HomeMy WebLinkAbout20170413 Ver 1_B-4943 Nationwide Durham April 6, 2017_20170406STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER
GOVERNOR
Apri16, 2017
U.S. Army Corps of Engineers
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
ATT'N: Mr. Eric Alsmeyer
NCDOT Regulatory Coordinator
JAMES H. TROGDON, III
SECRETARY
Subject: Application for Section 404 Nationwide Permits 13, 23, and 33, Section 401 Water
Quality Certification, and Neuse River Riparian Buffer Authorization for the
proposed replacement of Bridge No. 20 over Dial Creek (Lake Michie) on SR1616
(Bahama Road) in Durham County, North Carolina; TIP No. B-4943; Federal Aid Project
No. BRZ-1616(10). Debit $270 from WBS 40110.1.1
Dear Sir:
The North Carolina Department of Transportation (NCDOT) proposes to replace the existing 27-foot,
single-span bridge No. 20 with an 89-foot, single-span bridge on a new alignment. Traffic will be
maintained on the existing bridge during construction of the replacement structure. The replacement of
Bridge No. 20 will result in 0.15 acre of fill in surface water, due predominately to the shift in the
causeway. An additiona10.01 acre of fill and mechanized clearing in a wetland will be impacted due to
the causeway realignment. There will be 57 linear feet of bank stabilization to the jurisdictional stream
portion of Dial Creek for the bridge replacement. Impacts to Neuse River Riparian buffers will result in
disturbance of 10,101 square feet in zone 1 and 4,836 square feet in zone 2.
Please see enclosed copies of the Pre-Construction Notification (PCN), permit drawings, stormwater
management plan and design plans far the above referenced project. A Programmatic Categorical
Exclusion (PCE) was completed in Apri12016, and distributed shortly after. Additional copies are
available at the NCDOT website: http://207.4.62.65/PDEA/EnvironmentalDocs/
This project calls for a letting date of July 18, 2017 and a review date of May 30, 2017.
Regulatory Approvals
Section 404 Permit: We anticipate that the bridge replacement, including all approach work will be
authorized under Section 404 Nationwide Permits 13, 23, and 33 in accordance with Section 404 of the
Clean Water Act (33 U.S.C. 1344).
Section 401 Permit: We anticipate 401 General Certification numbers 4087, 4093, and 4094 will apply to
this project. NCDOT is requesting written concurrence from the North Carolina Department of
MailingAddress: Telephone: (919) 707-6000 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 212-5785 I O2O BIRCH RIDGE DRIVE
NATURAL ENVIRONMENT SECTION CuStOrit¢Y SeYViCe: 1-H%%-36H-496H RALEIGH NC Z.%61O
IS9g MAIL SERVICE CENTER Website.• www.ncdot.gov
RALEIGH NC 2%699-1S9g
Environmental Quality, Division of Water Resources. NCDOT also requests the issuance of a Neuse
River Riparian Buffer Authorization for this project.
A copy of this pernut application will be posted on the NCDOT Website at
https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under QuickLinks > Permit
Applications. Should you have any questions regarding this information, please contact Jason Dilday at
(919) 707-6111 or jldilday@ncdot.gov.
Sincerely,
�
�o� Philip S. Harris III, P.E., C.P.M.
Natural Environment Section Head
cc: NCDOT Permit Application Standard Distribution List
��Y ,� � T��� Office Use Only:
i � � F Corps action ID no.
� DWQ project no.
i�i�i � �
� '` Form Version 1.3 Dec 10 2Q08
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 13 23 33 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express � Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Replace Bridge No. 20 on SR 1616 (Bahama Rd.) over Dial Creek (Lake Michie)
2b. County: Durham
2c. Nearest municipality / town: Bahama
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state g�g43
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if not applicable
applicable):
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6111
3g. Fax no.: (919) 212-5785
3h. Email address: jldilday@ncdot.gov
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1 b. Site coordinates (in decimal degrees): Latitude: 36.1726 Longitude: -78.8584
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 3.0 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Dial Creek (Lake Michie)
proposed project:
2b. Water Quality Classification of nearest receiving water: WS-III; NSW, CA
2c. River basin: Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Land use is primarily residential development, forested land and lake front recreation areas.
3b. List the total estimated acreage of all existing wetlands on the property:
0.3
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
250
3d. Explain the purpose of the proposed project:
To replace a structurally deficient and functionally obsolete bridge.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing the existing single span, 27-foot bridge with a single span, 89-foot bridge on a slightly
shifted alignment. Traffic will be maintained on the existing bridge during construction of the new structure. Standard
road building equipment, such as trucks, dozers, and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained fo�r this property / � Yes ❑ No ❑ Unknown
project (including all prior phases) in the past.
Comments:
4b. If the Corps made the jurisdictional determination, what type � preliminary � Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NCDOT
Name (if known): James Pflaum Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Action ID 2009-01510 issued August 13, 2009, expired August 13, 2014
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for yaur project (check all that apply):
� Wetlands � Streams - tributaries � Buffers
� Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
Site 1� P❑ T Fill in Wetland Riparian ❑ Yes � Corps <0.01
� No ❑ DWQ
Mechanized ❑ Yes � Corps
Site 1� P❑ T Clearing Riparian � No � pWQ 0.01
Site 1❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 1❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 1❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 1❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts 0.01 Permanent
0 Temporary
2h. Comments: See Wetland Permit Impact Summary sheet for details.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average Impact length
number - (PER) or jurisdiction stream (linear feet)
Permanent (P) or intermittent (Corps - 404, 10 width
Temporary (T) (INT)? DWQ — non-404, (feet)
other)
Site 1� P❑ T Bank Dial Creek � PER � Corps 30 57
Stabilization ❑ INT � DWQ
Site 1❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 1❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 1❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 1❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 1❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
57 If
3h. Total stream and tributary impacts Permanent
(<0.01 ac)
3i. Comments: The channelized portion of the lake where the existing causeway and bridge are located was determined to be
the jurisdictional portion of Dial Creek, all other areas were deemed an open water feature.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of
impact number— waterbody Type of impact Waterbody type Area of impact (acres)
Permanent (P) or (if applicable)
Tem ora T
01 � P❑ T Dial Creek Fill in SurFace Water Lake <0.01
01 ❑ P� T Dial Creek Fill in SurFace Water Lake <0.01
01 � P❑ T Dial Creek Roadway embankment Lake 0.15
01 ❑ P� T Dial Creek Roadway embankment Lake 0.02
4f. Total open water impacts 0.15 ac. Permanent
0.02 ac. Temporary
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or (acres)
number purpose of pond Excavat
Flooded Filled ed Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surFace area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
im acts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
� Neuse ❑ Tar-Pamlico ❑ Other: Jordan
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason for impact Buffer Zone 1 impact Zone 2 impact
Permanent (P) or Stream name mitigation (square feet) (square feet)
Tem ora T re uired?
61 � P❑ T Roadway embankment Dial Creek � Nos 7,321 4,465
61 � P❑ T Bridge Dial Creek � Nos 2,680 371
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts 10,101 4,836
6i. Comments: Impacts to wetlands in buffers total 612 sq ft. in zone 1 and 94 sq ft in zone 2.
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
NCDOT Design Standards in Sensitive Watersheds will be employed. See Stormwater Management Plans for additional
measures.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
The proposed bridge is 62 feet longer than the existing bridge; the replacement bridge will be a single span, so no bents
in the water; the new bridge will have no deck drains or direct discharge to Dial Creek. Fill slopes of 1.5:1 will be utilized
in most of the jurisdictional areas. Traffic will be maintained on the existing bridge during construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes � No
impacts to Waters of the U.S. or Waters of the State? If no, explain: Compensatory mitigation is not proposed due
to minimal 'urisdictional im acts.
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? ❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
� Yes ❑ No
Comments: See attached permit drawings.
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? not applicable
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
4a. Which of the following state-implemented stormwater management programs apply ❑ HQW
(check all that apply): ❑ ORW
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State � Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) � Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes
additional development, which could impact nearby downstream water quality? � No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No
impacts?
� Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
N.C. Natural Heritage Heritage Program database; USFWS-Raleigh Field Office website; biological surveys for protected
species listed for Durham County, which includes smooth coneflower and Michaux's sumac. The species received a
Biological Conclusions of "No Effect", however habitat was present. Surveys for the species were conducted on 5/27/15
resulted in no specimens being found. No nesting habitat for bald eagle is present in the vicinity of the project. A
programmatic biological opinion (PBO) has been issued for the northern long-eared bat for North Carolina. The PBO
covers projects in Divisions 1-8. The programmatic determination for NLEB for this project is "May Affect, Likely to
Adversely Affect".
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA Documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA Maps
Digitally signed by Colin Mellor
C o I i n M e I I o r DN: cn=Colin Mellor, o=NCDOT, ou=NES,
email=cmellor@ncdot.gov, c=US
Date:2017.04.0612:00:34-04�00� 04-06-2017
Philip S. Harris III, P.E., C.P.M.
s�o'� ApplicanUAgent's Printed Name Applicant/AgenYs Signature Date
(AgenYs signature is valid only if an authorization letter from the applicant
is rovided.
1�
Hi�;hWay North Carolina Department of Transportation �
Stormw�ter M
,,,,,.,,�,,, Highway Stormwater Program �_�
STORMWATER MANAGEMENT PLAN
(Version 2.05; Released April 2016) FOR NCDOT PROJECTS
WBS Element: 40110.1.1 TIP No.: B-4943 County(ies): Durham Page 1 of 1
General Project Information
WBS Element: 40110.1.1 TIP Number: B-4943 Project Type: Brid e Replacement Date: 5/11/2016
NCDOT Contact: William Elam Contractor / Designer: Brandon Barham, PE - Ecological Engineerin
Address: 1020 Birch Ridge Dr Address: 1151 SE Cary Parkway
Raleigh, NC 27610 Suite 101
Car , NC 27518
Phone: 919-707-6718 Phone: 919-557-0929
Email: belam@ncdot. ov Email: bbarham@ecolo icalen .com
Cit /Town: Durham Count (ies : Durham
River Basin(s): Neuse CAMA Count ? No
Wetlands within Project Limits? Yes
Pro'ect Descri tion
Pro'ect Len th lin. miles or feet): 0.164 Miles Surroundin Land Use: Residential development, forested land and lake front recreational areas
Pro osed Pro'ect Existin Site
Pro'ect Built-U on Area ac. 0.7 ac. 0.5 ac.
Typical Cross Section Description: 2- 11 ft lanes, with variable shoulders (minimum of 4 ft and 9 ft shoulders at guardrail 2- 12' ft lanes with 1' shoulders
sections)
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 3585 Year: 2037 Existin : 2738 Year: 2017
General Project Narrative: State Project 8-4943 involves the replacement of existing NCDOT Bridge #310020 on SR 1616 over Dial Creek. Bridge #310020 consists of 1@25.7' timber floor on I-beams
(Description of Minimization of Water with RC vertical abutments. The proposed bridge at #310020 will be 1@85' 33" box beam with 4'-0" caps and sloping abutments. The roadway will be realigned for the
Quality Impacts) placement of the proposed bridge. The proposed bridge will provide more hydraulic opening that the existing bridge. One stormwater outfall is proposed with Rip Rap pad to
dissipate energy. No deck drains are required for this bridge. Minimization and avoidance measures incorporated into the design include elimination of direct discharge,
increased buffer treatment of discharges, retention of existing bridge abutments to minimize stream impacts and retain stability. Utilized open shoulder design for vegetative
shoulder section to obtain water treatment.
Waterbod Information
Surface Water Body (1): Dial Creek NCDWR Stream Index No.: 27-3-6-(2)
NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply III (WS-III)
Su iemental Classification: Nutrient Sensitive Waters (NSW)
Other Stream Ciassification: CA
Impairments: NA
A uatic T&E S ecies? NA Comments:
NRTR Stream ID: Buffer Rules in Effect: Neuse
Project Includes Bridge S anning Water Bod ? Yes Deck Drains Discharge Over Buffer? No Dissi ator Pads Provided in Buffer? Yes
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
����� �� ������ �������d��
������'�.� ��� ������.,�'���
D URHAM CD U1�lTY
LOCATION: BRIDGE 1110. 20 OVER DIAL CREEK
0111 SR 1616 (BAHAMA RD.)
TYPE OF WORK: GRADING, DRAINAGE, PAVI11lG, A11tD STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
�
�
�
See Sheet 9A For Index of Sheets
See Sheet 9B For Conventlonal Symbols
PERMIT DRAWING
SHEET 1 OF 10
NAPE�� RD �
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared an tae o�,�es of� �nnauLres E�vcINEEx
2017 ADT = 2738 VPD LENGTH ROADWAY TIP PROJECT B-4943 = 0.164 mi. ����f� � T � ��'>��' '°��
50 25 0 50 100 2037 ADT = 3585 VPD E<�� ECOLOGICAL �� B°��p�
K= 10% LENGTH STRUCTURES TIP PROJECT B-4943 = 0.016 mi. ��s3e�'";� �•��=��3 ENGINEERING ��� �`���
a
PLANS p= 850�o TOTAL LENGTH TIP PROJECT B-4943 = 0.180 mi. zot2 sra.vo,axo srEcrFrcnrroNs yt :� �
50 25 0 50 100 T= b% 'k ANDY YOUNG. PE SlGNATURE: � �
RlGHT OF WAY DATE: � �
rao�Ecr exciNSEa ROADWAY DESIGN ENGINEER �, �
V= 40 MPH DECEMBER 9. 2016 '� �
PROFILE (HORIZONTAL) �k (TTST 1% + DUAL 5%) MICHAEL BURNS, EI ��'.e��. ��:��
RURAL MINOR LETTING DATE: �Ro�scz nss,cx sxciNSEn �� p���s�
10 5 0 l0 2� FUNC. CLASS.= COLLECTOR GARY R. LOVERING, PE
JULY 18, 2017
PROFILE (VERTICAL) SUBREGIONAL TIER NcooT coxracr PE
SIGNATURE:
�-
e,
z
0
S 49' 29' 293' E
—L—POC Sta.10+00.00
S 42' S2' 24.9" E
ROCK PLATING—�
FROM STA 70+50
TO STA 13 I- 00 RT
�
�o
DETAIL 1 DETAIL 2
TOE PROTECTION BANK STABILIZATION
( Not fo Scale� ( Nol io Scole)
Q� 3 0'min.
NniURN�L �"`'��� SLOPE 20'
f� Nws
cao d 4
GEOTFMILE
d-2 ry, GEOTFXfILE
Type o4 Lincr= CIASS B Rip-Rap c o(t�i�c.� C1A55 IIRIPRAP
FROM STA. 15+16 TO STA.15+50 -L- RT STA 14+15 TO 14-50 L
STA 14;-60 TO 14-90 L
h
�
S I T E I gANK STABALIZATION
GLASS II RIP RAP
EST 700 TONS
E5T 750 SY GEOTEXTILE
SEE DETAIL 2
� �/ l�
REMOVE BRIDGE AND RETAIN � \�� .
E%ISTING CONC. ABUTMENTS
AND CONC WING WALLS UP \ ,
TO ELEVATION 345.5' TO 346.0'. V
LAY SLOPES BACK TO EXISTING ��
ROAD AT 1.5:1. f
SI T E I CLA55 B RIP RAP �
LaKE MICHIE EST 3 TON
EST 10 SY
GEOTEXTILE
TOE PROTECTION
SEE DETAIL 1
CLA55 B RIP RAP
EST 20 TON
EST 55 SV GEOTEXTILE
�ROCK PLATING
FROM STA 15+09
TO STA 18100 LT
ROCK EMBANKMENT
TO ELEVATION 341.3' +/-
SEE DETAIL SHEET 2G-2
SITE I �
ROCK PL4TING —'
FROM STA 16+50
TO STA 18+00 RT
O
PERMIT DRAWING
SHEET 2 OF 10
F F DENOTES FILL IN
WETLAND
� * � * DENOTES MECHANIZED
� � �� � � � CLEARING
PROIECT REFERENCE NO. SHEET NO.
B-4943 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
� -: L ��� ; "'I I P'�ECOLOGICAL
til-:I ���FNGINFERING
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�DENOTES IMPACTS IN
SURFACE WATER
(POND)
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER �o
�N
N � �
�, z z
—L—POT Sta.19t50A0
N 85 48' 43J" E
ti
0� e� R
P R
� Y�
� I C= G�U 350
� d��,��- 20' ------__� p
r %-,
O O _ N m
o go- ro `a
-- C
� Z 2
i l���j! ���+�j LL7]�7 r F
'ATrI
E sa rn�eR
�� �as.z9 LT.& RT.
�B 35.64'
S\
6� \�\.
\ � \� : O
I w
N
�
i '.P��
1
i
�
O
5�� �� ����
GRAPHIC SCALE
x�
—x—
/� / / `te�
��
�� �
$�
.>�pD (SR 16161 /
:: �'D F�PBN=� ��� �
�/�� �
GRN�EL /
N
� \ � OS
-�aAVE� & n �
cRass \
�.�
FOR -L- PROFILE,SEE SHEET 5
FOR STRIICfURE PUWS,SE£ SHEETS S-ITHRU S-?
N
Z
�
�
��
�J'---.. "'- J
z_
S 49' 29' 293' E
IP PROJECT B-4943,�
�o
Q� G��;�
Q I I I I�II I��/�
��� �
/ i'i''I!I
/ 1jji li
, �
/ � .
/ � Q��/
�r s�
r �'j � a � � ,Q
�./ .�
5� � 9TF�
� ��
_ � o�� / �
� ��� \ �
/ � `` i/ � �
r �
a2 , ��,
—L—POC Sta.10+00.00 � F c �
� ��
,_ , � �. �
�` --�:��a„� �-_ � \�_.. \\�s
�� �\
\
� S 4Z 52' 24.9" E
� \ \ ROCK PLATING—�
FROM STA 70+50
\ �. TO STA 13 I- 00 RT
� \
\,
``�� �... _ O
�� ���
�� ��\ \�, �
\� � '�
\`\ \ �.
\ \\ l
\ � \
\\
-....v��....._\ \\\�
l _\ .
���REMOVE BRIDGE AND-'R€TAIN J . �
E%ISTING CONC. ABUTMEIJTS �
AND CONC. WING WALLS UP
, TO ELEVATION 345.5' TO 346.0'.
`LAY SLOPES BACK TO EXIS7ING
ROAD AT 1.5:1.
� SITE I
� �
`� LAKE MICHIE
�,
DETAIL 1 DETAIL 2
TOE PROTECTION BANK STABILIZATION
( Not fo Scale� ( Nol io Scole)
Q� 3 0'min.
niURN�L �"`'��� SLOPE 20'
f� NWS
r �ao d SZ
� GEOTFMILE
d 2 ry GEOTFXfILE
Type o{ �ine�= CLASS B Rip-Rap e of liner= CUSS II RIPRAP
FROM $TA.15+16 TO STA.75+50 -L- RT STA 14+15 TO 14-50 L
STA 14;-60 TO 14+90 L
SITE
��/
\
CL455 B RIP�VRA�
EST 3 TON
EST 10 5Y
GEOTEXTILE
h
BANK STABALIZATION
CLA55 II RIP RAP
EST 700 TONS
E5T 750 SY GEOTEXTtLE
SEE DETAIL 2
�
�ROCK PLATING .. �
FROM STA 15+09
TO STA 18 i 00 LT
� l
ROCK EMBANKMENT � \
TO ELEVATION 34).3' +/- \
$EE DETAIL $HEET 2G-2
SITE I ��� \, �
,��, ��r� mti eti,�
��\\-�_`\ C �1�
�.�—_'_'— , _ '�."�'
TOE PROTECTION J
SEE DETAIL 1 �
CLA55 B RIP RAP
EST 20 TON
EST 55 SY GEOTEXTILE
�,__
\ S\
` ROCK PL4TING
FROM STA 16+50
-� TO STA 18+00 RT
� �� , �-.. . V
,_-
r�; -,�
� � �,
� �� \
�
�
��"'�� )
PERMIT DRAWING
SHEET 3 OF 10
F F DENOTES FILL IN
WETLAND
� * � * DENOTES MECHANIZED
� � �� � � � CLEARING
�DENOTES IMPACTS IN
SURFACE WATER
(POND)
PROIECT REFERENCE NO. SHEET NO.
B-4943 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
"'I I P'�ECOLOGICAL
S � LV� N I ���FNGINFFRING
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
II
N � � ��� �
� �� �) � � � � �
� II i �
+I
C`� !�'-, NI I I ,
/
i��� i / / � � �,1�' I I
—L—POT Sta.19t5pAp
N 8E 48' 43J" E
GRAU 350 \�" —�'�`
. N:% --- F
0
'� s ��'_N�
'ATrI
N
I
sa i ru-c�
i LT.& RT. R�
. I ���' I� � I�� \ 1
\ . �� � \ ISBG',�D
,���� , ,�,��m , �-
�,,. \\� �, � ���� 4 „� �
.\\\�� \\`l\ � �
\\� ��
,
I H(:'d l f`yd..L'�N iOLLY,
�� � ��� �� ��� � ��� i �
.hl3iIII�% r ��
�,�� I �
����lil� �
�� ����
FOR -L- PROFILE,SEE SHEET 5
FOR STRIICfURE PUWS,SE£ SHEETS S-ITHRU S-?
6
c
....��....�....�....�....�....�....��....'....'�... . . . . . . .. .. ..�... .. . . . ...�.�, ..�... . . . . . . .�... .�. .. . . . . . ��.
. . �. .. �, . . � . . . . �. . . . . ... _. . .
' � � �LPERMIT DRAWING � �
��
I'- HEET. 4, O�F 10 ,
I_
.. . � �....I ...- . . . . . . . . . . I _ l
. . .� . . . . . .... . . _- _II_L -'__- I '_'--_ �_-- . �._� .-. . I
. . . ..... .. . ...... .
� �
... . ...�. � .. ... .... . . .... .. .. .. . ..
. .�: I�i ,. I
I' II'
. . . . . . . .. . . . . . . . .. . . .. .. .. . .. . . . . . . . . . . .. . . .. . . . . . I li . . �I. . . . . . i �I . .
. . . . . . ....
... .... .... .... ......... .... .... ......:. .. .. .. ... .. .i.11l
... .... �.... ...�. ......�... .... .... I II III ..IIII I I IIII III II .IIII II III .IIII I I IIII III II.. IIII II III ..IIII I I IIII III II IIII II III .IIII I I IIII III I
..�. ...�..I . I.. . i, i.. I I I L I..I. I I I ....!.I I ! I I.J...._LJ_I � J._..I
375
365
� 355
Z _
0
� 345
335
325
�
��
s
T
J,
n.
�
w
3
�
2
�
BEGIN GRADE
_� _ �� ,��,
, ��
: � � �� �� ��� � � �
-.-.- -. . . i . . . . I I i i . i1 I.-i-. �. � �. �. �. �. �. i: I �i i I I i i
_. .. .. .. ��iJ I ...... _
�, �_ _� _ �;- �
_ . . . . . . . . BM �51 . . . . . . . . _ _ . . . - -- --- -- —
i�
i
.:.�. �. � �. N 882049 E 2D41501. . �Lil _II-_: . . . . . . ili_ _-_.. . _.__. I. I.- . 1 � .
-.. . -L- STA: 10+85:00. 25' RT � ��. i i �. �. i � _ . . . . . . -... � ''
.. . ELEV. 356JS �. _ ,_._ . _ _._.__ " . . . . . .... ,_ .
__..._ _.._. '
. . . . R/R SPIKE IN 16" WHITE OAK . � . . . - . . _ . . . . . . �. �. �. �. . �. �. �. �. . �. �. �. �. �. .-.-_ .- .-.- _ _ . . . -_- _
ii
_:. .. .. ... .. .. i .. . .-. ..... ... . . . .� __ . .. .. TBM-2.�. �. _ __-.
. . _ . i . i , � -' �� i -� - N 881837 E 2042646 . ._...
t Pl - 12+05A0 Pl - 13+50.00 �, -�- srn. io+oo.00
. . . . . . . . . i . . . . . . . . . . . . . . . �. .S 76'23'10.04" E Dlst 1221.91'
'- EL = 35678' EL = 353.66' aM so '; E�Ev. se9.s9�
!- P� _ ��-1-55.� . . . �. � VC = �� - I �. �. � � �. � :�C = �� �. � � . �. �. N 881877 E 2041663 �. � o i �. �. P� _ %%%.30.� . �. . � 600 NAIL W TELEPHONE POLE -�
_" EL - 358.98' K= 277 � i K= 63 �- SE�Ev�3soo ss�RT o EL = 35/50'
VC = ll0' V= 35 MPH - _ I�' VC = 370'
K- 29 - �� � D � R/R SPIKE IN 18 GUM TREE � n
o K=50
PROIECT REFERENCE NO. SHEET NO.
B-4943 5
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
' IP'�ECOLOGICAL
���� STEV�,,ti?� ,e,� o� �NNc�Nr:ERi[vc
� DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
� i . �. �. . . . �. . �.
. :-. -�. . �. :-I . . I__ __�� __. :
END GRADE
_ c-r n io�.Gn nn
� Vo = 35 MPH J � I c� sra ra�e�.00 �- n � rl' Vo = 35 MPH � _ - --
. �. - . I�85'33"BOX BEAM�. �. �.. .. �. . . �. _ --_ �.
/�i
. . . . . . . � _ __ _ _ ____ i �. . �. . �. . �� � W/4'-0' CAPS . . . . . . . . . . . . . _ . . . . / i i .
,.. ,.. .,,. i ..
.. . .. ... .. . . .. . ... _� . . ... ... . . . ��i i i . . // - ii i
GP 353.00' ._�._. .-._ ... _ � .: �� �i
�., i BEGIN BRIDGE sKew 90° END BRIDGE ,- , �'
f-JL46 , . , -L- STA/4t24.48 I _ _ 4 _ _
(+)2.300�% f-J1.96 ; SAG STA 15+73.66 -L- ----
�� (-J2✓SOpy _ EL = 352.47' � ��� I � � � � �
� �� �� ��
��-- � I ����
�- , gl/ - � � � � �
_ 7�oei' (-1057 � � �' +�7 S _ �'� �'� ' � � � � � � � � � � � � � '� '� '�
____ ; --'-r ��700%
( ____ �
� � �� � �
, �� �� � � �
�_�_� � �� � � �� � �� � ,� ,�
-I I I i i�-I-I II i�_,- � �i�-i i �-� � ��
� � ,� --- - _- -
1 ^ � � � �
. i � I�� � I�� I��
T i li
�, . .�� ...-� . ... ', ..,.i ii i ii ii
_L .. . �. . . . . . . . . . V / �. . �. �. . �. �. �. � i � i i i i �i
II II III I I I II III II �li I
... .. ... . I I I!I I il I II il I
.. .. . . . . .... ...�
���'� � � �
.� � ' „ '� ' '
�
„
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE _ 1400 CFS
DESIGN FREQUENCY = 25 YR
DESIGN HW ELEVATION = 3467 fT
BASE DISCHARGE = 2000 CFS
BASE FREQUENCY = l00 YR
BASE HW ELEVATION = 348b7 FT
OVERTOPPING DISCHARGE = 4349 CFS
OVERTOPPING FREQUENCY= 500+ YR
OVERTOPPING ELEVATION = 3529/ fT
DATE OF SURVEY = 6/2/20/5
WS. ELEVATION = 339.3 FT
AT DATE OF SURVEY
_ _ _ i ���
— �-r
FOR -L- PLAN VIEW,SEE SHEET 4 '-�
FOR STRUCTURE PLANS,SEE S-ITHRU S-?
,�
; � �
10 11 12 13 14 15 16 17 18 19 20
I+I
�-
375
365
355
345
335
325
6'
�
N
Z
�
�
K
C'I in� n r�� ini n T�I�
nrn►��� DRAWING
rSOF�o
PROIECT REFERENCE NO. SHEET NO.
B-4943 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
"'I I P'�ECOLOGICAL
_ V� �til-: I ���FNGINFERING
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
15' 0' 30'
GRAPHIC SCALE
F F
� � � �
� � �
� � � �
DENOTES FILL IN
WETLAND
DENOTES
MECHANIZED
CLEARING
DENOTES IMPACTS
IN SURFACE
WATER (POND)
DENOTES
TEMPORARY
IMPACTS IN
SURFACE WATER
�-
e,
z
0
�
�
�%r�%'�%;� F
POND)CMPACTER S T E
— TEMPO
SURFA
IMPAC
F�
RY
WATER
\
V�� ���
�,�,�\������-
\ ;' ` —
�
���\\��� � �\�� �t°
� �\ �-_%
\ � ,�- �- �
, / �:� i
�j� �\
/ �% �
��,
f , ~`�I
�,
�" i�'�
���� y, �/
,� , , \���,
���� \
��
�
,
TE�PO Y
SUR�� CE ER
IMPACY�
�� ��y��� � � �
ROCK PLATING ,� �� � o �
FROM STA 15 + 09 �'� � �
TO STA 18 + 00 LT ����'"'� ����"�_� � ������
o, _ ROCK EMBANKMENT
� TO ELEVATION 341.3' +/—
SEE DETAIL SHEET 2G-2
� SURFACE 1�''/ �TER � ' ' �
(POND) IMPACT` �
CLASS B RIP ,RAP ;i ,
,
EST 3� TON
�� �
EST 10 SY , ��> j� ,�
; �,,� � ,�/� � ;
GEOTEXTILE � � �� �
TOE PROTECTION —
SEE DETAIL l
GI
TB
F
,,\\\\\ C
,�
z -��iT �
� �_���
-= ---�� �
JS — --- � �
_�
. . _____ __ .
/ � `�
� ; � Z �__
C
JS--
� _
�
- - _-� � .
�j��—�� �
, �
'� ' �.����`�
; % /, „�.;�� �
� �� <_��
�/�� �. ����1��
I
PERMIT DRAWING
SHEET 6 OF 10
,
�.
PROIECT REFERENCE NO. SHEET NO.
B-4943 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
"'I I P'�ECOLOGICAL
V� N I ���FNGINHERING
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
15' 0' 30'
GRAPHIC SCALE
F F
� � � �
� � �
� � � �
i '
_�
1` ��
1 /�/
DENOTES FILL IN
WETLAND
DENOTES
MECHANIZED
CLEARING
DENOTES IMPACTS
IN SURFACE
WATER (POND)
DENOTES
TEMPORARY
IMPACTS IN
SURFACE WATER
/ \ \
TIP PROJECT B-4943 �
�
-L-POC Sto.10+00.00 �
�
���G
�,P
�oGOPI,
�G\� ��kh
��,� P.
ROCK PLA7/NG AREA
(SEE ROCK PLATING TABLE &
DETAIL N0. l & 21
�G \
�
Q�, \, �
x �
�
Q��Gx � \
�
��� P
5
I
ROCK EMBANKMENTS AREA AT END BENT
(SEE ROCK EMBANKMENiS TABLE &
DETAIL N0.41
O�
h
��
�
�� _
'�,� 1
_
h
Q
��
� x
ROCK EMBANKMENTS & ROCK PLATING LOCATIONS PLAN ��
2 �°
m�
FOR STRUCTURE DETAILS
fSEE STRUCTURE PLANSI
CLASS ll RlP RAP
(SEE STRUCTURE PLANSI
ROADWAY EMBANKMENT
(COMMON BORROW)
DRILLED PIERS
lSEE STRUCTURE PLANSJ
�(� U" FILL CLASS B& �
B.O.0 ELEV. ��7�� o CLA55 A RIPRAP �
lSEE STRUCTURE PLANSI ��� ON TOP OF CLA55 Vll
o�� � l'THICK x57 STONE \
�'��'�ICOMMON BORROWJ �GEOTEXTILE OR �
O Q� 00,� ROCK EMBANKMENTS
TOP OF ROCK EMBANKMENTS ELEV. 34/.3' +/- �.
�oa o(�:------------------ --- ----- ---- -----------------
,o� ���.� "57 STONE ' 1�l'TYP.
� 2' 7YP. „��°°,'�r .�����,. .��.9-�0� _ r,,�, .�„� o�.o�_—.���..�.�,.�,.� 1
N.W.S. ELEV.339.3'
J�
�1��
\�;,(
�'A`
n Oc�> C�o o\_� �7 al_,w��� �
� O ��
�a ROCK EMBANKMENTS o0�
� ICLASS VI/I O �
�' -`
o�o O � ��O�o ����� o
��������ngU
� ��C7 ----- 4-�J-�L7�.Q� --
\— EXISTING GROUND NARIESJ
ROCK EMBANKMENTS DETAIL NO. 4— TYPICAL SECTION ALONG —L—
ROCK PLATING AREA
(SEE ROCK PLATlN6 7ABLE &
DE7AlL N0. l & 21
ROCK EMBANKMENTS AREA
lSEE ROCK EMBANKMENTS TABLE &
DErAIL N0.3J
ROCK PLATlN6 AREA
(SEE ROCK PLAilN6 TABLE &
DETAIL N0. l, 2& 31
��
�X ?�
�� �o
2x �o
�� U ¢
Q
� � wN
�o
1�
�1
�
2
Q I
J \
��
U O
o+
��
od
W�n
�
-L-POT Sto. 19+50.00
N 86° 48' 43J" E
0
*
O
d
�
STEEL BEAM GUAR�RAIL
FOR ROADWAY DETAILS
(SEE ROADWAY TYPICALS)
GUARDRAIL
FACE4'-6" MIN
�� T �`�
2I � �
GEOTEXTILE FOR ROCK PLATING —v
��
EMBANKMENT
���
ROCK PLATING
l' CLEARANCE MlN
SHOULDER OR BERM
BREAK POINT (rOP OF SLOPEJ
�l8" CLASS N SELEC7 MATERIAL (ABCI
— SEE GEOTEXTILE
0
�o Q� OVERLAP DETAIL
�� / F
��� ��( ��q�� s,�
,Plq� � L ��/�F�P �Li�P
� SS. �ii,� Q�c�s��, l S
_-9�� �"�'�l)�%��(��<" /
2' TNICK RIPRAP
(SEE NOTE 31
l0' MAX
ROCK PLATING DETAIL NO. 1— TYPICAL SECTION
FOR ROCK PLATIN�. SEE SECTION 275 OF THE STANDARD SPEGFICATIONS.
USE ROCK PLATING AT FOLLOWING LOCATlONS:
BEGINNlN6 APPROX. ENDING APPROX. LOCATION ROCK PLATING RIPRAP
LINES SLOPE STAiION SLOPE STATION LT/RT DETAIL N0. CLASS� Sy
l/2/3 //2/B
—L— 2:l 10+50 L5:1 /1+25 RT I = eo
—L— 1.5:1 /1+25 1.75:1 /2+75 RT 2 = a35
—L— 1.75:1 /2+75 2:l 13+00 R7 I • ss
—L— 1.5d 15+09 1.5:1 /7+00 LT 3 • 445
—L— L5:1 /7+00 1.75:1 /7+75 LT 2 = ieo
—L— I.75:� 17+75 2:l 18+00 LT l = so
—L— 2:l 16+50 /.75:1 /7+25 RT I = as
—L— 1.75:1 /7+25 2:l 18+00 RT 2 • zio
USE CLASS l,2 OR B RIPRAP FOR ROCK PLATlN6 LOCATIONS.
ESTIMATED TOTAL QUANTITY OF ROCK PLATING = 1.470 SY
ROCK EMBANKMENTS
l8" OVERLAP
MIN (TYPJ
SLOPE STAKE POINT AND
CONSTRUCTION LlMlr
(TOE OF SLOPEI
GROUND LINE �
STEEL BEAM GUARDRAIL
FOR ROADWAY DETAILS
(SEE ROADWAY TYPICALS)
GUARDRAIL
FACE4,_6" MlN
�/ �
2 �
GEOTEXTILE FOR ROCK PLATING �
���
EMBANKMENT
� ��
/� GEOTEXTILE FOR
ROCK PLATING (TYPJ
rOP OF SLOPE
i
I % I
I � I
� �
� �
Ro�� wiorH � �
I
I I
� 5'OVERLAP � �
� MlN (TYPI �
I
— I I
I
I I
I I
TOE OF SLOPE
GEOTEXTILE OVERLAP DETAIL
(PLAN VIEW)
'+ -
TOP OF ROCK EMBANKMENTS ELEV. 34/3 /
FOR ROCK EMBANKMENTS. SEE ROCK EMBANKMENTS SPECIAL PROVISION.
2� rrP.
USE ROCK EMBANKMENTS AT FOLLOWING LOCATIONS: N.W.S. ELEV.339.3' \��JO
— ���1�
—UNE— APPROX. APPROX. LOCATION
BEGINNING STATION ENDIN� STATION LT/RT
—L— I4+92 +/— —L— 0+35 +/— —L— LEFT
CONSTRUCT ROCK EMBANKMENTS TO THE ELEVATION SHOWN IN THE ROCK EMBANKMENTS
& ROCK PLATING DETAIL N0.3 AND DETAIL N0. 4 OR 2 FT.ABOVE THE NORMAL WATER SURFACE
AND ACCORDING TO THE ROCK EMBANKMENTS SPECIAL PROVISION.
FILL VOIDS lN THE TOP OF ROCK EMBANKMENTS WITN CLASS B AND CLASS A RlP RAP.
PLACE "57 STONE (SELECT MATERIAL, CLASS VU UP TO l FT. ABOVE
ROCK EMBANKMENTS AS SHOWN lN THIS PLAN.
CONSTRUCT ROCK PLATING ABOVE ROCK EMBANKMENTS FROM ELEVATION SHOWN lN THE
ROCK EMBANKMENTS & ROCK PLATING DETAIL N0.3 OR 2 FT.ABOVE THE NORMAL WATER
SURFACE TO TNE SHOULDER HINGE POINT AND ACCORDlN6 TO THE SECTION 275 OF
THE STANDARD SPECIFICATIONS..
INSTALL GEOTEXTILE ON TOP OF N0. 57 STONE lN ACCORDANCE WITH
THE ARTICLE 270-3 OF THE STANDARD SPECIFICATIONS.
l' CLEARANCE MlN
SHOULDER OR BERM
BREAK POINr (TOP OF SLOPEJ
l8" CLA55 /V SELECT MATERIAL (ABCI
2' THICK RIPRAP
�SEE NOTE 3J
SEE GEOTEXrILE
OVERLAP DETAIL
�
�� ��9T �S,.
� ��c���' FG o
�� , *��� ���l� �P
� '�Q���o��'OF
3'-6"
ROCK PLATING DETAIL NO. 2— TYPICAL SECTION
l' CLEARANCE MlN
SHOULDER OR BERM
BREAK POINT (TOP OF SLOPE)
l8"CLASS lV SELECT MATERIAL �ABCJ
SEE GEOTEXTILE � �
OVERLAP DErAIL
2' THICK RIPRAP � �
lSEE NOTE 3J � ������`.
a
GUARDRAIL
4'-6" MINFACE /- STEEL BEAM GUARORAIL
SLOPE STAKE POINT
(TOE OF SLOPEJ
CONSTRUCTION UMIT
GROUND LINE -
FOR ROADWAY DETAILS
(SEE ROADWAY TYPlCALSI
;�z, �' �
- GEOTEXTILE FOR ROCK PLATING EMBANKMENT
�/��j,� � pJ ����' � (COMMON BORROWJ ��� � � , , , ,
� �� l' T HICK "57 SiONE i���
FILL CLA55 B & �
CLA55 A RIPRAP GEOTEXTILE FOR ��
ROCK EMBANKMENTS �
ON TOP OF CLA55 VlI �' EXISTING EMBANKMENT
i
i
- - - r.>
' - - ' - ^.ir
� ..: ..: .�.:...'.. .t....�.tv.�..�.. .•...: .'... r. .:�.�:v'.C�.�.�.��.�.'.�.�:�.�:i.°��?.�:i�.:�:t�:�.�.i��: ��.�.�:�.�.°.�: �.:.
«57 STONE::..::?`...`..:::t..:c::.t.:�:: ...:::`....:t:;`':.:..:.:.,;;;�:� rrrP.
R_��___ — ._. � � - -- �� — � ---- � ,.. _..._. .: �
.......... .
O ROCK EMBANKMENTS
� _ (CLASS VIIJ
—: °
r
EXISrING GROUND NARIESJ
ROCK EMBANKMENTS & ROCK PLATING DETAIL NO. 3— TYPICAL SECTION
ESTIMATED MATERIAL OUANTITIES FOR ROCK EMBANKMENTS
ROCK EMBANKMENTS (SELECT MATERIAL.CLASS VlIJ = 3,030 TONS
RlP RAP CLASS A= 480 TONS
RlP RAP CLASS B= 480 TONS
"57 STONE (SELECT MATERIAL.CLA55 VlJ = 590 TONS
GEOTEXTILE FOR ROCK EMBANKMENTS = 950 SY
WETLAND PERMIT IMPACT SUMMARY
Surtaceandwetiandaackage: WETLAND IMPACTS SURFACE WATER IMPACTS
Han Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (tt) (ft)
1 14+16 to 14+70 -L- Fill in Surface Water <0.01 <0.01
1 14+34 to 14+45 -L- RT Fill in Surface Water <0.01 <0.01
1 14+64 to 17+35 -L- Roadway Embankement <0.01 0.01 0.15 0.02
1 14+50 to 14+65 -L- Bank Stabalization <0.01 57
TOTALS: <0.01 0.01 0.15 0.02 57.0
Fe+ised 3/31/0.5
.,
�
V
�
0
�
�
�
�
�
• �
�
V
�
�
O
V
See Sheet 9A For Index of Sheets
See Sheet 9B For Conventlonal Symbols
�`���I°1� C�1F 1��1��II�� �� IIE��II�II1���'�
��'�1I��[�� '�1� lI���1�['�'�.�����
D URHAM CD U1�lTY
LOCATION: BRIDGE 1110. 20 OVER DIAL CREEK
0111 SR 1616 (BAHAMA RD.)
TYPE OF WORK: GRADING, DRAINAGE, PAVI11lG, A11tD STRUCTURE
BUFFER IMPACTS PERMIT
-�- sra io+oo.00
BEGIN BRIDGE
—L— STA/4+Q4.48
SITE
<�
END TlP PROJECT B-4943
—L— STA.19+50.00
END BRIDGE
—L— STA/5+
� �;�
��,- -Y-� SR l6/6 (BAHAMA ROJ
LAKE MICNIE
BUFFER DRAWING'
SHEET 1 OF 5
C APE�� RD �
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared an tae o�,�es of� �nnauLres E�vcINEEx
2017 ADT = 2738 VPD LENGTH ROADWAY TIP PROJECT B-4943 = 0.164 mi. ����f� � T � ��'>��' '°��
50 25 0 50 100 2037 ADT = 3585 VPD E<�� ECOLOGICAL �� B°��p�
K= 10% LENGTH STRUCTURES TIP PROJECT B-4943 = 0.016 mi. ��s3e�'";� �•��=��3 ENGINEERING ��� �`���
a
PLANS p= 850�o TOTAL LENGTH TIP PROJECT B-4943 = 0.180 mi. zot2 sra.vo,axo srEcrFrcnrroNs yt :� �
50 25 0 50 100 T= b% 'k ANDY YOUNG. PE SlGNATURE: � �
RlGHT OF WAY DATE: � �
rao�Ecr exciNSEa ROADWAY DESIGN ENGINEER �, �
V= 40 MPH DECEMBER 9. 2016 '� �
PROFILE (HORIZONTAL) �k (TTST 1% + DUAL 5%) MICHAEL BURNS, EI ��'.e��. ��:��
RURAL MINOR LETTING DATE: �Ro�scz nss,cx sxciNSEn �� p���s�
10 5 0 l0 2� FUNC. CLASS.= COLLECTOR GARY R. LOVERING, PE
JULY 18, 2017
PROFILE (VERTICAL) SUBREGIONAL TIER NcooT coxracr PE
SIGNATURE:
Z
0
5 0' 0' I 0 0'
GRAPHIC SCALE
i
��
.., ,\�� /�QP /
\ 6/ ;
� \� I � �
_ � 2y. : I/
�^�A a qc �
z�\ �����
�\r.
��
�
�
� �
��
�2 \
�J
S 49' 29' 293' E�
—L—POC Sta.10+00.00
SITE I
ROCK PLATING—�
FROM STA 70+50
TO STA 13 I- 00 RT
�o
�>C\/\/\/\/\/
x�'\,'\,7'\,'\, ALLOWABLE IMPACTS ZONE 1 REMOVE BRIDGE AND RETAIN—
/ / / l E%ISTING CONC. ABUTMENTS
AND CONC. WING WALLS UP
TO ELEVATION 345.5' TO 346.0'.
LAY SLOPES BACK TO EXISTING
� ROAD AT 1.5:1.
� ���� � � � � ALLOWABLE IMPACTS ZONE 2 �E M,�H,E
�
m
�
Y..
n�
a
/
6�
C
@
0
�
�
�
E
�
0
�
�.,
��
�
�
w
�
� i,
/
�,� �
'��
� ,' �
k%�T{— ��/
DETAIL 1 ��C�\J /�/ eY
TOE PROTECTION
� No� ro s�aie� / /
f���� s�oPF p� �//
NA1 URNO �
cao d // �
/
d_z F� �EorE���E ///
/
r�Pe or�����,= cuss e a��-aaP /�/ �
FROM STA.15+76 TO STA.15+50 -L- RT /� j
�
DETAIL 2
BANK $TA8ILIZATION
� No� �o S�aii;
3.0 m n.
l 0'
NWS
Q
GEOTEXrILF ',
� of �,��._ �as5 �� a�PRAP 6 3
sTn ia+is ro ia+so � g' RT ,�'� F
STA 14+60 TO 14}90 L �
� �
O SITE I
1
�
� �
SITE I �� (
I /
� BANK STABALIZATION \
GLA55 II RIP RAP
EST 700 TONS ,, �S(
E5T 750 SY GEOTEXTILE
SEE DETAIL 2 � �
� ,
�ROCK PLATING
FROM STA 15+09
TO STA 18100 LT
ROCK EMBANKMENT
TO ELEVATION 341.3' +/-
\ SEE DETAIL SHEET 2G-2
_i'� i���`T
I �
SITE I s �
CLA55 B RIP RP.P ., �
E5T 3 TON
E5T 10 SY
GEOTEXTILE
TOE PROTECTION
SEE DETAIL 1
CLA55 B RIP RAP
EST 20 TON
EST 55 SV GEOTEXTILE
ROCK PL4TING —'
FROM STA 16+50
TO STA 18+00 RT
O
SITE I
BUFFER DRAWING
SHEET 2 OF 5
SITE I
�D TlP PROJECT B-4943
—L—POT Sta.19t50A0
N 85 48' 43J" E
*�2a GRqU 350 \�
���3"_ ------__
;. %1`�%%',i'� � F
0 0 _ N m
" o go; N "�
=1�:17�10' i',U_� F� Z 2 C
�A 'ATrI
� sa rn�eR
E *9629 LT.& RT.
Im �B 35.64'
s\
6� \�
SITE I � �'�`
� w
N
�
i � P�� :
1
i
;
0
PROIECT REFERENCE NO. SHEET NO.
B-4943 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
"'I I P'�ECOLOGICAL
S I �v� �til-: I ���FNGINFFRING
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
I
n
ci o
� N
�
zz
3 0' 0' 6 0'
GRAPHIC INSET SCALE
N SITE I
x�
—X�
'� //� / / `�\��
rt-�` o /
�S/�� o
o. _. ,�`(
O\
�s
��
►'
S I T E I FOR —L— PROFILE,SEE SHEET 5
FOR STRIICfURE PUWS,SE£ SHEETS S—ITHRU S—?
/ \ \
TIP PROJECT B-4943 �
�
-L-POC Sto.10+00.00 �
�
���G
�,P
�oGOPI,
�G\� ��kh
��,� P.
ROCK PLA7/NG AREA
(SEE ROCK PLATING TABLE &
DETAIL N0. l & 21
�G \
�
Q�, \, �
x �
�
Q��Gx � \
�
��� P
5
I
ROCK EMBANKMENTS AREA AT END BENT
(SEE ROCK EMBANKMENiS TABLE &
DETAIL N0.41
O�
h
��
�
�� _
'�,� 1
_
h
Q
��
� x
ROCK EMBANKMENTS & ROCK PLATING LOCATIONS PLAN ��
2 �°
m�
FOR STRUCTURE DETAILS
fSEE STRUCTURE PLANSI
CLASS ll RlP RAP
(SEE STRUCTURE PLANSI
ROADWAY EMBANKMENT
(COMMON BORROW)
DRILLED PIERS
lSEE STRUCTURE PLANSJ
�(� U" FILL CLASS B& �
B.O.0 ELEV. ��7�� o CLA55 A RIPRAP �
lSEE STRUCTURE PLANSI ��� ON TOP OF CLA55 Vll
o�� � l'THICK x57 STONE \
�'��'�ICOMMON BORROWJ �GEOTEXTILE OR �
O Q� 00,� ROCK EMBANKMENTS
TOP OF ROCK EMBANKMENTS ELEV. 34/.3' +/- �.
�oa o(�:------------------ --- ----- ---- -----------------
,o� ���.� "57 STONE ' 1�l'TYP.
� 2' 7YP. „��°°,'�r .�����,. .��.9-�0� _ r,,�, .�„� o�.o�_—.���..�.�,.�,.� 1
N.W.S. ELEV.339.3'
J�
�1��
\�;,(
�'A`
n Oc�> C�o o\_� �7 al_,w��� �
� O ��
�a ROCK EMBANKMENTS o0�
� ICLASS VI/I O �
�' -`
o�o O � ��O�o ����� o
��������ngU
� ��C7 ----- 4-�J-�L7�.Q� --
\— EXISTING GROUND NARIESJ
ROCK EMBANKMENTS DETAIL NO. 4— TYPICAL SECTION ALONG —L—
ROCK PLATING AREA
(SEE ROCK PLATlN6 7ABLE &
DE7AlL N0. l & 21
ROCK EMBANKMENTS AREA
lSEE ROCK EMBANKMENTS TABLE &
DErAIL N0.3J
ROCK PLATlN6 AREA
(SEE ROCK PLAilN6 TABLE &
DETAIL N0. l, 2& 31
��
�X ?�
�� �o
2x �o
�� U ¢
Q
� � wN
�o
1�
�1
�
2
Q I
J \
��
U O
o+
��
od
W�n
�
-L-POT Sto. 19+50.00
N 86° 48' 43J" E
0
*
O
d
�
STEEL BEAM GUAR�RAIL
FOR ROADWAY DETAILS
(SEE ROADWAY TYPICALS)
GUARDRAIL
FACE4'-6" MIN
�� T �`�
2I � �
GEOTEXTILE FOR ROCK PLATING —v
��
EMBANKMENT
���
ROCK PLATING
l' CLEARANCE MlN
SHOULDER OR BERM
BREAK POINT (rOP OF SLOPEJ
�l8" CLASS N SELEC7 MATERIAL (ABCI
— SEE GEOTEXTILE
0
�o Q� OVERLAP DETAIL
�� / F
��� ��( ��q�� s,�
,Plq� � L ��/�F�P �Li�P
� SS. �ii,� Q�c�s��, l S
_-9�� �"�'�l)�%��(��<" /
2' TNICK RIPRAP
(SEE NOTE 31
l0' MAX
ROCK PLATING DETAIL NO. 1— TYPICAL SECTION
FOR ROCK PLATIN�. SEE SECTION 275 OF THE STANDARD SPEGFICATIONS.
USE ROCK PLATING AT FOLLOWING LOCATlONS:
BEGINNlN6 APPROX. ENDING APPROX. LOCATION ROCK PLATING RIPRAP
LINES SLOPE STAiION SLOPE STATION LT/RT DETAIL N0. CLASS� Sy
l/2/3 //2/B
—L— 2:l 10+50 L5:1 /1+25 RT I = eo
—L— 1.5:1 /1+25 1.75:1 /2+75 RT 2 = a35
—L— 1.75:1 /2+75 2:l 13+00 R7 I • ss
—L— 1.5d 15+09 1.5:1 /7+00 LT 3 • 445
—L— L5:1 /7+00 1.75:1 /7+75 LT 2 = ieo
—L— I.75:� 17+75 2:l 18+00 LT l = so
—L— 2:l 16+50 /.75:1 /7+25 RT I = as
—L— 1.75:1 /7+25 2:l 18+00 RT 2 • zio
USE CLASS l,2 OR B RIPRAP FOR ROCK PLATlN6 LOCATIONS.
ESTIMATED TOTAL QUANTITY OF ROCK PLATING = 1.470 SY
ROCK EMBANKMENTS
l8" OVERLAP
MIN (TYPJ
SLOPE STAKE POINT AND
CONSTRUCTION LlMlr
(TOE OF SLOPEI
GROUND LINE �
STEEL BEAM GUARDRAIL
FOR ROADWAY DETAILS
(SEE ROADWAY TYPICALS)
GUARDRAIL
FACE4,_6" MlN
�/ �
2 �
GEOTEXTILE FOR ROCK PLATING �
���
EMBANKMENT
� ��
/� GEOTEXTILE FOR
ROCK PLATING (TYPJ
rOP OF SLOPE
i
I % I
I � I
� �
� �
Ro�� wiorH � �
I
I I
� 5'OVERLAP � �
� MlN (TYPI �
I
— I I
I
I I
I I
TOE OF SLOPE
GEOTEXTILE OVERLAP DETAIL
(PLAN VIEW)
'+ -
TOP OF ROCK EMBANKMENTS ELEV. 34/3 /
FOR ROCK EMBANKMENTS. SEE ROCK EMBANKMENTS SPECIAL PROVISION.
2� rrP.
USE ROCK EMBANKMENTS AT FOLLOWING LOCATIONS: N.W.S. ELEV.339.3' \��JO
— ���1�
—UNE— APPROX. APPROX. LOCATION
BEGINNING STATION ENDIN� STATION LT/RT
—L— I4+92 +/— —L— 0+35 +/— —L— LEFT
CONSTRUCT ROCK EMBANKMENTS TO THE ELEVATION SHOWN IN THE ROCK EMBANKMENTS
& ROCK PLATING DETAIL N0.3 AND DETAIL N0. 4 OR 2 FT.ABOVE THE NORMAL WATER SURFACE
AND ACCORDING TO THE ROCK EMBANKMENTS SPECIAL PROVISION.
FILL VOIDS lN THE TOP OF ROCK EMBANKMENTS WITN CLASS B AND CLASS A RlP RAP.
PLACE "57 STONE (SELECT MATERIAL, CLASS VU UP TO l FT. ABOVE
ROCK EMBANKMENTS AS SHOWN lN THIS PLAN.
CONSTRUCT ROCK PLATING ABOVE ROCK EMBANKMENTS FROM ELEVATION SHOWN lN THE
ROCK EMBANKMENTS & ROCK PLATING DETAIL N0.3 OR 2 FT.ABOVE THE NORMAL WATER
SURFACE TO TNE SHOULDER HINGE POINT AND ACCORDlN6 TO THE SECTION 275 OF
THE STANDARD SPECIFICATIONS..
INSTALL GEOTEXTILE ON TOP OF N0. 57 STONE lN ACCORDANCE WITH
THE ARTICLE 270-3 OF THE STANDARD SPECIFICATIONS.
l' CLEARANCE MlN
SHOULDER OR BERM
BREAK POINr (TOP OF SLOPEJ
l8" CLA55 /V SELECT MATERIAL (ABCI
2' THICK RIPRAP
�SEE NOTE 3J
SEE GEOTEXrILE
OVERLAP DETAIL
�
�� ��9T �S,.
� ��c���' FG o
�� , *��� ���l� �P
� '�Q���o��'OF
3'-6"
ROCK PLATING DETAIL NO. 2— TYPICAL SECTION
l' CLEARANCE MlN
SHOULDER OR BERM
BREAK POINT (TOP OF SLOPE)
l8"CLASS lV SELECT MATERIAL �ABCJ
SEE GEOTEXTILE � �
OVERLAP DErAIL
2' THICK RIPRAP � �
lSEE NOTE 3J � ������`.
a
GUARDRAIL
4'-6" MINFACE /- STEEL BEAM GUARORAIL
SLOPE STAKE POINT
(TOE OF SLOPEJ
CONSTRUCTION UMIT
GROUND LINE -
FOR ROADWAY DETAILS
(SEE ROADWAY TYPlCALSI
;�z, �' �
- GEOTEXTILE FOR ROCK PLATING EMBANKMENT
�/��j,� � pJ ����' � (COMMON BORROWJ ��� � � , , , ,
� �� l' T HICK "57 SiONE i���
FILL CLA55 B & �
CLA55 A RIPRAP GEOTEXTILE FOR ��
ROCK EMBANKMENTS �
ON TOP OF CLA55 VlI �' EXISTING EMBANKMENT
i
i
- - - r.>
' - - ' - ^.ir
� ..: ..: .�.:...'.. .t....�.tv.�..�.. .•...: .'... r. .:�.�:v'.C�.�.�.��.�.'.�.�:�.�:i.°��?.�:i�.:�:t�:�.�.i��: ��.�.�:�.�.°.�: �.:.
«57 STONE::..::?`...`..:::t..:c::.t.:�:: ...:::`....:t:;`':.:..:.:.,;;;�:� rrrP.
R_��___ — ._. � � - -- �� — � ---- � ,.. _..._. .: �
.......... .
O ROCK EMBANKMENTS
� _ (CLASS VIIJ
—: °
r
EXISrING GROUND NARIESJ
ROCK EMBANKMENTS & ROCK PLATING DETAIL NO. 3— TYPICAL SECTION
ESTIMATED MATERIAL OUANTITIES FOR ROCK EMBANKMENTS
ROCK EMBANKMENTS (SELECT MATERIAL.CLASS VlIJ = 3,030 TONS
RlP RAP CLASS A= 480 TONS
RlP RAP CLASS B= 480 TONS
"57 STONE (SELECT MATERIAL.CLA55 VlJ = 590 TONS
GEOTEXTILE FOR ROCK EMBANKMENTS = 950 SY
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
ROAD PARALLEL ZONE1 ZONE2 TOTAL ZONE1 ZONE2 TOTAL ZONE1 ZONE2
SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2)
1 ROADWAY EMBANKMENT 12+41 TO 14+12 -L- LT X 2037.0 3201.0 5238.0
1 1@85' 33" BOX BEAM W/ 4' CAPS 14+12 TO 14+56 -L- LT X 2340.0 371.0 2711.0
1 ROADWAY EMBANKMENT 16+80 TO 17+62 -L- LT X 765.0 535.0 1300.0
1 ROADWAY EMBANKMENT 17+07 TO 18+16 -L- RT X 1762.0 729.0 2491.0
1 ROADWAY EMBANKMENT 11+00 TO 12+84 -L- RT X 2757.0 0.0 2757.0
1 1@85' 33" BOX BEAM W/ 4' CAPS 14+06 TO 14+41 -L- RT X 440.0 0.0 440.0
TOTAL: 10101.0 4836.0 14937.0 0.0 0.0 0.0
�
•
See Sheet � A For I ndex of Sheets
See Sheet � B For Conventi onal Symbols
����� �� ����� �������.�_
�� ��� _ ��� C��� ��� � �\ 1��
LOCA TI01�1: BRIDGE 1��. 20 O VER DIAL CREEI�
01� SR 1616 (BAHAMA RD. )
TYPE OF WORK: GRADII�G, DRAII�AGE, PA VI1�lG, A1�D STR UCTURE
,IJ���ir/ � 7 T����I���
��S JS JS�
i �.
LAKE MICHIE
90% RET�IEW S UBMITTAL
�
0
0
N
N
�
N
Z
�
�
�
Z
E ��� S �
T� PE� RD�
�NA
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepared in the O�ces of: HYDRA ULICS E1VGI11lEER
GRAPHIC SCALES DESIGI� DATA PROJECT LEI�GTH
2 017 ADT — 2 73 8 VP D S T E V�IA R T � NC FIRM LICENSE No: F-1148
LENGTH ROADWAY TIP PROJECT B-4943 — 0.164 mi. ��s�sE���YParkW�y,s";re�o�
Cary, NC 27518
(919)557-0929
50 25 0 50 l00 2037 ADT = 3585 VPD 4z�FAYEnE����EST,5TE400 FirmLicense# C-1051 0� �0a�%�
ECOLOGICAL �'
K= 10% LENGTH STRUCTURES TIP PROJECT B-4943 = 0.016 mi. _ RA�E=�H,NC27601 wwwstewartinc.com ENGINEERING Q�� �g�o
T 919.380.8750 PROJECT #:H15013.00
�
PLANS p= 850�o TOTAL LENGTH TIP PROJECT B-4943 = 0.180 mi. 2012 STANDARD SPECIFICATIONS P.E. � ��
50 25 0 50 l00 T= b% * ANDY YOUNG PE SIGII�ATURE: rr� �
= 4 0 M P H RIGHT OF WA Y DA TE: PROJECT ENGINEER R OAD WA Y DESIG11l E1VGIIVEER � �
V �
DECEMBER 9, 2016 � Q
PROFILE (HORIZONTAL) *(TTST 1% + DUAL 5%) MICHAEL BURNS, EI ���, o�`�
�
PROJECT DESIGN ENGINEER / 0/,� �� p��Q
10 5 0 l0 2� FUNC. CLASS. RURAL MINOR LETTI11lG DATE:
— COLLECTOR JULY 18, 2017 GARY R. LOVERING, PE
PROFILE (VERTICAL) SUBREGIONAL TIER NCDOT CONTACT
P.E.
SIGNATURE:
BOUNDARIES AND PROPERTY.•
State Line ----- -----
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin �
Property Corner �
Property Monument 0
Parcel/Sequence Number �23
Existing Fence Line -x x x-
Proposed Woven Wire Fence �
Proposed Chain Link Fence �
Proposed Barbed Wire Fence '�
Existing Wetland Boundary - - - -W�B- - - -
Proposed Wetland Boundary W�B
Existing Endangered Animal Boundary EAB
Existing Endangered Plant Boundary EPB
Existing Historic Property Boundary HPB
Known Contamination Area: Soil -�•�� S •� -
Potential Contamination Area: Soil -�� S �� -
Known Contamination Area: Water J�' ,-W- �' -
Potential Contamination Area: Water -� W �?� -
Contaminated Site: Known or Potential �' �
BUILDINGS AND OTHER CULTURE:
Gas Pump Vent or U/G Tank Cap O
Sign �
Well °
W
Small Mine �'
Foundation 0
Area Outline
Cemetery fi
Building
School �
Church -v
Dam
HYDROLOGY.•
Stream or Body of Water
Hydro, Pool or Reservoir � �
Jurisdictional Stream �S -
Buffer Zone 1 Bz �
Buffer Zone 2 Bz 2
F I ow Arrow � --- ---
Disappearing Stream � -- ---
Spring �-����_--�
Wetland �
Proposed Lateral, Tail, Head Ditch
� FCON
False Sump r����a
����� �� �_'� ����� ��� �����9 �Jd"� �����_ ,�' �� ����� \ � ���i'
Note: Not to Scale *S. U.E. = Subsurface Utility Engineering
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
RIGHT OF WAY.•
Baseline Control Point
Existing Right of Way Marker
Existing Right of Way Line
Proposed Right of Way Line
Proposed Right of Way Line with
Iron Pin and Cap Marker
Proposed Right of Way Line with
Concrete or Granite R1W Marker
Proposed Control of Access Line with
Concrete C�A Marker
Existing Control of Access
Proposed Control of Access
Existing Easement Line
Proposed Temporary Construction Easement -
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Drainage / Utility Easement
Proposed Permanent Utility Easement
Proposed Temporary Utility Easement
Proposed Aerial Utility Easement
CSX TRANSPORTATION
0
MILEPOST 35
0
SWITCN
� � � �
Proposed Permanent Easement with
Iron Pin and Cap Marker
ROADS AND RELATED FEATURES:
Existing Edge of Pavement -
Existing Curb -
�
.
W
.
W
�\ �
� W
in� �
'`�' �iI
,� c ��
T
�A,
E
E
TDE
PDE
PUE
TUE
AUE
�
Proposed Slope Stakes Cut --- �---
Proposed Slope Stakes Fill --- F---
Proposed Curb Ramp �R
Existing Metal Guardrail T T T
Proposed Guardrail T T T T
Existing Cable Guiderail n n �
Proposed Cable Guiderail n n n n
Equality Symbol �
Pavement Removal
I�EGETATION.•
Single Tree
Single Shrub
Hedge
Woods Line
�
�
Orchard
Vi neya rd
EXISTI11lG STRUCTURES.•
MAJ O R:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall -
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
Storm Sewer
UTILITIES.•
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
U/G Power Cable Hand Hole
H-Frame Pole
U/G Power Line LOS B(S.U.E.*)
U/G Power Line LOS C(S.U.E.*)
U/G Power Line LOS D(S.U.E.*)
TELEPHONE:
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
Telephone Cell Tower
U/G Telephone Cable Hand Hole
U/G Telephone Cable LOS B(S.U.E.*) -
U/G Telephone Cable LOS C(S.U.E.*) -
U/G Telephone Cable LOS D(S.U.E.*) -
U/G Telephone Conduit LOS B(S.U.E.*)
U/G Telephone Conduit LOS C(S.U.E.*)
U/G Telephone Conduit LOS D(S.U.E.*)
U/G Fiber Optics Cable LOS B(S.U.E.*)
U/G Fiber Optics Cable LOS C(S.U.E.*)
U/G Fiber Optics Cable LOS D(S.U.E.*)
� � � �
Vineyard
CONC
J ��N� WW �
}---
CONC HW
� CB
O
s
- -TC- - -
TC
- - - -T FO- - -
- -T FO- - -
T FO
WATE R:
Water Manhole
Water Meter
Water Valve
Water Hydrant
U/G Water Line LOS B(S.U.E*)
U/G Water Line LOS C(S.U.E*)
U/G Water Line LOS D(S.U.E*)
Above Ground Water Line
TV:
TV Ped esta I
TV Towe r
U/G TV Cable Hand Hole
U/G TV Cable LOS B(S.U.E.*)
U/G TV Cable LOS C(S.U.E.*)
U/G TV Cable LOS D(S.U.E.*)
U/G Fiber Optic Cable LOS B(S.U.E.*)
U/G Fiber Optic Cable LOS C(S.U.E.*)
U/G Fiber Optic Cable LOS D(S.U.E.*)
GAS :
Gas Valve
Gas Meter
U/G Gas Line LOS B(S.U.E.*)
U/G Gas Line LOS C(S.U.E.*)
U/G Gas Line LOS D(S.U.E.*)
Above Ground Gas Line
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Above Ground Sanitary Sewer
SS Forced Main Line LOS 6(S.U.E.*)
SS Forced Main Line LOS C(S.U.E.*)
SS Forced Main Line LOS D(S.U.E.*)
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
Utility Unknown U/G Line LOS B(S.U.E.*)
U/G Tank; Water, Gas, Oil
Underground Storage Tank, Approx. Loc. -
A�G Tank; Water, Gas, Oil
Geoenvironmental Boring
U/G Test Hole LOS A(S.U.E.*)
Abandoned According to Utility Records -
End of Information
-W--
W
A/G Water
- -TV- - -
TV
- - - -TV FO- - -
- -TV FO-
TV FO
- —�— —
�-
A/G Gas
�
O
ss
A/G Sanitary Sewer
- - - -FSS- - - -
- - FSS - -
F55
•
�
0
a
7UTL
0
UST
0
�
m
AATU R
E.O.I.
x�0
�0
FOR STRUCTURE DETAILS
l SEE ST RUCT URE PLANS)
CLASS ll R/P RAP
(SEE ST RUCT URE PLANSI
B.O.0 ELEV.
(SEE ST RUCT URE PLANSI
0
(COMMON BORROW I
vv-" J
TOP OF ROCK EMBANKMENTS ELEV. 34/.3' +/- o a��'�
N. W. S. ELEV. 339.3' �
2' TYP.
0
,, -
o ------� o ,�, oo -- -- o-
oc�°o o°oao°� � ao � �e °o #57 � STONE,�o a a�,� �ao 0
�����c��LJ� G o����� oOaC� �� e��� i iC
0 a000�000 0 o a � �a-
0 ov � O
Jl '- a °�00 ��a°��a° °°�°
��
�� � a o � °' '�
�j� o a � a�a [�o ROCK EMBANKMENTS o0 � �C
�� a��� � � �' '0�
� o�� O� � �CLASS VlIJ O �� �C
�o � a � �� �� o �� �
��� a � ���o--���a � ��
, a ��
a� a�aO���Q �----��
° °p - �-� - �� /-�� ��� \�� � �-
���%,�,�� ��i����\ � �
� i� ����.� � �� i i
__�__, - __1,-
ROCK EMBANKMENTS DETAIL NO. 4
ROADW AY EMBANKMENT
(COMMON BORROW l
DR/LLED PIERS
(SEE ST RUCT URE PLANS)
F/LL CLASS B &
CLASS A R/PRAP
ON T OP OF CLASS V ll
l' TH/CK #57 STONE
GEOTEXTILE FOR
ROCK EMBANKMENTS
•e--- -a-,-- --,- ------------'o'.------o�
���� ����oo��o°�� � o�oa� �a�a � � o�o�o � � �
a�aoa��o �Dao��o a�
�° a� a � o°� �°�� a
�a 0 o a
O�a � o a 0 � a
j� aa oo a� o�0� 0o a a0a
�a� 0a
��� � a�o�a0
�� �° -- ❑0��0�
____��.�__ _ ���Q___.
EXISTING GROUND fVARIES�
- TYPICAL SECTION ALONG -L-
m
/ 1 V li /\ / LI'"1 /// Y V I'"1/ 1 L I'"1
l SEE ROCK PLAT /NG T ABLE &
DET AlL N0. l& 21
GUARDRA/L
FACE4' -6" MlN
ST EEL BEAM GUARDRAIL � E-
FOR ROADW AY DET AILS
(SEE ROADW AY T YP/CALS� o� ����� o� ���
o�oa oo � � -o�o�
��, ,�� ��o
�
o ��oy
��
2 �
, �
�
�
GEOTEXTILE FOR ROCK PLAT/NG
EMBANKMENT
ROCK PLAT lNG
l' CLEARANCE MlN
SHOULDER OR BERM
BREAK POINT fTOP OF SLOPE)
l8" CLASS /V SELECT MATERIAL IABCJ
� '� ��
S � �
,
'� C
�� ti ��� , ����
F'�-, q.o -,
Fssq �j� �
��- /
SEE GEOTEXTILE
OVERLAP DETA/L
����� ���
>���''p �5°��
� o��� �
������nol��OF
2' T H/CK R/PRAP
�SEE NOT E 3)
I l0' MAX
ROCK PLATING DETAIL NO. 1— TYPICAL SECTION
FOR ROCK PLAT ING, SEE SECT lON 275 OF T HE ST ANDARD SPECIFICAT IONS<
USE ROCK PLAT lNG AT FOLLOW lNG LOCAT /ONSe
BE�/NN/NG APPROX. END/N� APPROX. LOCAiION ROCK PLATING R/PRAP
LINES SLOPE STATION SLOPE STATION LT/RT �ErA/L N0. CLASSX SY
l/2/3 //2/B
-L- 2:l 10+50 /.5:1 /1+25 RT l = ao
-L- 1.5:1 /1+25 /.75:1 /2+75 RT 2 x 435
-L- 1.75:1 /2+75 2:l 13+00 RT l = 35
-L- 1.5:1 /5+09 /.5:1 /7+00 LT 3 = 445
—L— 1.5:1 /7+00 /.75:1 /7+75 LT 2 = �so
—L— 1.75:1 /7+75 2:l 18+00 LT l = so
—L— 2:l 16+50 /.75:1 /7+25 RT l x es
—L— 1.75:1 /7+25 2:l 18+00 RT 2 x 2�0
USE CLASS l, 2 OR B RIPRAP FOR ROCK PLAT lNG LOCAT IONSe
EST IMAT ED T OT AL QUANT lT Y OF ROCK PLAT lNG = l, 470 SY
ROCK EMBANKMENTS
FOR ROCK EMBANKMENT S, SEE ROCK EMBANKMENT S SPEC/AL PROV/SION.
USE ROCK EMBANKMENT S AT FOLLOW lNG LOCAT /ONSo
-L/NE - APPROX. APPROX. � LOCAiION
BEGINN/N� STATION END/NG SiATION LT/RT
-L- 14f92 f/- -L- 17f35 f/- -L- LEFT
ST EEL BEAM GUARDRAIL
GUARDRAIL
FACE4, _6" MlN
FOR ROADW AY DET AILS
l SEE ROADW AY T YPICALS) ���a���
� o�� �
aog000� ,
o �,
o�o r
2' �
�
�
�
GEOT EXT lLE FOR ROCK PLAT lNG -
SLOPE ST AKE PO/NT AND
CONST RUCT lON LlMIT
lTOE OF SLOPE)
GROUND LINE �
I
I
I
l8" OVERLAP I
MlN (TYP)
GEOTEXTILE FOR
ROCK PLAT/NG (TYP)
TOP OF SLOPE
I
�
�
�
ROLL W/DTH I
j 5' OVERLAP �
� MlN ITYP) �
TOE OF SLOPE
GEOTEXTILE OVERLAP DETAIL
�P�,N vi Ew�
EMBANKMENT
l' CLEARANCE MlN
�SHOULDER OR BERM
BREAK POINT (TOP OF SLOPE)
���°°� l8" CLASS /V SELECT MAT ER/AL (ABC)
��� o
� 0 °o 00 �°�°
�fl��oo 0��0�.
2' T HICK RIPRAP
�SEE NOTE 3)
SEE GEOTEXTILE
OVERLAP DETAIL
.����� s/�
�� �'�' ,��,`°�i
�> �� i�� O,�'
D��'��,� s�
, ���o �,o�,
3' -6„
ROCK PLATING DETAIL NO. 2— TYPICAL SECTION
l' CLEARANCE MlN
SHOULDER OR BERM
BREAK PO/NT (TOP OF SLOPE) �
l8" CLASS /V SELECT MATERIAL IABC) ���
o�°o �� � �
��� �_ �oo
SEE �EOTEXTILE
OVERLAP DETA/L
2' T H/CK RIPRAP
f SEE NOT E 3� �
���,�: � P ��
� P
�-,-' � P
, ��� �c�5
GUARDRAIL
4' -6" MINFACE
ST EEL BEAM GUARDRAIL
FOR ROADW AY DET AILS
(SEE ROADWAY TYPICALS)
� ��
� 2'
�
,
,
- GEOT EXT /LE FOR ROCK PLAT /NG
(COMMON BORROW �
SLOPE ST AKE POINT
(TOE OF SLOPE)
CONST RUCT lON LlMIT
�ROUND LINE -
;
EMBANKMENT
,� ��ao�a C��� � o ��� , , , _ � _ �
F�,P� � � ODO�- �� �—'
� ���� � l' TH/CK #57 STONE � �
�J �� 0���(�� F/LL CLASS B& ��
\�� ��0�,� CLASS A RIPRAP �EOTEXT/LE FOR ��
� ��� �� ON TOP OF CLASS Vll ROCK EMBANKMENTS �� EXISTING EMBANKMENT
T P F R K A K T 4/ '+/ — � � ��
0 0 OC EMB N MEN S ELEV. 3.3 a�D��CQo—o___o__o_oo_o____ ____________e_o___oo_o_o_o___ o___o__o_oo__o_oa_0__e___o__a__o__a____
Oo —�,���
a�a � oo�o°o°oa�4# ���' ,
O�
a o 0 o a o 57 STONE o 0 0 0 o a ��o� l TYP.
a oa000 ooe o00 o�e voe voe ov, °oe o00
, o o��� a o 0 0 0 0 0 � �o��o�����
2 TYP. �o �� °�°��� ��� o�a�j ���o�a o o a o� o. o 0 000 �oo ,°�°a� oo ��°� o 0 00o e o Qoo 0 o a o 00 �oo a o e o�o o � o
o � a o� �o� �� a� ° o °. �a ° o o° o� o�
�� �� �°a° o�a �o °�� o� � �ao���a� �°o�� ���° ���oo�o o��a �°a a��n o�oa a��� ��
N.W.S. ELEV. 339.3 �. o oo� a0o[�Ga�������Do �000 � � � 0 � Q o
� �° a �
� o a o o � a 0
� a o a° ° o a o 0° a a a O a � o �
� o � � � o �a
\• a 0 CI D ROCK EMBANKMENT S �o� �a o a o O a
ODo � O o � o ��
a�O�oa � � 0�00 O� O° O o� O�aao ��
a a� �� «�Ass v��� ,� 0 o Do � � a �o�
ao o� � �� U � �� O � ��� � �� EXISTING GROUND (VARIES)
a a �� o aa � �a a a ����� ° a° �
°Oo �o�°a Oa� ao��O�Oa � ��
aoo �____ __ a o0 ��Q
----------���i�%����;%��\;,- ���� �, ---------����T�-�,�„-��,
�\��� �;', ,� ; i ;�� \ : , �/�; ,� :`�; <���� � ;\,.
CONSTRUCT ROCK EMBANKMENTS TO THE ELEVATION SHOWN lN THE ROCK EMBANKMENTS
& ROCK PLAT lNG DET AlL N0. 3 AND DET AlL N0. 4 OR 2 FT o ABOV E T HE NORMAL W AT ER SURFACE
AND ACCORDING T 0 T HE ROCK EMBANKMENT S SPECIAL PROV lSIONo
F/LL V 0/DS lN T HE T OP OF ROCK EMBANKMENT S W lT H CLASS B AND CLASS A RlP RAPo
PLACE #57 ST ONE (SELECT MAT ERIAL, CLASS V l) UP T 0/ FT e ABOV E
ROCK EMBANKMENT S AS SHOW N lN T HlS PLANe
CONST RUCT ROCK PLAT lNG ABOV E ROCK EMBANKMENT S FROM ELEV AT lON SHOW N lN T HE
ROCK EMBANKMENT S& ROCK PLAT lNG DET AlL NOa 3 OR 2 FT o ABOV E T HE NORMAL W AT ER
SURFACE T 0 T HE SHOULDER HINGE POINT AND ACCORDING T 0 T HE SECT lON 275 OF
T HE ST ANDARD SPECIFICAT /ONS.e
INST ALL GEOT EXT /LE ON T OP OF NOa 57 ST ONE /N ACCORDANCE W lT H
T HE ART ICLE 270 —3 OF T HE ST ANDARD SPECIFICAT IONSa
ROCK EMBANKMENTS & ROCK PLATING DETAIL NO. 3- TYPICAL SECTION
EST IMAT ED MAT ERIAL QUANT lT lES FOR ROCK EMBANKMENT S
ROCK EMBANKMENT S(SELECT MAT ERIAL, CLASS V ll) = 3, 030 T ONS
RlP RAP CLASS A= 480 TONS
RlP RAP CLASS B= 480 TONS
#57 STONE (SELECT MATERIAL,CLASS Vl) = 590 TONS
GEOTEXTILE FOR ROCK EMBANKMENTS = 950 SY
N
0
N
�
w
�
BL-100
Fi o
S 49° 29' 29.3" E
BEGIN T lP PROJECT B-4943
-L -POC Sto. l0 +00.00
& 50' RT
��
& 65� �r
���
� � � �P
�
�� -��-� \
� � ��
F� �oo
\
x�0 g26L=
�
F
:
�� �
�
� L
� ,
:�\ \
%�:� .�„ \ �
BM 51 �
N 882049 E 2041501
-L- STA, 10+85,00, 25' RIGHT �.
ELEV, 356,15'
R/R SPIKE IN 16" WHITE OAK
S 42° 52' 24.9" E
ROCK PLATING �
FROM STA 10 + 50
TO STA 13 + 00 RT
�
CITY OF DURHAM
DB NO DEED REF.FOUND PG
�0
k�%
Pl Sto 9 +37.40
0= 6° 40' 35.9" (RT l
D = 8° 56' 13.8"
L = 74.7/'
T = 37.40'
R = 64/.l0'
�'� �� \
\
� +50.00
r� � ��. � � 55' LT
� z 0� 8i �'f'y� ��� �
, �, +
� o0 0� ��. X1h��- \ m 6
r,� �' O 2
t�' '�R 0�' c'p �` \ \
�.
�r 1 �� F
<
{ �.
� �
`,1_'�i Cr;� , \
�.1� /
��� � � !� �
��,,' `'��
tC ` �`� �, � � C
� \ F' ,
� ��
+00.00
EXIST R/W
& 65� Rr
BM 50
N 881877 E 2041663
-L- STAo 13+15e00, 38' RT
ELEVa 351065'
R/R SPIKE IN 18" GUM TREE \
flJ�.�� �
Exisr Riw
& 90' RT
REMOVE BRIDGE AND RETAIN
EXISTING CONC ABUT ENTS
02
x
Pl Sto l0 +37.2/
�= 6` 37' 04.4" l RT )
D = 6° 50' 03.9"
L = 96.83'
T = 48.47'
R = 838.34'
Runoff = Ex1st.
DETAIL 1
TOE PROTECTION
( Not to Scale)
�� FILL
NATURAL ��,'��� SLOPE
GROUND d
GEOTEXTILE
d = 2 Ft.
Type of Liner= CLASS B Rip-Rap
FROM STA. 15 + 16 TO STA. 15 + 50 -L- RT
M �F �
AND CONC. WING WALLS UP
TO ELEVATION 345.5' TO 346.0'.
LAY SLOPES BACK TO EXISTING
ROAD AT 1.5:1. +05.00
EXIST R/W
& 95' RT
CLASS B RIP RAP
EST 3 TON
EST 10 SY
GEOTEXTILE
F
�
�
CITY OF DURHAM
DB NO DEED REF.FOUND PG
BANK STABALIZATION
CLASS II RIP RAP
EST 700 TONS
EST 750 SY GEOTEXTILE
SEE DETAIL 2
+75.00
�5� cr
+75.0
5 L5
Pl Sto l5 +20.36
� = 50° l8' S2.0" (LT �
D = 7° 38' 22.0"
L = 658.6/'
T = 352.24'
R = 750.00'
Runof f = 80'
Se = 4%
DETAIL 2
BANK STABILIZATION
( Not to Scale)
3.0'min.
2.0�
NWS
�
GEOTEXTILE �
Type of Liner= CLASS II RIPRAP
STA 14+15 TO 14+50 L
STA 14+60 TO 14+90 L
�� �� �
�t�
ROCK PLATING J
FROM STA 15 + 09
TO STA 18 + 00 LT �,;
ROCK EMBANKMENT � �.�',`:�
TO ELEVATION 341.3' +/- i
SEE DETAIL SHEET 2G-2
�
F TB 2G1 �� +26.i
� 1 55' L
;-�t ,, �, • � m
�S!�';�%i, �Cn��; � r'
TOE PROTECTION �
SEE DETAIL 1
CLASS B RIP RAP
EST 20 TON
EST 55 SY GEOTEXTILE
F
E�
+50.00
EXIST R/W
ROCK PLATING �
FROM STA 16+50
TO STA 18 + 00 RT
1
CITY OF DURHAM
DB NO DEED REF.FOUND PG
E
2
BARTFAY, SELMA I.
TRUSTEE OF THE BARTFAY
FAMILY TRUST
DEED 2121
PAGE 539
END T lP PROJECT B-4943
-L -POT Stoe l9 +50.00
N 86° 48' 43.1" E
+5n_nn ,
�� ,v �
..
� ■ �
_ ��
��_■ •�� . . ��
-�� .
�—\ �� — —��, !
� '� '��
� . '
�
.•
+75.00
50' RT
��
�
�
_
�
r
�
n
-i
m
�
i0' TAPEh
LT. & RT.
s
'�' `�S°
�,
s� '�-�
°�� % � �
F` ` `'��
�
, a- _
N �
N �
o �
N N
o -
�� �
� 3 r
IROBERTS, LISA G.
H ROBERTS. JEANETTE K.
ti MILLER. BETSY R,
� DEED 6665
PAGE 063 �
N
PROJECT REFERENCE NO
B —4943
ROADWAY DESIGN
ENGINEER
SHEET NO.
4
HYDRAULICS
ENGINEER
Firm License No. CQO51
421 Fayet[eville St, I� NC FIRM LICF.NSF. No: F-1148
. Suite 400 ' � J 1151 SG Cary Parkway, Suite 101
Raleigh, NC 27601 Cary, NC 27518
T 919.380.8750 �� �919) 557-0929
wwwstewartinc.mm � ECOLOGICAL
S T E WA R T I�ENGINEERING
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
c�Y' O
00 N
� �
ZZ
TBM-2
N 881837 E 2042646
-L- STAo 10+00,00
S 76°23'IOo04" E Dist 1221091'
ELEV, 399,89'
60D NAIL IN TELEPHONE POLE
/
�
�.
� _ ��Q
� /
_ ExisTi�� Riw / •
- ,_ _ o �Q
=-- � /
UNDEFINA LE _ � ��� �
�-. F�JAD ��� 1616)
� n r �l a�' �
5 ��A�' - � \
-� � �' �
EXIS GNTI R�W �
� i �zy,'
, , i �i .
� i OS
+50.00 =�AVEi _� � � , n ��'�
EXIST R/W c���� �� - � �
& 40'RT --'�� ��
�� �
�
�� �
,
�
4
MARY RUTH TILLEY
LIFE ESTATE
MILDRED TILLEY WALKER
& ROBERT ALLEN TILLY
DB 6671- PG 794
� EMBANKMENT EXCAVATION
FOR -L - PROFILE. SEE SHEET 5
FOR STRUCTURE PLANS,SEE SHEETS S-ITHRU S-?