Monte/Dave,
Slaughter, Johnathan H
Tuesday, April 04, 2017 1:49 PM
monte.matthews@usace.army.mil; Matthews, Monte K SAW;
Wanucha, Dave; Carpenter,Kristi; Chambers, Marla 1; Marella Buncick
(Marella_Buncick@fws.gov)
Guynn, Jami C; Souther, Zachary S; Hiatt, Todd M; Pettyjohn, Michael
A; Wayne, David A; Fuchs, Eileen A; David Petty
(dpetty@tgsengineers.com); Kathleen Gray
(KGRAY@TGSENGINEERS.COM); Johnson, Mark G; Roger McGrady;
Mellor, Colin
Caldwell Bridge #262 Application
Bridge #262 Application.pdf; 130262_PermitDrawings_20170403.pdf;
NHP project_report_bridge_262_sr_1107_caldwell.pdf; Bridge #262
Topo.pdf
High
Follow up
Completed
See attached permit application for the subject bridge. Please be advised that this is
the number 1 priority for Division 11. If you are working on other Division 11 Projects,
we'd prefer to have this one first.
This project is a little different than most in that the bridge crosses a large pond with a
stream running through it so I listed the impacts under streams and open water in the
PCN. I'm not sure which you preferred so I just covered both. Also, due to the potential
benefits of retaining the lower foot of the causeway, I did not request mitigation. If you
just have to have it, let me know and I will request it.
Additional emails will follow due to file size. Let me know if you have any questions or
need additional information. Thanks.