� ��
\ � i
�
DS
50' TAPER
LTiRT
+ 00.00
30.00'
50.00'
I
� �
� ���� F _ Fo—
SR 1100 � RIVER ROAD
30'PAVED ROADWAY
WOODS
+ 00.00
50.00'
60.00'
w -���,�- v ��-,J�
�� = —
--------0� 1
� �—
N � SI ION L TO E
AT G �
EST ITON RR
� � �ST �$y �nTF�T
�
0
�
1
BURNETT ENTERPRISES.INCORPORATED
DB �000 PG 265
CL B RIP RAP
EST I TON RR \
EST 5 SY GEOTEXT �O�
� �s '
� MARSH�R � �'�
E A �s �F�
��
\ 15"
W/ELBOWS O404
�
� -� F �
o- C
��� ------- N �F
W/EL
E
WOODS
2G1
TB
SIGNATURE RIVER OAKS NC. LTD.
DB 5694 PG 1007
CL B RIP RAP
�EST I TON RR
; EST i 5 SY GEOTEXT
� ...._. _ _.�\
— — -�
OPEN WATER `
� ��
MARSH AREA
� �
040
F 6" DUCTI E IRON FORCE MAIN P
CL B RI P P '��' `�ROS � 15" �\J/��
R �80 040 �n//ELB�WS
E_ 5 SY EOTEXT � FFi� 9S �3�8�� CL B RIP RAP
�� �_\ �29. F
� EST I TON RR
8" DUCTILE IRON WL �Y—GFaTEX�E
/ � � � � N� � �
�
MARSH AREA
SKETCH OF BRIDGE IN RELATIONSHIP TO PAVEMENT
BEGIN APPROACH END APPROACH
-L- STA 16 + 35.57
-L- STA 14+93.23
8:1 PS TAPER
� TYPE-III � TYPE-III
N N N N N
� � � O �
N N N N N N
r o r BRIDGE N0.19 � �
TYPE-I I I TYPE-I I I
`n 8:1 PS TAPER `n
BEGIN BRIDGE END BRIDGE
-L- STA 15 + 04.40 - - + . 0
NOT TO SCALE
�
NAD 83/ SRS 2007
�
PROJECT REFERENCE NO.
B-52 3 6
WW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
4
HYDRAULICS
ENGINEER
/
�
�
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
N
MA GARET C. EDWARDS
� B 5777 PG i5u
� �
RUTH B. PHILLIPS REVOCABLE TRUST RUDIE W MALPASS
FIRST TRACT REVOCABLE TRUST
DB 3911 PG 389 DB 5617 PG 2578
� POT Sto. 2/+20.4
� �
� ��
�
WOODS 1 �� ��
+50.00 0 � 2
� � W���S
\ 30.�0� s � �' 6' �'
�s �/ �-/ 50.00' m � � � p ` ` �
9 � �9 l�� \ � ➢
9 9 � 6' � � � s � \ \� �' �W
� 9 \ 50 TAPER °� �' � c� �� �
�
' �, s � �� � � o ��
� ➢ LTiRT � � , � ��� �
� � � � �' ��� �
EIP x�s �NG R�GHT ��` � EIP
W 8:1 PS T�PER � � `\
_ ---__ F �� � �, ���
i� — _
GRAU 350 TL-3 — — = _ �� � — — — — —' —
� 1 � — — — — — — � _ � 1= � = fi � @ _ _ _
� , I � � -
�
— — O � �� m
� �
O O � o
� o —� � m
—_�� _ —_—� T—=,o=
o ��-- —z===---�`Fss�'==
L B�rt�,u 350 TL-3 _ — � � � �
-- -- — ]' _ /
"'� 8:1 PS TAPER N
�p��\���I,,,yyy/�����,� \I/ \I/
� RIf�CNP FOR SL�P PROTE�iION � � �
SEE DETAIL 1
_ 35' DUKEE ENERGY ROW PER MB 51 PG 7 _
� � � � � � �
MARSH AREA
SIGNATURE RIVER OAKS NC. LTD.
DB 5190 PG 1195
M6 51 PG 7
\�
-E
�
�, � . ,�, � ,-,�-, , �"
�. EXISTING RIGHT OF WAY
\
WOODS
_ �
� � �
�, �1�
/��
�
���
� �
, END TIP PROJECT B-5236
-L- STA. 20 + 50.00
ROCK PLATING
DETAIL 1
RIP RAP FOR SLOPE PROTECTION
GUARDRAIL ( NOf f0 SCple)
� 18" CL A STONE
� 2' THICK CL II RIPRAP
* FROM STATION 16+28 TO " ?�
16+50 RIGHT USE 1.5:1
SLOPE AND KEY IN 3.5' `r�pA�l�
GEOTEXTILE `�
Type of Liner= ??(94) Tons,CL A Stone
??(200 Tons Class II Rip-Rap; Geotextile=
NATURAL
GROUND
FROM STA. 16 + 28 TO STA. 18 + 50 -L- RT*
FROM STA. 16 + 28 TO STA. 18 + 50 -L- LT
� BRIDGE APPROACH SLAB
FOR -L- PROFILE, SEE SHEET 5
FOR STRUCTURE PLANS, SEE SHEET S-1 THROUGH S-?