March 17, 2017
Mr. Dave Thomson
Associated Asphalt Greensboro, LLC
P.O. Box 12626
Roanoke, VA 24027-
SUBJECT:
4027
SUBJECT: Compliance Evaluation Inspection
Associated Asphalt - Greensboro, NC
NPDES Permit No. NCO074241
Guilford County
Dear Mr. Thomson:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
RECEiVEDINCDEO)DWR
MAH 2 8
Wa+terQualay
Permiltdcgsecoor)
On March 17, 2017, Min Xiao of this office met with Mr. Bruce Weaver to perform a Compliance
Evaluation Inspection on the wastewater/stormwater discharge from the Associated Asphalt
terminal located at 100 S. Chimney Rock Road. The inspection findings are detailed below and an
inspection checklist is attached.
I. Permit
The NPDES permit has expired on August 31, 2016. The Water Quality Permitting Section has
received your permit renewal application on March 4, 2016.
II. Self -Monitoring Program
Submittal of the electronic Discharge Monitoring Reports (eDMRs) began in January 2015. The
monthly discharge monitoring reports (DMR's) were reviewed for the period January 2016 through
December 2016. The facility was found to be in compliance with the NPDES effluent limits for the
above period. In regards to the permit monitoring requirements, it was noted that all sampling was
performed per the frequencies specified in the permit.
III. Flow Measurement
The permit requires episodic flow monitoring. The discharge volume from the retention pond is
calculated by opening the locked release valve four turns and then timing the release (600 gpm). It
was noted that no discharge occurred during the review months of January, March, April, June,
September, November, December in 2016.
IV. Facility Site Review
The treatment system consists of a 1.0 MG retention pond. The retention pond is used to receive
accumulated wastewater/stormwater from the bulk liquid storage containment, truck loading areas,
boiler blowdown, and condensate. Effluent flow from the pond is calculated by opening a locked
release valve four turns and then timing the release (600 gpm). The water'in the pond was observed
to be clear.
450 West Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
Phone: 336-776-9800 \ Internet: www.ncwaterouality.ors
An Equal Opportunity \ Affirmative Action Employer— Made in part by recycled paper
Page 2
March 17, 2017
VII. Records/Reports
Only pH is measured onsite by Associated Asphalt staff. Other parameters are measured by
Meritech, Inc. The facility does not possess a field parameter certification currently, which shall be
obtained through Laboratory Certification Branch of NC DEQ.
A comparison of,February and October 2016 DMR with the field records and laboratory results
revealed that Flow, pH, Turbidity, TSS, Oil -Grease, and Benzene had been correctly transcribed.
The unit'of Plieriol was reported in mg/L in Meritech's laboratory results, however, the data of
Phenol were directly -put into DMR without converting the units from mg/L to ug/L. Please note the
difference between these two units and correct this mistake in the following DMR's.
VIII.. Effluent/Receiving Waters
The. effluent eventually reaches a tributary of the East Fork Deep River, class WS -IV waters of the
Cape Fear River Basin. No effluent was being discharged on the day of the inspection.
Should you have any questions concerning this report, please contact Min Xiao or me at (336) 776
9800.
Sincerely,
'V
"r/Sherri V. Knight, -PE
Assistant Regional Supervisor
Water Quality Regional Operations. Section
Division of Water Resources
cc: Bruce Weaver (bweaver@associatedasphalt.com)
Central Files
NPDES Unit
WSRO .
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 I 3 I NC0074241 111 12 17/03/16 17 18 L] 19 Li I 201
211111 1 1 I I I III 11 I I I I I I I I I I I I I I I I I I I I III I I I I I r6
Inspection Work Days Facility Self -Monitoring Evaluation Rating 81 QA ---Reserved-----
-Reserved-----67
671 70 I_j 71 Li72 � N � 73 I I 174 75 80
l_J I 1 1
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:20AM 17/03/16
12/01/01
AA Greensboro terminal
100 S Chimney Rock Rd
Exit Time/Date
Permit Expiration Date
Greensboro NC 27409
10:35AM 17/03/16
16/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Not Required/ORC/919-807-6353/
Name, Address of Responsible Officialrritle/Phone and Fax Number
Contacted
Scott Matthews, 100 S Chimney Rock Rd Greensboro NC 27409//336-294-0025/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Records/Reports Self -Monitoring Program
Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Min Xiao WSRO WQ//336769800/
3 ii7r
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
31 NCO074241 I11 12 17/03/16 17 18 ICI
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO074241 Owner - Facility: AA Greensboro terminal,
Inspection Date: 03/16/2017 Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
0
❑
❑
❑
application?
0
❑
❑
❑
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
M
. ❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?.
0
❑
❑
❑
Comment: The current permit has expired on August 31, 2016. They have submitted a'permit renewal
application in March, 2016.
Record Keeping
Yes . No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
❑
❑
❑
M
Are analytical results consistent with data reported on DMRs?
❑
❑
❑
Is the chain -of -custody complete?
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
.❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
M
❑
i
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
M
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
0
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Page# 3
Permit: NCO074241
Inspection Date: 03/16/2017
Record Keeping
Owner - Facility: AA Greensboro terminal
Inspection Type: Compliance Evaluation
y
Yes No NA NE
Comment: Flow is measured once the discharge event occurs. Only pH is measured onsite, other
parameters are measured by Meritech, Inc. However, this facility shall obtain a field
parameter certification (do not have a field certification currently).
A_ comparison of February and October 2016 DMR with the field records and laborato
results revealed that Flow. PH, Turbidity, TSS, Oil -Grease, and Benzene had been correctly
transcribed. The unit of Phenol was reported in ma/L in Meritech's laboratory results,
however, the data of Phenol were directly put into DMR without converting the units from
mg/L to ug/L. This parameter is measured only for monitoring purpose (without a limit).
An annual Acute Toxicity Test report was prepared for review.
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
❑
❑
0
❑
Is flow meter calibrated annually?
❑
❑
-M
❑
Is the flow meter operational?
❑
❑
0
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
❑
Comment: The retention pond is used to receive accumulated wastewater/stormwater from the bulk
liquid storage containment, truck loading areas, boiler blowdown, and condensate. Effluent
flow from the single retention pond is calculated by opening a locked release valve four turns
and then timing the release (600 qpm).
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ M ❑
If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ M ❑
Comment: The effluent eventually reaches a tributary of the East Fork Deep River, class WS -IV waters
in the Cape Fear River Basin. No discharge occurred during the day of inspection.
Page# 4