Loading...
HomeMy WebLinkAbout20170412 Ver 1_Bridge 580245 McDowell Plans_20170406c rn � L N t� -� � Q N m � N E a � 0 0 U �Z Pam 0 NlD m \NM mr � ��� •� � V W � O � � • � � V � � 0 V � GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2010 = 790 V = 25 MPH FUNCT. CLASS = LOCAL SUB REGIONAL TIER �"I�a'I'I��: C�i�� \(�I'�'I'i-I ��.�I'�(�[.I\.�� ll)l ��l�l(�>\ (�)I�� f-I I� �I-1 \\�.�� �"� MCDOWELL COUI�TY LOCATION: BRIDGE N0.245 OVER JORDAN BRANCH ON SR 1128 (SILVERS WELCH ROAD) TYPE OF WORK: GRADWG, PAVING, DRAINAGE AND STRUCTURE WETLANDS AND SURFACE WATER IMPACTS PERMIT � �� CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. PROJECT LENGTH LENGTH ROADWAY TIP PROJECT = 0.040 MILES LENGTH STRUCTURE TIP PROIECT = 0.003 MILES TOTAL LENGTH TIP PROJECT = 0.043 MILES P�epo�ed in ihe Office of Mottern & Croig fo� DIVISION 13 NORTH CAROLINA DEPARTMF.NT OF TR9NSPORT9T/ON 1012 STANDARD SPEClFICATIONS LETTING DATE: JAMES VOSO, PE PRoJfiCT F,NGlh'EER RIGHT-OF-WAY DATE: DANA BOLDEN,PE X3'DR9ULIGS F,NGINECR NCDOT CONTACT: PAUL SPROUSE, PE DINISION 13 BRJD�F PROfCCT MANA�ER '41'A'16 B�'A'IE PROJe(J�' RBPBRBN4� � �� �gryg � AV a�in 1LA ll.Ulf"aJL�allpplL� 1L 91`A'IFi PNQIP.�A` N0. P.A.PRW.N0. D�`RIP�YON 17BP.13.R.12 R.O.W., UTIL. 17BP.13.R.12 CONST. ROADWAY DESIGN ENGINEER P.E. tcxnru�: HYDRAULICS ENGINEER PERMIT DRAWING SHEET 1 OF 3 PLA11lS PREPARED BY: �� ��V`I Mattern & Craig V CONSULTING ENGINEERS • SURVEYORS 12 BROAD STREET ASHEVILLE, NORTH CAROLINA �828> 254_22�, FAl( (828) 264-4562 � _ ` Nf' � � EXC.WATlOH / � M�� F4TER FABRM N/D R/P RAP CLA55 ll —�r `� ON�Y��PEL BAI�KS yy /5'TX/CK i� INLET CHANNEL r��� — Nc � \ excavarroN �� i r� ��ON� FOME C{/5�� ��r. �qIR FIBER BA�NF/LC �'?M NATUR.Y B£0 NATER/Al. yarriHc 9�lILAR /N S/ZE TO CLASS 'B R/P RAP. r SUBS/DiZE 1�lTN CLA55 'B' MP R4P IF NEEDEQ �� Y Au �� SElELT ¢,dCl(F/LL rNaTNE Naree�a.� Z O > s c -o L n a a v ui v N 0 W � i Y E � m -o 0 N Z c m E c 0 w � N "m rn � � m M 0 CULVERT INTERNAL CHANNEL rpar ro sc,tcE, excavarro,y � �� — � f/LTER FABR2 AHO — — 'i�� a� �,d R/P RAP CLASS /I Oh CnN/NEL BANKS �� � i5• rnxrc oNtr r7rai �� OUTLE�T CHANNEL por BRIDGE HYDRAULIC DATA DESIGIy DISCHARGE = 480 CFS DESIGN FREOUENCY = 25 YRS DESIGIy Fryy ELEV.4TlON = 145TA FT BASE DISCHARGE = 750 CFS BASE FREOUEN�1' _ l�0 YRS BASE Ffy� ELEVATlOIy = 1449.46FT OVERTOPPING DISCNARGE = 650 CFS OVERTOPPING FREQUEN� = 50 YRS OVERTOPPING ELEVATlOIy = 1458b FT DATE OF SURyEY y�.S.ELEVATlOIy AT pATE OF SURVEY 1,470 = 5-28-10 _ 115259FT � \� G�ENDOLrN L.NARRiS DB 869 PG 832 BEGIN TlP PROJECT l7BPJ3.RJ2 �\ STA �1+00 \ \ \ \ REraN !I � DONALD C.& �IARGARET LAyENDER DB 857 PG 549 / ! F I c 1 ' j� LATE AL FILL SLOPE DIT SEE DETNL B CLA55 U RlP RAP � FILTER FABRIC fSTRUCTURfS PAY ITEAl1 O GEFALD & BEULAN L,LAyEN�ER DB 367 PG 8B6 Q NAFlOL� B. 8 FI1CH511 J. SHLI�IdN �B A35 PG 3�4 CLASS ll RIP RAP AND F/LTER fABR/C fSTRUCTURES PAY /rE�IJ LATERAL F/LL SLOPE D/TC/i SEE DE7NL A DETAIL A LATERAL FILL SLOPE 'V' DITCH ( Noi to Smle) Noturol � I �—' Fill Ground 2;� �,�.� 1"iFi. Slope D Min. D= 2Ft. Min 6= 2Ft. FROM -L- STA. 12 + 10 TO STA. 12 + 45 LT FROM -L- STA.11+50 TO STA.12+15 RT END TIP PROJECT l7BPJ3.RJ2 -L- STA �3+25 b \ \�JI \ i DOUGLdS LdyENDER C DB 124 PG <94 � \ �F \ \9 \ � s" \ 9 l� CU RANOY �, 8 TEpESAL, yE55 UB 980 PG 706 \ PROJECT REfERENCE NO. SHEET NO. 178P.13.R.12 2 of 3 2W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER :e f Mattern & Craig 0,///�� CONSULiiNG ENGiNEERS -S�HYErONS 15 Ey LLE.NORTx �AROLNA 2880i �828�35��-it0i � %dz �Biel t5�-4562 50 25 0 50 100 SCALE PERMIT DRAWING SHEET 2 OF 3 JORDAN BRANCH (DWQ CLASS: C) �DENOTES IMPACTS IN SURFACE WATER �DENOTES TEMPORARY IMPACTS IN SURFACE WATER / n � O 00 N �� Z Z .. ., �,. .. . � . . . , . . . . . . . . ' . . _ _ . . � . . _ . . . . .. . . . , . . . . . , , . . , , . . , , , , , , , , , , , , , , ,, , , , , , , , , , , , , , , , � . . . . . . . . �, . . . . . . , . . . . . . . . . . . . . . . .. . . . . .. . . . . .. . . . . . . . i i_ - ' - � � F . - � . . _ _ . . i. �. . . - . . . . . � . . . . . _. . , , � , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , : , _ , , , , �. , , , , �,, , . . . .. . . . . - . . . . . . . . _ . . . . . . , , , � , , , , , . , , . . . . . . . . . . BEGIN PROJECT END PROJECT �L�� _D,A/�� STA. 17+00.00 STA. 13+25.00 0 V V . . . .. .. . .. . . . .. . . . . . . . . . . . . . .. . . . . . . . . . '. . . . . . . . . . . . . . . . . . . , . . .. . . . . . . . . . . . . �.-. . . . . . . . . . . . . .. . . . . . . . .. . . ... . . . . . . BEGIN GRADE END GRADE * DW� — `� cL STA. 10 + 10.00 STA. 13 + 15.00 -L2- STA l0+1352 � � c�� 9ao EL = 1,465.90 EL = 1,460.40 TlE TO EX EOP SR 1127 • ���i ��,� NN PROP 2s rR 1„470 1,470 : Ec�V = 1�4e�3s 1 470 �m*a 1 47p ��`"NNQa 1 470 �'SE' = 1457A PI = 12+10.03 , , �O� „ , , �� u u O-.�. , PROP 700 YR EL = 1,458.55 /��6. -L2- STA i0+B8b4 ��8 JQ' �i n� � � �V n ii u u N SE = 1459,46 VC = 160' �� �33i TlE TO PROP EOP -L- �� ��� �'\� YaW�Y� dD � K = 18 / � . .� ' W � W' �p . � To V- 20 MPH � � ELEV =�.463,43 i. (+)3 �`'�9S a 1 460 Exisr �>3 - — ' 1,460 ],46Q , � 1,460 . � ��O`� , 6 — — — — , 6 �, � � 1 4 0 �+���� . . . . . . . . . r . . . .. . . . . , . . . . . 9�Sj. . -. . . BIEND. . .. . . . . . . . . . . . . . . . .. . . . . . . .. . _ . . . . . . � . . . . . .� .�.4 �. . . . �+)17631% 9% NVi'S = 145259 - EX�T +' DATE OF SURVEY 5-28-10� GRADESED o�. EX/STING GRADE ii 1,45Q v-o°sE��cr encKF�« . . 1,45Q 1,45Q , 1,450 1,45Q . . . . . . . . �W . . . . . . 1,450 . . . . . lIyVERT PLATE � 145L12 1,440 , 1,44Q 1,440 . 1,440 1,440. 1,440 10+00 11+00 12+00 13+00 14+00 10+00 11+00 1Of00 11+00 10+00 11+00 ` � � ` � � exc.W.vrop / M�� F4TER FABRM N/D R/P RAP CLA55 ll —�r `� ON�Y��PEL BAI�KS yy /5'TX/CK �� INLET CHANNEL r��� — Nc � \ excavarroN �� i r� ��ON� FOME C{/5f.� ��r. �qIR FIBER BA�NF/LC �'?M NATURAL B£0 MATER/Al. yarriHc 9�lILAR /N S/ZE TO CLASS 'B R/P RAP. r SUBS/DiZE 1�lTN CLA55 'B' MP R4P IF NEEDEQ �� Y Au �� SElELT ¢d�Cl(F/LL �NATNE MAiERiAt1 CULVERT INTERNAL CHANNEL (NOT i0 SCACEI z s � -o L n a a � u� Q N 0 ro � i Y E � a m -o 0 N Z c m E c 0 w � N "m rn � � m M 0 excavarro,y � �� — � f/LTER FABR2 AHO — — 'i�� a� �,d R/P RAP CLASS /I Oh CnN/NEL BANKS �� � i5• rnxrc oNtr r7rai �� rt•-s OUTLE�T CHANNEL por BRIDGE HYDRAULIC DATA DESIGIy DISCHARGE = 480 CFS DESIGN FREOUENCY = 25 YRS DESIGIy Fryy ELEV.4TlON = 145TA FT BASE DISCHARGE = 750 CFS BASE FREOUEN�1' _ l�0 YRS BASE Ffy� ELEVATlOIy = 1449.46FT OVERTOPPING DISCNARGE = 650 CFS OVERTOPPING FREQUEN� = 50 YRS OVERTOPPING ELEVATlOIy = 1458b FT \ � ,� BEGIN TlP F'F?OJf CT /7BPJ::.R12 �\ STA Il+(;;; \ �I� � E�NL B I � I � io �IP RAP �" ER FAB lC z �f 5 PA lT E6/1 BEULOAN IC.LAyEN�ER % ��� 367 PfA�8B6 � I I �� � �� � � . � y a '�/ � ��,i ,! � �OB�435p�3Y; � LLASS ll R/P R��P I aNn {a*_a ,-at�riic ' � // /�j rsrRuc�uREs ,�ar ne�✓� � / � �\\\ � L.4F �\ . .a�.. �. , �;T�������� \� i � ,i1 DETAIL A LATERAL FILL SLOPE 'V' DITCH ( Noi to Smle) Noturol � I r' Fill Ground 2;� �,�.� 1"iFi. Slope D Min. D= 2Ft. Min 6= 2Ft. FROM -L- STA. 12 + 10 TO STA. 12 + 45 LT FROM -L- STA.11+50 TO STA.12+15 RT <<ND TIP PROJECT l7BPJ3.RJ2 -L- STA �3+25 �OUGLAS LAVEN�ER �D6 2� PG.494 \�__ .. ., �,. .. . � . . . , . . . . . . . . ' . . _ _ . . � . . . . . , . . . . . , , . I I . . , , .- . , , , , , , , , , , , , , , ,, , , , , , , , , , , , , , , , , , , , , , , . . . . . . - � F . � . . . i. �. . i PROJECT REfERENCE NO. SHEET NO. 178P.13.R.12 3 of 3 2W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER :e f Mattern & Craig 0,////� CONSULiiNG ENGiNEERS -S�HYErONS z eao�o sraeer �828x�yi�LZ=�NORFdz�B�e1�25< 4562 so zs o 5so ,00 SCALE PERMIT DRAWING SHEET 3 OF 3 JORDAN BRANCH (DWQ CLASS: C) �DENOTES IMPACTS IN SURFACE WATER �DENOTES TEMPORARY IMPACTS IN SURFACE WATER / n O � O �� ZZ DATE OF SURVEY = 5-28-10 � y�.S.ELEVATlOIy - 115259FT AT pATE OF SURVEY �L�� —DW�� BEGIN PROJECT END PROJECT � STA. 17+00.00 STA. 13+25.00 � . .. . . . .. . . . . . . . . . . . . . . . . .. .. . .. . . . . . . . - � . . . : . . . . , . . .. _ . . . . . . . . . . . . �.-. . . . . . . . . . . . . .. . . . . . . . .. . . ... . . . . . . BEGIN GRADE END GRADE * —DW� — `� STA. 10 + 10.00 STA. 13 + 15.00 -L2- STA l0+1352 � � c�N 9ao EL = 1,465.90 EL = 1,460.40 TlE TO EX EOP SR 1127 • ���i ��,� NN 1,470 /'ROP 2s rR 1„470, 1,470, : El-EV = 1�4e�3s 1 470 , m*v 1 47p ��`"N�Qa 1 470 �'SE' = 1457A PI = 12 + 10.03 , , � O� „ , , � � u u O , ----� PROP 700 YR EL = 1,458.55 /��6. -L2- STA i0+B8b4 ��8 JQ' �i n� � � �V n ii u u N SE = 1459,46 VC = 160' �� �33i TlE TO PROP EOP -L- �i ��� ���W�Y�W�Y� - BLEND � K = 18 / - � . .� � W � �p � To V- 20 MPH � � ELEV =�.463,43 i. (+)3 �`'�9S a 1 460 Exisr �>3 — — ' 1,460 ],46Q , � 1,460 . � ��O`� , 6 — — — — , 6 �, � � 1 4 0 �+���� . . . . . . . . . r . . . .. . . . . , . . . . . 9�Sj. . -. . . BIEND. . .. . . . . . . . . . . . . . . . .. . . . . . . .. . _ . . . . . . � . . . . . .� .�.4 �. . . . �+)17631% 9% NVi'S = 145259 - EX�T +' DATE OF SURVEY 5-28-10� GRADESED o�. EX/STING GRADE ii 1,45Q v-o°sE��cr encKF�« . . 1,45Q 1,45Q , 1,450 1,45Q . . . . . . . . �W . . . . . . 1,450 . . . . . lIyVERT PLATE � 145L12 1,440 , 1,44Q 1,440 . 1,440 1,440. 1,440 10+00 11+00 12+00 13+00 14+00 10+00 11+00 1Of00 11+00 10+00 11+00 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS an Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 12+09± to 12+27± Culvert 0.0097 0.0019 55 16 2 12+09±to 12+27± Riprap Banks 0.0083 60 TOTALS: 0.0180 0.0019 114 16 Revised 3/37/05 k 11�;11�� <14' North Carolina Department of Transportation SL[?1'llitYcl�PP � Highway Stormwater Program �. STORMWATER MANAGEMENT PLAN (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 17BP.13.R.12 TIP No.: County(ies): Mcdowell Page 1 of 2 General Project Information WBS Element: 17BP.13.R.12 TIP Number: Project Type: Bridge Replacement Date: 5/6/2013 NCDOT Contact: Paul F. Fisher, P.E. Contractor I Designer: Designer (Dana Bolden) - Mattern & Craig Consultin Engineers Address: H draulics Unit Address: 12 Broad Street 1020 Birch Ridge Road Asheville, N.C. 28801 Ralei h, 27610 Phone: 919-707-6726 Phone: 828-254-2201 Email: fisher ncdot. ov Email: d'bolden matternandcrai .com CitylTown: Old Fort Count ies : Mcdowell River Basin s: Catawba CAMA County? No Wetlands within Project Limits? No Pro'ect Description Pro'ect Len th lin. miles or feet : 331 ;inear feet Surroundin Land Use: �Noods / Open Grass Land Proposed Pro'ect Existin Site Pro'ect Buiit-Upon Area ac. 0.1 ac. 0.1 ac. Typical Cross Section Description: Two 9.6' Lanes without shoulder (19.2' EP to EP) Two 10' Travel Lanes with 3' Grassed Shoulders (20' EP to EP) Annual Avg Daily Traffic (veh/hr/day): Design/Future: 1200 Year: 2025 Existin : 600 Year: 1998 General Project Narrative: Project consists of replacing an old timber bridge ( McDowell County Structure # 245) with an aluminum box culvert. The existing bridge is 1@ 16'-6" timber bridge with vertical (Description of Minimization of Water abutments. The proposed aluminum box culvert is 1@ 16'-6" x 6'-8" buried one foot with a 6' wide low flow channel. Roadway alignments and built upon areas are to remain Quality Impacts) basicly the same. No structural Stormwater BMP's are associated with this project. Waterbody Information Surface Water Body (1): Jordan Branch NCDWR Stream Index No.: 11-12-6 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: Catawba Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) I G�;h11'E11' North Carolina Department of Transportation �rl�l'l1]�'�"c3f(`C � i Highway Stormwater Program �' STORMWATER MANAGEMENT PLAN (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 17BP.13.R.1� TIP No.: County(ies): Mcdowell Pa e 2 of 2 Bridge to Culvert Avoidance and Minimization Proposed Structure Summary Sheet No. & Station Sheet No.: 4 Station: 12+18.15 -L- Number of Barrels: 1 Drainage Area (ac or sq mi): 0.78 Sq. Miles Barrel Width/Diameter (ft): 16'-6" Surface Water Body: 1 Jordan Branch Barrel Hei ht ft: 6'-8" Culvert T e: Aluminum box culvert Culvert Len th ft 54' Avoidance and Minimization Efforts: Culvert is designed to minimize stream impact by being the minimum length to provide an adequate roadway cross section and by placement at or (Bridge to Culvert) near natural streeam grade. Culvert will include sills and low flow channel to closely match existing stream bed Stream Slope Fish and/or Aquatic Life Passa e Existing Average Stream Slope %): 1.80 % Existing Low Flow Channel Dimensions The existing low flow channel is approiximately Proposed Culvert Slope (%): 1.00 % in the Stream: 6 feet wide Culvert Burial Proposed Cubert Burial Depth (ft): 2 Existing Streambed Material: Cobbles and gravel with some coarse sand Proposed Low Flow Dimensions The low flow channel through the culvert will be Through the Culvert: 6 feet wide at the base and 8 feet wide at the Proposed Sills/Baffles: Culvert will include 1 foot sills at each end top Existing Low Flow Velocities in the 4.8 (Q5) Stream (ft/s : ropose ow ow e oci ies roug the Culvert (ft/s : 4.7 (Q5) Alternating Low Flow Sills/Baffles: The low flow sills will extend the width of the culvert Culvert/Stream Ali nment Stream Patterns Upstream and Downstream The stream is of uniform slope immediately up and down stream of the culvert with no sharp bends. of the Culvert that Could Affect Fish Passage and Bank Stability: Bed Forms Impacted by Culvert (riffles, Stream is generally shallow and free flowing through project area; no signifigant bed forms will be impacted pools, glides, etc.): Low Flow Floodplain Bench Required? Yes Low flow channel was provided to match existing stream channel (provide justification) Sharp Bends at Inlet/Outlet? No (describe culvert alignment with stream) Stream Realignment Necessary? (provide No justification) Bank Stabilization: Streambanks to be stabilized with Class II rip rap for approximately 30 feet up and down sterem from culvert Outlet Velocities Natural Stream Channel 2-yr Velocity (ft/s): 5.1 Q5 Natural Stream Channel 10-yr Velocity (ft/s): 6.6 Proposed Culvert 2-yr Outlet Velocity (ft/s): 4.7 Q5) Proposed Culvert 10-yr Outlet Velocity (ft/s): 7 Roadwa Geometric Considerations Evaluate/Describe Roadway Geometric Constraints: The proposed culvert has been designed to generally maintain the roadway alignment with slight improvement to the cross-section.