HomeMy WebLinkAbout20081180 Ver 1_Approval Letter_20080821O?O? W A T ?9QG
6? -7
rJ_
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
August 21, 2008
DWQ# 08-1180
Mecklenburg County
Mr. Isaac Hinson
City of Charlotte, Stormwater Services
600 East Fourth St.
Charlotte, NC 28202
Subject: 10137 Thomas Payne Circle Maintenance, Charlotte
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Hinson:
You have our approval, in accordance with the attached conditions and those listed
below, to relocate 166 linear feet (If) of unnamed stream to Four Mile Creek in order to complete
the proposed project in Mecklenburg County, as described in your application received by the
Division of Water Quality (DWQ) on August 1, 2008. After reviewing your application, we have
determined that this project is covered by Water Quality General Certification Numbers 3688
and 3689 which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetlands. The
General Certification allows you to use Nationwide Permit Numbers 27, and 33 once they are
issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other
federal, state or local permits before proceeding with your project, including those required by
(but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed
regulations.
The above noted Certification will expire when the associated 404 permits expire unless
otherwise specified in the General Certification. This approval is only valid for the purpose and
design that you described in your application. If you change your project, you must notify us in
writing, and you may be required to send us a new application for a new certification. If the
property is sold, the new owner must be given a copy of the Certification and approval letter;
and is thereby responsible for complying with all conditions.
In addition to the requirements of the certification, you must also comply with the
following conditions:
1. The Mooresville Regional Office shall be notified in writing once construction at the approved
impact areas has commenced.
2. Use of native vegetation and other soft stream bank stabilization techniques must be used
where practicable instead of riprap or other bank hardening methods. If riprap is necessary, it
shall not be placed in the streambed, unless approved by the DWQ.
3. Upon completion of the project, the applicant shall complete and return the enclosed
"Certificate of Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality.
Mailing Address Phone (704) 663-1699 Location 0-
b,
610 East Center Avenue, Suite 301 Fax (704) 663-6040 610 East Center Avenue, Suite 301 No turn l!!y
?atura
Mooresville, NC 28115 Mooresville, North Carolina
Internet: www.ncwaterguality.or¢ Customer Service 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
4. Continuing Compliance. The applicant (City of Charlotte) shall conduct all activities in a
manner so as not to contravene any state water quality standard (including any requirements
for compliance with section 303(d) of the Clean Water Act) and any other appropriate
requirements of state and federal law. If DWQ determines that such standards or laws are not
being met (including the failure to sustain a designated or achieved use) or that state or
federal law is being violated, or that further conditions are necessary to assure compliance,
DWQ may reevaluate and modify this certification to include conditions appropriate to assure
compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d).
Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of
Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide
opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised
conditions shall be provided to the applicant in writing, shall be provided to the United States
Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the
Clean Water Act, and shall also become conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to
the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This
certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the
Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the
Mooresville Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh
919-733-9721.
Sincerely,
for Qoleen H. Sullins
Attachments
cc: Army Corps of Engineers, Asheville
Ian McMillan, Wetlands Unit
MRO, Land Quality
Central Files
File Copy