Loading...
HomeMy WebLinkAbout20170402 Ver 1_Beaufort 88 Attachment G and L signed_20170405Attachment L: Low Impact Bridge Replacement Process Low impact Bridge Project No.: 17BP.2.R.75 County: Beaufort Bridge No. 88 over Horsepen Swamp WBS Element Number 17BP.2.R.75 This project is subject to the Low Impact Bridge Process as agreed to on October 6, 2009. This project meets the documentation requirements and approval procedures under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project meets the standards of NCDOT's Minimum Criteria Rules. Date: Applicant Name: Applicant Address: Aoril 4. 2017 North Carolina Deaartment of Transportation P.O. Box 1584 Greenville NC 27835 Primary Contact for Project: Hon Yeuna Phone No.: 252-249-2800 Is this an after-the-fact application: Yes X No River Basin: Stream Classification: Tar-Pamlico C: Sw. NSW Regulatory Authorization Options for this Activity Federal: USACE Nationwide General Permit 3— Maintenance State: General Water Quality Certification #3687 and/or Buffer Authorization Local: None ProjeCt Description — State project 176P.2.R.75 involves the replacement of Beaufort County Bridge #660088 on SR 1414 (Horsepen Swamp Rd.) over Horsepen Swamp. The existing bridge consists of 1@ 16' - 1", 1@ 14' - 7", t@ 15' - 0" and 1@ 16' - 1" timber deck spans on timber joists and is to be replaced with a 1 @ 70' - 0", 24" cored slab bridge (70' total Iength, 33' total width) at the same location. In accordance with Tar- Pamlico River Buffer Regulations, the proposed bridge does not contain deck drains. All stormwater from the bridge and approaches will be collected by a storm drainage system and discharged into wetland. The drainage system will outlet outside of the buffer limits in the southeast quadrant at -L- station 14+60 RT with the outlet pipe set at 0.3% to reduce velocity into the wetland. Northwest quadrant ditch discharges directly into the wetland at -L- station 12+80 LT with rip rap set at 0.0% to reduce velocity into the wetland. The southwest quadrant ditch design maintains the existing drainage pattems along Horsepen Swamp. Signature: �( � // "!/ Print Name: Hon Yeunq Title: Proiect Enqineer Low/Minimal Impact Bridge Project Data Sheet TIP NO 176P.2.R.75 WBS Element No. 176P.2.R.75 Stream Existing Structure Proposed Structure Stream Wetlands T&E Moratorium Trout Waters Location Comments Completed by: Description Basin Classification SIN Type Size Type Size Suff. Rating Type USACE Impacts (AC) Non 4041mpacts (AC) Species Present Bio Conclusion Trout Species Present Trout Conditions (Y/N) WRC Reviewer AECs Area SR 1414 Horsepen Swamp Rd Tar-Pamlico C; Sw, NSW 28-103-10 perennial/inland 62' 31.89 fR.7 0' .06 0 0 Zone 2 - N/A N/A N/A N/A N/A No No -77.1