HomeMy WebLinkAbout20160710 Ver 1_April 2017 Inspection_20170404Wetland Inspection Report
Project Num: 20151179 Version: 1
Project Name: NCDOT - Replace Bridge 208 0
County: Guilford
Location: NCDOT - Replace Bridge 208 on SR 3051 (B-4961)
Latitude: +36° 03'
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 4/5/2017
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Title:
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant ❑ Not Compliant
Program Areas: Standards/Sediment
Question Areas:
� Unpermittable Activities
Inspection Summary:
Status: Issued
Project Type: Replace bridge with bridge
Region: Winston-Salem
Longitude: -79° 38' 41"
Phone:
Phone: 336-776-9703
page: 1
Site Number: 20151179 Owner: Thorpe, Gregory
Inspection Date: 4/5/2017 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Unpermittable Activities
# Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining
wetlands, etc.).
Is stream(s) free of unpermittable impacts?
Is wetland(s) free of unpermittable impacts?
Is open water(s) free of unpermittable impacts?
Are other standards being met (turbidity, pH, etc.) in all surface waters onsite?
Are surface waters on the site free of illegal discharges?
Yes No NA NE
� ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
� ❑ ❑ ❑
� ❑ ❑ ❑
Comment: The site was dewatered to qain access to the sediment. Dewaterinq was necessarv because a beaver
dam downstream was causiinq water to back up into the culvert hiqh flow barrels. Sediment was removed
to the qreatest extent practical.
page: 2