Loading...
HomeMy WebLinkAbout20061804 Ver 12_Stormwater Approval_20161219Water Resources LNViRONMEN7AL QUALITY December 19, 2016 Ms. Rebecca Flowers — Owner/Developer River Dell Company Inc. 4880 NC 42 East Clayton, North Carolina 27527 ,PAT MCCRORY Govel-no DONALD R. VAN DER VAART Subject: APPROVAL OF STORMWATER MANAGEMENT PLAN Woodlands at Flowers Plantation — POD NE -6 Dear Ms. Flowers: sm-efar4• S. JAY ZIMMERMAN Director DWR # 06-1804v12 Johnston County The Division of Water Resources (Division) has reviewed the stormwater management plan (SMP) received on September 8, 2016 and additional information received on December 14-15, 2016 for the subject project associated with a 401 Water Quality Certification approval issued by the Division on November 5, 2008. Submittal and approval of the SMP satisfies Condition No. 9 of the 401 Certification letter for the subject phase as follows below. The Division approvesthe SMP consisting of one (1) wet detention basin and one (1) grassed bioretention cell and all associated stormwater conveyances, inlet and outlet structures, and grading and drainage patterns depicted on design drawings dated June 24, 2016 and sealed by Michael Stocks, PE, and calculations which are incorporated by reference and are enforceable by the Division. The following conditions also apply [15A NCAC 02H .0506(b)(5)]: The maximum allowable drainage area for the wet detention basin shall be 7.77 acres with maximum built -upon area of 130,244 square feet. The maximum allowable drainage area for the bioretention cell shall be 1.76 acres with a maximum allowable built -upon area of 51,836 square feet. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the Division. [15A NCAC 02H .0506(b)(5)] The footprint of all stormwater management devices as well as an additional 10 -foot wide area on all sides of the devices shall be located in either: public rights-of-way; dedicated common areas; or recorded easement areas. The final plats for the project showing all such rights-of-way, common areas and easement areas shall be in accordance with the approved plans. [15A NCAC 02H .0506(b)(5)] State of North Carolina I $nvironmental Quality I Water Resources 1 401 & Buffer Permitting 1617 Mail service Center I Raleigh, North Carolina 27699-1617 919 707 6300 DWR tt 06-1804v12 SMP Approval Page 2of2 The approved SMP shall be constructed and operational before any permanent building or other structure is occupied at the site. [15A NCAC 02H .0506(b)(5)] The SMP may not be modified without prior written authorization from the Division. [15A NCAC 02H .0506(b)(5)] Maintenance activities for the wet detention basin and bioretention cell shall be performed in accordance with the notarized O&M agreements entered by Edwin Woods (VP of Dan Ryan Builders NC, LLC) on December 16, 2016. The 0&M agreements shall transfer with the sale of the land or transfer of ownership/responsibility for the BMP facility. The Division shall be notified promptly of every transfer. [15A NCAC 02H .0506(b)(5)] The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at htt ortal.ncdenr,or web w sw ws 401 certsand ermits a l forms). [15A NCAC 02H .0506(b)(5)] Please contact Cory Larsen, PE at 919-807-6379 or cory.Iarse n@ncdenr.go_v if you have any questions or concerns. Sincerely, a Karen Higgins, Supervi 401 & Buffer Permitting ranch cc: DWR 401 & Buffer Permitting Branch File Kevin Varnell —Stocks Engineering, PA (PO Box 1108, Nashville, NC 27856) DWR RRO Files Filename: 20061804v12woodland s_SMP_Approva 1161219.docx