Loading...
HomeMy WebLinkAbout20150342 Ver 2_More Info Received - Email_20170404Homewood, Sue From: Ashley Steele <asteele@smeinc.com> Sent: Tuesday, April 04, 2017 9:51 AM To: Homewood, Sue Cc: Walter Cole; wbarber@allied-engsurv.com Subject: RE: Smith Crossing revision Attachments: Page 5 Smith Crossing Permit.pdf, CREEK CROSSING LENGTHS.PDF Sue, that was my mistake. I was trying to get this back to you quickly and mistakenly typed the wrong numbers. This should be correct. Again, my apologies. I have also attached a sketch of the crossing lengths from Wayne to help clear up any confusion. Ashley From: Homewood, Sue[mailto:sue.homewood@ncdenr.gov] Sent: Tuesday, April 04, 2017 9:38 AM To: Ashley Steele <asteele@smeinc.com> Cc: Walter Cole <WCole@smeinc.com>; wbarber@allied-engsurv.com Subject: RE: Smith Crossing revision Walter, On the phone a few minutes ago you said the relocation was somewhere around 50 feet (I think). I'm confused as to how you came up with 117 feet? Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 "Nothjng Compares., Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Ashley Steele [mailto:asteele@smeinc.com] Sent: Tuesday, April 04, 2017 9:28 AM To: Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Walter Cole <WCole@smeinc.com>; wbarber@allied-engsurv.com Subject: Smith Crossing revision Sue, Please see the attached word document for the revised table on page 5 for the Smith Crossing Stream Crossing permit per your request to Wayne Barber and Walter Cole yesterday evening. Let me know if you have any questions or if you need anything else. C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Culvert Installation UT to Abbotts Creek ❑ PER ® INT ® Corps ® DWQ 3 117 S2 ❑ P ®T Dewatering UT to Abbotts Creek ❑ PER ® INT ® Corps ® DWQ 3 25 S3 ❑ P ®T Stream Relocation UT to Abbotts Creek ❑ PER ® INT ® Corps ® DWQ 3 36 S4 ❑ P ® T Riprap Outlet UT to Abbotts ❑ PER ® Corps 3 30 Stabilization Creek ® INT ® DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 208 3i. Comments: Impacts are the result of culvert, headwall and rip rap outlet pad installation. Page 5 of 11