Loading...
HomeMy WebLinkAbout20051068 Ver 3_More Info Requested - Email_20170405Strickland, Bev From: Homewood, Sue Sent: Wednesday, April 05, 2017 8:36 AM To: 'Scott Gregory' Subject: RE: Afton Ridge II, Building 1 BMP Review Scott, I re -reviewed your responses and have a few follow up questions/items. • With regard to the construction sequence for cleanout of the basin, you referenced notes on sheet C4.1. These notes indicate that the baffles and the skimmer should be removed but it should also include a note that it must be completely cleaned out and meet the design volume and shape shown on the plans. Can you add that to the notes please? • With regards to the short circuiting question, maybe I'm reading the plans incorrectly but I don't see how you are calculating 170' of travel way from structure S9 to the existing riser? Can you draw out the flow path for me to show that please. Regarding the side slopes. I checked with the stormwater unit in Raleigh. The MDC (which is a state rule) for all SCMs says that side slopes "shall be 2:1" and the Figure 2 in the design manual (which is just guidance) for Wet Ponds is an error. The MDC for all SCMs states that "steeper vegetated slopes may be considered on a case -by- case basis if the applicant demonstrates that the soils and vegetation shall remain stable" Please provide a justification/demonstration for an exception to this requirement. Please note that previous decisions and actions may not suffice as justification/demonstration for relaxation of requirements. I'm headed to a meeting for the day but will be in the office tomorrow and Friday if you want to discuss any of this by phone. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 NothingCompares.,-.,... Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Scott Gregory[mailto:sgregory@geosciencegroup.com] Sent: Thursday, March 23, 2017 2:48 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Cc: 'Kevin Caldwell' <kcaldwell@geosciencegroup.com> Subject: Afton Ridge II, Building 1 BMP Review Sue Please find attached the revised plans, O&M Agreement, and our response to the comments. Give us a call if you have any questions Thank You, Scott Gregory Civil Design, Project Manager GeoScience Group, Inc. 500 Clanton Road, Suite K Charlotte, NC 28217 USA 704-941-2244 (Direct) Email: sgreg_ory@geoscience.er�oup.com