Loading...
HomeMy WebLinkAbout20011202 Ver 2_Triage Check List_20080903Triage Check List Date: 9/03/2008 Project Name: Wanchese Marsh Creation/Protection DWQ#: 01-1202 Ver 2 County: Dare To: Kyle Barnes, Washington Regional Office 60-day processing time: 9/02/08 - 11/01/08 From: Ian McMillan Telephone: (919) 715-4631 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Steam length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern ? If there is enhancement/restoration or preservation a copy has been given to Eric Ku1z for comments and if it has stormwater a copy has been given to Annette Lucas for review so please contact then for comments before you issue the project. Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks!