Homewood, Sue
From:Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>
Sent:Monday, March 20, 2017 3:15 PM
To:Chris Oliver; 'Chad Abbott'
Cc:'Randy Hall'; mdouglas@greenlevelnc.com; 'jim parker'; Homewood, Sue
Subject:RE: \[EXTERNAL\] 14-0243 - Bedford Hills Residential Development in Green Level, NC
Chris,
Thank you for your revised PCN and attachments sent via email on 3/14/2017. I have reviewed the information and need
clarification before proceeding with verifying the use of Nationwide Permit 29 http://saw-
reg.usace.army.mil/NWP2017/2017NWP29.pdf. Please submit the requested information below (via e-mail is fine) within 30 days
of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your
application withdrawn and close the file:
1) The proposed cumulative loss of waters of the US (i.e. footprint of fill in streams due to culverts = 149 linear feet) is very close
to the compensatory mitigation threshold of 150 linear feet. Our experience in the Piedmont is that proposed impacts
approaching the 150 linear foot threshold often exceed it due to surveying errors in the field, culvert lengths delivered on-site,
etc. Further, your original PCN submittal on 1/10/2017 proposed only 133 linear feet of fill in streams due to culverts. As such, can
additional avoidance measures be taken to reduce the proposed loss of waters of the US from culvert fill? If so, please update the
PCN and plan sheets accordingly. If not, please describe why additional avoidance is not practicable per Nationwide Permit
Condition 23(a).
2) The rip rap footprint does not appear to show up on the crossing 1 (i.e. northern crossing) plan sheet (Sheet D‐10). Please add
this footprint to the plan sheet to clearly show the 27 linear feet of rip rap impacts proposed.
3) Please update plan sheet C-17 to show the proposed dewatering footprint in the stream.
If you have any questions, please let me know. Thanks.
-Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do
so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Chris Oliver \[mailto:chris.oliver@summitde.net\]
Sent: Tuesday, March 14, 2017 7:57 AM
To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>; 'Chad Abbott' <chad.abbott@summitde.net>