Loading...
HomeMy WebLinkAbout20140762 Ver 3_R-2915B Modification Ashe April 7 2017_20170407STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER UOVERNOR Apri17, 2017 U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 ATTN: Mr. Steve Kichefski, NCDOT Regulatory Coordinator JAMES H. TROGDON, III SECRETARY Subject: Request for Modification to the Section 404 Individual Permit and Section 401 Water Quality Certification for the proposed US 221 Widening from US 421 to US 221 Business/NC 88 in Jefferson in Watauga and Ashe Counties. Federal Aid Project No. STP-0221(13), Division l 1, TIP No. R-2915, WBS 34518.1.1. Reference: USACE Individual Permit Action ID SAW-2012-00882, January 7, 2015. USACE Individual Permit Modification Action ID SAW-2012-00882, August 31, 2016. NCDWR Project No. 20140762, Certification No. 4001, September 8, 2014. NCDWR Project No. 20140764_v2, Certificarion No. 4001, August 23, 2016. Dear Sir: The purpose of this letter is to request a modification to the United Stated Army Corps of Engineers (USACE) Section 404 Individual Permit and North Carolina Division of Water Resources Section 401 Certification for the above referenced project. The origina12014 permit application and subsequeni 2016 modification application (referenced above) presented final impacts for R-2915A, R-2915B, R-2915C, and R-2915D. This modification presents changes to two permit sites in the B Section needed as a result of a driveway modification and new temporary wetland fill. The last section, R-2915E, is currently scheduled to let in September 2019. A permit modification for the final impacts for R-2915E will be submitted prior to let. All changes in impacts due to the two modified sites in the B Section are in red italics. Please see the enclosed revised permit drawings for Section B. Summary of R-2915 Jurisdictional Impacts: The preliminary projected impacts for the overall (Sections A-E) project will be approximately 3.11 acres of permanent wetland impacts, 0.15 acre of'temporary wetland impacts, 8,156 linear feet of permanent stream impacts (6,983 linear feet of fill and 1,173 linear feet of bank stabilization), and 0.34 acre of temporary stream impacts (see Tables 1 and 2 for a breakdown of impacts by Section). Mniling Address: Tedephone: (919) 707-6000 I,ocation: NC DEPARTMLNT OF TRANSPORTATTON Fax: (919) 21 2-5785 I020 BTRCH RIDGE DRNF NATURAL ENVTRONMENT SGCTiON C�ustomer Service: 1-877-368-4968 RALCiaH NC 27610 1 S9�' MAIL SERV ICE CENTER Ra�e��F� NC 27699-1598 Website: www.ncdot.gov Table 1— Summar of Wetland Im acts for R-2915 Design Wetland Wetland Impacts Section Stage wetland Impact Type Impact Area Requiring (ac) Miti ation (ac Perin. Wetland Fill 0.48 Excavation in Wetlands 0.01 R-2915A Fina] 0.57* Mechanized Clearing in Wetlands 0.08 Hand Clearing in Wetlands 0.05� Perm. Wetland Fill 0.32 R-2915B Final Excavation in Wetlands 0.04 0.43* Mechanized Clearin in Wetlands 0.06 Tem ovaY FiU in Wetlands 015 Perm. Wetland Fill 0.22 R-2915C Final Excavation in Wetlands -- 0.27* Mechanized Clearin in Wetlands 0.05 Perin. Wetland Fill 1.01 R-2915D Final Excavation in Wetlands 0.01 1.32 Mechanized Clearing in Wetlands 0.30 Perm. Wetland Fill 0.43 R-2915E Preliminary Excavation in Wetlands -- 0.52 Mechanized Clearin in Wetlands 0.09 Total 3.11 j�Additlonally, 0.01 acre of temporary till ln wetlands w111 occur ln the hand clearing areas for erosion control measures * Values are based on rounding, due to calculating totals with actual numbers to the thousandths Table 2— Summar of Stream Im acts for R-2915 Design Impact Temporary Stream Impacts Section Stage Stream Impact Type Length (lfl Impacts (ac) Requiring Miti ation (1� PermanentFill 1,119 -- R-2915A Fina] Bank Stabilization 402 __ 1,119 Tem orary -- 0.05 Permanent Fill 493 -- R-2915B Final Bank Stabilization 411 __ 493* Tem orary -- 0.15 Permanent Fill 2,339 -- R-2915C Final Bank Stabilization 234 -- 2,339 Tem orar -- 0.09 Permanent Fill 2,627 -- R-2915D Final Bank Stabilization 126 __ 2,627 Tem ora -- 0.05 Permanent Fill 405 R-2915E Preliminary 405 Tem ora -- <0.01 Total 8,156 0.34 6,983 * See 7'able 4 R-2915 Individual Permit Modification Application Page 2 of 5 Tables 3 and 4 summarize the impacts to jurisdictional water resources for the final design of R-2915B. Site numbers correspond with the permit (hydraulic) drawings included in this application. The stream and wetland numbers correspond to the NRTR. A brief description of the impact sites that have changed since the 2014 permit application the will follow the tables. Table 3- R-2915B Wetland Im acts* Pennanent Tenzporary Impacts Site Wetland Wetland Fill in Excavation Mechanized Fill in Requiring Number Size (ac) Wetlands (ac) (ac) Clearing (ac) Wetlands (ac) Mitigation (ac) 4 W 11 0.26 <0.01 -- <0.01 0.15 <0.01 5 W 11 0.26 <0.01 -- -- -- <0.01 6 W 11 0.26 <0.01 -- -- -- <0.01 7 W 11 0.26 0.05 0.03 -- -- 0.08 8 W 12 0.05 <0.01 -- <0.01 -- <0.01 11 W 14 0.02 <0.01 -- <0.0 ] -- <0.01 12 W15** 0.12 O.12 -- <0.01 -- 0.12 14 W 16 0.04 -- 0.01 <0.01 -- 0.02 15 W126** 0.19 0.14 -- 0.05 -- 0.19 Total Impacts: 0.32 0.04 0.06 0.15 0.43*** * All wetlands impacted are riparian ** Total take of wetland *** Values are based on rounding, due to calculating totals with actual numbers to the thousandths l able 4- K-Ly 1513 Jtream lm acts Stream Name & Temporary Mitigation Stream Impact Length Z Site Intermittent (I) or Impact Type Impacts Requirement Perennial (P) ' Number (linear feet) (acres) (linear feet) Perm. Fill 170 -- USACE & DWR lA UT to Gp� Creek S32 Bank Stabilization 44 -- DWR Temp Fill -- <0.01 -- Perm. Fill 15 -- USACE & DWR 1B Gap Creek (P) S1 Bank Stabilization 35 -- DWR Tem Fill -- <0.01 -- UT to Gap Creek Perm. Fill 34 -- USACE 2 �P� S35 Bank Stabilization -- -- -- Temp Fill -- -- -- Perm. Fill 71 -- USACE UT to Gap Creek 3 �P� S35 Bank Stabilization -- -- -- Temp Fill -- -- -- 4 N/A (wetland -- -- -- -- -- onlY) 5 N/A (wetland onl ) 6 N/A (wetland onl ) � N/A (wetland onl ) g N/A (wetland onlY) R-2915 Individual Permit Modification Application Page 3 of 5 Table 4 continued — R-2915B Stream Im acts Stream Name & Temporary Mitigation Stream Impact Length Z Site Intermittent (I) or Impact Type Impacts Requirement Perennial (P) � Number (linear feet) �acres) (linear feet) UT to Gap Creek Pern�. Fill 124 -- USACE 9 �� S36 Bank Stabilization 23 -- -- Tem . Fill -- -- -- Perm. Fill -- -- -- 10 Gap Creek (P) S1 Bank Stabilization 154 -- DWR Tem . Fill -- 0.02 -- 11 N/A (wetland onl ) 12 N/A (wetland onl ) Perm. Fill 52 -- USACE UT to Gap Creek 13 �� S40 Bank Stabilization -- -- -- Tem . Fill -- <0.01 -- 14 N/A (wetland only) 15 N/A (wetland onl ) Perm. Fill 27 -- USACE 16 UT to GP� Creek S42 Bank Stabilization 9 -- -- Temp. Fill -- -- -- Perm. Fill -- -- -- 17 Gap Creek (P) S1 Bank Stabilization 54 -- DWR Tem . Fill -- -- -- Perm. Fill -- -- -- 18 Gap Creek (P) S1 Bank Stabilization 53 -- DWR Tem . Fill -- -- -- Perm. Fill -- -- -- South Fork New 19 River (P) S43 Bank Stabilization --- -- -- Tem . Fill -- 0.12 -- Perm. Fill -- -- -- South Fork New �� River (P) S43 Bank Stabilization 19 -- -- Tem . Fill -- -- -- Perm. Fill -- -- -- South Fork New 21 River (P) S43 Bank Stabilization 20 -- -- Tem . Fill -- -- -- Total Temporary Impacts: -- 0.153 -- Total Permanent Impacts (Perm. Fill + Bank Stabilization): 904 -- -- Permanent Impacts Requiring DWR Mitigation: 525 -- -- Permanent Impacts Requiring USACE Mitigation: 493 -- -- Total Impacts Requiring Mitigation: 493 -- -� 1— All streams are Class C; Tr+ waters except S43 (South Fork New River), which is WS-V; HQW 2— Mitigation for bank stabilization impacts required by DWR — not required by USACE 3— Values are based on rounding, due to some of the individual impacts being <0.01 acre -� — Final mitigation requirement will be up to the USACE and DWR R-2915 Individual Permit Modification Application Page 4 of �5 Permit Site 3: Due to landowner and constructabiliry issues, the drivewriy at Site 3 ltus been modifted such that it crosses S35 in a location further downstream than previously permitted. A new 29" pipe will be installed in this location, resulting in 71 linear feet (1� of per►nanent impacts to 535. Tlzis is 40 If less iinpact than previously permitted. Permit Site 4: The existing 30" RCP which drains to W 11 is being replaced with a new 12" RCP. There will be <0.01 acre of permanent wetland fll and <0.01 acre of inechanized clearing in W 11 at the outlet of the new pipe. While perforrrring cut work on tlze opposite side of tlte road, a storm waslted sediment into tfie weUand. Due to the lack of otf:er options nt the time, the decision was made (with the agreement of NCDWR) to install baffles an�l use WIl us a te`rtpornry sedi`rtent bnsin to protect Gap Creek. After construction, tfre baffles will be removQd �as well �ss the sediment, Wetlan�l dimensions will be reestablished, seeded witla a native seed mix, and coir fiber »tntting ivill be pince�l on t{te bank. This will result i�t 0.15 �ecre of temporary wetland fzll to Wll. MITIGATION At this time, DMS is providing compensatory mitigation for Sections A, B, C, and D impacts. Table 5 summarizes the total mitigation needs as 2.59 acres of wetlands impacts and 6,578 linear feet of stream impacts. Compensatory mitigation for Section E will be provided accordingly during the subsequent permit modifcation. This modification will occur when final design on the remaining Section has been completed. Table 5 — Summarv of Section R-2915A R-2915B R-2915C R-2915D Design Stage Final Final Final Final Total uested from DMS Wetland Impacts Requiring Stream Impacts Requiring Mitieation (acl Miti�ation (lfl 0.57 0.43 0.27 132 2.59 1,119 493 2.339 578 * At tllis ti»re, 6,618 lf of strenn: mitrgnlio�t is requested from D�YIS. However, this ntodiftcntiar resulls ii: a 401f reductio�t iit »rilignble slren»: impncts. Upon project conrplelion !he request to DMS will be nrodified Jo rejlect Nris chnfige. REGULATORY APPROVALS Section 404: Application is hereby made for a modification to the USACE Individual 404 Permit as required for the above-described activities. Section 401: We are hereby requesting a modification to the 401 Water Quality Certification from the N.C. Division of Water Resources. A copy of this application and distribution list will also be posted on the NCDOT website at: http://connect.ncdot.gov/resources/Environmental. If you have any questions or need additional information, please contact Erin Cheely at ekcheely@ncdot.gov or (919) 707-6108. Sincerely, �(-Philip S. Harris III, P.E., C.P.M. Natural Environment Section Head R-29151ndividual Permit Modification Application Page 5 of 5 ;1 l/') � N � � � •� � V � � O ,V_ See Sheet 9-A Fcr Index of Sheets See Sheet 9 6 Fo� Gonventlonol �ymbols ��_�11�� �� ����1L1�L �������� WETLAND AND SURFACE WATER IMPACTS PERMIT NCDOT CONTACT: BRENDA L. MOORE, P.E. ,v � ACCESS BEING� LIMITED TO��ONE�DRIVEWAY PER PARCEL. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III HYDRA ULICS ENGINEER GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepored in tne off�ce �f: ADT 2015 = 12,os9 CDM Smith 5� 2$ 0 5� ��0 SA00 Glenwood Avenue, Suite 300, Raleigh, NC 27612 �� GB�R�\ ���� �� � ADT 2035 = 20,204 _ �� ��� PLANS DHV = 10 % LENGTH ROADWAY TIP PROJECT R-29156 1.675 MILES zoiz szaxnnxn srEcrFrcnrroxs �� ��s � P.E. � D = 65 % SIGNATURE: `� 50 25 0 50 loo LENGTH STRUCTURE TIP PROJECT R-2915B = 0.094 MILES RIGHT OF WAY DATE: DOUGLAS B. SAUNDERS, P.E. � � ROADWAY DESIGN � � T= 9 %* SEPTEMBER 30, 2013 PRmscr E,vcrxE�aa ENGINEER ���� ��a� PROFILE (HORIZONTAL) V= 50 MPH TOTAL LENGTH TIP PROJECT R-2915B = 1.769 MILES �'� pr�a.e��` � �0 5 0 �0 2p * TTST 2% DUAL 7% LETTING DATE: RICKY E. STATON FUNC CLASS=ARTERIAL JUNE 16, 2015 PRo�scr Dssrcx ExcnvsEx I I I I \\ .— STATEWIDE TIER P.E. PROFILE (VERTICAL) S7GNATURE: DETAIL #1 LATERAI GRASSED SWALE � Not �o Smle) b �{ Nat�ral � I flLl Gro�nd 3:� p g�� �^�t. S�oPE � ,, � Min. D=1.0 Ft. �. � B-2.0 F. 6=5.0 F. FROM STA.160+20 TO STA.161+00 -L- RT FROM STA. 234+35 TO STA. 238+00 -L- RT DETAIL #2 TOE PROTECTION INo��o scaiei F�o��e< Notural 1.� ;�S\oee Ground �-b--.{ F I I �d d-2.0 Ft. 6=2.0 Ft. Geotex�ile Type of L'�ner= Class'B' Rip-Rap FROM STA. 761 i� 00 TO STA. 161 I� 70 -L- RT FROM STA. 197+50 TO STA. 197+80 -L- RT FROM STA.250+00 TO STA.251 '�-50 -L- RT FROM STA.251 I�00 TO STA.2521�50 -L- LT FROM STA.15+05 TO STA.15+50 -DRIREV- RT FROM STA.I5+00 TO STA.I5+50 -DRIREV- LT DETAIL #3 $iANDARD BASE DITCH �No�ro Scole) ural rvo�urol G.ound ��� �,� Gro�nd d � �ea�ex��le 0 Min. D=1.0 Ft. Max.d=1.5 Ft. wV�eN e is , 6.0' 8=3.0 Ft. Sid. a. 8)6.01 Type af Liner= Class'I' Rip-Rop STA. 166+00 -L- LT DETAIL #4 SPECIAL CUT DITCH (Norio s�aie� Natural p.�o� D'oF Gro„�d ?�/ p F�o"s` Slove d �eo�ex��le Min. D=1.0 Ft. Type oft'iner= Closs'B'Rip-Rap Mox.d-1.0 Ft. FROM STA. 16+20 TO STA. 16+90 -Y9- RT DETAIL #5 STANDARD BASE DIiCH � N � m s�oi�I Na��.ai �,oi G.ound 2�� p .�,� G�o�nd d ceo�e.��le 8 Min. D=1.0 Ft. Max. d=1.5 ff. ^when e �s . e.o 8=2,0 Ft. Type o4 Liner= Closs 'I' Rip-Rap STA.16+50 -Y9- LT DETAIL #b IATERAL GRASSE� SwALE � Notto Scale) �Natural Fill Ground 3:� p 3� �^�{, SLOPE ���NGER � ,, � Min. D=1.0 Ff. i �. � B=6.0 F. 6=5.0 Ft. FROM STA.180+00 TO STA.182-00 -L- LT DETAIL #7 SPECIAL CUT DITCH wMINGE I Na�+o s�oie� urol Ground �p.1 °� � �i�cF 9� p F�p�le SIoPc b.a� � Min. D=1.0 Ft. FROM STA.196+50 TO STA.197+00 -L- RT DETAIL #8 STANDARD BASE DITCH ( No� fo Scole) Hai�.ai No�u�oi Ground Z.� D �.� Ground Min. �=1.0 Ft. � g � B=2.0 Ft. �--i FROM STA.198+80 TO STA. 199-55 -L- lT RIP RAP AT EMBANKMENT � Nm m s<oie� 10'min. on�n Grode �'��'- 1�0 GEOTEXTILE �� DETAIL R10 SPECIAL CUT GRASSED SWALE ( Not to Scale) Nofurol From Groun :� p A�p�e� Ditch F Slope u Min. D=1.0 Ff. 6=2.0 Ft. FROM STA.271+80 TO STA.215+55 -L- RT DETAIL #11 BERM DITCH � No� �o s�aiel u Oa wE N 5.0' 8 0' S.0' U F io.o'v.C. ?� � JP d Geo�ex�ile Min. D� 1_0 F. Type of Liner- Class'I' Rip Rop Max. d 1.5 Ft. FROM STA. 171+50 TO STA. 172+75 -L- RT DETAIL #12 N.G/f.e. � FN �So ScUT s.o' 2-GI .1\ d ONe' Fill R 1,.� `Esisf. D'itch Bed P�Pe P�iPe FROM STA.208+80 TO STA.2091 60 -L- LT DETAIL #13 STANDARD BASE DITCH �Nof�o Scale� ral Graund 7;� .�� G�ound d � Gooie.�iio B Min. D=1.5 Ft. Max.d=4.0 Ft. WFen B is > 6.d B=5.0 Ft. sid. Ho_ s�e.oi TypeofLiner� Class'I'Rip-Rap STA. 217+50 -L- RT DETAIL #14 SPECIAL CUT GRASSED SWALE ( Nor io Swle) No�fu�al � Front Gr d :� p A�ptte� Diich F Slope � Min. D=1.0 Ft. B=5.0 Ff. FROM STA. 222 i� 50 TO STA. 229 I 50 -L- LT DETAIL #15 SPECIAL L4TERAL 'V' DITCH �No�+o Scale� r�n Natural p� �� Slope Ground 1:1 D F�oxte� a Gea�ex�ile � Min. D=1.0 Ff. Type of Liner= Closs 'B' Rip-Rap Mox. d=1.0 Ft. FROM STA.10+55 TO STA.12+18 -Y71- RT FROM STA.13+95 TO STA.14+55 -Yi2- RT DETAIL #16 SPECIAL LATERAL BASE DITCH �Ho��o s�oie� Noiurol Fill Ground 2�� A, Me� slope d p F�o Geo�e.�ile g Min. D-1.0 Ff. Max.d-1.0 Ff. peofLiner- Class'B'Rip-Rap B�=3.OF1. DETAIL #17 ROADWAY DITCH � Hoi ro s�oie� D'i�ch , � sioae Grou�d 4.� D P�\o`te� d Gea�eNile Min. �-1.0 Ft. TypeofLiner= Closs'8'Ri{NRap Mox.d-1.OFt. FROM STA.252+00 TO STA.255+50 -DET- RT FROM STA.253+21 TO STA.255+50 -0ET- LT FROM STA.256+42 TO STA. 261+05 -0ET- RT FROM STA. 256 � 50 TO STA. 260 I 50 -0ET- LT DETAIL #18 STANDARD BASE DITCH �N �to S�nle) Natural NoN.ol Ground 7;� .�� Ground d � Geo�aade B Min.D=2.0 Ft, Max.d=2.0 Ft. 'When B is < 6.0' B=i.O F. Type af Liner= Class 'B' Rip-Rop STA.13+35 -Y10- RT DETAIL #19 STANDARD BASE DITCH iH �ro s�oiel Gaiural Gor�rvl ro nd 7:� .�� ro�nd d � Gea�ex�ile B Min. D�-2.0 Ft. Max.d=1.0 Ft. 'when B is < 6.0' 8=3.0 Ft. Type of Liner= Class 'I' Rip-Rop STA.222+69 -L- RT DETAIL #20 (ATERAL GRASSED SWALE (No+to Scale) ��Natvral FILI Gro�nd 3:� p 3�� j"/Ft. SLOPE � p � Min. D=1.0 Ft. 1.=-.! B=3.0 Ft. 6-5.0 Ff. FROM STA. 244+00 TO STA. 247+00 -L- LT DETAIL #21 LATERAL 'V' DITCH 1 No� ro s�aie� Now,oi � I ---- � F�n Gro��d 1:l 1.� t^hi. Slope D Min. D=1A Ft. b-5.0 Ft. FROM STA. 247+00 TO STA.249+00 -L- LT DETAIL #22 L4TERAL BASE DITCH �Norb S�ole� Noe rol � Gaund Z.� p ry�� ����, Fill sioae � o I Min. D=1.0 Ft. �='� 8=4.0 F�. b - 5.0 F�. FROM STA. 242+60 TO STA. 248+50 -L- RT DETAIL #23 L4TERAL BASE DITCH ( Ho� �o S�ala�oPe Nm�,�i I --- � u Gro�nd 2.) p �,.iff d vEo1e'xn�[ B Min. D=1.5 Ft. Mon. d=1.5 Ft. 'when B'�s � 6.0' B=4.0 Ft. Type of Liner= CL'I' Rip-Rap 6=5.0 Ft. FROM STA.248+50 TO STA. 250+00 -L- RT DETAIL #24 STANDARD BASE DITCH �rvo�ro s�oie� Nai�.ai Nm�,oi Ground Z.� ,t.\ Gro�nd D Min. D=1.0 Ft. � g I 8=3.0 Ft. � -i FROM STA. 243+50 TO STA. 244+00 -L- LT PERMIT DRAWING SHEET 2 OF 31 DETAIL #25 SPECIAL CUT DITGH �Horro s�oia) � o� D'il<F ry' sloae Grou�d ?.) D ��o�te d Gea�e.�ile Min. D-1.0 F. Type of Liner= Qass 'B' Rip-Rap Mox. d-1.0 Ft. FROM STA.16+40 TO STA.19+00 -DRIREV- LT FROM STA.75-50 TO STA.16+05 -DRIREV- LT FROM STA. 10+20 TO STA. 10+50 -DR2REV- RT FROM STA. 10 �r 15 TO STA. 10 �i� 50 -DR2REV- LT DETAIL #27 STANDARD BASE GRP.SSED SWALE ( Not ro Smle) Not�rol Na�ru�al Groun pR , ���� FCq D F�p �FR �O� Min. D=1.0 F}. B �NorEs�. B=2.0 F}. 1) LONGIiUDINAL SLOPES BETNEEN 0.3% AND 4.�%. 2) MODIFICATIONS MAY BE NEEDED,AS APPROVED BY ENGINEER. FROM STA. 233+80 TO STA. 234+35 -L- RT DETAIL #28 LATERAL BASE DITCH � rvo� o S�nle) I -- � No�urol Gro��d z� p 1� .�F�. F;il Slopo � e � Min. D=1.5 Ft. l.'-'.J 8=2.0 Ft. 6=5.0 Ft. FROM srn. zis+oo ro sTn. zn+no -�- �r DETAIL #29 PIPE OUTLET CHANNEL �No�to Scole� �a„� am a�'" ���e d-3o F. Length=l2 F. ��jvo,;aeie�Eo D=3.0 Ft. Esr. = 15 Tons of Class '1' Rip-Rap STA.189+40 -L- LT DETAIL #30 ROADWAY DITCH lHoem s�oial r.om � o� Di�<F Graund ?') p 1F�o�te� slope d Geaienile Min. D=1.0 N. Type of Liner- Class'B' Rip-Rop Mox. d=1.0 Ft. FROM STA.10+50 TO STA.15+00 -DRIREV- LT FROM STA.10+70 TO STA.14+50 -DRIREV- RT FROM STA.15r50 TO STA.16+50 -DRiREV- RT FROM STA.10+50 TO STA.12+80 -DR2REV- RT FROM STA. 10 i� 50 TO STA. 12 i� 00 -0R2REV- LT FROM STA. 10+50 TO STA. 16+00 -Y9- LT & RT FROM STA.10+84 TO STA.15'�-00 -DR3- LT FROM STA. 17 I 30 TO STA. 15 i 00 -0R3- RT FROM STA. 17+00 TO STA. 19+72 -DR3- RT FROM STA.17+00 TO STA.19-30 -DR3- LT FROM STA. 10 i 25 TO STA. 11 +55 -DRS- LT FROM STA.10+25 TO STA.17+00 -DRS- RT FROM STA.10+50 TO STA.12+10 -Y13A- RT FROM STA.10+50 TO STA.12+50 -Y13A- LT PROIECT REFERENCE NO. SHEET NO. R-29/58 20-1 ILW SHEET NO. HYDRAULIC$ ENGINEER DETAIL #31 FILTER BERM SECTION VIEW ( Not to Scale) #57 STONE 1.0 FT THICK � 3.0' Depth ,� 'Y CLASS 'B' RIP RAP EST 10 TONS #57 STONE EST 40 TONS CL B RIP RAP EST 70 SY GEOTEXTILE STA. 198 + 00 -L- RT DETAIL #32 00 FALSE SUMP �F � rvo� �o Scolej Oviside Ditch . Iq o,l _ T��,��.� 20:1 '1 f GI �-5- S=Ditch Slope � Proposed Difch STA. 178+63 -L- RT STA.182+84 -L- RT STA. 188+90 -L- RT STA. 792+15 -L- RT STA. 195+60 -L- RT STA 197+14 -L- RT STA. 256+75 -DET- LT STA. 14+86 -Y10. LT STA. 15+72 -Y10- LT DETAIL #33 No FALSE SUMP �Notto Scale) O�tside Ditch Traffic Flow �O. I �2,1_ r GI �- s - er�. S=Ditch Slope 4 Proposed Diich STA.1671-37 -L- RT STA. 171+37 -L- RT STA.173+87 -L- RT STA.201+62 -L- LT STA.204 114 -L- LT STA. 206 i 64 -L- LT STA.252+10 -0ET- RT STA. 72+90 -Y9- RT STA. 16 -10 -Y9- RT STA. 14 i 32 -DR3- RT T MIN. 1' TUCK � GEOTEXTILE FABRIC DETAIL #34 BERM DITCH _ Q Q �Na��a Smle� � �F N 5.0' B 0' a.o 10.0' V.C. ?�� D �P0.. Min. D=1.0 Ft. FROM STA.165+45 TO STA. 166+05 -L- RT FROM STA.770+65 TO STA.771+50 -L- RT DETAIL #35 RIP RAP SLOPE PROTECTION � No� �a s�aia� !s.� F��sop o,ia ro e�. o�ePifa�a �-� Nolural ceote.we c.o��d Type of Liner- Class'll' R'ip-Rop FROM STA. 199+70 TO STA.211+65 -l- RT FROM STA. 215+50 TO STA. 219+20 -L- RT FROM STA.221-63 TO STA.223+80 -L- RT Pipe or Di}ch o�r�er A L Square Prefoi Scour Hole (F (Rip Rap in basin not shown for clari PREFORMED SCOUR HOLE *NOT TO SCALE PLAN VIEW INSTALL LEVEL AND FLUSH WITH NATURAL GROUND A J SECTION A-A p��� PIPE (d = 15" OR 18") S��p F � - PSRM INFLOW NATURAL � - GROUND LINER: CLA55 B RIPRAP F�- B-�i WITH GEOTEXTILE MIN. 1' TUCK B D STATION FT. FT. FOR 15" PIPE 4.0 1.0 165+00 -L- LT 4.0 1.0 171+50 -L- LT 4.0 1.0 200+00 -L- RT 4.0 1.0 204+00 -L- RT 4.0 1.0 206+50 -L- RT 4.0 1.0 211+27 -L- RT 4.0 1.0 216+75 -L- RT 4.0 1.0 221+g5 -L- RT 4.0 1.0 231+50 -L- RT 4.0 1.0 232+g0 -L- RT 4.0 1.0 238+00 -L- LT 4.0 1.0 FOR 18" PIPE 6.0 1.0 182+30 -L- LT 6.0 1.0 PROIECT REFERENCE NO. PERMIT DRAWING R-29�58 S H E ET 3 O F 31 � S"EET "°. DETAIL #36 (NOT TO SCALE) SKEWED MULTI-BARREL CULVERT LOW FLOW CHANNEL,SILLS AND FLOOD PLAIN *NOTES: 1) NATIVE MATERIAL BETWEEN SILLSBAFFLES IN THE CULVERT SHALL PROVIDE A CONTINUOUS LOW FLOW CHANNEL. NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE THE STREAM OR FLOODPLAIN AT THE PROJECT SITE DURING CONSTRUCTION. ONLY MATERIAL THAT IS EXCAVATED FROM THE STREAM BED MAY BE USED TO LINE THE LOW FLOW CULVERT BARREL.RIP-RAP MAY BE USED TO SUPPLEMENT THE NATIVE MATERIAL IN THE HIGH FLOW CULVERT BARREL S). IF RIP-RAP IS USED TO LINE THE HIGH LOW CULVERT BARREL(S), NATIVE MATERIAL SHOULD BE PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE FOR ANIMAL PASSAGE. NATIVE MATERIAL IS SUBJECT TO APPROVAL BY THE ENGINEER AND MAY BE SUBJECT TO PERMIT CONDITIONS. 2) SILLSBAFFLES ARE TO BE 1.0 FT. WIDE, CAST SEPARATELY AND ATfACHED BY DOWELS. 3) TOP OF LOW FLOW SILLSBAFFLES SHOULD MATCH STREAM BED ELEVATION IN LOW FLOW CHANNEL OF STREAM. (THALWEG) 4) DO NOT SET ELEVATION OF HIGH SILLBAFFLES ABOVE BANK FULL. 5) NUMBER OF SILIBAFFLES DETERMINED BY THE ENGINEER. FLOOD PIAIN BENCH L SILL SILLS AT INLET AND OUTLET PLAN VIEW FLOOD PLAIN BENCH SILL � 1 BAFFLE NUMBER OF BAFFLES=7 ON 38FT CENTERS FROM DOWNSTREAM SILL I1 SECTION A-A INLET AND OUTLET CHANNEL CL 'I' RIP RAP (TYP.) ON STREAM BANKS GEOTEXTILE � CL 'I' RIP RAP > , , / 1' I I e• I-- e --I STA. 160 + 40.08 -L- RT STA. 162 +28.52 -L- LT SHEET NO. 20 -2 HYDRAULIC$ ENGINEER s.o� COIR FIBER MATf I N G NG WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1A 159+80 / 160+40 -L- RT BANK STABILIZATION (TRIB.) 0.01 < 0.01 44 21 160+40 / 161+80 -L- CULVERT (TRIB.) 0.05 170 � B 162+15 / 162+30 -L- LT CULVERT (GAP CREEK) < 0.01 < 0.01 15 6 162+15 / 162+65 -L- LT BANK STABILIZATION (GAP CREEK) < 0.01 35 2 165+73 -L- BDO / 30" RCP < 0.01 5 166+00 -L- LT TAIL DITCH < 0.01 29 3 15+32 / 15+00 -DR1 REV- 24" PIPE < 0.01 71 4 172+58 / 172+85 -L- LT 12" RCP < 0.01 0.15 < 0.01 5 174+00 -L- LT 30" CSP < 0.01 6 178+50 -L- LT 24" CSP < 0.01 7 180+00 / 182+00 -L- LT ROAD FILL 0.05 0.03 8 186+21 / 186+43 -L- LT ROAD FILL < 0.01 < 0.01 9 187+63 / 189+15 -L- 36" RCP 0.01 124 189+35 / 189+45 -L- LT BANK STABILIZATION < 0.01 23 10 197+20 / 198+90 -L- BANK STABILIZATION 0.02 154 198+80 / 198+90 -L- WORKPAD / CULVERT REMOVAL 0.02 57 11 207+00 / 207+05 -L- RT ROAD FILL < 0.01 < 0.01 12 208+72 / 209+51 -L- RT ROAD FILL 0.12 < 0.01 13 209+23 -L- LT 24" Pipe < 0.01 < 0.01 52 8 14 210+01 / 210+36 -L- LT ROAD FILL 0.01 < 0.01 15 215+54 / 217+43 -L- RT ROAD FILL 0.14 0.05 16 217+48 -L- LT 60" RCP < 0.01 27 217+45 -L- LT BANK STABILIZATION < 0.01 9 SUBTOTALS*: 0.32 0.15 0.04 0.06 0.12 0.03 758 92 *Rounded totals are sum of actual impacts NOTES: Site 10: Total Permanent Pier Impacts = 25.1 SF = 0.0006 AC Site 15: Fill Imapcts = 0.14 ac, Mechanized Clearing Impacts=0.013, Total Take Impacts=0.036 \TN Revised 3/12/13 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 17 217+22 / 217+75 -L- RT BANK STABILIZATION < 0.01 54 18 222+55 / 222+83 -L- RT BANK STABILIZATION < 0.01 53 19 241+75 / 243+25 -L- WORK PAD 0.12 115 20 242+41 / 242+54 -L- RT BANK STABILIZATION < 0.01 19 21 243+31 / 243+46 -L- LT BANK STABILIZATION < 0.01 20 SUBTOTALS*: 0.02 0.12 146 115 SUBTOTALS FROM PAGE 1*: 0.32 0.15 0.04 0.06 0.12 0.03 758 92 TOTALS*: 0.32 0.15 0.04 0.06 0.14 0.15 904 207 *Rounded totals are sum of actual impacts NOTES: Site 19: Total Permanent Pier Impacts = 150.8 SF = 0.003 AC Revised 3/12/13