Loading...
HomeMy WebLinkAbout20081180 Ver 1_Approval Letter_20080821O?O? W A T ?9QG 6? -7 rJ_ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality August 21, 2008 DWQ# 08-1180 Mecklenburg County Mr. Isaac Hinson City of Charlotte, Stormwater Services 600 East Fourth St. Charlotte, NC 28202 Subject: 10137 Thomas Payne Circle Maintenance, Charlotte APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Hinson: You have our approval, in accordance with the attached conditions and those listed below, to relocate 166 linear feet (If) of unnamed stream to Four Mile Creek in order to complete the proposed project in Mecklenburg County, as described in your application received by the Division of Water Quality (DWQ) on August 1, 2008. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Numbers 3688 and 3689 which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetlands. The General Certification allows you to use Nationwide Permit Numbers 27, and 33 once they are issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permits expire unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. In addition to the requirements of the certification, you must also comply with the following conditions: 1. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 2. Use of native vegetation and other soft stream bank stabilization techniques must be used where practicable instead of riprap or other bank hardening methods. If riprap is necessary, it shall not be placed in the streambed, unless approved by the DWQ. 3. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality. Mailing Address Phone (704) 663-1699 Location 0- b, 610 East Center Avenue, Suite 301 Fax (704) 663-6040 610 East Center Avenue, Suite 301 No turn l!!y ?atura Mooresville, NC 28115 Mooresville, North Carolina Internet: www.ncwaterguality.or¢ Customer Service 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper 4. Continuing Compliance. The applicant (City of Charlotte) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721. Sincerely, for Qoleen H. Sullins Attachments cc: Army Corps of Engineers, Asheville Ian McMillan, Wetlands Unit MRO, Land Quality Central Files File Copy