Loading...
HomeMy WebLinkAbout20160710 Ver 1_April 2017 Inspection_20170404Wetland Inspection Report Project Num: 20151179 Version: 1 Project Name: NCDOT - Replace Bridge 208 0 County: Guilford Location: NCDOT - Replace Bridge 208 on SR 3051 (B-4961) Latitude: +36° 03' SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 4/5/2017 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Title: Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant ❑ Not Compliant Program Areas: Standards/Sediment Question Areas: � Unpermittable Activities Inspection Summary: Status: Issued Project Type: Replace bridge with bridge Region: Winston-Salem Longitude: -79° 38' 41" Phone: Phone: 336-776-9703 page: 1 Site Number: 20151179 Owner: Thorpe, Gregory Inspection Date: 4/5/2017 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Unpermittable Activities # Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands, etc.). Is stream(s) free of unpermittable impacts? Is wetland(s) free of unpermittable impacts? Is open water(s) free of unpermittable impacts? Are other standards being met (turbidity, pH, etc.) in all surface waters onsite? Are surface waters on the site free of illegal discharges? Yes No NA NE � ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ Comment: The site was dewatered to qain access to the sediment. Dewaterinq was necessarv because a beaver dam downstream was causiinq water to back up into the culvert hiqh flow barrels. Sediment was removed to the qreatest extent practical. page: 2