HomeMy WebLinkAboutNC0036269_Site Visit_20170321Water Resources
Environmental Quality
March 21, 2017
Mr. T. Mark Fowler, Director
Water and Sewer Authority of Cabarrus County
Post. Office Box 428
Concord, NC 28026-0428
SUBJECT: Compliance Evaluation Inspection .
Rocky River WWTP
NPDES Permit NCO036269
Cabarrus County, NC
Dear Mr. Fowler:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
RECEIVEDINCDEQIDWR
MAR 2 8 2017
WaterQuality
pemiltting Section
On March 15, 2017, Roberto Scheller of this Office conducted a compliance inspection at the
subject facility. This inspection was conducted as a Compliance Evaluation Inspection (CEI) to
insure compliance with permit requirements and conditions. At the time of inspection facility
appeared to -be well maintained and operated. We wish. to thank you and the operating staff for
assistance regarding this inspection.
The enclosed report should be self-explanatory; however, should you have- any questions, please.
do not hesitate to contact myself or Roberto Scheller at (704) 235-2204 or
roberto.scheller@n.cdenr.gov.
Sincerely, W -I -Q
C-,-e_W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosed
cc: John Ritchie, ORC, email: jritchie@wsacc.org
•Wastewater Branch
File
State of North Carolina I Environmental Quality
1611 Mail Service Center I Raleigh, North Carolina 27699-1611
919-707-9000
r
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
EPA
OMB No. 2040-0057
Water Compliance Inspection Reporf-""'" --"-- "
ApProvaiezpines8--3f-08
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 1 3 I NCO036269 I11 12 17/03/15 17 18 i CJ 191 S 1 20 L
21111 1 I I I I I III 111 I I I I I I I I I I I I I I I I I I I I 11 I I I I Lf
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved --
67 70 Id I 71 80
LJ lJI 72 NJ 73 I -751 I I I I I
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
10:33AM 17/03/15 '
13/12/01
Rocky River WWrP
Exit Time/Date
permit Expiration Date
PO Box 428
01:23PM 17/03/15
18/10/31 "
Concord NC 280260428
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
///
John Walter Ritchie/ORC/704-788-4164/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Travis M Fowler,6400 Breezy Ln Concord NC 28025/Facilities Director/704-788-4164/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers - Date
J�Ro o Sch ler MRO WQ//252-946-6481/
Signature of Management A vi r Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger • MRO WQ//704-235-2194/
L �
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
31 NCO036269 I11 12I 17/03/15 117 18
Ici
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO036269 Owner -Facility: RockyRiverWWTP
Inspection Date: 03/16/2017 Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
M
❑
application?
0
❑
❑
❑
Is the facility as described in the permit?
M
•❑
.❑
❑
# Are there any special conditions for the permit?
M
❑
❑
❑
Is access to the plant site restricted to the general public?
M
❑
❑
El
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: Current permit issued on December 1, 2013 and expires on October 31, 2018. Facility
description has left out*the use of dechlorination and should be added next permit reissue.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
�.
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
M
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
0
❑
❑
❑
(If the facility is ='or> 5 MGD permitted flow) Do they operate 2417 with a certified operator
0
❑
❑
❑
on each shift?
Is the ORC visitation log available and. current?
0
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
M
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
0
❑
❑
❑
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
❑
Comment: Records and reports were well organized and maintained. DMR's were reviewed from
October 2015 through November 2016 with no reported violations noted during
the review
period.
Laboratory
Yes No NA NE
Page# 3
Permit: NCO036269 Owner - Facility: Rocky River WWTP
Inspection Date: 03/15/2017 Inspection Type: Compliance Evaluation
#177. Pollutant
scan and toxicity farmed out to contaract laboratories. Instruments used for field analyses
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
❑
Is the tubing clean?
M
❑
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑ ❑ ❑ M
❑ ❑ ❑ M
Comment: Influent and effluent analyses performed by WSACC's certified laboratory
#177. Pollutant
scan and toxicity farmed out to contaract laboratories. Instruments used for field analyses
appeared to be properly calibrated and documented.
Influent Sampling
Yes No NA NE
# Is composite sampling flow proportional?
M
❑
❑
❑
Is sample collected above side streams?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
M
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
❑
Celsius)?
Is sampling performed according to the permit?
M
❑
❑
❑
Comment: At time of inspection influent sampler temperature was noted at 1 degrees Celsius.
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
M
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
M
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
M
❑
❑
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: At time of inspection effluent sampler temperature was noted at 2 degrees Celsius.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? M ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable M ❑ ❑ ❑_
Solids, pH, DO, Sludge Judge, and other that are applicable?
Page# 4
Permit: NCO036269 Owner -Facility: Rocky RiverVWVfP
Inspection Date: 03/15/2017 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Comment: A 30 minute settleable test was conducted on Step I and Step II aeration tanks. Step I settled
to 340 ml/I and Step II settled to 300 ml/I. MLSS appeared to settle out well with a clear liquid
above sludge blanket. Facility is equiped with SCADA system to monitor treatment process.
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Yes No NA NE
Comment: Facility has a total of six (6) mechanical bar screens with 4 located at the main lift station
and 2 located at the headworks.
Pump Station - Influent
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Comment:
Grit Removal
Type of grit removal
a.Manual
b.Mechanical
Is the grit free of excessive organic matter?
Is the grit free of excessive odor?
# 1 d' I f 't ' 1' 0
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ E ❑
Yes No NA NE
E El El E]■ El 1:1 E]s Isposa o grl In comp lance.. M ❑ ❑ ❑
Comment: Headworks is equipped with dual grit removal systems and classifiers. Screenings and _grit
are disposed of at landfill.
Page# 5
■❑❑❑.
M
❑
❑
❑
M
❑
❑
❑
0
❑
❑
❑
Comment: Facility has a total of six (6) mechanical bar screens with 4 located at the main lift station
and 2 located at the headworks.
Pump Station - Influent
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Comment:
Grit Removal
Type of grit removal
a.Manual
b.Mechanical
Is the grit free of excessive organic matter?
Is the grit free of excessive odor?
# 1 d' I f 't ' 1' 0
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ E ❑
Yes No NA NE
E El El E]■ El 1:1 E]s Isposa o grl In comp lance.. M ❑ ❑ ❑
Comment: Headworks is equipped with dual grit removal systems and classifiers. Screenings and _grit
are disposed of at landfill.
Page# 5
Permit NCO036269 Owner - Facility: Rocky River WWTP
Inspection Date: 03/15/2017 Inspection Type: Compliance Evaluation
Generated on-site
M
❑
❑
Flow Measurement - Influent
Yes No NA NE
# Is flow meter used for reporting?
❑
❑
❑
❑
Is flow meter calibrated annually?
❑
❑
❑
❑
Is the flow meter operational?
M
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
M
❑
❑
❑
Comment: Influent flow meter calibrated monthly by WSACC instrumentation group.
Primary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center.well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the sludge blanket level acceptable?
Is the sludge blanket level acceptable? (Approximately % of the sidewall depth)
Comment:
Pure Oxygen
Type of pure oxygen system
Is there a back-up source for the system?
Are mixers operational?
Are samples port/points easily accessible?
Yes NoNANE
■ ❑ ❑ ❑
M ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
M ❑ 1:11:1
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ❑ ■
Yes No NA NE
Generated on-site
M
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
Comment: It was noted that one of the Step I areation tanks was down for maintenance at time of
inspection.
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
M
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
❑
❑
❑
Are weirs level?
M
❑
❑
❑
Is the site free of weir blockage?
M
❑
❑
❑
Is the site free of evidence of short-circuiting?
E
❑
❑
❑
Is scum removal adequate?
M
❑
❑
❑
Page# 6
Permit: NC0036269 Owner - Facility: Rocky River WWTP
Inspection Date: 03/15/2017 Inspection Type: Compliance Evaluation
Secondary Clarifier .. Yes No NA NE
Is the site free of excessive floating sludge?
M
❑
1111
Is the drive unit operational?
M
❑
❑
❑
Is the return rate acceptable (low turbulence)?
M
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
E
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately Y4 of the sidewall depth)
❑
❑
❑
0
Comment: At time of inspection effluent from secondary clarifiers was clear with few suspended solids.
Pumps -RAS -WAS
Are pumps in place?
Are pumps operational?
Are there adequate spare parts and supplies on site?
Comment: Facility is equipped with five (5) RAS screw pumps.
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated.annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment: Flow meter calibrated monthly.
Disinfection -Liquid
Is there adequate reserve supply of disinfectant?
(Sodium Hypochlorite) Is pump feed system operational?
Is bulk storage tank containment area adequate? (free of leaks/open drains)
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Yes No NA NE
M ❑ ❑ ❑
M ❑ ❑ ❑
❑'❑ ❑ ■
M ❑ ❑ ❑
■ ❑ ❑ ❑
M ❑ ❑ ❑
❑ ❑ M .❑
Yes No NA NE
• ❑ ❑ ❑
• El ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: SCADA system is used to monitor chlorination/dechlorination levels. Aqueous sodium
bisulfite is used for dechlorination.
De -chlorination Yes No NA NE
Type of system ? Liquid
Is the feed ratio proportional to chlorine amount (1 to 1)? ❑ ❑ M ❑
Page# 7
Permit: NC0036269 Owner - Facility: Rocky River WVVTP
Inspection Date: 03/15/2017 Inspection Type: Compliance Evaluation
De -chlorination Yes No NA NE
Is storage appropriate for cylinders? ❑ ❑ M ❑
# Is de -chlorination substance stored away from chlorine containers? ❑ ❑ M ❑
Comment:
Are the tablets the proper size and type? ❑ ❑ M ❑
Are tablet de -chlorinators operational? ❑ ❑ 0 ❑
Number of tubes in use?
Comment: Aqueous Sodium Bisulfite is uesd for dechlorination.
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑ .
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
M
❑
Comment:- At time of inspection effluent was clear with no visible suspended solids. Receiving
stream
did not appear to be negatively impacted.
Chemical Feed
Is containment adequate?
Is storage adequate?
Are backup pumps available?
Is the site free of excessive leaking?
Comment:
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
Comment: Generator is tested weekly and serviced quarterly by contracted company.
Solids Handling Equipment
Yes No NA NE
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
M ❑ ❑ ❑
■ ❑ ❑ ❑
M ❑ ❑ ❑
M ❑ ❑ ❑
Yes No NA NE
Page# 8
Permit: NC0036269 Owner -Facility: RockyRiverWWTP
Inspection Date: 03/15/2017 Inspection Type: Compliance Evaluation
Solids Handling Equipment
Yes No NA NE
Is the equipment operational?
0
❑
❑
❑
Is the chemical feed equipment operational?
N
❑
❑
❑
Is storage adequate?
0
❑
❑
❑
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
❑
❑
0
❑
Is the site free of sludge buildup on belts and/or rollers of filter press?
❑
❑
M
❑
Is the site free of excessive moisture in belt filter press sludge cake?
❑
❑
0
❑
The facility has an approved sludge management plan?
0
❑
❑
❑
Comment: Facility has two (2) gravity thickners, sludge receiving station, two (2) centrifuges, and an
incenerator. Facility also has two ash basins for ash storage.
Page# 9