Loading...
HomeMy WebLinkAbout20060447 Ver 2_Stormwater Analysis and Nitrogen Calculations_20080826Stormwater Analysis Nitrogen Calculations for Preliminary Subdivision Olde Towne - Phase II in Raleigh, North Carolina Submitted to: City of Raleigh Prepared for: oLO QA- C) \1 2- Olde Towne Company, LLC 387 Medina Road Medina, Ohio 44256 Prepared by: ELAM TODD d'AMBROSI URBAN PLANNING /LANDSCAPE ARCHITECTURE 2880 SLATER ROAD, SUITE 200, MORRISVILLE, NC 27560 May 3, 2007 *007 AUG ? ? 2008 fol, bE??'? S???P,?ER$Rpp1CH WEZ1ANas ?? TABLE OF CONTENTS 10 . 1. NARRATIVE ¦ Project Summary ¦ Pre-Development Condition ¦ Post-Development Condition 2. APPENDICIES ¦ APPENDIX A:Pre-Development Condition ¦ APPENDIX B: Post Development Condition ¦ APPENDIX C: BMP Calculations Page 1 1 2-3 ¦ APPENDIX D: Nitrogen Calculations Page 1 Olde Towne - Phase II - Preliminary Subdivision Rock Quarry & New Hope Road Raleigh, North Carolina Proiect Summary The enclosed drainage and nitrogen calculations were prepared for a project known as Olde Towne - Phase II, a mixed use golf community located off Rock Quarry & New Hope Road in Raleigh, NC. These calculations have been developed to comply with the City of Raleigh, NC, Stormwater Management Design Manual, and the guidelines for BMP design set forth by the State of North Carolina. Phase I of the project is currently under construction and has been designed by others. The proposed development in Phase II associated with this submittal includes six (6) tracts and consists of approximately seven hundred and seventy three (773) residential units. The tracts included in this submittal are known as; SF-2, SF-3, SF-4, SF/TH-1, SF/TH-2, SF/TH-3. (Please refer to attached Overall Subdivision Plan C-01). This report contains calculations of stormwater runoff for the pre and post- development conditions and includes sizing of the proposed BMP stormwater management devices. This report also includes nitrogen calculations compiled in compliance with the City of Raleigh and the Neuse River Basin Nutrient Management Strategy. Soils information was obtained from the USDA Soil Conservation Service (SCS) Maps and available data for Wake County. The soils on the site included in this study area were classified as SCS Hydrologic Soil Group B and SCS Hydrologic Soil Group C. Refer to Plan DR-1, Pre-development Watershed Plan, for a delineation of the boundaries of the soil with respect to the subject drainage areas. Pre-Development Condition The majority of the subject drainage area is currently lightly wooded, undeveloped land. Refer to Plan DR-1, Pre-development Watershed Plan for a delineation of the four (4) pre-development subcatchment areas and their associated design points. The topography with in this study ranges from elevation 307 to elevation 165 and includes areas of moderate to steep slopes. The area also includes a network of jurisdictional streams protected by an up- gradient fifty foot (50') no-build Neuse River Buffer. Most of the streams on-site flow in a northerly direction toward a larger wetland Page 2 network associated with Walnut Creek. The computer calculations for the pre and post-development peak flows, subcatchment routing and outlet control device sizing, were developed using Hydraflow Hydrographs (version 2004) by Intelisolve which is based on the Technical Release 20 (TR-20) developed by the United States Soil Conservation Service (SCS). Drainage calculations were prepared for the pre-development condition for the 2, 10, and 100-year type II twenty four (24) hour storm events. Refer to Appendix A for the pre-development computer results. Refer to DR-1, Pre-development Watershed Plan in Appendix A for the delineation of pre- development drainage subareas. In both the pre-development and post- development stormwater analysis the watershed area analyzed was approximately 179.7 acres which includes a small portion of offsite tributary areas. The peak rates of runoff for this condition are as follows: Design Point Storm Event 2-YR 10-YR 100-YR (cfs) (cfs) (cfs) DP#1 39.38 85.90 163.57 DP#2 110.26 269.42 549.79 DP#3 52.55 106.39 191.32 DP#4 36.85 76.28 137.98 Post-Development Condition In the post-development condition, flow from nearly all proposed roadways and flow from the majority of impervious areas associated with lot development has been routed to one of eleven (11) extended detention wetland basins. These basins were sized based to meet NCDWQ water quality guidelines to provide 85% TSS removal and 40% nitrogen removal. Although the basins were mainly sized to meet DWQ water quality standards, they were also sized to ensure that the water elevation during the 100 year storm event will not breach the top elevation of the basin berm. Please refer to Appendix C for sizing characteristics of the extended detention wetland basins. Time of concentrations were developed using the TR-55 method. Flow paths were calculated for both sheet flow and shallow concentrated flow and in most instances followed the proposed roadway. In some cases the computed program calculated a time of concentration less than six minutes (6 min.) Following the guidelines of TR-55, a minimum time of six minutes was assigned to these areas Page 3 and used for analysis. Design Points for the post-development condition correspond to that of the pre- development condition. Drainage calculations were performed by employing the SCS TR-20 Methods for the 2, 10, and 100-year Type II storm events. Refer to Appendix B for computer results. The peak rates of runoff for this condition are as follows: Design Point Storm Event 2-YR 10-YR 100-YR (cfs) (cfs) (cfs) DP#1 24.45 47.36 91.60 DP#2 54.28 184.80 401.17 DP#3 45.03 125.08 209.77 DP#4 22.90 67.99 123.16 A comparison of the peak rates of runoff for both pre-development and post- development conditions indicates that a decrease in the rate of runoff will be realized in the developed condition for most storm events. For the 10 year & 100 year storm events at Design Point #3 the analysis indicates a slight increase in flow. However, due to the fact that the discharge is adjacent to a flood plain area associated with Walnut Creek peak flow attenuation is not required. Hydrograph Summary Report Nu. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 39.38 3 726 131,951 ---- ------ ------ Predevelopment Subarea Al 2 SCS Runoff 137.77 3 723 393,095 --- ------ ----- Predevelopment Subarea A2 3 Reach 110.26 3 729 393,091 2 ------ ----- Stream Flow Presub A2 4 SCS Runoff 52.55 3 720 145,406 ---- ---- ------ Predevelopment Subarea A3 5 SCS Runoff 39.51 3 720 109,329 -- ----- --- Predevelopment Subarea A4 6 Reach I I 36.85 3 726 109,326 5 ---- --- Stream Flow Presub A4 Old Towne_TR-20 (Existing).gpw Return Period: 2 Year Wednesday, May 9 2007, 2:42 PM Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 1 Predevelopment Subarea Al Hydrograph type = SCS Runoff Peak discharge = 39.38 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 29.70 ac Curve number = 72 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.9 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 131,951 cult Q (cfs) 40.00 30.00 20.00 10.00 0 00 Predevelopment Subarea Al Hyd. No. 1 -- 2 Yr Q (cfs) 40.00 30.00 20.00 10.00 0 00 1 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 1 Time (hrs) TR55 Tc Worksheet HydraFlow Hydrographs by Intelisolve Hyd. No. 1 Predevelopment Subarea Al Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 8.06 + 0.00 + 0.00 = 8.06 Shallow Concentrated Flow Flow length (ft) = 2358.00 0.00 0.00 Watercourse slope (%) = 4.20 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 3.31 0.00 0.00 Travel Time (min) = 11.89 + 0.00 + 0.00 = 11.89 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................. ...................... .......................... 19.90 min 2 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 2 Predevelopment Subarea A2 Hydrograph type = SCS Runoff Peak discharge = 137.77 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 101.17 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.2 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 393,095 cult Predevelopment Subarea A2 Q (cfs) Hyd. No. 2 -- 2 Yr 140.00 J.00 100.00 80.00 60.00 40.00 20.00 0.00 1 0 3 5 Hyd No. 2 Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 ' 0.00 8 10 13 15 18 20 23 25 Time (hrs) 3 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Predevelopment Subarea A2 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 8.06 + 0.00 + 0.00 = 8.06 Shallow Concentrated Flow Flow length (ft) = 841.00 0.00 0.00 Watercourse slope (%) = 7.70 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 4.48 0.00 0.00 Travel Time (min) = 3.13 + 0.00 + 0.00 = 3.13 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................. ...................... .......................... 11.20 min 4 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 3 Stream Flow Presub A2 Hydrograph type = Reach Peak discharge = 110.26 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 2 Section type = Trapezoidal Reach length = 2607.0 ft Channel slope = 2.2% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.843 Rating curve m = 1.457 Ave. velocity = 4.17 fUs Routing coeff. = 0.3464 Modified Att-Kin routing method used. Stream Flow Presub A2 Q (cfs) Hyd. No. 3 -- 2 Yr 140.00 20.00 ..... _ ....... _ 100.00 80.00 60.00 40.00 20.00 Hydrograph Volume = 393,091 cult 0.00 1 0 3 5 Hyd No. 3 Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 I I e I i I I I \L l 0.00 8 10 13 15 18 20 23 25 - Hyd No. 2 Time (hrs) L Hydrograph Plot ydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 4 Predevelopment Subarea A3 Hydrograph type = SCS Runoff Peak discharge = 52.55 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 27.85 ac Curve number = 76 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.9 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 145,406 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 1--- I I I r ' 0.00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 4 Predevelopment Subarea A3 Hyd. No. 4 -- 2 Yr 6 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Predevelopment Subarea A3 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 4.00 0.00 0.00 Travel Time (min) = 8.81 + 0.00 + 0.00 = 8.81 Shallow Concentrated Flow Flow length (ft) = 680.00 0.00 0.00 Watercourse slope (%) = 11.30 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 5.42 0.00 0.00 Travel Time (min) = 2.09 + 0.00 + 0.00 = 2.09 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..................................... ...................... ................... 10.90 min 7 Hydrograph Plot ydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 5 Predevelopment Subarea A4 Hydrograph type = SCS Runoff Peak discharge = 39.51 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 20.94 ac Curve number = 76 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.1 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 109,329 cuft Q (cfs) 40.00 30.00 20.00 10.00 0 00 Predevelopment Subarea A4 Hyd. No. 5 - 2 Yr Q (cfs) 40.00 30.00 20.00 10.00 0.00 8 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 5 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Predevelopment Subarea A4 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 3.00 0.00 0.00 Travel Time (min) = 9.89 + 0.00 + 0.00 = 9.89 Shallow Concentrated Flow Flow length (ft) = 702.00 0.00 0.00 Watercourse slope (%) = 11.00 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 5.35 0.00 0.00 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................. ............................. ................... 12.10 min 9 Hydrograph Plot lydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 6 Stream Flow Presub A4 Hydrograph type = Reach Peak discharge = 36.85 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 5 Section type = Trapezoidal Reach length = 1096.0 ft Channel slope = 3.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 1.000 Rating curve m = 1.457 Ave. velocity = 3.17 ft/s Routing coeff. = 0.5496 Modified Aft-Kin routing method used. Hydrograph Volume = 109,326 cuft Q (cfs) 40.00 30.00 20.00 10.00 0 00 Stream Flow Presub A4 Hyd. No. 6 -- 2 Yr Q (cfs) 40.00 30.00 20.00 10.00 0 00 10 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 6 Hyd No. 5 Hydrograph Summary Report ?._. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 85.90 3 723 277,330 -- ------ ------ Predevelopment Subarea Al 2 SCS Runoff 310.91 3 720 852,861 ---- ---- ------ Predevelopment Subarea A2 3 Reach 269.42 3 726 852,858 2 --- ---- Stream Flow Presub A2 4 SCS Runoff 106.39 3 720 288,308 ---- ---- ------ Predevelopment Subarea A3 5 SCS Runoff 79.99 3 720 216,774 --- ------ --- Predevelopment Subarea A4 6 Reach 76.28 3 726 216,772 5 -- --- Stream Flow Presub A4 Old Towne_TR-20 (Existing).gpw Return Period: 10 Year Wednesday, May 9 2007, 2:42 PM Hydrograph Plot Iydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 1 Predevelopment Subarea Al Hydrograph type = SCS Runoff Peak discharge = 85.90 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 29.70 ac Curve number = 72 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.9 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 277,330 cult Q (cfs) 90.00 0.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Predevelopment Subarea Al Hyd. No. 1 -- 10 Yr 0 3 5 8 10 13 15 18 20 23 Hyd No. 1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 25 Time (hrs) 11 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Predevelopment Subarea Al Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 8.06 + 0.00 + 0.00 = 8.06 Shallow Concentrated Flow Flow length (ft) = 2358.00 0.00 0.00 Watercourse slope (%) = 4.20 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 3.31 0.00 0.00 Travel Time (min) = 11.89 + 0.00 + 0.00 = 11.89 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............. ........................ ..................... ................... 19.90 min 1 Hydrograph Plot ydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 2 Predevelopment Subarea A2 Hydrograph type = SCS Runoff Peak discharge = 310.91 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 101.17 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.2 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 852,861 cuft Predevelopment Subarea A2 Q (cfs) Hyd. No. 2 -- 10 Yr 320.00 J.00 240.00 .......... 200.00 160.00 120.00 80.00 40.00 0.00 -L 0 3 5 8 10 13 15 18 20 23 Hyd No. 2 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 1 0.00 25 Time (hrs) 13 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Predevelopment Subarea A2 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 8.06 + 0.00 + 0.00 = 8.06 Shallow Concentrated Flow Flow length (ft) = 841.00 0.00 0.00 Watercourse slope (%) = 7.70 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 4.48 0.00 0.00 Travel Time (min) = 3.13 + 0.00 + 0.00 = 3.13 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................................................................. 11.20 min 14 Hydrograph Plot ldraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 3 Stream Flow Presu b A2 Hydrograph type = Reach Peak discharge = 269.42 cfs Storm frequency = 10 yrs. Time interval = 3 min Inflow hyd. No. = 2 Section type = Trapezoidal Reach length = 2607.0 ft Channel slope = 2.2% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.843 Rating curve m = 1.457 Ave. velocity = 5.38 ft/s Routing coeff. = 0.4257 Modified Att-Kin routing method used. Hydrograph Volume = 852,858 cult Stream Flow Presub A2 Q (cfs) Hyd. No. 3 -- 10 Yr 320.00 A.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 0 3 5 8 10 Hyd No. 3 Hyd No. 2 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 13 15 18 20 23 25 Time (hrs) 15 Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 4 Predevelopment Subarea A3 Hydrograph type = SCS Runoff Peak discharge = 106.39 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 27.85 ac Curve number = 76 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.9 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 288,308 cuft Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0 00 Predevelopment Subarea A3 Hyd. No. 4 -- 10 Yr Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 16 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 4 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Predevelopment Subarea A3 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 4.00 0.00 0.00 Travel Time (min) = 8.81 + 0.00 + 0.00 = 8.81 Shallow Concentrated Flow Flow length (ft) = 680.00 0.00 0.00 Watercourse slope (%) = 11.30 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 5.42 0.00 0.00 Travel Time (min) = 2.09 + 0.00 + 0.00 = 2.09 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 17 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 10.90 min Hydrograph Plot iydraflow Hydrographs by Intelisolve Hyd. No. 5 Predevelopment Subarea A4 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 20.94 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, May 9 2007, 2:6 PM Peak discharge = 79.99 cfs Time interval = 3 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 12.1 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 216,774 cult Predevelopment Subarea A4 Q (cfs) Hyd. No. 5 -- 10 Yr 80.00 0.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 3 5 8 10 13 15 18 20 23 Hyd No. 5 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 25 Time (hrs) 1f TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Predevelopment Subarea A4 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 3.00 0.00 0.00 Travel Time (min) = 9.89 + 0.00 + 0.00 = 9.89 Shallow Concentrated Flow Flow length (ft) = 702.00 0.00 0.00 Watercourse slope (%) = 11.00 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 5.35 0.00 0.00 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............. ............................................. ................... 12.10 min 1? Hydrograph Plot /draflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 6 Stream Flow Presu b A4 Hydrograph type = Reach Peak discharge = 76.28 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 5 Section type = Trapezoidal Reach length = 1096.0 ft Channel slope = 3.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 1.000 Rating curve m = 1.457 Ave. velocity = 3.95 ft/s Routing coeff. = 0.6419 Modified Att-Kin routing method used. Stream Flow Presub A4 Q (cfs) Hyd. No. 6 -- 10 Yr 80.00 J.00 60.00 .. ................ ... 50.00 40.00 30.00 20.00 10.00 n nn Hydrograph Volume = 216,772 cult 0 3 5 8 10 Hyd No. 6 Hyd No. 5 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 13 15 18 20 23 25 Time (hrs) 20 Hydrograph Summary Report Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 163.57 3 723 521,929 ---- ---- ------ Predevelopment Subarea Al 2 SCS Runoff 605.21 3 720 1,639,496 ---- ------ ----- Predevelopment Subarea A2 3 Reach 549.79 3 726 1,639,494 2 ----- ---- Stream Flow Presub A2 4 SCS Runoff 191.32 3 720 521,440 --- ----- - Predevelopment Subarea A3 5 SCS Runoff 143.85 3 720 392,063 ---- ----- ----- Predevelopment Subarea A4 6 Reach 137.98 3 726 392,062 5 ----- --- Stream Flow Presub A4 Old Towne_TR-20 (Existing).gpw Return Period: 100 Year Wednesday, May 9 2007, 2:42 PM Hydrograph Plot -iydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 1 Predevelopment Subarea Al Hydrograph type = SCS Runoff Peak discharge = 163.57 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 29.70 ac Curve number = 72 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.9 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 521,929 cult Predevelopment Subarea Al Q (cfs) Hyd. No. 1 -- 100 Yr 180.00 10.00 140.00 120.00 _I 1.00 00 80.00 60.00 I I 40.00 20.00 0 00 ? - Q (cfs) 0 3 5 8 10 13 15 18 20 Hyd No. 1 180.00 160.00 140.00 120.00 I - 100.00 80.00 60.00 40.00 20.00 0.00 23 25 Time (hrs) 21 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Predevelopment Subarea Al Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 8.06 + 0.00 + 0.00 = 8.06 Shallow Concentrated Flow Flow length (ft) = 2358.00 0.00 0.00 Watercourse slope (%) = 4.20 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 3.31 0.00 0.00 Travel Time (min) = 11.89 + 0.00 + 0.00 = 11.89 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 22 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 19.90 min Hydrograph Plot vdraflow Hydrographs by Intelisolve Hyd. No. 2 Predevelopment Subarea A2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 101.17 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 8.00 in Storm duration = 24 hrs Wednesday, May 9 2007, 2:6 PM Peak discharge = 605.21 cfs Time interval = 3 min Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 11.2 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 1,639,496 cuft Predevelopment Subarea A2 Q (cfs) Hyd. No. 2 -- 100 Yr 630.00 ;"J.00 450.00 360.00 270.00 180.00 90.00 0.00 -L 0 3 5 Hyd No. 2 Q (cfs) 630.00 540.00 450.00 360.00 270.00 180.00 90.00 ' ' ' ' 0.00 8 10 13 15 18 20 23 25 Time (hrs) 23 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Predevelopment Subarea A2 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 8.06 + 0.00 + 0.00 = 8.06 Shallow Concentrated Flow Flow length (ft) = 841.00 0.00 0.00 Watercourse slope (%) = 7.70 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 4.48 0.00 0.00 Travel Time (min) = 3.13 + 0.00 + 0.00 = 3.13 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 24 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 11.20 min Hydrograph Plot !ydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 3 Stream Flow Presu b A2 Hydrograph type = Reach Peak discharge = 549.79 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 2 Section type = Trapezoidal Reach length = 2607.0 ft Channel slope = 2.2% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.843 Rating curve m = 1.457 Ave. velocity = 6.63 ft/s Routing coeff. = 0.4998 Modified Att-Kin routing method used. Hydrograph Volume = 1,639,494 cult Q (cfs) 630.00 :,40.00 450.00 360.00 270.00 180.00 90.00 0.00 L 0 Stream Flow Presub A2 Hyd. No. 3 -- 100 Yr Q (cfs) 630.00 3 5 Hyd No. 3 540.00 450.00 360.00 270.00 180.00 90.00 ' _ 0.00 8 10 13 15 18 20 23 25 - Hyd No. 2 Time (hrs) 25 26 Hydrograph Plot +ydraflow Hydrographs by Intelisolve Hyd. No. 4 Predevelopment Subarea A3 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 27.85 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 8.00 in Storm duration = 24 hrs Hydrograph Volume = 521,440 cuft Q (cfs) 210.00 -180.00 150.00 120.00 90.00 60.00 Wednesday, May 9 2007, 2:6 PM Peak discharge = 191.32 cfs Time interval = 3 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 10.9 min Distribution = Type II Shape factor = 484 Predevelopment Subarea A3 Hyd. No. 4 -- 100 Yr 30.00 0.00 1 0 Q (cfs) 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 4 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Predevelopment Subarea A3 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 4.00 0.00 0.00 Travel Time (min) = 8.81 + 0.00 + 0.00 = 8.81 Shallow Concentrated Flow Flow length (ft) = 680.00 0.00 0.00 Watercourse slope (%) = 11.30 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 5.42 0.00 0.00 Travel Time (min) = 2.09 + 0.00 + 0.00 = 2.09 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 27 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 10.90 min Hydrograph Plot lydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 5 Predevelopment Subarea A4 Hydrograph type = SCS Runoff Peak discharge = 143.85 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 20.94 ac Curve number = 76 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.1 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 392,063 cuft Predevelopment Subarea A4 Q (cfs) Hyd. No. 5 -- 100 Yr 160.00 .00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 3 5 8 10 13 15 18 20 23 Hyd No. 5 Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 25 Time (hrs) 28 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Predevelopment Subarea A4 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 3.00 0.00 0.00 Travel Time (min) = 9.89 + 0.00 + 0.00 = 9.89 Shallow Concentrated Flow Flow length (ft) = 702.00 0.00 0.00 Watercourse slope (%) = 11.00 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 5.35 0.00 0.00 Travel Time (minl = 2.19 + 0.00 + 0.00 = 2.19 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 2f Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 12.10 min U Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, May 9 2007, 2:6 PM Hyd. No. 6 Stream Flow Presu b A4 Hydrograph type = Reach Peak discharge = 137.98 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 5 Section type = Trapezoidal Reach length = 1096.0 ft Channel slope = 3.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 1.000 Rating curve m = 1.457 Ave. velocity = 4.75 fUs Routing coeff. = 0.7246 Modified Att-Kin routing method used. Hydrograph Volume = 392,062 cuft Stream Flow Presub A4 Q (cfs) Hyd. No. 6 -- 100 Yr Q (cfs) 160.00 ,0.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 3 5 Hyd No. 6 160.00 140.00 120.00 j 100.00 80.00 60.00 40.00 20.00 0.00 8 10 13 15 18 20 23 25 - Hyd No. 5 Time (hrs) Hydrograph Summary Report F J. ?. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 29.16 3 720 79,038 ---- ------ ------ Postdevelopment Subarea P1 2 Reservoir 6.67 3 738 72,119 1 200.34 39,815 Flow BMP #1 3 SCS Runoff 38.70 3 720 105,631 ---- ------ ----- Postdevelopment Subarea P2 4 Reservoir 28.63 3 726 100,334 3 182.27 39,330 Flow BMP #2 5 SCS Runoff 16.58 3 720 44,964 --- ------ ------ Postdevelopment Subarea P3 6 Reservoir 1.89 3 756 40,523 5 210.14 24,340 Flow BMP #3 7 SCS Runoff 30.32 3 720 82,148 ---- ------ ------ Postdevelopment Subarea P4 8 Reservoir 18.09 3 729 77,858 7 192.66 31,911 Flow BMP #4 9 SCS Runoff 65.18 3 717 147,343 ---- ---- ---- Postdevelopment Subarea P5 10 Reservoir 0.22 3 1446 90,628 9 220.57 137,981 Flow BMP #5 11 SCS Runoff 27.01 3 717 61,560 ---- ----- ---- Postdevelopment Subarea P6 12 Reservoir 16.83 3 723 59,605 11 238.63 25,286 Flow BMP#6 13 SCS Runoff 37.66 3 717 85,519 --- ------ -- - Postdevelopment Subarea P7 14 Reservoir 26.12 3 723 78,480 13 196.53 33,910 Flow BMP#7 SCS Runoff 32.24 3 717 72,883 ---- ----- -- Postdevelopment Subarea P8 16 Reservoir 3.60 3 747 70,270 15 232.22 36,729 Flow BMP#8 17 SCS Runoff 10.82 3 720 24,987 -- ---- ---- Postdevelopment Subarea P9 18 Reservoir 0.71 3 792 23,248 17 268.06 13,262 Flow BMP#9 19 SCS Runoff 24.28 3 717 54,820 --- ------ --- Postdevelopment Subarea P10 20 Reservoir 6.37 3 729 53,971 19 258.33 24,874 Flow BMP#10 21 SCS Runoff 6.87 3 723 20,520 --- ----- ------ Postdevelopment Subarea P11 22 Reservoir 0.86 3 765 18,984 21 258.08 8,719 Flow BMP#11 23 SCS Runoff 30.28 3 717 68,947 ---- --- - - Postdevelopment Subarea P1-A 24 SCS Runoff 17.72 3 717 40,222 ---- ----- ------ Postdevelopment Subarea P4-A 25 Combine 22.90 3 726 118,079 8,24 --- ---- DESIGN POINT #4 26 SCS Runoff 15.54 3 720 36,026 --- ----- --- Postdevelopment Subarea P8-A 27 Reach 10.34 3 726 36,020 26 ------ ---- Stream Flow for 8A 28 SCS Runoff 33.14 3 720 76,152 --- ------ ---- Postdevelopment Subarea P7-A 29 SCS Runoff 24.45 3 717 55,486 --- ------ ------ Postdevelopment Subarea P11-A 30 Reach 0.72 3 792 18,814 22 ------ ------ Stream flow from P11-A Old Towne_TR-20 (Proposed).gpw Return Period: 2 Year Wednesday, Apr 25 2007,1:44 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report J. ,), Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 31 Reach 9.57 3 732 59,592 12 ------ ------ Stream flow from BMP#6 32 Reach 0.22 3 1503 90,218 10 ---- --- Stream flow from BMP#5 33 Reach 3.27 3 750 53,956 20 --- ------ Stream flow from BMP#10 34 Reach 0.52 3 846 23,212 18 --- ------ Stream flow from BMP#9 35 Reach 1.73 3 768 40,508 6 ---- ---- Stream flow from BMP#3 36 Combine 24.45 3 717 74,300 29, 30, ------ ----- DESIGN POINT #1 37 Reach 22.87 3 726 78,472 14 ------ ---- Stream flow from BMP#7 38 Reach 2.86 3 768 70,242 16 ----- --- Stream flow from BMP#8 39 Combine 41.96 3 720 315,938 27, 28, 31, 2, 337--- ----- Flow to Design Point #2 40 Combine 22.98 3 726 212,434 34, 35, 37, 8, - --- --- Flow to Design Point #2 41 Combine 54.28 3 726 528,372 39.40 ---- ----- DESIGN POINT #2 42 Combine 45.03 3 723 241,400 2, 4, 23, ------ ------ DESIGN POINT #3 Old Towne_TR-20 (Proposed).gpw Return Period: 2 Year Wednesday, Apr 25 2007,1:44 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007,1:44 PM Hyd. No. 1 Postdevelopment Subarea P1 Hydrograph type = SCS Runoff Peak discharge = 29.16 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 10.35 ac Curve number = 85 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.8 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 79,038 cult Postdevelopment Subarea P1 Q (cfs) Hyd. No. 1 -- 2 Yr 30.00 r-- 25.00 20.00 15.00 10.00 5.00 0 00 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 1 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Postdevelopment Subarea P1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 1001.00 0.00 0.00 Watercourse slope (%) = 2.30 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.08 0.00 0.00 Travel Time (min) = 5.41 + 0.00 + 0.00 = 5.41 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ....................................... .......................... 10.80 min Hydrograph Plot ` 4ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 2 Flow BMP #1 Hydrograph type = Reservoir Peak discharge =. 6.67 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 1 Max. Elevation = 200.34 ft Reservoir name = BMP #1 Max. Storage = 39,815 cuft Storage Indication method used. Q (cfs) 30.00 25.00 Flow BMP #1 Hyd. No. 2 -- 2 Yr Hydrograph Volume = 72,119 cult 20.00 15.00 10.00 5.00 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' 1/ 1 1 1 I I I I I 1 0.00 0 7 14 21 28 35 42 49 56 63 70 Time (hrs) Hyd No. 2 Hyd No. 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Postdevelopment Subarea P2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 12.33 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.60 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:44 PM Peak discharge = 38.70 cfs Time interval = 3 min Curve number = 88 Hydraulic length = 0 ft Time of conc. (Tc) = 10.8 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 105,631 cuft Q (cfs) 40.00 30.00 20.00 10.00 0 00 Postdevelopment Subarea P2 Hyd. No. 3 - 2 Yr Q (cfs) 40.00 30.00 20.00 10.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 3 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Postdevelopment Subarea P2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 1001.00 0.00 0.00 Watercourse slope (%) = 2.30 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.08 0.00 0.00 Travel Time (min) = 5.41 + 0.00 + 0.00 = 5.41 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 1 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 10.80 min Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 4 Flow BMP #2 Hydrograph type = Reservoir Peak discharge = 28.63 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 3 Max. Elevation = 182.27 ft Reservoir name = BMP #2 Max. Storage = 39,330 cuft Storage Indication method used. Hydrograph Volume = 100,334 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 Flow BMP #2 Hyd. No. 4 -- 2 Yr Q (cfs) 40.00 30.00 20.00 10.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 4 Hyd No. 3 Hydrograph Plot 4ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 5 Postdevelopment Subarea P3 Hydrograph type = SCS Runoff Peak discharge = 16.58 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 6.64 ac Curve number = 82 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.1 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 44,964 cult Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 Postdevelopment Subarea P3 Hyd. No. 5 - 2 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 ' ' ' ' --+-- ' I I I I 'S. 1 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 5 Time (hrs) i TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Postdevelopment Subarea P3 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.50 0.00 0.00 Travel Time (min) = 5.95 + 0.00 + 0.00 = 5.95 Shallow Concentrated Flow Flow length (ft) = 1190.00 0.00 0.00 Watercourse slope (%) = 2.50 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.21 0.00 0.00 Travel Time (min) = 6.17 + 0.00 + 0.00 = 6.17 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ..................................... ...................... ................... 12.10 min 10 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007,1:44 PM Hyd. No. 6 Flow BMP #3 Hydrograph type = Reservoir Peak discharge = 1.89 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 5 Max. Elevation = 210.14 ft Reservoir name = BMP #3 Max. Storage = 24,340 cuft Storage Indication method used. Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 ' ' ' ' ' ' 0.00 0 15 29 44 58 73 87 102 116 131 145 Hyd No. 6 Hyd No. 5 Time (hrs) Flow BMP #3 Hyd. No. 6 -- 2 Yr Hydrograph Volume = 40,523 cuft 11 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 7 Postdevelopment Subarea P4 Hydrograph type = SCS Runoff Peak discharge = 30.32 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 11.19 ac Curve number = 84 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.9 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 82,148 cuft Postdevelopment Subarea P4 Q (cfs) Hyd. No. 7 -- 2 Yr 35.00 .0.00 25.00 20.00 15.00 10.00 5.00 0.00 1 0 3 5 Hyd No. 7 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 8 10 13 15 18 20 23 25 Time (hrs) 12 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Postdevelopment Subarea P4 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 3.42 + 0.00 + 0.00 = 3.42 Shallow Concentrated Flow Flow length (ft) = 653.00 182.00 607.00 Watercourse slope (%) = 3.80 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.96 3.57 3.52 Travel Time (min) = 2.75 + 0.85 + 2.87 = 6.47 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............. ....................... ...................... ................... 9.90 min 13 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 8 Flow BMP #4 Hydrograph type = Reservoir Peak discharge = 18.09 cfs. Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 7 Max. Elevation = 192.66 ft Reservoir name = BMP #4 Max. Storage = 31,911 cuft Storage Indication method used. Q (cfs) 35.00 30.00 Hydrograph Volume = 77,858 cuft Flow BMP #4 Hyd. No. 8 -- 2 Yr 25.00 20.00 15.00 10.00 5.00 0.00 0 Q (cfs) 35.00 30.00 3 5 Hyd No. 8 25.00 20.00 15.00 10.00 5.00 I -? t I I 0.00 8 10 13 15 18 20 23 25 Time (hrs) - Hyd No. 7 14 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 9 Postdevelopment Subarea P5 Hydrograph type = SCS Runoff Peak discharge = 65.18 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 25.23 ac Curve number = 80 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.6 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 147,343 cult Q (cfs) 70.00 30.00 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 Postdevelopment Subarea P5 Hyd. No. 9 -- 2 Yr Q (cfs) 70.00 60.00 3 5 Hyd No. 9 50.00 40.00 30.00 20.00 10.00 ' -'- - ' ' ' -i 0.00 8 10 13 15 18 20 23 25 Time (hrs) 1x V TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Postdevelopment Subarea P5 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 4.20 0.00 0.00 Travel Time (min) = 3.94 + 0.00 + 0.00 = 3.94 Shallow Concentrated Flow Flow length (ft) = 990.00 0.00 0.00 Watercourse slope (%) = 4.80 4.90 3.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 3.53 3.57 3.52 Travel Time (min) = 4.67 + 0.00 + 0.00 = 4.67 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............. ....................... ...................... ................... 8.60 min 1E Hydrograph Plot 'iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007,1:44 PM Hyd. No. 10 Flow BMP #5 Hydrograph type = Reservoir Peak discharge = 0.22 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 9 Max. Elevation = 220.57 ft Reservoir name = BMP #5 Max. Storage = 137,981 cuft Storage Indication method used. Q (cfs) 70.00 ,0.00 Flow BMP #5 Hyd. No. 10 -- 2 Yr 50.00 40.00 30.00 20.00 Hydrograph Volume = 90,628 cult 10.00 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 / - 0.00 0 15 29 44 58 73 87 102 116 131 145 Hyd No. 10 Hyd No_ 9 Time (hrs) 17 Hydrograph Plot lydraflow Hydrographs by Intelisolve Hyd. No. 11 Postdevelopment Subarea P6 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 7.96 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.60 in Storm duration = 24 hrs Wednesday, Apr 25 2007,1:44 PM Peak discharge = 27.01 cfs Time interval = 3 min Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 61,560 cult Postdevelopment Subarea P6 Q (cfs) Hyd. No. 11 -- 2 Yr Q (cfs) 28.00 X4.00 20.00 16.00 12.00 8.00 4.00 0 00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 18 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 11 Hydrograph Plot 'iydraflow Hydrographs by Intelisolve Hyd. No. 12 Flow BMP#6 Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 11 Reservoir name = BMP #6 Wednesday, Apr 25 2007, 1:44 PM Peak discharge = 16.83 cfs Time interval = 3 min Max. Elevation = 238.63 ft Max. Storage = 25,286 cuft Storage Indication method used. Hydrograph Volume = 59,605 cult Flow BMP#6 Q (cfs) Hyd. No. 12 -- 2 Yr Q (cfs) 28.00 14.00 20.00 16.00 12.00 8.00 4.00 0 00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 1 CS 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 12 Hyd No. 11 Hydrograph Plot `iydraflow Hydrographs by Intelisolve Hyd. No. 13 Postdevelopment Subarea P7 Hydrograph type = . SCS Runoff Storm frequency = 2 yrs Drainage area = 11.49 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.60 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:44 PM Peak discharge = 37.66 cfs Time interval = 3 min Curve number = 86 Hydraulic length = 0 ft Time of conc. (Tc) = 6.1 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 85,519 cuft Q (cfs) 40.00 30.00 20.00 10.00 0 00 Postdevelopment Subarea P7 Hyd. No. 13 -- 2 Yr Q (cfs) 40.00 30.00 20.00 10.00 0 00 20 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 13 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 13 Postdevelopment Subarea P7 Description A B C Totals Sheet Flow Manning's n-value = 0.013 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 0.75 + 0.00 + 0.00 = 0.75 Shallow Concentrated Flow Flow length (ft) = 1330.00 0.00 0.00 Watercourse slope (%) = 4.20 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 4.17 3.57 3.52 Travel Time (min) = 5.32 + 0.00 + 0.00 = 5.32 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 21 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 6.10 min Hydrograph Plot 'iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007,1:44 PM Hyd. No. 14 Flow BMP#7 Hydrograph type = Reservoir Peak discharge = 26.12 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 13 Max. Elevation = 196.53 ft Reservoir name = BMP #7 Max. Storage = 33,910 cuft Storage Indication method used. Hydrograph Volume = 78,480 cult Q (cfs) 40.00 30.00 20.00 10.00 0 00 Flow BMP#7' Hyd. No. 14 -- 2 Yr Q (cfs) 40.00 30.00 20.00 10.00 0 00 22 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 14 Hyd No. 13 Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 15 Postdevelopment Subarea P8 Hydrograph type = SCS Runoff Peak discharge = 32.24 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 12.48 ac Curve number = 80 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 72,883 cuft Postdevelopment Subarea P8 Q (cfs) Hyd. No. 15 -- 2 Yr 35.00 ,0.00 25.00 20.00 15.00 10.00 5.00 0.00 1 0 3 5 Hyd No. 15 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 ' ' ' 0.00 8 10 13 15 18 20 23 25 Time (hrs) 23 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 15 Postdevelopment Subarea P8 Description A B C Totals Sheet Flow Manning's n-value = 0.013 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.20 0.00 0.00 Travel Time (min) = 0.72 + 0.00 + 0.00 = 0.72 Shallow Concentrated Flow Flow length (ft) = 1512.00 0.00 0.00 Watercourse slope (%) = 2.90 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.46 3.57 3.52 Travel Time (min) = 7.28 + 0.00 + 0.00 = 7.28 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................. ............................. ................... 8.00 min 24 Hydrograph Plot `iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 16 Flow BMP#8 Hydrograph type = Reservoir Peak discharge = 3.60 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 15 Max. Elevation = 232.22 ft Reservoir name = BMP #8 Max. Storage = 36,729 cuft Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 Flow BMP#8 Hyd. No. 16 -- 2 Yr 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 0.00 5.00 0.00 i -/j I i i i i i i i _ 0.00 0 13 26 39 52 65 78 91 104 117 130 Time (hrs) Hyd No. 16 Hyd No. 15 Hydrograph Volume = 70,270 cult 25 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 17 Postdevelopment Subarea P9 Hydrograph type = SCS Runoff Peak discharge = 10.82 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 6.51 ac Curve number = 71 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 24,987 cuft Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 Postdevelopment Subarea P9 Hyd. No. 17 -- 2 Yr Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 i 1 1 1 1 1 r? 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 17 Time (hrs) 2E 27 Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 18 Flow BMP#9 Hydrograph type = Reservoir Peak discharge = .0.71 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 17 Max. Elevation = 268.06 ft Reservoir name = BMP #9 Max. Storage = 13,262 cuft Storage Indication method used. Hydrograph Volume = 23,248 cuft Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 ' ` ' ' ' ' ' 0.00 0 15 29 44 58 73 87 102 116 131 145 Time (hrs) Hyd No. 18 Hyd No. 17 Flow BMP#9 Hyd. No. 18 -- 2 Yr Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 19 Postdevelopment Subarea P10 Hydrograph type = SCS Runoff Peak discharge = 24.28 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 9.00 ac Curve number = 81 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 54,820 cuft Postdevelopment Subarea P10 Q (cfs) Hyd. No. 19 -- 2 Yr 28.00 -T- 24.00 20.00 16.00 12.00 8.00 4.00 0.00 -L 0 3 5 Hyd No. 19 Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 1 - 0.00 8 10 13 15 18 20 23 25 Time (hrs) 2f Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 20 Flow BMP#10 Hydrograph type = Reservoir. Peak discharge = 6.37 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 19 Max. Elevation = 258.33 ft Reservoir name = BMP #10 Max. Storage = 24,874 cuft Storage Indication method used. Hydrograph Volume = 53,971 cult Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 Flow BMP#10 Hyd. No. 20 -- 2 Yr Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 1 1 -I 7 I 1 I I I I I 1 0.00 0 6 11 17 22 28 33 39 44 50 55 61 Hyd No. 20 Hyd No. 19 Time (hrs) 111 _i 2S Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 21 Postdevelopment Subarea P11 Hydrograph type = SCS Runoff Peak discharge = 6.87 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 6.61 ac Curve number = 66 Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 10.2 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 20,520 cuft Postdevelopment Subarea P11 Q (cfs) Hyd. No. 21 -- 2 Yr 7.00 6.00 5.00 4.00 3.00 11 r%n 4M 1.00 0.00 -L 0 3 5 Hyd No. 21 Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 I I % 1 0.00 8 10 13 15 18 20 23 25 Time (hrs) 3( TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 21 Postdevelopment Subarea P11 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 637.00 524.00 0.00 Watercourse slope (%) = 6.60 3.80 3.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 4.15 3.96 3.52 Travel Time (min) = 2.56 + 2.20 + 0.00 = 4.77 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 31 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 10.20 min Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 22 Flow BMP#11 Hydrograph type = Reservoir Peak discharge = 0.86 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 21 Max. Elevation = 258.08 ft Reservoir name = BMP #11 Max. Storage = 8,719 tuft Storage Indication method used. Hydrograph Volume = 18,984 tuft Q (cfs) 7.00 6.00 5.00 Flow BMP#11 Hyd. No. 22 -- 2 Yr Q (cfs) 7.00 4.00 3.00 2.oe 1.00 0.00 -L 0 6.00 5.00 4.00 3.00 2.00 1.00 0.00 15 29 44 58 73 87 102 116 131 145 Hyd No. 22 Hyd No. 21 Time (hrs) 3; Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 23 Postdevelopment Subarea P1 -A Hydrograph type = SCS Runoff Peak discharge = 30.28 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 13.46 ac Curve number = 77 Basin Slope = 0.0% Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 68,947 cult Postdevelopment Subarea P1-A Q (cfs) Hyd. No. 23 -- 2 Yr Q (cfs) 35.00 .10.00 25.00 20.00 15.00 10.00 5.00 0 00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 33 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 23 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 24 Postdevelopment Subarea P4-A Hydrograph type = SCS Runoff Peak discharge = 17.72*cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 7.51 ac Curve number = 78 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 40,222 cult Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0 00 Postdevelopment Subarea P4-A Hyd. No. 24 -- 2 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0 00 3 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 24 Time (hrs) Hydrograph Plot 3! Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 25 DESIGN POINT #4 Hydrograph type = Combine Peak discharge = 22.90 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyds. = 8, 24 Hydrograph Volume = 118,079 cult Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 DESIGN POINT #4 Hyd. No. 25 -- 2 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ' ' ' -? ' I 0.00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 25 Hyd No. 8 Hyd No. 24 Hydrograph Plot 3t Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 26 Postdevelopment Subarea P8-A Hydrograph type = SCS Runoff Peak discharge = 15.54 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 9.89 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 36,026 cuft Postdevelopment Subarea P8-A Q (cfs) Hyd. No. 26 -- 2 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 26 Hydrograph Plot 34 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 27 Stream Flow for 8A Hydrograph type = Reach Peak discharge = 10.34 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 26 Section type = Trapezoidal Reach length = 1748.0 ft Channel slope = 2.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.823 Rating curve m = 1.457 Ave. velocity = 2.07 ft/s Routing coeff. = 0.2686 Modified Att-Kin routing method used. Hydrograph Volume = 36,020 cult Stream Flow for 8A Q (cfs) Hyd. No. 27 -- 2 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 27 Hyd No. 26 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 28 Postdevelopment Subarea P7-A Hydrograph type = SCS Runoff Peak discharge = 33.14 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 17.94 ac Curve number = 73 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 76,152 cult Q (cfs) 35.00 0.00 25.00 20.00 15.00 10.00 5.00 0.00 -L 0 Postdevelopment Subarea P7-A Hyd. No. 28 -- 2 Yr Q (cfs) 35.00 3 5 Hyd No. 28 30.00 25.00 20.00 15.00 10.00 5.00 0.00 8 10 13 15 18 20 23 25 Time (hrs) 31 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 29 Postdevelopment Subarea P11-A Hydrograph type. = SCS Runoff Peak discharge = 24.45 cfs Storm frequency = 2 yrs Time interval = 3 min Drainage area = 10.36 ac Curve number = 78 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 55,486 cuft Postdevelopment Subarea PI I-A Q (cfs) Q (cfs) Hyd. No. 29 -- 2 Yr 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 I 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 29 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 30 Stream flow from P11-A Hydrograph type = Reach Peak discharge = 0.72 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 22 Section type = Trapezoidal Reach length = 1285.0 ft Channel slope = 2.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.862 Rating curve m = 1.457 Ave. velocity = 0.86 fUs Routing coeff. = 0.1613 Modified Att-Kin routing method used. Stream flow from P11-A Q (cfs) Hyd. No. 30 -- 2 Yr 1.00 0.90 - 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 -L 0 Hydrograph Volume = 18,814 cuft 14 28 42 56 Hyd No. 30 Hyd No. 22 70 84 98 112 126 Q (cfs) 1.00 0.90 0.80 0.70 ).60 ).50 ).40 ).30 ).20 ).10 ---T 0.00 140 Time (hrs) 41 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 31 Stream flow from BMP#6 Hydrograph type = Reach Storm frequency = 2 yrs Inflow hyd. No. = 12 Reach length = 1930.0 ft Manning's n = 0.050 Side slope = 2.0:1 Rating curve x = 0.762 Ave. velocity = 2.01 fUs Wednesday, Apr 25 2007, 1:44 PM Peak discharge = 9.57 cfs Time interval = 3 min Section type = Trapezoidal Channel slope = 1.8% Bottom width = 12.0 ft Max. depth = 2.0 ft Rating curve m = 1.457 Routing coeff. = 0.2404 Modified Att-Kin routing method used. Stream flow from BMP#6 Q (cfs) Hyd. No. 31 -- 2 Yr 18.00 Hydrograph Volume = 59,592 cult 15.00 12.00 9.00 6.00 3.00 0.00 Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0 00 4' 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 31 Hyd No. 12 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 32 Stream flow from B MP#5 Hydrograph type = Reach Storm frequency = 2 yrs Inflow hyd. No. = 10 Reach length = 2003.0 ft Manning's n = 0.050 Side slope = 2.0:1 Rating curve x = 0.783 Ave. velocity = 0.53 ft/s Wednesday, Apr 25 2007, 1:44 PM Peak discharge = 0.22 cfs Time interval = 3 min Section type = Trapezoidal Channel slope = 1.9% Bottom width = 12.0 ft Max. depth = 2.0 ft Rating curve m = 1.457 Routing coeff. = 0.0668 Modified Att-Kin routing method used. Stream flow from BMP#5 Q (cfs) Hyd. No. 32 -- 2 Yr 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 -L 0 Hydrograph Volume = 90,218 cuft 15 29 44 58 Hyd No. 32 Hyd No. 10 73 87 102 116 131 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 ' 0.00 145 Time (hrs) 4; Hydrograph Plot '-lydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007,1:44 PM Hyd. No. 33 Stream flow from B MP#10 Hydrograph type = Reach Peak discharge = 3.27 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 20 Section type = Trapezoidal Reach length = 2840.0 ft Channel slope = 2.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.823 Rating curve m = 1.457 Ave. velocity = 1.56 fUs Routing coeff. = 0.1346 Modified Att-Kin routing method used. Q (Cfs; 7.00 6.00 5.00 4.00 3.00 2.00 1.00 Q (Cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 'J 0.00 0 11 21 32 42 53 63 74 84 95 105 116 Hyd No. 33 Hyd No. 20 Time (hrs) Hydrograph Volume = 53,956 cult 4; Hydrograph Plot 'iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A4 PM Hyd. No. 34 Stream flow from B MP#9 Hydrograph type = Reach Peak discharge = 0.52 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 18 Section type = Trapezoidal Reach length = 3000.0 ft Channel slope = 2.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.862 Rating curve m = 1.457 Ave. velocity = 0.81 fUs Routing coeff. = 0.0684 Modified Att-Kin routing method used. Hydrograph Volume = 23,212 cuft Stream flow from BMP#9 Q (cfs) Hyd. No. 34 -- 2 Yr 1.00 0.90 0.80 0.70 0.60 0.50 0.40 030 0.20 0.10 0.00 0 15 29 44 58 Hyd No. 34 Hyd No. 18 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 73 87 102 116 131 145 Time (hrs) 44 Hydrograph Plot 4! Hydraflow Hydrographs by lntelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 35 Stream flow from B MP#3 Hydrograph type = Reach Peak discharge = 1.73 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 6 Section type = Trapezoidal Reach length = 765.0 ft Channel slope = 2.0% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.803 Rating curve m = 1.457 Ave. velocity = 1.05 fUs Routing coeff. = 0.3050 Modified Att-Kin routing method used. Q (cfs) 2.00 1.00 0.00 1 0 Hydrograph Volume = 40,508 cult Stream flow from BMP#3 Hyd. No. 35 -- 2 Yr 15 29 44 58 73 Hyd No. 35 Hyd No. 6 Q (cfs) 2.00 1.00 0.00 87 102 116 131 145 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 36 DESIGN POINT #1 Hydrograph type = Combine Storm frequency = 2 yrs Inflow hyds. = 29, 30 DESIGN POINT #1 Q (cfs) Hyd. No. 36 -- 2 Yr 28.00 24.00 20.00 Wednesday, Apr 25 2007, 1:44 PM Peak discharge = 24.45 cfs Time interval = 3 min Hydrograph Volume = 74,300 cult 16.00 12.00 8.00 4.00 0.00 -- 0 3 5 Hyd No. 36 Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 V 0.00 8 10 13 15 18 20 23 25 Time (hrs) - Hyd No. 29 Hyd No. 30 4E Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 37 Stream flow from B MP#7 Hydrograph type = Reach Peak discharge = 22.87 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 14 Section type = Trapezoidal Reach length = 490.0 ft Channel slope = 1.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.648 Rating curve m = 1.457 Ave. velocity = 2.06 fUs Routing coeff. = 0.7117 Modified Att-Kin routing method used. Hydrograph Volume = 78,472 cuft Stream flow from BMP#7 Q (cfs) Hyd. No. 37 -- 2 Yr 28.00 _4.00 20.00 16.00 12.00 8.00 4.00 0.00 J- 0 3 5 Hyd No. 37 Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 8 10 13 15 18 20 23 25 - Hyd No. 14 Time (hrs) 4, Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 38 Stream flow from B MP#8 Hydrograph type = Reach Peak discharge = 2.86 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 16 Section type = Trapezoidal Reach length = 1955.0 ft Channel slope = 1.9% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.783 Rating curve m = 1.457 Ave. velocity = 1.26 fUs Routing coeff. = 0.1563 Modified Att-Kin routing method used. Q (cfs) A An 3.00 2.00 1.00 1 I I I I I 0.00 0 Hydrograph Volume = 70,242 cult Stream flow from BMP#8 Hyd. No. 38 -- 2 Yr 14 28 Hyd No. 38 42 56 - Hyd No. 16 Q (cfs) 4.00 3.00 2.00 1.00 n nn 70 84 98 112 126 140 v v v Time (hrs) 4t Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 39 Flow to Design Point #2 Hydrograph type = Combine Peak discharge = 41.96 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyds. = 27, 28, 31, 32, 33 Hydrograph Volume = 315,938 cult Flow to Design Point #2 Q (cfs) Hyd. No. 39 -- 2 Yr Q (cfs) 50.00 50.00 40.00 40.00 I i 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 39 Hyd No. 27 Hyd No. 28 Hyd No. 31 Time (hrs) Hyd No. 32 Hyd No. 33 4? Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 40 Flow to Design Point #2 Hydrograph type = Combine Peak discharge = 22.98 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyds. = 34, 35, 37, 38 Hydrograph Volume = 212,434 cuff Flow to Design Point #2 Q (cfs) Hyd. No. 40 -- 2 Yr 24.00 20.00 16.00 12.00 8.00 4.00 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ' ' "' z ' 0.00 0 5 10 15 20 25 30 35 40 45 50 Hyd No. 40 Hyd No. 34 Hyd No. 35 Hyd No. 37 Time (hrs) Hyd No. 38 5( Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 41 DESIGN POINT #2 Hydrograph type = Combine. Peak discharge = 54.28 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyds. = 39, 40 Hydrograph Volume = 528,372 cuft DESIGN POINT #2 Q (cfs) Hyd. No. 41 -- 2 Yr 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ?. , i i 0.00 0 6 11 17 22 28 33 39 44 50 55 Hyd No. 41 Hyd No. 39 Hyd No. 40 Time (hrs) 5' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 42 DESIGN POINT #3 Hydrograph type = Combine Storm frequency = 2 yrs Inflow hyds. = 2, 4, 23 Wednesday, Apr 25 2007, 1:44 PM Peak discharge = 45.03 cfs Time interval = 3 min Hydrograph Volume = 241,400 cult DESIGN POINT #3 Q (cfs) Hyd. No. 42 -- 2 Yr Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 42 Hyd No. 2 Hyd No. 4 Hyd No. 23 Time (hrs) 5 5: Hydrograph Summary Report Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 50.90 3 720 139,795 ---- ------ ------ Postdevelopment Subarea P1 2 Reservoir 33.98 3 729 132,843 1 201.01 53,807 Flow BMP #1 3 SCS Runoff 64.77 3 720 180,419 ---- ------ ------ Postdevelopment Subarea P2 4 Reservoir 52.94 3 726 175,111 3 182.69 47,997 Flow BMP #2 5 SCS Runoff 30.29 3 720 82,459 ---- ----- ------ Postdevelopment Subarea P3 6 Reservoir 19.94 3 729 78,001 5 210.71 32,183 Flow BMP #3 7 SCS Runoff 53.72 3 720 147,036 ---- ---- ------ Postdevelopment Subarea P4 8 Reservoir 37.06 3 726 142,729 7 193.38 43,230 Flow BMP #4 9 SCS Runoff 122.11 3 717 277,063 ---- ------ ------ Postdevelopment Subarea P5 10 Reservoir 3.21 3 912 177,653 9 222.20 204,234 Flow BMP #5 11 SCS Runoff 45.64 3 717 106,364 --- ----- ------ Postdevelopment Subarea P6 12 Reservoir 39.26 3 720 104,400 11 239.11 30,797 Flow BMP#6 13 SCS Runoff 64.49 3 717 149,490 --- --- ----- Postdevelopment Subarea P7 14 Reservoir 54.07 3 720 142,441 13 196.98 40,566 Flow BMP#7 SCS Runoff 60.40 3 717 137,049 - ---- --- Postdevelopment Subarea P8 Reservoir 36.44 3 723 134,414 15 233.06 52,993 Flow BMP#8 17 SCS Runoff 23.53 3 717 53,344 Postdevelopment Subarea P9 18 Reservoir 16.38 3 723 51,598 17 268.62 17,797 Flow BMP#9 19 SCS Runoff 44.76 3 717 101,790 --- ----- ---- Postdevelopment Subarea P10 20 Reservoir 34.87 3 723 100,935 19 259.03 33,563 Flow BMP#10 21 SCS Runoff 17.16 3 723 47,780 ---- ---- ------ Postdevelopment Subarea P11 22 Reservoir 14.40 3 726 46,241 21 258.57 11,882 Flow BMP#11 23 SCS Runoff 59.69 3 717 134,850 ---- ---- ------ Postdevelopment Subarea P1 -A 24 SCS Runoff 34.32 3 717 77,622 ---- ------ ---- Postdevelopment Subarea P4-A 25 Combine 67.99 3 720 220,350 8,24 ---- ------ DESIGN POINT #4 26 SCS Runoff 34.41 3 717 78,162 ---- ------ ---- Postdevelopment Subarea P8-A 27 Reach 26.02 3 723 78,157 26 ----- ----- Stream Flow for 8A 28 SCS Runoff 69.76 3 717 157,644 -- -- ------ Postdevelopment Subarea P7-A 29 SCS Runoff 47.35 3 717 107,079 ---- ------ ------ Postdevelopment Subarea P11-A 30 Reach 10.25 3 735 46,075 22 -- ------ Stream flow from P11-A Old Towne-TR-20 (Proposed).gpw Return Period: 10 Year Wednesday, Apr 25 2007,1:44 PM Hydraflow Hydrographs by Intelisolve 5Z Hydrograph Summary Report 31 32 33 34 35 36 37 38 39 40 41 42 Old Hydrograph ty pe (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description Reach 28.73 3 729 104,390 12 ------ ------ Stream flow from BMP#6 Reach 3.14 3 936 177,417 10 •----- ------ Stream flow from BMP#5 Reach 20.08 3 732 100,925 20 ------ ------ Stream flow from BMP#10 Reach 7.05 3 735 51,585 18 ------ - --- Stream flow from BMP#9 Reach 17.73 3 735 77,993 6 ------ --- Stream flow from BMP#3 Combine 47.36 3 717 153,154 29, 30, ------ ------ DESIGN POINT #1 Reach 53.52 3 726 142,434 14 ---- ------ Stream flow from BMP#7 Reach 25.14 3 732 134,399 16 ------ ------ Stream flow from BMP#8 Combine 114.93 3 720 618,533 27, 28, 31, 2, 33;---- ------ Flow to Design Point #2 Combine 90.22 3 729 406,411 34,35,37, 38 - ------ ------ Flow to Design Point #2 Combine 184.80 3 726 1,024,943 39,40 --- -- DESIGN POINT #2 Combine I 125.08 3 720 442,803 2, 4, 23, ------ -- DESIGN POINT #3 Towne_TR-20 (Proposed).gpw Return Period: 10 Year Wednesday, Apr 25 2007, 1:44 PM Hvdraflow Hvdroaraohs by Intelisnlve 5f Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Postdevelopment Subarea P1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 10.35 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:44 PM Peak discharge = 50.90 cfs Time interval = 3 min Curve number = 85 Hydraulic length = 0 ft Time of conc. (Tc) = 10.8 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 139,795 cult Postdevelopment Subarea P1 Q (cfs) Hyd. No. 1 -- 10 Yr 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' - -' ' ' -- ' ' 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 1 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Postdevelopment Subarea P1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 1001.00 0.00 0.00 Watercourse slope (%) = 2.30 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.08 0.00 0.00 Travel Time (min) = 5.41 + 0.00 + 0.00 = 5.41 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................................................................. 10.80 min 5( Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 2 Flow BMP #1 Hydrograph type = Reservoir Peak discharge = 33.98 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 1 Max. Elevation = 201.01 ft Reservoir name = BMP #1 Max. Storage = 53,807 cuft Storage Indication method used. Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 2 Hyd No. 1 Time (hrs) Flow BMP #1 Hyd. No. 2 -- 10 Yr Hydrograph Volume = 132,843 cuft 5; Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 3 Postdevelopment Subarea P2 Hydrograph type = SCS Runoff Peak discharge = 64.77 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 12.33 ac Curve number = 88 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.8 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 180,419 cult Postdevelopment Subarea P2 Q (cfs) Hyd. No. 3 -- 10 Yr 70.00 10.00 50.00 40.00 30.00 20.00 10.00 0.00 -- 0 3 5 Hyd No. 3 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 8 10 13 15 18 20 23 25 Time (hrs) 5E TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Postdevelopment Subarea P2 Description - A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 1001.00 0.00 0.00 Watercourse slope (%) = 2.30 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.08 0.00 0.00 Travel Time (min) = 5.41 + 0.00 + 0.00 = 5.41 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. .............................................. ................... 10.80 min 59 Hydrograph Plot 6( Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 4 Flow BMP #2 Hydrograph type = Reservoir Peak discharge = 52.94 cfs . Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 3 Max. Elevation = 182.69 ft Reservoir name = BMP #2 Max. Storage = 47,997 cuft Storage Indication method used. Hydrograph Volume = 175,111 cult Flow BMP #2 Q (cfs) Hyd. No. 4 -- 10 Yr 70.00 00.00 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 3 5 Hyd No. 4 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 8 10 13 15 18 20 23 25 - Hyd No. 3 Time (hrs) Hydrograph Plot '-iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A4 PM Hyd. No. 5 Postdevelopment Subarea P3 Hydrograph type = SCS Runoff Peak discharge = 30.29 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 6.64 ac Curve number = 82 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.1 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 82,459 cult Q (cfs) 35.00 j0.00 25.00 20.00 15.00 10.00 5.00 0.00 -l 0 Postdevelopment Subarea P3 Hyd. No. 5 -- 10 Yr Q (cfs) 35.00 3 5 Hyd No. 5 30.00 25.00 20.00 15.00 10.00 5.00 -L- --? i I I __ 1 1 0.00 8 10 13 15 18 20 23 25 Time (hrs) 61 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Postdevelopment Subarea P3 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.50 0.00 0.00 Travel Time (min) = 5.95 + 0.00 + 0.00 = 5.95 Shallow Concentrated Flow Flow length (ft) = 1190.00 0.00 0.00 Watercourse slope (%) = 2.50 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.21 0.00 0.00 Travel Time (min) = 6.17 + 0.00 + 0.00 = 6.17 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 6; Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 12.10 min Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 6 Flow BMP #3 Hydrograph type Reservoir Peak discharge = 19.94 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 5 Max. Elevation = 210.71 ft Reservoir name = BMP #3 Max. Storage = 32,183 cuft Storage Indication method used. Q (cfs) 35.00 Hydrograph Volume = 78,001 cult Flow BMP #3 Hyd. No. 6 -- 10 Yr ,0.00 25.00 20.00 15.00 10. ^v0 5.00 0.00 -L 0 3 5 Hyd No. 6 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 1----- -t- ' I I i 0.00 8 10 13 15 18 20 23 25 Time (hrs) - Hyd No. 5 6; Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Postdevelopment Subarea P4 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 11.19 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1 A4 PM Peak discharge = 53.72 cfs Time interval = 3 min Curve number = 84 Hydraulic length = 0 ft Time of conc. (Tc) = 9.9 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 147,036 cult Q (cfs) 60.00 Postdevelopment Subarea P4 Hyd. No. 7 -- 10 Yr 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 ----- 1 1 1 ' 0.00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 7 6? TR55 Td Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Postdevelopment Subarea P4 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 3.42 + 0.00 + 0.00 = 3.42 Shallow Concentrated Flow Flow length (ft) = 653.00 182.00 607.00 Watercourse slope (%) = 3.80 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.96 3.57 3.52 Travel Time (min) = 2.75 + 0.85 + 2.87 = 6.47 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............. ....................... ...................... ................... 9.90 min 6! Hydrograph Plot Hydraflow Hydrographs by lntelisolve Wednesday, Apr 25 2007, 1:44 PM Hyd. No. 8 Flow BMP #4 Hydrograph type = Reservoir Peak discharge = 37.06 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 7 Max. Elevation = 193.38 ft Reservoir name = BMP #4 Max. Storage = 43,230 cuft Storage Indication method used- Q (cfs) 60.00 50.00 Flow BMP #4 Hyd. No. 8 -- 10 Yr Hydrograph Volume = 142,729 cuft 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' L_-?-T 1 1 i 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 8 Hyd No. 7 Time (hrs) 6E 61 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 9 Postdevelopment Subarea P5 Hydrograph type = SCS Runoff Peak discharge = 122.11 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 25.23 ac Curve number = 80 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.6 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 277,063 cuft Q (cfs) 140.00 _0.00 100.00 80.00 60.00 40.00 20.00 0.00 -L 0 Postdevelopment Subarea P5 Hyd. No. 9 -- 10 Yr Q (cfs) 140.00 3 5 Hyd No. 9 120.00 100.00 80.00 60.00 40.00 20.00 0.00 8 10 13 15 18 20 23 25 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Postdevelopment Subarea P5 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 4.20 0.00 0.00 Travel Time (min) = 3.94 + 0.00 + 0.00 = 3.94 Shallow Concentrated Flow Flow length (ft) = 990.00 0.00 0.00 Watercourse slope (%) = 4.80 4.90 3.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 3.53 3.57 3.52 Travel Time (min) = 4.67 + 0.00 + 0.00 = 4.67 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 61 Total Travel Time, Tc .............................................................................. 8.60 min Hydrograph Plot ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 10 Flow BMP #5 Hydrograph type = Reservoir Peak discharge = 3.21 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 9 Max. Elevation = 222.20 ft Reservoir name = BMP #5 Max. Storage = 204,234 cuft Storage Indication method used. Q (cfs) 140.00 . 0.00 100.00 80.00 60.00 40.00 20.00 Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 1 1- 11 --t_ f I I I I I I I 0.00 0 15 29 44 58 73 87 102 116 131 145 Hyd No. 10 Hyd No. 9 Time (hrs) Flow BMP #5 Hyd. No. 10 -- 10 Yr Hydrograph Volume = 177,653 cuft 69 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Postdevelopment Subarea P6 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 7.96 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 45:64 cfs Time interval = 3 min Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 106,364 cult Q (cfs) 50.00 40.00 30.00 20.00 10.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 11 Time (hrs) Postdevelopment Subarea P6 Hyd. No. 11 -- 10 Yr 7( Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 12 Flow BMP#6 Hydrograph type = Reservoir Peak discharge = 39.26 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 11 Max. Elevation = 239.11 ft Reservoir name = BMP #6 Max. Storage = 30,797 cuft Storage Indication method used. Q (cfs) 50.00 Flow BMP#6 Hyd. No. 12 -- 10 Yr Hydrograph Volume = 104,400 cuft 40.00 30.00 20.00 10.00 0 00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0 00 7' 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 12 Hyd No. 11 Hydrograph Plot +ydraflow Hydrographs by Intelisolve Hyd. No. 13 Postdevelopment Subarea P7 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 11.49 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, Apr 25 2007,1:45 PM Peak discharge = 64.49 cfs Time interval = 3 min Curve number = 86 Hydraulic length = 0 ft Time of conc. (Tc) = 6.1 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 149,490 cuft Q (cfs) 70.00 J.00 50.00 40.00 30.00 20.00 10.00 Postdevelopment Subarea P7 Hyd. No. 13 -- 10 Yr Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 '- 1 _ I 1- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 13 Time (hrs) ? ?. ICI 1I\ I? I II II 72 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 13 Postdevelopment Subarea P7 Description A B C Totals Sheet Flow Manning's n-value = 0.013 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 0.75 + 0.00 + 0.00 = 0.75 Shallow Concentrated Flow Flow length (ft) = 1330.00 0.00 0.00 Watercourse slope (%) = 4.20 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 4.17 3.57 3.52 Travel Time (min) = 5.32 + 0.00 + 0.00 = 5.32 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................. ...................... .......................... 6.10 min 7: Hydrograph Plot iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 14 Flow BMP#7 Hydrograph -type = Reservoir Peak discharge = 54.07 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 13 Max. Elevation = 196.98 ft Reservoir name = BMP #7 Max. Storage = 40,566 cuft Storage Indication method used. Q (cfs) 70.00 0.00 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 Hydrograph Volume = 142,441 cuft Flow BMP#7 Hyd. No. 14 -- 10 Yr Q (cfs) 70.00 60.00 3 5 Hyd No. 14 50.00 40.00 30.00 20.00 10.00 .f- I 1 0.00 8 10 13 15 18 20 23 25 - Hyd No. 13 Time (hrs) 74 Hydrograph Plot lydraflow Hydrographs by Intelisolve Hyd. No. 15 Postdevelopment Subarea P8 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 12.48 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 60.40 cfs Time interval = 3 min Curve number = 80 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 137,049 cult a (cfs) 70.00 X0.00 50.00 40.00 30.00 20.00 10.00 0 00 Postdevelopment Subarea P8 Hyd. No. 15 -- 10 Yr Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 75 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 15 Time (hrs) TR55 Tc Worksheet HydraFlow Hydrographs by Intelisolve Hyd. No. 15 Postdevelopment Subarea P8 Description A B C Totals Sheet Flow Manning's n-value = 0.013 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.20 0.00 0.00 Travel Time (min) = 0.72 + 0.00 + 0.00 = 0.72 Shallow Concentrated Flow Flow length (ft) = 1512.00 0.00 0.00 Watercourse slope (%) = 2.90 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.46 3.57 3.52 Travel Time (min) = 7.28 + 0.00 + 0.00 = 7.28 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................................................................. 8.00 min 71 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 16 Flow BMP#8 Hydrograph type = Reservoir Peak discharge = 36.44 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 15 Max. Elevation = 233.06 ft Reservoir name = BMP #8 Max. Storage = 52,993 cuft Storage Indication method used. Q (cfs) 70.00 x0.00 50.00 Hydrograph Volume = 134,414 cult Flow BMP#8 Hyd. No. 16 -- 10 Yr Q (cfs) 70.00 60.00 40.00 30.00 20.00 10.00 0.00 -L 0 3 5 Hyd No. 16 50.00 40.00 30.00 20.00 10.00 0.00 8 10 13 15 18 20 23 25 - Hyd No. 15 Time (hrs) 71 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 17 Postdevelopment Subarea P9 Hydrograph type- = SCS Runoff Storm frequency = 10 yrs Drainage area = 6.51 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, Apr 25 2007,1:45 PM Peak discharge = 23.53 cfs Time interval = 3 min Curve number = 71 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 53,344 cult Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ' ' ' -? ' ' ' ' 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 17 Time (hrs) Postdevelopment Subarea P9 Hyd. No. 17 -- 10 Yr 7f Hydrograph Plot 79 lydraFlow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 18 Flow BMP#9 Hydrograph type = Reservoir Peak discharge = 16.38 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 17 Max. Elevation = 268.62 ft Reservoir name = BMP #9 Max. Storage = 17,797 cult Storage Indication method used. Q (cfs) 24.00 20.00 16.00 Flow BMP#9 Hyd. No. 18 -- 10 Yr Hydrograph Volume = 51,598 cult 12.00 8.00 4.00 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ' ' ' ' ' ' ' ' 0.00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 18 Hyd No. 17 Hydrograph Plot 8( Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 19 Postdevelopment Subarea P10 Hydrograph type = SCS Runoff Peak discharge = 44.76 cfs Storm frequency = 10 yrs Time interval = 3 -min Drainage area = 9.00 ac Curve number = 81 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 101,790 cult Postdevelopment Subarea P10 Q (cfs) Hyd. No. 19 -- 10 Yr 50.00 40.00 30.00 20.00 10.00 0.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 19 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 20 Flow BMP#10 Hydrograph type = Reservoir Peak discharge = 34.87 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 19 Max. Elevation = 259.03 ft Reservoir name = BMP #10 Max. Storage = 33,563 cuft Storage Indication method used. Q (cfs) 50.00 40.00 30.00 20.00 10.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' I L 1 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 20 Hyd No. 19 Time (hrs) Flow BMP#10 Hyd. No. 20 -- 10 Yr Hydrograph Volume = 100,935 cuft 81 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 21 Postdevelopment Subarea P11 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 6.61 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 17.16 cfs Time interval = 3 min Curve number = 66 Hydraulic length = 0 ft Time of conc. (Tc) = 10.2 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 47,780 cuft Postdevelopment Subarea P11 Q (cfs) Hyd. No. 21 -- 10 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0 00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 8; 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 21 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 21 Postdevelopment Subarea P11 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 637.00 524.00 0.00 Watercourse slope (%) = 6.60 3.80 3.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 4.15 3.96 3.52 Travel Time (min) = 2.56 + 2.20 + 0.00 = 4.77 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 8; Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 10.20 min 8d Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 22 Flow BMP#11 Hydrograph type = Reservoir Peak discharge = 14.40 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 21 Max. Elevation = 258.57 ft Reservoir name = BMP #11 Max. Storage = 11,882 cuft Storage Indication method used. Hydrograph Volume = 46,241 cuft Flow BMP#11 Q (cfs) Hyd. No. 22 -- 10 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0 00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 22 Hyd No. 21 Hydrograph Plot ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007,1:45 PM Hyd. No. 23 Postdevelopment Subarea P1 -A Hydrograph type = SCS Runoff Peak discharge = 59.69 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 13.46 ac Curve number = 77 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 134,850 cult Postdevelopment Subarea P1-A Q (cfs) Hyd. No. 23 -- 10 Yr 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 i i 1 i i i ' 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 23 Time (hrs) 85 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 24 Postdevelopment Subarea P4-A Hydrograph type = SCS Runoff Peak discharge = 34.32 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 7.51 ac Curve number = 78 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 77,622 cult Postdevelopment Subarea P4-A Q (cfs) Hyd. No. 24 -- 10 Yr 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 -L 0 3 5 Hyd No. 24 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 - , _ i_ 1 - -1- - - --- 0.00 8 10 13 15 18 20 23 25 Time (hrs) 8( Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 25 DESIGN POINT #4 Hydrograph type = Combine Peak discharge = 67.99 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyds. = 8, 24 Hydrograph Volume = 220,350 cuft DESIGN POINT #4 Q (cfs) Hyd. No. 25 -- 10 Yr 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 3 5 Hyd No. 25 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 1- ' 0.00 8 10 13 15 18 20 23 25 - Hyd No. 8 Hyd No. 24 Time (hrs) 8'. Hydrograph Plot iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 26 Postdevelopment Subarea P8-A Hydrograph type = SCS Runoff Peak discharge = 34.41 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 9.89 ac Curare number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 78,162 cuft Q (cfs) 35.00 10.00 25.00 20.00 15.00 10.00 5.00 0.00 -L 0 Postdevelopment Subarea P8-A Hyd. No. 26 -- 10 Yr Q (cfs) 35.00 3 5 Hyd No. 26 30.00 25.00 20.00 15.00 10.00 5.00 ' -'-- ' ' ' 0.00 8 10 13 15 18 20 23 25 Time (hrs) 88 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 27 Stream Flow for 8A Hydrograph type = Reach' Peak discharge = 26.02 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 26 Section type = Trapezoidal Reach length = 1748.0 ft Channel slope = 2.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.823 Rating curve m = 1.457 Ave. velocity = 2.65 fUs Routing coeff. = 0.3320 Modified Att-Kin routing method used. Hydrograph Volume = 78,157 cuft Stream Flow for 8A Q (cfs) Hyd. No. 27 -- 10 Yr Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 8? 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 27 Hyd No. 26 Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 28 Postdevelopment Subarea P7-A Hydrograph type = SCS Runoff Peak discharge = 69.76 cfs Storm frequency = 10 yrs Time interval = 3 min Drainage area = 17.94 ac Curve number = 73 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 157,644 cuft Q (cfs) 70.00 AM Postdevelopment Subarea P7-A Hyd. No. 28 -- 10 Yr Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 3 5 Hyd No. 28 60.00 50.00 40.00 30.00 20.00 10.00 I i 0.00 8 10 13 15 18 20 23 25 Time (hrs) 90 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 29 Postdevelopment Subarea P11-A Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 10.36 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.38 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 47.35 cfs Time interval = 3 min Curve number = 78 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 107,079 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 s 0 Postdevelopment Subarea P11-A Hyd. No. 29 -- 10 Yr 3 5 Hyd No. 29 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ----- ' 0.00 8 10 13 15 18 20 23 25 Time (hrs) 91 Hydrograph Plot '-lydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 30 Stream flow from P11 -A Hydrograph type = Reach Peak discharge = 10.25 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 22 Section type = Trapezoidal Reach length = 1285.0 ft Channel slope = 2.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.862 Rating curve m = 1.457 Ave. velocity = 2.08 ft/s Routing coeff. = 0.3506 Modified Att-Kin routing method used- Q (cfs) 15.00 12.00 9.00 6.00 3.00 Q (cfs) 15.00 12.00 9.00 6.00 3.00 0.00 ' ' ` ' ' ' ' -n6-j- 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 30 Hyd No. 22 Time (hrs) Stream flow from P11-A Hyd. No. 30 -- 10 Yr Hydrograph Volume = 46,075 cuft 9s Hydrograph Plot 93 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 31 Stream flow from B MP#6 Hydrograph type = Reach Peak discharge = 28.73 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 12 Section type = Trapezoidal Reach length = 1930.0 ft Channel slope = 1.8% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.762 Rating curve m = 1.457 Ave. velocity = 2.62 ft/s Routing coeff. = 0.3025 Modified Att-Kin routing method used. Stream flow from BMP#6 Q (cfs) Hyd. No. 31 -- 10 Yr 40.00 30.00 20.00 10.00 0.00 Hydrograph Volume = 104,390 cuft Q (cfs) 40.00 30.00 20.00 10.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 31 Hyd No. 12 Hydrograph Plot lydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 32 Stream flow from B MP#5 Hydrograph type = Reach Peak discharge = 3.14 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 10 Section type = Trapezoidal Reach length = 2003.0 ft Channel slope = 1.9% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.783 Rating curve m = 1.457 Ave. velocity = 1.22 ft/s Routing coeff. = 0.1478 Modified Att-Kin routing method used. Q (cfs) 4.00 3.00 2.00 1.00 0 00 Hydrograph Volume = 177,417 cult Stream flow from BMP#5 Hyd. No. 32 -- 10 Yr Il?lIIIII?I Q (cfs) 4.00 3.00 2.00 1.00 0 00 94 0 15 29 44 58 73 87 102 116 131 145 Time (hrs) Hyd No. 32 Hyd No. 10 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 33 Stream flow from B MP#10 Hydrograph type = Reach Peak discharge = 20.08 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 20 Section type = Trapezoidal Reach length = 2840.0 ft Channel slope = 2.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.823 Rating curve m = 1.457 Ave. velocity = 2.66 ft/s Routing coeff. = 0.2191 Modified Att-Kin routing method used. Stream flow from BMP#10 Q (cfs) Hyd. No. 33 -- 10 Yr 35.00 10.00 25.00 20.00 15.00 iv.00 5.00 0.00 -L 0 Hydrograph Volume = 100,925 cult 3 5 Hyd No. 33 Q (cfs) 35.00 30.00 25.00 20.00 15.00 1 u.00 5.00 -E-: . 0.00 8 10 13 15 18 20 23 25 - Hyd No. 20 Time (hrs) 9e V Hydrograph Plot iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 34 Stream flow from B MP#9 Hydrograph' type = Reach Peak discharge = 7.05 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 18 Section type = Trapezoidal Reach length = 3000.0 ft Channel slope = 2.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.862 Rating curve m = 1.457 Ave. velocity = 2.17 fUs Routing coeff. = 0.1732 Modified Att-Kin routing method used. Hydrograph Volume = 51,585 cult Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 Stream flow from BMP#9 Hyd. No. 34 -- 10 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 1 1 1 1 1 --1 1 1 1 1 1 ?' 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 34 Hyd No. 18 Time (hrs) i 96 Hydrograph Plot 'iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 35 Stream flow from B MP#3 Hydrograph type = Reach Peak discharge = 17.73 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 6 Section type = Trapezoidal Reach length = 765.0 ft Channel slope = 2.0% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.803 Rating curve m = 1.457 Ave. velocity = 2.20 ft/s Routing coeff. = 0.5475 Modified Att-Kin routing method used. Hydrograph Volume = 77,993 cult Q (cfs) 21.00 8.00 15.00 12.00 9.00 o. vv" ^ 3.00 0.00 -L 0 Stream flow from BMP#3 Hyd. No. 35 -- 10 Yr Q (cfs) 21.00 3 5 Hyd No. 35 18.00 15.00 12.00 9.00 6.00 3.00 I , ---1 0.00 8 10 13 15 18 20 23 25 - Hyd No. 6 Time (hrs) 97 98 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 36 DESIGN POINT #1 Hydrograph type = Combine Peak discharge = 47.36 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyds. = 29, 30 Hydrograph Volume = 153,154 cuft DESIGN POINT #1 Q (cfs) Hyd. No. 36 -- 10 Yr 50.00 40.00 30.00 20.00 10.00 0 00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 36 Hyd No. 29 Hyd No. 30 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 37 Stream flow from B MP#7 Hydrograph type = Reach Peak-discharge = 53.52 cfs, Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 14 Section type = Trapezoidal Reach length = 490.0 ft Channel slope = 1.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.648 Rating curve m = 1.457 Ave. velocity = 2.59 ft/s Routing coeff. = 0.8193 Modified Att-Kin routing method used. Hydrograph Volume = 142,434 cuft Stream flow from BMP#7 Q (cfs) Hyd. No. 37 -- 10 Yr Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0 00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 9c 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 37 Hyd No. 14 Hydrograph Plot lydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 38 Stream flow from B MP#8 Hydrograph type = Reach Peak discharge = 25.14 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 16 Section type = Trapezoidal Reach length = 1955.0 ft Channel slope = 1.9% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.783 Rating curve m = 1.457 Ave. velocity = 2.61 fUs Routing coeff. = 0.2980 Modified Att-Kin routing method used. Stream flow from BMP#8 Q (cfs) Hyd. No. 38 -- 10 Yr 40.00 Hydrograph Volume = 134,399 cuft 30.00 20.00 10.00 0 00 Q (cfs) 40.00 30.00 20.00 10.00 0 00 100 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 38 Hyd No. 16 101 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 39 Flow to Design Point #2 Hydrograph type = Combine Storm frequency = 10 yrs Inflow hyds. = 27, 28, 31, 32, 33 Wednesday, Apr 25 2007, 1 A5 PM Peak discharge = 114.93 cfs Time interval = 3 min Hydrograph Volume = 618,533 cuft Flow to Design Point #2 Q (cfs) Hyd. No. 39 -- 10 Yr Q (cfs) 120 00 120 00 . . 00 00 0 . . 100. 0 80 00 . 80.00 60 00 . 60.00 40 00 . I I 40.00 00 20 . 20.00 1 0.00 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 39 Hyd No. 27 Hyd No. 28 Hyd No. 31 Time (hrs) Hyd No. 32 Hyd No. 33 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 40 Flow to Design Point #2 Hydrograph type = Combine Peak discharge = 90.22 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyds. = 34, 35, 37, 38 Hydrograph Volume = 406,411 tuft Flow to Design Point #2 Q (cfs) Hyd. No. 40 -- 10 Yr 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 I I I 20.00 10.00 0.00 0 3 5 8 10 Hyd No. 40 Hyd No. 34 Hyd No. 38 13 15 Hyd No. 35 18 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 - - 0.00 20 23 25 - Hyd No. 37 Time (hrs) 10. Hydrograph Plot iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 41 DESIGN POINT #2 Hydrograph type = Combine Peak discharge = 184.80 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyds. = 39, 40 Hydrograph Volume = 1,024,943 cult Q (cfs) 210.00 10.00 150.00 120.00 90.00 60.00 30.00 0.00 -L 0 DESIGN POINT #2 Hyd. No. 41 -- 10 Yr Q (cfs) 210.00 3 5 Hyd No. 41 180.00 150.00 120.00 90.00 60.00 30.00 I 0.00 8 10 13 15 18 20 23 25 - Hyd No. 39 Hyd No. 40 Time (hrs) 103 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 42 DESIGN POINT #3 Hydrograph type = Combine Storm frequency = 10 yrs Inflow hyds. = 2, 4, 23 DESIGN POINT #3 Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 125.08 cfs Time interval = 3 min Hydrograph Volume = 442,803 cult 10, 105 Hydrograph Summary Report NU. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuff) Hydrograph description 1 SCS Runoff 83.09 3 720 233,434 = ------ ------ "Postdevelopment Subarea P1 2 Reservoir 66.24 3 726 226,450 1 201.62 68,863 Flow BMP #1 3 SCS Runoff 102.89 3 720 293,978 ---- ------ ------ Postdevelopment Subarea P2 4 Reservoir 67.54 3 729 288,658 3 183.73 70,891 Flow BMP #2 5 SCS Runoff 50.94 3 720 141,239 ---- ------ ------ Postdevelopment Subarea P3 6 Reservoir 41.32 3 726 136,767 5 211.24 39,929 Flow BMP #3 7 SCS Runoff 88.55 3 720 247,587 ---- - ------ Postdevelopment Subarea P4 8 Reservoir 82.85 3 723 243,265 7 193.97 53,252 Flow BMP #4 9 SCS Runoff 208.78 3 717 482,967 ---- ------ ------ Postdevelopment Subarea P5 10 Reservoir 46.42 3 729 383,352 9 223.31 255,112 Flow BMP #5 11 SCS Runoff 72.91 3 717 174,715 ---- ------ ---- Postdevelopment Subarea P6 12 Reservoir 60.14 3 720 172,745 11 239.64 37,399 Flow BMP#6 13 SCS Runoff 103.95 3 717 247,570 ---- ------ ----- Postdevelopment Subarea P7 14 Reservoir 78.77 3 723 240,511 13 197.92 56,096 Flow BMP#7 SCS Runoff 103.27 3 717 238,899 ---- --- - ------ Postdevelopment Subarea P8 16 Reservoir 67.43 3 723 236,244 15 234.00 73,075 Flow BMP#8 17 SCS Runoff 44.84 3 717 101,450 ---- ------ -- - Postdevelopment Subarea P9 18 Reservoir 41.03 3 720 99,699 17 269.15 22,266 Flow BMP#9 19 SCS Runoff 75.73 3 717 175.875 ---- ---- - -- Postdevelopment Subarea P10 20 Reservoir 59.69 3 723 175,015 19 259.68 42,409 Flow BMP#10 21 SCS Runoff 35.42 3 720 96,159 --- ------ ----- Postdevelopment Subarea P11 22 Reservoir 24.12 3 729 94,617 21 259.64 20,203 Flow BMP#11 23 SCS Runoff 105.49 3 717 241,597 ---- ----- ------ Postdevelopment Subarea P1 -A 24 SCS Runoff 59.98 3 717 137,781 ---- ------ ------ Postdevelopment Subarea P4-A 25 Combine 123.16 3 720 381,046 8,24 ------ ---- DESIGN POINT #4 26 SCS Runoff 66.47 3 717 150,254 ---- ----- ------ Postdevelopment Subarea P8-A 27 Reach 54.37 3 723 150,251 26 ------ ------ Stream Flow for 8A i 28 SCS Runoff 129.41 3 717 293,656 ---- ------ ------ Postdevelopment Subarea P7-A 29 SCS Runoff 82.74 3 717 190,068 ---- ---- ------ Postdevelopment Subarea P11-A 30 Reach 22.17 3 735 94,455 22 ------ ------ Stream flow from P11-A Old Towne_TR-20 (Proposed).gpw Return Period- 100 Year Wednesday, Apr 25 2007,1:45 PM ---- - -J - -1 J 10E Hydrograph Summary Report Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 31 Reach 49.98 3. 729 172,735 12. -- ------ Stream flow from BMP#6 32 Reach 39.10 3 741 383,239 10 ------ ------ Stream flow from BMP#5 33 Reach 4515 3 729 175,008 20 --- ------ Stream flow from BMP#10 34 Reach 25.26 3 729 99,688 18 ------ --- Stream flow from BMP#9 35 Reach 40.17 3 732 136,759 6 ---- - - - Stream flow from BMP#3 36 Combine 91.60 3 720 284,523 29, 30, ------ ------ DESIGN POINT #1 37 Reach 78.06 3 726 240,505 14 ------ ------ Stream flow from BMP#7 38 Reach 60.45 3 732 236,231 16 ------ ------ Stream flow from BMP#8 39 Combine 239.04 3 720 1,174,890 27, 28, 31, 2, 33;---- ------ Flow to Design Point #2 40 Combine 195.75 3 726 713,183 34,35,37, 38 - ----- ------ Flow to Design Point #2 41 Combine 401.17 3 723 1,888,074 39,40 ------ ------ DESIGN POINT #2 42 Combine 209.77 3 720 756,706 2, 4, 23, ---- --- DESIGN POINT #3 Old Towne_TR-20 (Proposed).gpw Return Period: 100 Year Wednesday, Apr 25 2007, 1:45 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 1 Postdevelopment Subarea P1 Hydrograph type = SCS Runoff Peak discharge = 83.09 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 10.35 ac Curve number = 85 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.8 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 233,434 cuft Postdevelopment Subarea P1 Q (cfs) Hyd. No. 1 -- 100 Yr 90.00 0.00 70.00 60.00 50.00 40.00 30.00 I 20.00 10.00 0.00 0 3 5 8 10 13 15 18 20 23 Hyd No. 1 107 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 25 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Postdevelopment Subarea P1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 1001.00 0.00 0.00 Watercourse slope (%) = 2.30 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.08 0.00 0.00 Travel Time (min) = 5.41 + 0.00 + 0.00 = 5.41 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................. ............................. ................... 10.80 min 10E Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 2 Flow BMP #1 Hydrograph type = Reservoir Peak discharge = 66.24 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 1 Max. Elevation = 201.62 ft Reservoir name = BMP #1 Max. Storage = 68,863 cuft Storage Indication method used. Hydrograph Volume = 226,450 cult Q (cfs) 90.00 '0.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Flow BMP #1 Hyd. No. 2 -- 100 Yr 0 3 5 8 10 13 15 18 20 23 Hyd No. 2 Hyd No. 1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 25 Time (hrs) 10i Hydrograph Plot ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 3 Postdevelopment Subarea P2 Hydrograph type = SCS Runoff Peak discharge = 102.89 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 12.33 ac Curve number = 88 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.8 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 293,978 cult Postdevelopment Subarea P2 Q (cfs) Hyd. No. 3 -- 100 Yr 120.00 ,- 100.00 80.00 60.00 40.00 20.00 Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 ' 1 -- I -t 1 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 3 Time (hrs) 110 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Postdevelopment Subarea P2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 1001.00 0.00 0.00 Watercourse slope (%) = 2.30 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.08 0.00 0.00 Travel Time (min) = 5.41 + 0.00 + 0.00 = 5.41 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 111 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 10.80 min Hydrograph Plot lydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 4 Flow BMP #2 Hydrograph type = Reservoir Peak discharge = 67.54 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 3 Max. Elevation = 183.73 ft Reservoir name = BMP #2 Max. Storage = 70,891 cuft Storage Indication method used. Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 Flow BMP #2 Hyd. No. 4 -- 100 Yr Hydrograph Volume = 288,658 cuft Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 i i I I 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 4 Hyd No. 3 Time (hrs) 112 Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007,1:45 PM Hyd. No. 5 Postdevelopment Subarea P3 Hydrograph type = SCS Runoff Peak discharge = 50.94 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 6.64 ac Curve number = 82 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.1 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 141,239 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 _ _i L 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 5 Time (hrs) Postdevelopment Subarea P3 Hyd. No. 5 -- 100 Yr 113 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Postdevelopment Subarea P3 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.50 0.00 0.00 Travel Time (min) = 5.95 + 0.00 + 0.00 = 5.95 Shallow Concentrated Flow Flow length (ft) = 1190.00 0.00 0.00 Watercourse slope (%) = 2.50 0.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.21 0.00 0.00 Travel Time (min) = 6.17 + 0.00 + 0.00 = 6.17 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 11t Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 12.10 min Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 6 Flow BMP #3 Hydrograph type = Reservoir Peak discharge = 41.32 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 5 Max. Elevation = 211.24 ft Reservoir name = BMP #3 Max. Storage = 39,929 cuft Storage Indication method used. Q (cfs) 60.00 50.00 Flow BMP #3 Hyd. No. 6 -- 100 Yr Hydrograph Volume = 136,767 cult 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 t I 1 - - - 0.00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 6 Hyd No. 5 11! 11E Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 7 Postdevelopment Subarea P4 Hydrog.raph type = SCS Runoff Peak discharge = 88.55 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 11.19 ac Curve number = 84 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.9 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 247,587 cuft Postdevelopment Subarea P4 Q (cfs) Hyd. No. 7 -- 100 Yr 90.00 0.00 - 70.00 60.00 50.00 40.00 30.00 I 20.00 10.00 0.00 - 0 3 5 8 10 13 15 18 20 23 Hyd No. 7 Q (cfs) 90.00 80.00 70.00 60.00 50.00 - 40.00 30.00 20.00 10.00 0.00 25 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Postdevelopment Subarea P4 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 3.42 + 0.00 + 0.00 = 3.42 Shallow Concentrated Flow Flow length (ft) = 653.00 182.00 607.00 Watercourse slope (%) = 3.80 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.96 3.57 3.52 Travel Time (min) = 2.75 + 0.85 + 2.87 = 6.47 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................. ................................................ 9.90 min 117 Hydrograph Plot Hyd. No. 8 Flow BMP #4 Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 7 Reservoir name = BMP #4 Flow BMP #4 Hyd. No. 8 -- 100 Yr Storage Indication method used. Q (cfs) 90.00 - '0.00 - 70.00 - 60.00 J 50.00 40.00 30.00 20.00 10.00 - 0.00 Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 82.85 cfs Time interval = 3 min Max. Elevation = 193.97 ft Max. Storage = 53,252 cuft Hydrograph Volume = 243,265 cult 0 3 5 8 10 13 15 18 20 23 Hyd No. 8 Hyd No. 7 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 25 Time (hrs) 11E Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Postdevelopment Subarea P5 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 25.23 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 8.00 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1 45 PM Peak discharge = 208.78.cfs Time interval = 3 min Curve number = 80 Hydraulic length = 0 ft Time of conc. (Tc) = 8.6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 482,967 cuft Postdevelopment Subarea P5 Q (cfs) Hyd. No. 9 -- 100 Yr 210.00 J.00 150.00 120.00 90.00 00.00 30.00 0.00 -L 0 3 5 Hyd No. 9 Q (cfs) 210.00 180.00 150.00 120.00 90.00 an nn vv.vv 30.00 - 1 0.00 8 10 13 15 18 20 23 25 Time (hrs) Ills TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Postdevelopment Subarea P5 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 4.20 0.00 0.00 Travel Time (min) = 3.94 + 0.00 + 0.00 = 3.94 Shallow Concentrated Flow Flow length (ft) = 990.00 0.00 0.00 Watercourse slope (%) = 4.80 4.90 3.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 3.53 3.57 3.52 Travel Time (min) = 4.67 + 0.00 + 0.00 = 4.67 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 12C Total Travel Time, Tc .............................................................................. 8.60 min Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 10 Flow BMP #5 Hydrograph type = Reservoir Peak discharge = 46.42 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 9 Max. Elevation = 223.31 ft Reservoir name = BMP #5 Max. Storage = 255,112 cuft Storage Indication method used. Hydrograph Volume = 383,352 cuft Q (cfs) 210.00 0.00 150.00 120.00 90.00 Fn nn 30.00 Q (cfs) 210.00 180.00 150.00 120.00 90.00 600.00 30.00 0.00 -1 ' ' t I I ?- 0.00 0 3 5 8 10 13 15 18 20 23 25 28 Hyd No. 10 Hyd No. 9 Time (hrs) 121 Flow BMP #5 Hyd. No. 10 -- 100 Yr Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Postdevelopment Subarea P6 Hydrograph type = SCS Runoff . Storm frequency = 100 yrs Drainage area = 7.96 ac Basin Slope = 0.0% Tc method = USER Total precip. = 8.00 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 72.91 cfs Time interval = 3 min Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 174,715 cuft Postdevelopment Subarea P6 Q (cfs) Hyd. No. 11 -- 100 Yr 80.00 0.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 12; 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 11 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 12 Flow BMP#6 Hydrograph type = Reservoir Peak discharge = 60.14 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 11 Max. Elevation = 239.64 ft Reservoir name = BMP #6 Max. Storage = 37,399 cuft Storage Indication method used. Hydrograph Volume = 172,745 cult Q (cfs) Q (cfs) 80.00 80.00 70.00 60 00 . 60.00 50 00 . 50.00 40 00 . 40.00 30 00 . 30.00 00 20 _ . 20.00 10 00 . 10.00 0.00 0 00 0 Flow BMP#6 Hyd. No. 12 -- 100 Yr 3 5 8 10 13 15 18 20 23 Hyd No. 12 Hyd No. 11 25 Time (hrs) 12; 124 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 13 Postdevelopment S ubarea P7 Hydrograph type = SCS Runoff Peak discharge = 103.95 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 11.49 ac Curve number = 86 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.1 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 247,570 cuft Postdevelopment Subarea P7 Q (cfs) Hyd. No. 13 -- 100 Yr 120.00 100.00 80.00 60.00 40.00 20.00 0 00 Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 13 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 13 Postdevelopment Subarea P7 Description A B C Totals Sheet Flow Manning's n-value = 0.013 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 0.75 + 0.00 + 0.00 = 0.75 Shallow Concentrated Flow Flow length (ft) = 1330.00 0.00 0.00 Watercourse slope (%) = 4.20 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 4.17 3.57 3.52 Travel Time (min) = 5.32 + 0.00 + 0.00 = 5.32 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. .............................................. ................... 6.10 min 12! 126 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 14 Flow BMP#7 Hydrograph type = Reservoir Peak discharge = 78.77 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 13 Max. Elevation = 197.92 ft Reservoir name = BMP #7 Max. Storage = 56,096 cuft Storage Indication method used. Q (cfs) 120.00 100.00 Flow BMP#7 Hyd. No. 14 -- 100 Yr Hydrograph Volume = 240,511 cult 80.00 60.00 40.00 20.00 Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 1 -L_- , I a 0.00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 14 Hyd No. 13 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 15 Postdevelopment Subarea P8 Hydrograph type = SCS Runoff Peak discharge = 103.27 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 12.48 ac Curve number = 80 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 238,899 cuft Postdevelopment Subarea P8 Q (cfs) Hyd. No. 15 -- 100 Yr 120.00 -100.00 80.00 60.00 40.00 20.00 Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 ' 1 1 0.00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 15 127 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 15 Postdevelopment Subarea P8 Description A B C Totals Sheet Flow Manning's n-value = 0.013 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.20 0.00 0.00 Travel Time (min) = 0.72 + 0.00 + 0.00 = 0.72 Shallow Concentrated Flow Flow length (ft) = 1512.00 0.00 0.00 Watercourse slope (%) = 2.90 4.90 3.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.46 3.57 3.52 Travel Time (min) = 7.28 + 0.00 + 0.00 = 7.28 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc ............. ................. ...................... .......................... 8.00 min 128 Hydrograph Plot -lydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 16 Flow BMP#8 Hydrograph type = Reservoir Peak discharge = 67.43 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 15 Max. Elevation = 234.00 ft Reservoir name = BMP #8 Max. Storage = 73,075 cuft Storage Indication method used. Hydrograph Volume = 236,244 cuft Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 i I 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 16 Hyd No. 15 Time (hrs) Flow BMP#8 Hyd. No. 16 -- 100 Yr 12S Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 17 Postdevelopment Subarea P9 Hydrograph type . = SCS Runoff Peak discharge = 44.84 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 6.51 ac Curve number = 71 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 101,450 cult Postdevelopment Subarea P9 Q (cfs) Hyd. No. 17 -- 100 Yr 50.00 r- 40.00 30.00 20.00 10.00 0.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0 00 13C 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 17 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 18 Flow BMP#9 Hydrograph type = Reservoir Peak discharge = 41.03 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 17 Max. Elevation = 269.15 ft Reservoir name = BMP #9 Max. Storage = 22,266 cuft Storage Indication method used. Q (cfs) 50.00 40.00 Flow BMP#9 Hyd. No. 18 -- 100 Yr Hydrograph Volume = 99,699 cult 30.00 20.00 10.00 0.00 Q (cfs) 50.00 40.00 131 30.00 20.00 10.00 0 00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 18 Hyd No. 17 Hydrograph Plot Hyd. No. 19 Postdevelopment Subarea P10 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 9.00 ac Basin Slope = 0.0% Tc method = USER Total precip. = 8.00 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 75.73 cfs Time interval = 3 min Curve number = 81 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 175,875 cuft Q (cfs) on nn 0.00 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 ' ' ___ I I 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hrs) Hyd No. 19 Postdevelopment Subarea P10 Hyd. No. 19 -- 100 Yr 132 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 20 Flow BMP#10 Hydrograph type = Reservoir Peak discharge = 59.69 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 19 Max. Elevation = 259.68 ft Reservoir name = BMP #10 Max. Storage = 42,409 cuft Storage Indication method used. Hydrograph Volume = 175,015 cuft Flow BMP#10 Q (cfs) Hyd. No. 20 -- 100 Yr Q (cfs) 80.00 '0.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 13 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 20 Hyd No. 19 Hydrograph Plot lydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 21 Postdevelopment Subarea P11 Hydrograph type = SCS Runoff Peak discharge = 35.42 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 6.61 ac Curve number = 66 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.2 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 96,159 cult Postdevelopment Subarea P11 Q (cfs) Hyd. No. 21 -- 100 Yr 40.00 -? 30.00 20.00 10.00 0.00 Q (cfs) 40.00 30.00 20.00 10.00 0 00 134 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 21 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 21 Postdevelopment Subarea P11 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.90 0.00 0.00 Travel Time (min) = 5.42 + 0.00 + 0.00 = 5.42 Shallow Concentrated Flow Flow length (ft) = 637.00 524.00 0.00 Watercourse slope (%) = 6.60 3.80 3.00 Surface description = Unpaved Paved Paved Average velocity (f /s) = 4.15 3.96 3.52 Travel Time (min) = 2.56 + 2.20 + 0.00 = 4.77 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 13f Total Travel Time, Tc .............................................................................. 10.20 min Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 22 Flow BMP#11 Hydrograph type = Reservoir Peak discharge = 24.12 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 21 Max. Elevation = 259.64 ft Reservoir name = BMP #11 Max. Storage = 20,203 cuft Storage Indication method used- Q (cfs) 40.00 30.00 20.00 10.00 0 00 Flow BMP#11 Hyd. No. 22 -- 100 Yr Hydrograph Volume = 94,617 cuft Q (cfs) 40.00 30.00 20.00 10.00 0 00 13E 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 22 Hyd No. 21 Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 23 Postdevelopment Subarea P1-A Hydrograph type = SCS Runoff Peak discharge = 105.49 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 13.46 ac Curve number = 77 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 241,597 cuft Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 Postdevelopment Subarea PI -A Hyd. No. 23 -- 100 Yr Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 1 1 ?---r 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 23 Time (hrs) 137 Hydrograph Plot 131 Hydraflow Hydrographs by intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 24 Postdevelopment Subarea P4-A Hydrograph type = SCS. Runoff Peak discharge = 59.98 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 7.51 ac Curve number = 78 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 137,781 cuft Postdevelopment Subarea P4-A Q (cfs) Hyd. No. 24 -- 100 Yr 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 f I -, I I 1 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 24 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 25 DESIGN POINT #4 Hydrograph type = Combine Peak discharge = 123.16 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyds. = 8, 24 Hydrograph Volume = 381,046 cult DESIGN POINT #4 Q (cfs) Hyd. No. 25 -- 100 Yr Q (cfs) 140.00 _0.00 100.00 80.00 60.00 40.00 20.00 0.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 13? 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 25 Hyd No. 8 Hyd No. 24 Hydrograph Plot iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 26 Postdevelopment Subarea P8-A Hydrograph type = SCS Ru-noff Peak discharge = 66.47 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 9.89 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 150,254 cuft Postdevelopment Subarea P8-A Q (cfs) Hyd. No. 26 -- 100 Yr 70.00 - ,0.00 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 3 5 Hyd No. 26 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 . 0.00 8 10 13 15 18 20 23 25 Time (hrs) 140 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 27 Stream Flow for 8A Hydrograph type = Reach Peak discharge = 54.37 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 26 Section type = Trapezoidal Reach length = 1748.0 ft Channel slope = 2.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.823 Rating curve m = 1.457 Ave. velocity = 3.26 fUs Routing coeff. = 0.3931 Modified Att-Kin routing method used. Stream Flow for 8A Q (cfs) Hyd. No. 27 -- 100 Yr 70.00 0.00 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 Hydrograph Volume = 150,251 cuft 3 5 Hyd No. 27 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.0000 10.00 -? 0.00 8 10 13 15 18 20 23 25 Time (hrs) - Hyd No. 26 141 Hydrograph Plot 9ydraflow Hydrographs by Intelisolve Hyd. No. 28 Postdevelopment Subarea P7-A Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 17.94 ac Basin Slope = 0.0% Tc method = USER Total precip. = 8.00 in Storm duration = 24 hrs Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 129.41 cfs Time interval = 3 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 293,656 cuft Q (cfs) 140.00 10.00 100.00 80.00 60.00 40.00 20.00 Postdevelopment Subarea P7-A Hyd. No. 28 -- 100 Yr Q (cfs) 140.00 0.00 1 0 3 5 Hyd No. 28 120.00 100.00 80.00 60.00 40.00 20.00 ----fi- -----1 0.00 8 10 13 15 18 20 23 25 Time (hrs) 142 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 29 Postdevelopment Subarea P11-A Hydrograph type = SCS Runoff Peak discharge = 82.74 cfs Storm frequency = 100 yrs Time interval = 3 min Drainage area = 10.36 ac Curve number = 78 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 190,068 cult Postdevelopment Subarea P11-A Q (cfs) Hyd. No. 29 -- 100 Yr 90.00 '0.00 70.00 60.00 50.00 40.00 30.00 I I I I 20.00 10.00 0.00 - 0 3 5 8 10 13 15 18 20 23 Hyd No. 29 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 25 Time (hrs) 14: Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 30 Stream flow from P 11-A Hydrograph type = Reach Peak discharge = 2217 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 22 Section type = Trapezoidal Reach length = 1285.0 ft Channel slope = 2.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.862 Rating curve m = 1.457 Ave. velocity = 2.45 ft/s Routing coeff. = 0.3998 Modified Att-Kin routing method used. Hydrograph Volume = 94,455 cuft Q (cfs) 28.00 -4.00 20.00 16.00 12.00 8.00 4.00 Stream flow from P11-A Hyd. No. 30 -- 100 Yr 0.00 -- 0 L -J- I I I 11 1 1 1 1 1 3 5 Hyd No. 30 Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 8 10 13 15 18 20 23 25 - Hyd No. 22 Time (hrs) 14. Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 31 Stream flow from BMP#6 Hydrograph type = Reach Peak discharge = 49.98 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 12 Section type = Trapezoidal Reach length = 1930.0 ft Channel slope = 1.8% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.762 Rating curve m = 1.457 Ave. velocity = 3.00 ft/s Routing coeff. = 0.3384 Modified Att-Kin routing method used. Q (cfs) 70.00 00.00 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 Hydrograph Volume = 172,735 cuft Stream flow from BMP#6 Hyd. No. 31 -- 100 Yr Q (cfs) 70.00 3 5 Hyd No. 31 60.00 50.00 40.00 30.00 20.00 10.00 1 1 U--I I --T 0.00 8 10 13 15 18 20 23 25 - Hyd No. 12 Time (hrs) 145 146 Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 32 Stream flow from B MP#5 Hydrograph type = Reach Peak discharge = 39.10 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 10 Section type = Trapezoidal Reach length = 2003.0 ft Channel slope = 1.9% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.783 Rating curve m = 1.457 Ave. velocity = 2.82 ft/s Routing coeff. = 0.3113 Modified Att-Kin routing method used. Q (cfs) 50.00 40.00 30.00 20.00 10.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 1 ' ' ' ?_j I ' ' 0.00 0 3 5 8 10 13 15 18 20 23 25 28 Hyd No. 32 Hyd No. 10 Time (hrs) Stream flow from BMP#5 Hyd. No. 32 -- 100 Yr Hydrograph Volume = 383,239 cult Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 33 Stream flow from B MP#10 Hydrograph type = Reach Peak discharge = 45.75 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 20 Section type = Trapezoidal Reach length = 2840.0 ft Channel slope = 2.1 % Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.823 Rating curve m = 1.457 Ave. velocity = 3.15 ft/s Routing coeff. = 0.2542 Modified Att-Kin routing method used. Hydrograph Volume = 175,008 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 -1 1 1 , U 1 1- 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 33 Hyd No. 20 Time (hrs) Stream flow from BMP#10 Hyd. No. 33 -- 100 Yr 147 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 34 Stream flow from B MP#9 Hydrograph type = Reach Peak discharge = 25.26 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 18 Section type = Trapezoidal Reach length = 3000.0 ft Channel slope = 2.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.862 Rating curve m = 1.457 Ave. velocity = 2.89 fUs Routing coeff. = 0.2245 Modified Att-Kin routing method used. Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 Hydrograph Volume = 99,688 cuft Stream flow from BMP#9 Hyd. No. 34 -- 100 Yr Q (cfs) 50.00 3 5 Hyd No. 34 40.00 30.00 20.00 10.00 L 0.00 8 10 13 15 18 20 23 25 Time (hrs) - Hyd No. 18 14? Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 35 Stream flow from BMP#3 Hydrograph type = Reach Peak discharge = 40.17 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 6 Section type = Trapezoidal Reach length = 765.0 ft Channel slope = 2.0% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.803 Rating curve m = 1.457 Ave. velocity = 2.76 fUs Routing coeff. = 0.6428 Modified Att-Kin routing method used. Hydrograph Volume = 136,759 cult Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 -L 0 Stream flow from BMP#3 Hyd. No. 35 -- 100 Yr Q (cfs) 50.00 3 5 Hyd No. 35 40.00 30.00 20.00 10.00 i ¦ I I I I 0.00 8 10 13 15 18 20 23 25 - Hyd No. 6 Time (hrs) 149 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 36 DESIGN POINT #1 Hydrograph type = Combine Peak discharge = 91.60 cfs . Storm frequency = 100 yrs Time interval = 3 min Inflow hyds. = 29, 30 Hydrograph volume = 284,523 cuft Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 DESIGN POINT #1 Hyd. No. 36 -- 100 Yr Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.C0 20.00 10.00 0 00 15( 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 36 Hyd No. 29 Hyd No. 30 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 37 Stream flow from BMP#7 Hydrograph type = Reach Peak discharge = 78.06 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 14 Section type = Trapezoidal Reach length = 490.0 ft Channel slope = 1.3% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.648 Rating curve m = 1.457 Ave. velocity = 2.92 ft/s Routing coeff. = 0.8769 Modified Att-Kin routing method used. Stream flow from BMP#7 Q (cfs) Hyd. No. 37 -- 100 Yr 80.00 0.00 60.00 i 50.00 40.00 30.00 I I_ _ 20.00 10.00 0.00 Hydrograph Volume = 240,505 cuft Q (cfs) 0 3 5 8 10 13 Hyd No. 37 Hyd No. 14 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 15 18 20 23 25 Time (hrs) 151 152 Hydrograph Plot Iydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1 A5 PM Hyd. No. 38 Stream flow from BMP#8 Hydrograph type = Reach Peak discharge = 60.45 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 16 Section type = Trapezoidal Reach length = 1955.0 ft Channel slope = 1.9% Manning's n = 0.050 Bottom width = 12.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.783 Rating curve m = 1.457 Ave. velocity = 3.17 ft/s Routing coeff. = 0.3503 Modified Att-Kin routing method used. Hydrograph Volume = 236,231 cult Stream flow from BMP#8 Q (cfs) Hyd. No. 38 -- 100 Yr 70.00 X0.00 50.00 40.00 30.00 20.00 10.00 0.00 -- 0 3 5 Hyd No. 38 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 8 10 13 15 18 20 23 25 - Hyd No. 16 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 39 Flow to Design Point #2 Hydrograph type = Combine Peak discharge = 239.04 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyds. = 27, 28, 31, 32, 33 Hydrograph Volume = 1,174,890 cult Q (cfs) 240.00 200.00 160.00 120.00 80.00 40.00 Q (cfs) 240.00 200.00 160.00 120.00 80.00 40.00 0.00 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 39 Hyd No. 27 Hyd No. 28 Hyd No. 31 Time (hrs) Hyd No. 32 Hyd No. 33 Flow to Design Point #2 Hyd. No. 39 -- 100 Yr 15" Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 40 Flow to Design Point #2 Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 34, 35, 37, 38 Flow to Design Point #2 Q (cfs) Hyd. No. 40 -- 100 Yr 210.00 T Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 195.75 cfs Time interval = 3 min Hydrograph Volume = 713,183 cult Q (cfs) 210.00 0.00 150.00 120.00 90.00 50.00 30.00 180.00 150.00 120.00 90.00 60.00 0.00 -L 0 3 5 Hyd No. 40 30.00 0.00 8 10 13 15 18 20 23 25 - Hyd No. 34 Hyd No. 35 Hyd No. 37 Time (hrs) - Hyd No. 38 154 Hydrograph Plot 'ydraflow Hydrographs by Intelisolve Wednesday, Apr 25 2007, 1:45 PM Hyd. No. 41 DESIGN POINT #2 Hydrograph type =. Combine Peak discharge = 401.17 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyds. = 39, 40 Hydrograph Volume = 1,888,074 cult Q (cfs) 420.00 J.00 300.00 DESIGN POINT #2 Hyd. No. 41 -- 100 Yr 240.00 180.00 120.00 60.00 0.00 1 0 3 5 Hyd No. 41 Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 60.00 0.00 8 10 13 15 18 20 23 25 - Hyd No. 39 Hyd No. 40 Time (hrs) 155 Hydrograph Plot Hydraflow Hydrographs by Infelisolve Hyd. No. 42 DESIGN POINT #3 Hydrograph type = - Combine Storm frequency = 100 yrs Inflow hyds. = 2, 4, 23 Q (cfs) 210.00 160.00 150.00 120.00 90.00 60.00 30.00 0.00 L 0 Wednesday, Apr 25 2007, 1:45 PM Peak discharge = 209.77 cfs Time interval = 3 min Hydrograph Volume = 756,706 cult DESIGN POINT #3 Hyd. No. 42 -- 100 Yr Q (cfs) 210.00 3 5 Hyd No. 42 180.00 150.00 120.00 90.00 60.00 30.00 - --7- F a1 0.00 8 10 13 15 18 20 23 25 - Hyd No. 2 Hyd No. 4 Hyd No. 23 Time (hrs) 156 E i?#L i6a I o n n n A 1[ H n 0 s z a PLnrrr _LArmscnpEAnc==TuF`2:7 c mgrG?GIS 2601 WEE TON PKV7V, STm 2031 C.Aizy NC 27513 www_etdpa_caim (o) 919.678-10-71 (F'j 919.678.1290 Extended Detention Wetland Design BMP #1 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 2.75 Roadways / Sidewalks / Det. Ponds 2.39 Total Impervious Landcover: 5.14 Total Drainage Area (DA): 10.35 Percent of Impervious in Drainage Ares 49.66 , ', Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) ' I Where I = Percent of impervious from above. Rv -' 0 50 . Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall) (Rv)(Drainage Aarea) V=1"(1/12)' Rv (1/12)(D) V 18,bry79 'cubic feet Calculate the required permanent pool surface areas I = 49.66 % imperv ratio (a)_ 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 2.04 percent N VV S: A., R, qu 9,197 square feet By: WSN Date: 4/25/2007 Revised: High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay Pool -15% Micro Pool -15% Required Areas: High Marsh 4 3 219 square feet Low Marsh , 9£?ys.Cquare,feet Forebay u C380Tsquare l'eet ' Micro Pool f ? i^ ti Pr1,380'uare feet Provided Areas: High Marsh ?<5010square feet., Elev. 197.50 Low Marsh 5 403.:square,feet -, Elev. 197.00 Forebay ,588squarefeet Elev. 196.00 Oulet _ ?, 1x879 sg?ae>feet Elev. 190.00 Riser Size 3'X2' Top of Riser Elevation 200.00 Riser Outlet Pipe Size 24" RCP Invert at Riser Outlet P ipe 190.00 Water Quality Outlet Size (inches) 1.50 0.125 ft Water Quality Outlet Elevation 198.00 Top of Berm 202.00 Bottom of pond 190.00 NWSE 198.00 Secondary Spillway Size 20 ft Secondary Spillway Elavation 201.20 Elev_ 198 14,337 Elev. 199 16,008 Elev. 200 19,314 Elev. 201 22,070 Elev. 202 27,569 Water Quality draw down time: Volume 18,671 cf 0.012 area 0.083 cfs 7211 cf/day 2.6 days H L A l[ T O B B D ' A M B R O S I Pr..aNr?c.LnFro?s?cxRpE.AxczsrFxrcr?.F27?nr?.GIS 2601 VTESTON PISVTY, STE 203, CARN NC 2-7513 www_etdpa_cOM (o)919.678. 10'71 (F-)919.678.1290 Extended Detention Wetland Design BMP #2 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 3.44 Roadways / Sidewalks / Det. Ponds 2.20 Total Impervious Landcover: 5.64 Total Drainage Area (DA): 12.33 Percent of Impervious in Drainage Area (1): 45.74 Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * Where I = Percent of impervious from above. Rv = 0.46 Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall)(Rv)(Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) V= `20,664 cubic feet Calculate the required permanent pool surface areas = 45.74 % imperv ratio (@ 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 2.04 percent N.W.S.A. Required 10,957 square feet By: WSN Date: 4/25/2007 Revised: High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay Pool -15% Outlet Pool -15% Required Areas: High Marsh 3,835 square feet Low Marsh 3,835 square feet Forebay 1,644 square feet Oulet 1,644 square feet Provided Areas: High Marsh 3,306 square feet Elev. 179.50 Low Marsh 3,253 square feet Elev. 179.00 Forebay 4,191 square feet Elev. 174.00 Mirco Pool 2,261 square feet Elev. 174.00 Riser Size 3'X2' 2 required Top of Riser Elevation 182.00 Riser Outlet Pipe Size 24" RCP Invert at Riser Outlet Pipe 176.00 Water Quality Outlet Size (inch es) 1.50 0.125 ft Water Quality Outlet Elevation 180.00 Top of Berm 184.00 Bottom of pond 176.00 NWSE 180.00 Secondary Spillway Size 20 ft Secondary Spillway Elavation 183.00 Elev. 180 14,730 Elev. 181 16,930 Elev. 182 19,187 Elev. 183 21,500 Elev. 184 23,870 Water Quality draw down time: Volume 20,664 cf 0.012 area 0.083 cfs 7211 cf/day 2.9 days E z w T o n n n' A 1W n g o s: _ Pi.axrm4G.LnrmscxpE ARC3?2'EC TCiRE.F1Tf II27N G. GIS By 2601 WEE TON Px%nr. STE 203s Ceuzx NC 27513 Date: www_etdpa_cc= (o) 919.678. 1071 (F-) 919.6-18.1290 Revised: Extended Detention Wetland Design BMP #3 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 2.00 Roadways / Sidewalks / Det. Ponds 0.85 Total Impervious Landcover: 2.85 Total Drainage Area (DA): 6.64 ,Percent o?lmpernous,in Drainage. Area (I) 42 92 Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * I Where I = Percent of impervious from above. Rv = '0 44 Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall)(Rv)(Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) V 10,516 cubic feet Calculate the required permanent pool surface areas I = 42.92 % imperv ratio (a) 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 1.86 percent N.W.S A. Required 5,380 - squafle feet WSN 4/27/2007 High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay -15% Micro Pool -15% Required Areas: High Marsh ! i 883 square feet Low Marsh 1 1 t883?square feet= Forebay X07, square_feet Micro Pool 807-'§* feet Provided Areas: High Marsh r? 2 002 square feet ;Elev. 207.50 ua ' Low Marsh t 16fq eetl Elev. 207.00 f r Forebay +4167 s ua eef Elev. 210.00 e Micco Pool 1295; square feet ; Elev. 174.00 Riser Size 3'X2' Top of Riser Elevation 210.00 Riser Outlet Pipe Size 24" RCP Invert at Riser Outlet Pipe 202.00 Water Quality Outlet Size (inches) 1.25 0.104 ft Water Quality Outlet Elevation 208.00 Top of Berm 212.00 Bottom of pond 202.00 NWSE 208.00 Secondary Spillway Size 20 ft Secondary Spillway Elavation 211.50 Elev. 208 9,540 Elev. 209 11,181 Elev. 210 12,907 Elev. 211 14,696 Elev. 212 16,541 Water Quality draw down time: Volume 10,516 cf 0.009 area 0.058 cfs 5007 cf/day 2.1 days E L A m T O D D D A It H R O S I i. PLAt72??C"i.IJU?SCAPE p.R.CF?TEC 1'CTItE.)?.7CII2¢7G. Cr1S 2601 WEaTON PfCWY, STE 203, CAIZYNC 27513 www_etdpa_ccKm (o) 919.678-10-71 (F') 919.678.1290 Extended Detention Wetland Design BMP #4 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 2.96 Roadways / Sidewalks / Det. Ponds 1.85 Total Impervious Landcover: 4.81 Total Drainage Area (DA): 11.19 ecentof Inprviousin Drainag r42 98_ Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) Where I = Percent of impervious from above. Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall)(Rv)(Drainage Aarea) V=1"(1/12)' Rv (1/12)(D) 'V?17,7?5 w cubic feet Calculate the required permanent pool surface areas I = 42.98 % imperv ratio (cD_ 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 1.73 percent By: WSN Date: 4/25/2007 Revised: iN 1N.S.A. Required 7 8,433 square feet High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay -15% Micro Pool -15% Required Areas: High Marsh r 951qua?r feet 1 Low Marsh 951 uarefeet 3 Forebay ,265 re feel k Micro Pool P . j1?65 s u rex Provided Areas: High Marsh - x,97 _tsquare?. eet Elev. 189.50 Low Marsh ai5Y Elev. 189.00 Forebay Elev. 188.00 Mirco Pool 539 s ua?e, ;feet Elev. 186.00 .:. q Riser Size 3'X2' Top of Riser Elevation 192.00 Riser Outlet Pipe Size 24" RCP Invert at Riser Outlet Pipe 186.00 Water Quality Outlet Size (inches) 1.50 0.125 ft Water Quality Outlet Elevation 190.00 Top of Berm 194.00 Bottom of pond 186.00 NWSE 190.00 Secondary Spillway Size 20 ft 2 reqd. Secondary Spillway Elavation 193.50 Elev. 190 8,954 Elev. 191 11,130 Elev. 192 13,362 Elev. 193 15,635 Elev. 194 18,206 Water Quality draw down time: Volume 17,745 cf 0.012 area 0.083 cfs 7211 cf/day 2.5 days E z w T o n n n A M H R o s i ?. Piaxrmac.LxrmscnrEARCFSrF?cTt?.F1r?arc_GIS 2601 WEE TON PXC x, STE 203s Cntzy NC 2'7513 www_etdpa_com (o) 919.678.10-71 (F'j 919.6-78.1290 Extended Detention Wetland Design BMP #5 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 7.58 Roadways / Sidewalks / Det. Ponds 4.23 Total Impervious Landcover: 11.81 Total Drainage Area (DA): 25.23 t0 MR9.r sous in, ura page Area (I): 46.81 " Percen. H., -- Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * I Where I = Percent of impervious from above. Ry 0.47 Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall) (Rv)(Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) V= 43,163 cubic feet Calculate the required permanent pool surface areas I = 46.81 % imperv ratio () 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 1.95 percent NM--S.A. Required 21,431 square feet By: WSN Date: 4/27/2007 Revised: High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay -15% Micro Pool -15% Required Areas: High Marsh 7 50square Ki?eet Low Marsh 7 50 .{square feet,, Forebay 3 215 "s uare `feet Micro Pool -3,215. Provided Areas: High Marsh 7 548 square feet 'Elev. 215.50 y Low Marsh .: a 7 ,,e 56 s'uare feet Elev. 215.00 Forebay , y ,3 305 suare feet ' Elev. 212.00 Mirco Pool r? 3 225:'square feet Elev. 212.00 Riser Size 3'X2' Top of Riser Elevation 222.00 Riser Outlet Pipe Size 24" RCP Invert at Riser Outlet Pipe 212.00 Water Quality Outlet S ize (inches) 2.00 0.167 ft Water Quality Outlet E levation 216.00 Top of Berm 224.00 Bottom of pond 212.00 NWSE 216.00 Secondary Spillway Size 20 ft Secondary Spillway Elavation 223.50 Elev. 216 21,643 Elev. 217 24,740 Elev. 218 28,038 Elev. 219 31,386 Elev. 220 34,793 Elev. 221 38,257 Elev. 222 41,778 Elev. 223 45,355 Elev. 224 48,989 Water Quality draw down time: Volume 43,163 cf 0.022 area 0.148 cfs 12819 cf/day 3.4 days E L A M T O D D D A IN& H R O S I ,. By. PLAi4vmuc.lxrm ScAFD-Axics-XrTD= TURE.IISGII?IF7G. GIS 2601 WDSTON PxWx, STE 2031 CARY NC 2`7513 Date: www_etdpa_com (o) 919.678. 1071 (F-)919.6-181290 Revised: Extended Detention Wetland Design BMP #6 Olde Town Phase 11 Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 1.85 Roadways / Sidewalks / Det. Ponds 2.38 Total Impervious Landcover: 4.23 Total Drainage Area (DA): 7.96 r - sax ercent of Impervious in Drainage Area (1): 53,14 Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * Where I = Percent of impervious from above. Rv .53 7- 0 J Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall)(Rv)(Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) V=';15;264 cubic feet Calculate the required permanent pool surface areas = 53.14 % imperv ratio Co) 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 2.24 percent N.W.S.A. Required 7,767 square feet WSN 4/25/2007 High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay -15% Micro Pool -15% Required Areas: High Marsh 2 718"square feet . Low Marsh J 32,718,quare;feet . Forebay y 's1 165 " s9uarefeet Micro Pool ( ry ` _ 165 square feet Provided Areas: High Marsh ri # 2,723 + a e`feet": Elev. 235.50 Low Marsh N2 769x feef feet-; Foreba a Elev. 235.00 Elev 232 00 y . . . Mirco Pool ?' ,1 180tsquare feet.. Elev. 232.00 Riser Size 3'X2' 2 required Top of Riser Elevation 238.00 Riser Outlet Pipe Size 24" RCP Invert at Riser Outlet Pipe 232.00 Water Quality Outlet Size (inches) 1.25 0.104 ft Water Quality Outlet Elevation 236.00 Top of Berm 240.00 Bottom of pond 236.00 NWSE 236.00 Secondary Spillway Size 12 ft Secondary Spillway Elavation 239.50 Elev. 236 7,880 Elev. 237 9,122 Elev. 238 10,420 Elev. 239 11,774 Elev. 240 13,185 Water Quality draw down time: Volume 15,264 cf 0.009 area 0.058 cfs 5007 cf/day 3.0 days 0 MIN E z. .k ihc r o n n n - A 3t 13 R O S I By: WSN !. PLAJn M.L.rmscnpEAxC3-Mnc7i=.Mitrm4m:nro.GIS 2601 WESTow PF:Wx, STm 2os cAz<v 14C 2751s Date: 4/25/2007 www_eidpi_com (o) 919.678. 1071 (F'j 919.678.1290 Revised: Extended Detention Wetland Design BMP #7 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 2.53 Roadways / Sidewalks / Det. Ponds 3.18 Total Impervious Landcover: 5.71 Total Drainage Area (DA): 11.49 erceir, lm enr?ous ?n Drana?e'Area (I): 49 70 Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * I Where I = Percent of impervious from above. Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall)(Rv)(Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) cubic feet Calculate the required permanent pool surface areas = 49.70 % imperv ratio (@ 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 2.06 percent N.1NS.A. Required 10,310 , square feet High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool 35% - 6" to 12" deep Forebay -15% Micro Pool -15% Required Areas: High Marsh ? 609 square feet Low Marsh 6?9Fquae feet Forebay € ; h 57quarf?et Micro Pool ? ? . 5} uareeet s ; Provided Areas: High Marsh Low Marsh Forebay Micco Pool Riser Size 3'X2' Top of Riser Elevation 196.00 Riser Outlet Pipe Size 30" RCP Invert at Riser Outlet Pipe 190.00 Water Quality Outlet Size (inches) 1.50 Water Quality Outlet Elevation 194.00 Top of Berm 198.00 Bottom of pond 190.00 NWSE 194.00 Secondary Spillway Size 20 ft Secondary Spillway Elavation 197.50 Elev. 193.50 Elev. 193.00 Elev. 190.00 Elev. 190.00 0.125 ft Elev. 194 11,595 Elev. 195 12,927 Elev. 196 14,315 Elev. 197 15,760 Elev. 198 17,261 Water Quality draw down time: Volume 20,740 0.012 0.083 7211 2.9 cf area cfs cf/day days E L w T o n n n A » m o s I among M PLAm4nxc.LuroscAPE kRasr Ec TVRE. E?ac six G.GIS 2601 WES TON PX-%VY, S= 203, C7v NC 2`7513 s _etdpa_com (o) 919.678.10-71 (F'j 919.678.1290 Extended Detention Wetland Design BMP #8 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 1.74 Roadways / Sidewalks / Det. Ponds 1.88 Total Impervious Landcover: 3.62 Total Drainage Area (DA): 12.48 Percent of Impervious in Drainage Area (1): 29.01 Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * I Where I = Percent of impervious from above. Rv = 0.31 Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall) (Rv) (Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) V= ,14,092 cubic feet Calculate the required permanent pool surface areas I= 29.01 % impeN 10 20 30 40 50 60 70 80 ratio @ 3 feet N.W.S.A. Required ratio (ED 3' deep 0.59 0.97 1.34 1.73 2.06 2.40 2.88 3.36 1.82 percent 9,894 square feet By: WSN Date: 4/25/2007 Revised: High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay - 15% Micro Pool - 15% Required Areas: High Marsh 3,463 square feet Low Marsh 3,463 square feet Forebay 1,484 square feet Micro Pool 1,484 square feet Provided Areas: High Marsh 3,991 square feet" Elev. 227.50 Low Marsh 2,406 square feet Elev. 227.00 Forebay 1,649 square feet Elev. 224.00 Mirco Pool 1,449 square feet Elev. 224.00 Riser Size 3'X2' Top of Riser Elevation 230.00 Riser Outlet Pipe Size 24" Invert at Riser Outlet Pipe 224.00 Water Quality Outlet Size (inches) 1.25 Water Quality Outlet Elevation 228.00 Top of Berm 235.00 Bottom of pond 224.00 NWSE 228.00 Secondary Spillway Size 20 ft Secondary Spillway Elavation 234.50 Elev. 228 9,495 Elev. 229 11,031 Elev. 230 12,624 Elev. 231 14,273 Elev. 232 15,978 Elev. 233 17,740 Elev. 234 19,559 Elev. 235 21,434 Water Quality draw down time: Volume 0.104 ft 14,092 cf 0.009 area 0.058 cfs 5007 cf/day 2.8 days 1E M. w s[ 7 o n n n A IM s x o s I PL 260ax1 mSTLOaN lmsctwE IiRCF1TT}7CTYRE E]a??uac?GI S PkCWY, ST& 203. CAKv NC 27513 wcvw_etdpa_co= (o) 919.6-78.10-71 (F) 919.6"78.1290 Extended Detention Wetland Design BMP #9 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 1.67 Roadways / Sidewalks / Det. Ponds 0.30 Total Impervious Landcover: 1.97 Total Drainage Area (DA): 6.51 Percent of lm envious in 0'airiage Area (I): 30.26. p. Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * 1 Where I = Percent of impervious from above. Rv : 0.32 Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall)(Rv)(Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) V 7,618TMT cubic feet Calculate the required permanent pool surface areas I= 30.26 % imperv ratio (cD- 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 1.73 percent NNTS A. Required . 4,906 square feet By: WSN Date: 4/2512007 Revised: High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay - 15% Micro Pool - 15% Required Areas: High Marsh X 2 ;385 squire feet . Low Marsh 1 . 1 30j3 square feet Forebay 587 square feet- Micro Pool . 975`sg6are feet.. Provided Areas: High Marsha F 35991 ucuae feet ;u Elev. 265.50 Low Marsh a 2,406 square feet ,? Elev. 265.00 Forebay feet{ ,,4 Elev. 262.00 Mirco Pool 449 scLiare feet Elev. 262.00 Riser Size 3'X2' Top of Riser Elevation 232.00 Riser Outlet Pipe Size 30" Invert at Riser Outlet Pipe 226.00 Water Quality Outlet Size (inches) 1.00 Water Quality Outlet Elevation 230.00 Top of Berm 235.00 Bottom of pond 224.00 NWSE 230.00 Secondary Spillway Size 20 ft Secondary Spillway Elavation 234.50 Elev. 266 5,248 Elev. 267 6,357 Elev. 268 7,524 Elev. 269 8,746 Elev. 270 10,026 Water Quality draw down time: Volume 0.083 ft 7,618 cf 0.005 area 0.037 cfs 3205 cf/day 2.4 days E L A M Z O D D D A It B H O S I PLaxxmac . L -AIM scAPE .41Za-nT 2= TURM. F?rcwbUMUN G - GI S 2601 uTFSTON Plcwsr, S=- 203. CnizY NC 27513 www_eidpa_com (o) 919.678.1071 (F) 919.678.1290 Extended Detention Wetland Design BMP #10 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 2.28 Roadways / Sidewalks / Det. Ponds 2.68 Total Impervious Landcover: 4.96 Total Drainage Area (DA): 9.00 Percent of ImPervious in Drainage Area (I): - 55.11 Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * Where I = Percent of impervious from above. ! Rv =, 0.55 Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall)(Rv)(Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) 7-7 -V 17,838 ? T - cubic feet Calculate the required permanent pool surface areas I= 55.11 % imperv ratio (ED 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 2.23 percent N.W.S.A. Required 8,742 square feet By: WSN Date: 4/25/2007 Revised: High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay -15% Micro Pool - 15% Required Areas: High Marsh 3 06Q sc)uare feef Low Marsh 3060 square feef Forebay ?f 31t square feet` Micro Pooh squ,are feet Provided Areas: High Marsh ?240 square feet Elev. 255.50 Low Marsh #? x,3square feet Elev. 255.00 Forebay ?Ui square feet` Elev. 252.00 Micco Pool 1328 square feet Elev. 262.00 Riser Size 3'X2' Top of Riser Elevation 258.00 Riser Outlet Pipe Size 30" Invert at Riser Outlet Pipe 254.00 Water Quality Outlet Size (inches) 1.50 0.125 ft Water Quality Outlet Elevation 256.00 Top of Berm 260.00 Bottom of pond 254.00 NWSE 256.00 Secondary Spillway Size 20 ft Secondary Spillway Elavation 259.50 Elev. 256 9,193 Elev. 257 10,404 Elev. 258 11,672 Elev. 259 12,996 Elev. 260 14,377 Water Quality draw down time: Volume 17,838 cf 0.012 area 0.083 cfs 7211 cf/day 2.5 days E L A l T o n n n A?, \3W B g o s I PLa1-rr -L_oamsc"ic&1Rcz-=mzTjRE. i'-t4cn"E II G"GIS By. 2601 -W crow FKvrx, Sxm 203y CaRV NC 27513 Date: mww_etdpa.ca?m <o) 919.6-78.1071 (F') 919.678.1290 Revised: Extended Detention Wetland Design BMP #11 Olde Town Phase II Type of Impervious Landcover Area (acres) Buildings / Patios / Driveways 0.29 Roadways / Sidewalks / Det. Ponds 0.55 Total Impervious Landcover: 0.84 Total Drainage Area (DA): 6.61 Percent of Impervious in Drainage Area (1): LL 12:71 Calculate the required storage volume (Rv) for the 1" first flush storm event: Rv = 0.05 + (0.009) * Where I = Percent of impervious from above. Rv = 0.16 Calculate the required drainage volume from the 1" storm to be controlled: Volume = (design rainfall)(Rv)(Drainage Aarea) V=1"(1/12) * Rv (1/12)(D) V= 3,944 cubic feet Calculate the required permanent pool surface areas = 12.71 % imperv ratio (ED 3' deep 10 0.59 20 0.97 30 1.34 40 1.73 50 2.06 60 2.40 70 2.88 80 3.36 ratio @ 3 feet 0.74 percent NXV_S.A. Required 2,131 square feet ; WSN 4/25/2007 High Marsh Pool - 35% - 0" to 6" deep Low Marsh Pool - 35% - 6" to 12" deep Forebay -15% Micro Pool - 15% Required Areas: High Marsh 746 square feet Low Marsh 7 square feet :,t Forebay 320 sa"use feet Micro Pool 320 square feet Provided Areas: High Marsh 3 240 square feet ' Elev. 255.50 Low Marsh ) f ?3 4 ,square. feet , Elev. 255.00 Forebay t,467i9quare feet Elev. 252.00 Mirco Pool ` ..1,328 square feet: Elev. 262.00 Riser Size 3'X2' Top of Riser Elevation 258.00 Riser Outlet Pipe Size 18.00 Invert at Riser Outlet Pipe 254.00 Water Quality Outlet Size (inches) 0.75 0.063 Water Quality Outlet Elevation 256.00 Top of Berm 260.00 Bottom of pond 252.00 NWSE 256.00 Secondary Spillway Size 10.00 Secondary Spillway Elavation 259.50 Elev. 256 3,000 Elev. 257 3,956 Elev. 258 5,503 Elev. 259 7,387 Elev. 260 9,844 ft Water Quality draw down time: Volume 3,944 cf 0.003 area 0.021 cfs 1803 cf/day 2.2 days Nitrogen Export Olde Towne Date: 5-03-07 Calculations Phase II By: W.S.N. Raleigh, NC Post-development Nitrogen Loading (Subarea P1 to BMP#1) Type of Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/Ac/Yr LB/Yr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 0.69 1.20 0.83 Impervious Surfaces - Right of Way (Export value from Figure 3-1) 2.36 14.00 33.04 Impervious Surfaces - Buildings (Export value from Figure 3-2) 7.32 6.00 43.92 Total 10.37 77.79 Nitrogen oa mg from lExtended De t. Wetland o = os eve opmen Nitrogen Loading (Subarea to Type o Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/Ac/Yr LB/Yr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 1.06 1.20 1.27 Impervious Surfaces - Right of Way (Export value from Figure 3-1) 2.81 14.00 39.34 Impervious Surfaces - Buildings (Export value from Figure 3-2) 8.67 6.00 52.02 Total 12.54 92.63 Nitrogen Loading rom Extended e. Wetland o = 55.58 Nitrogen Export Olde Towne Date: 5-03-07 Calculations Phase II By: W.S.N. Raleigh, NC Post-development Nitrogen Loading (Subarea to Type of Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/AcNr LBNr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 0.59 1.20 0.71 Impervious Surfaces - Right of Way (Export value from Figure 3-1) 1.63 14.00 22.82 Impervious Surfaces - Buildings (Export value from Figure 3-2) 4.47 6.00 26.82 Total 6.69 50.35 Nitrogen Loading rom WPM 4 Extended De t. Wetland o = 3U.2 Post-development Nitrogen Loading (Subarea to Type o Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/AcNr LBNr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 2.67 1.20 3.20 Impervious Surfaces - Right of Way (Export value from Figure 3-1) 2.28 14.00 31.92 Impervious Surfaces - Buildings (Export value from Figure 3-2) 6.52 6.00 39.12 Total 11.47 74.24 Nitrogen Loading from ltzxtended e. Wetland o = . Nitrogen Export Olde Towne Date: 5-03-07 Calculations Phase 11 By: W.S.N. Raleigh, NC Post-development Nitrogen Loading (Subarea to Type of Landcover Site Area TNN Export TN Export Ac. : Coeff. Land Use BB/ Ac/Yr LBNr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 6.40 1.20 7.68 Impervious Surfaces - Right of Way (Export value from Figure 3-1) 4.78 14.00 66.92 Impervious Surfaces - Buildings (Export value from Figure 3-2) 14.34 6.50 93.21 Total 25.52 167.81 Nitrogen Loading from 1BMP#5 Extended Det. Wetland # X 60% = 100.69 Post-development Nitrogen Loading (Subarea P6 to BMP#6) Type of Landcover Site Area Ac. TN Export Coeff. LB/AcNr TN Export Land Use LBNr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 4.11 1.20 4.93 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 4.03 21.20 85.44 Total 8.14 90.37 Nitrogen Loading from BMP#6 Extended Det. Wetland # X 60% = 54.22 Nitrogen Export Olde Towne Date: 5-03-07 Calculations Phase II By: W.S.N. Raleigh, NC Post-development Nitrogen Loading (Subarea P7 to.BMP#7) Type of Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/Ac/Yr LB/Yr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 0.00 1.20 0.00 Impervious Surfaces - Right of Way (Export value from Figure 3-1) 4.27 14.00 59.78 Impervious Surfaces - Buildings (Export value from Figure 3-2) 7.1 6.50 46.15 Total 11.37 105.93 Nitrogen Loading from BMP#7 Extended Det. Wetland # X 60% = 63.56 Post-development Nitrogen Loading (Subarea P8 to BMP#8) Type of Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/Ac/Yr LB/Yr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 8.86 1.20 10.63 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 3.62 21.20 76.74 (Assume 3000 sf. impervious per unknown lot) Total 12.48 87.38 Nitrogen Loading from BMP#8 Extended Det. Wetland # X 60% = 52.43 Nitrogen Export Olde Towne Date: 5-03-07 Calculations Phase II By= W.S.N. Raleigh, NC Post-development Nitrogen Loading (Subarea P9 to RMP#9) Type of Landcover Site Area TN Export TN Export off-site contributing area was removed Ac. Coeff. Land Use LB/Ac/Yr LB/Yr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 1.46 1.20 1.75 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 1.67 21.20 35.40 (Assume 3000 sf. impervious per unknown lot) Total 3.13 37.16 Nitrogen Loading from BMP#9 Extended Det. Wetland # X 60% = 22.29 Post-development Nitrogen Loading (Subarea P10 to BMP#10) Type of Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/ Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 4.04 1.20 4.85 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 4.96 21.20 105.15 (Assume 3000 sf. impervious per unknown lot) Total 9.00 110.00 Nitrogen Loading from BMP#10 Extended Det. Wetland # X 60% = 66 Nitrogen Export Olde Towne Date: 5-03-07 Calculations Phase II By: W.S.N. Raleigh, NC eve opmen Nitrogen oa ding (Subarea P1 I to BMP#1 1) Type of Landcover Site Area TNNEExport TN Export Ac. 7 . Land Use r LB/Yr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 0.00 0.60 0.00 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 5.97 1.20 7.16 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 0.64 21.20 13.57 (Assume 3000 sf. impervious per unknown lot) Total 6.61 20.73 Nitrogen Loading from BMP#11 Extended Det. Wetland # X 60% = 12.44 Post-development Nitrogen Loading (Undetained Subarea P1-A) Type of Landcover Site Area Ac. TN Export Coeff. LB/Ac/Yr TN Export Land Use LB/Yr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 4.11 0.60 2.47 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 8.18 1.20 9.82 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 1.17 21.20 24.80 Total 13.46 37.09 Nitrogen Loading from P1 -A Grassed Swale # X 80% = 29.67 Nitrogen Export Olde Towne Date: 5-03-07 Calculations Phase II By: W.S.N. Raleigh, NC Post-development Nitrogen Loading (Undetained Subarea P4-A) Type of Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/AcNr LBNr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 4.38 0.60 2.63 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 2.51 1.20 3.01 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 0.62 21.20 13.14 Total 7.51 18.78 Post-development Nitrogen Loading (Undetained Subarea P7-A) Type of Landcover Site Area Ac. TN Export Coeff . LB/AcNr TN Export Land Use LBNr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 8.02 0.60 4.81 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 7.45 1.20 8.94 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 2.47 21.20 52.36 Total 17.94 66.12 Nitrogen Loading from P7-A Grassed Swale # X 80% = 52.89 Nitrogen Export Olde Towne Date: 5-03-07 Calculations Phase II By: W.S.N. Raleigh, NC Post-development Nitrogen Loading (Undetained Subarea P 8-A) Type of Landcover Site Area Ac. TN Export Coeff. LB/AcNr TN Export Land Use LBNr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 5.28 0.60 3.17 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 4.61 1.20 5.53 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 0 21.20 0.00 Total 9.89 8.70 Nitrogen Loading from P87A Grassed Swale # X 80% = 6.96 Post-development Nitrogen Loading (Undetained Subarea P1 1-A) Type of Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/AcNr LBNr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 4.63 0.60 2.78 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 1.70 1.20 2.04 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 4.03 21.20 85.44 Total 10.36 90.25 Nitrogen Export Olde Towne Date: 5-03-07 By: W.S.N. Calculations Phase II Raleigh, NC Post-development Nitrogen Loading (Subarea North of Work Limit) Type of Landcover Site Area TN Export TN Export Ac. Coeff. Land Use LB/AcNr LB/Yr Permanently Preserved Undisturbed Open Space (Forest, Unmown Meadow) 29.76 0.60 17.86 Permanently Preserved Managed Open Space (Grass, Landscaping, etc.) 0.61 1.20 0.73 Impervious Surfaces (Roads, Parking Lots, Driveways, Roofs, Paved Storage Areas, etc. 0.61 21.20 12.93 (Includes impervious for future Greenway) Total 30.98 31.52 Total -Nitrogen Buy Down Fee Calculation ( Lb/Yr) Total Export Nitrogen 778.71 Lbs/Yr Site Area 207.46 Acres Total Weighted Export Nitrogen 3.75354 Lbs/Yr/Ac Allowed Export Nitrogen 3.60000 Lbs/Yr/Ac Difference 0.15354 Lbs/Yr/Ac Fee ($330*Ac*Lbs/Yr) $10,511.82 Payment