Loading...
HomeMy WebLinkAboutNC0074241_Compliance Evaluation Inspection_20170317Water Resources ENVIRONMENTAL QUALITY March 17, 2017 Mr. Dave Thomson Associated Asphalt Greensboro, LLC P.O. Box 12626 Roanoke, VA 24027- SUBJECT: 4027 SUBJECT: Compliance Evaluation Inspection Associated Asphalt - Greensboro, NC NPDES Permit No. NCO074241 Guilford County Dear Mr. Thomson: ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director RECEiVEDINCDEO)DWR MAH 2 8 Wa+terQualay Permiltdcgsecoor) On March 17, 2017, Min Xiao of this office met with Mr. Bruce Weaver to perform a Compliance Evaluation Inspection on the wastewater/stormwater discharge from the Associated Asphalt terminal located at 100 S. Chimney Rock Road. The inspection findings are detailed below and an inspection checklist is attached. I. Permit The NPDES permit has expired on August 31, 2016. The Water Quality Permitting Section has received your permit renewal application on March 4, 2016. II. Self -Monitoring Program Submittal of the electronic Discharge Monitoring Reports (eDMRs) began in January 2015. The monthly discharge monitoring reports (DMR's) were reviewed for the period January 2016 through December 2016. The facility was found to be in compliance with the NPDES effluent limits for the above period. In regards to the permit monitoring requirements, it was noted that all sampling was performed per the frequencies specified in the permit. III. Flow Measurement The permit requires episodic flow monitoring. The discharge volume from the retention pond is calculated by opening the locked release valve four turns and then timing the release (600 gpm). It was noted that no discharge occurred during the review months of January, March, April, June, September, November, December in 2016. IV. Facility Site Review The treatment system consists of a 1.0 MG retention pond. The retention pond is used to receive accumulated wastewater/stormwater from the bulk liquid storage containment, truck loading areas, boiler blowdown, and condensate. Effluent flow from the pond is calculated by opening a locked release valve four turns and then timing the release (600 gpm). The water'in the pond was observed to be clear. 450 West Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 Phone: 336-776-9800 \ Internet: www.ncwaterouality.ors An Equal Opportunity \ Affirmative Action Employer— Made in part by recycled paper Page 2 March 17, 2017 VII. Records/Reports Only pH is measured onsite by Associated Asphalt staff. Other parameters are measured by Meritech, Inc. The facility does not possess a field parameter certification currently, which shall be obtained through Laboratory Certification Branch of NC DEQ. A comparison of,February and October 2016 DMR with the field records and laboratory results revealed that Flow, pH, Turbidity, TSS, Oil -Grease, and Benzene had been correctly transcribed. The unit'of Plieriol was reported in mg/L in Meritech's laboratory results, however, the data of Phenol were directly -put into DMR without converting the units from mg/L to ug/L. Please note the difference between these two units and correct this mistake in the following DMR's. VIII.. Effluent/Receiving Waters The. effluent eventually reaches a tributary of the East Fork Deep River, class WS -IV waters of the Cape Fear River Basin. No effluent was being discharged on the day of the inspection. Should you have any questions concerning this report, please contact Min Xiao or me at (336) 776 9800. Sincerely, 'V "r/Sherri V. Knight, -PE Assistant Regional Supervisor Water Quality Regional Operations. Section Division of Water Resources cc: Bruce Weaver (bweaver@associatedasphalt.com) Central Files NPDES Unit WSRO . United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 15 I 3 I NC0074241 111 12 17/03/16 17 18 L] 19 Li I 201 211111 1 1 I I I III 11 I I I I I I I I I I I I I I I I I I I I III I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating 81 QA ---Reserved----- -Reserved-----67 671 70 I_j 71 Li72 � N � 73 I I 174 75 80 l_J I 1 1 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09:20AM 17/03/16 12/01/01 AA Greensboro terminal 100 S Chimney Rock Rd Exit Time/Date Permit Expiration Date Greensboro NC 27409 10:35AM 17/03/16 16/08/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Not Required/ORC/919-807-6353/ Name, Address of Responsible Officialrritle/Phone and Fax Number Contacted Scott Matthews, 100 S Chimney Rock Rd Greensboro NC 27409//336-294-0025/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Records/Reports Self -Monitoring Program Facility Site Review Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Min Xiao WSRO WQ//336769800/ 3 ii7r Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type 31 NCO074241 I11 12 17/03/16 17 18 ICI Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NCO074241 Owner - Facility: AA Greensboro terminal, Inspection Date: 03/16/2017 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? 0 ❑ ❑ ❑ Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ M . ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection?. 0 ❑ ❑ ❑ Comment: The current permit has expired on August 31, 2016. They have submitted a'permit renewal application in March, 2016. Record Keeping Yes . No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ❑ ❑ ❑ M Are analytical results consistent with data reported on DMRs? ❑ ❑ ❑ Is the chain -of -custody complete? ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? ❑ .❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ M ❑ i (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ M ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ 0 ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Page# 3 Permit: NCO074241 Inspection Date: 03/16/2017 Record Keeping Owner - Facility: AA Greensboro terminal Inspection Type: Compliance Evaluation y Yes No NA NE Comment: Flow is measured once the discharge event occurs. Only pH is measured onsite, other parameters are measured by Meritech, Inc. However, this facility shall obtain a field parameter certification (do not have a field certification currently). A_ comparison of February and October 2016 DMR with the field records and laborato results revealed that Flow. PH, Turbidity, TSS, Oil -Grease, and Benzene had been correctly transcribed. The unit of Phenol was reported in ma/L in Meritech's laboratory results, however, the data of Phenol were directly put into DMR without converting the units from mg/L to ug/L. This parameter is measured only for monitoring purpose (without a limit). An annual Acute Toxicity Test report was prepared for review. Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? ❑ ❑ 0 ❑ Is flow meter calibrated annually? ❑ ❑ -M ❑ Is the flow meter operational? ❑ ❑ 0 ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ ❑ Comment: The retention pond is used to receive accumulated wastewater/stormwater from the bulk liquid storage containment, truck loading areas, boiler blowdown, and condensate. Effluent flow from the single retention pond is calculated by opening a locked release valve four turns and then timing the release (600 qpm). Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ M ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ M ❑ Comment: The effluent eventually reaches a tributary of the East Fork Deep River, class WS -IV waters in the Cape Fear River Basin. No discharge occurred during the day of inspection. Page# 4