Loading...
HomeMy WebLinkAbout20100362 Ver 1_Meeting Minutes_20080820Subject: Minutes from Interagency 4B Hydraulic Design Review Meeting On August 20, 2008 for U-4007A in Onslow County Team Members: Brad Shaver-USACOE David Wainnght-NCDWQ Travis Wilson-NCWRC Steve Sollod-NCDCM Steven Lane-NCDCM Gary Jordan-USFWS Kathy Matthews-EPA Chris Militscher-EPA Donnie Brew-FHWA Chris Rivenbark-NEU John Merritt-NEU (present) (present) (absent) (present) (absent) (present) (absent) (present) (present) (present) (present) General Comments: Participants: Marshall Clawson, NCDOT Hydraulics Dan Duffield, NCDOT Hydraulics Josh Dalton, Sungate Design Group Brian Elam, Sungate Design Group Mason Herndon, NCDOT Division 3 Timmy Zepeda, NCDOT Division 3 Brian Yamamoto, NCDOT PDEA Jim Rerko, NCDOT Division 6 Omar Azizi, NCDOT Structures Emily Murray, NCDOT Structures Marshall Clawson started the meeting by introducing the project and stating that the purpose of the meeting was to review the 30% hydraulic designs and show that the commitments made at the 4A meeting were met Mr Clawson then handed the meeting over to Josh Dalton Mr Dalton proceeded through the project sheet by sheet explaining the proposed drainage design and fielding questions Plan Sheets 4: There are no streams or wetlands on this sheet Plan Sheets 5: Mr Dalton noted that there is an existing culvert under US 17 Bypass that will be extended on both ends Two jurisdictional streams converge dust upstream of the existing culvert The existing culvert is a double barrel 6' by 8' RCBC The barrels of the culvert will be extended separately in the direction of the two channels Downstream of the existing culvert, Scales Creek will be conveyed under Loop A and Ramp A by double barrel 6' by 8' RCBC's The culverts will be separated by approximately 220 feet of open channel Photographs of Scales Creek and the UT to Scales were passed around and the extreme amount of garbage in the streams was noted A small portion of the wetland will be left in the gore area between Ramp A and Loop A This wetland will be considered a total take I s A wetland will be impacted along Ramp B Discussion occurred regarding the installation of an equalizer pipe to provide hydrology to the isolated wetland between Ramp B and Loop B Chris Rivenbark will discuss with Lelam Paugh and inform us of the decision If an equalizer pipe is installed and the wetland not considered a total take, a commitment will need to be added that this area is not mowed Plan Sheets 6• Mr Dalton noted that the road crosses the UT to Scales Creek A 66-inch RCP buried 1-foot will be installed at this location A small wetland will also be impacted at this location Mr Dalton mentioned that preformed scour holes will be used outside of the wetland areas Photographs of the stream were passed around and again the garbage and tires in the stream were noted Plan Sheet 7:, Mr Dalton stated that a wetland exists right of stations 42+50 to 45+00 -L- This area is currently shown as cut, but expressway gutter will be installed to remove the cut ditch from the wetland area Plan Sheets 8: Mr Dalton stated that a small wetland exists right of stations 55+00 to 58+00 -L- This area is currently shown as cut, but the curb and gutter will be extended, past the wetland to remove the cut ditch from the wetland area Mr Dalton stated that there is aj unsdictional stream parallel to and north of Huff Drive This stream enters an existing 36-inch RCP and exits the system from an existing 60-inch RCP on the west side of Western Boulevard A portion of this system will be revised Additional Discussion A layout of the culvert extension at US 17 was provided to Mr Zepeda for constructabilrty issues and input regarding construction phasing Meeting Adjourned