HomeMy WebLinkAbout20091149 Ver 1_Meeting Minutes_20080820Subject: Minutes from Interagency 4B Hydraulic Design Review Meeting On August 20, 2008 for R49_00 in Columbus County Team Members: Richard Spencer-USACOE (absent) Brad Shaver-USACOE (present) Travis Wilson-NCWRC (present) Rob Ridings-NCDWQ (present) Gary Jordan-USFWS (present) Kathy Matthews- EPA (absent) Chris Mihtscher-EPA (present) Donnie Brew-FHWA (present) David Hams-REU (absent) Chris Rivenbark-NEU (present) Tyler Stanton-NEU (present) Rob Hanson-PDEA (present) Kristine Graham- PDEA (present) Charles Cox-PDEA (present) Participants: Marshall Clawson, NCDOT Hydraulics Dan Duffield, NCDOT Hydraulics Henry Wells, Sungate Design Group Jim Rerko, NCDOT Construction Roger Thomas, NCDOT Roadway Mike Little, NCDOT Roadway Paul Rochester, NCDOT Roadway Omar Azizi, NCDOT Structures General Comments: Marshall Clawson started the meeting by introducing the project and stating that the purpose of the meeting was to review Avoidance and Minimization and the 30% hydraulic designs Mr Clawson indicated that the commitment regarding spanning the two lateral ditches along US 74 by installation of a 2 span bridge should not be a commitment since the lateral ditches are not jurisdictional He indicated, however, that the lateral ditch on the south side would be spanned in order to utilize the existing 2 @ 48" RCP under US 74 Mr Clawson then handed the meeting over to Henry Wells Mr Wells proceeded through the project sheet by sheet explaining the proposed drainage design and fielding questions Plan Sheets 4: No jurisdiction streams are present on this plan sheet and there are no impacts to wetlands Plan Sheets 5: Mr Wells noted that there is an existing culvert under US 74 that will be extended on the inlet end There is no extension on the outlet end where the jurisdictional stream begins The existing culvertis a2 @ 48" RCP The culverts will be extended and a headwall installed A portion of the wetland will be left inside Loop C between existing NC 242 and proposed NC 242 This wetland will be considered a total take It was proposed by Chris Militscher that the area within the Loop not be mowed Stormwater from Loop C discharges into the jurisdictional stream at the outlet of the 2 @ 48" RCP Stormwater from the pavement and curb and gutter installed on Loop C will be discharged into a preformed scour hole and allowed to flow overland before discharge into the jurisdictional stream A wetland will be impacted by proposed NC 242 on the south side of US 74 An equalizer pipe will be installed in order to provide hydrology to the wetland on the east side of proposed NC 242 A wetland will be impacted along Ramp A Discussion occurred regarding the installation of a proposed equalizer pipe to provide hydrology to the isolated wetland between Ramp A and Loop A Chris Militscher requested that installation of the pipe be a commitment A wetland will be impacted by proposed Ramp A and a proposed driveway (SR) No comments were made There is a jurisdictional stream that is outside the project area will not be impacted Plan Sheets 6: A wetland will be impacted by proposed Ramp A No further comments were made other than those mentioned above by Mr Militscher Plan Sheet 7! Mr Wells stated that a there is a 3 @ 7' X 8' box culvert at the beginning of the fob The roadway grade has been tied in prior to impacting the culvert and therefore there will be no need for a culvert extension Plan Sheets 8: Just a small amount of wetland impact continued from the previous plan sheet at the matchhne No other impacts Meeting Adjourned